Borescope Inspection Report Centaur 40 CED
Rev A - 01/24/13
Caterpillar Confidential: Green 160309 Fletcher HG85D93 Borescope Report Author : CS-TSTS Owner: CS-TS Manager Page 1 of 13
Country Customer Name Site Name
USA US Oil Sands Bonanza
Specific Reports Task Risk Assessment CSA/Invoice/Work Order Numbers
Borescope Inspection YES
Borescope Completed By Borescope Date
PD Number
Customer Tag
Report Date
Edan Fletcher 3/9/16 40601 East 3/9/16
Package Engine
S/N Hours Starts S/N Hours
Starts Next
Overhaul Gas Liquid Total
HG85D93 N/A N/A N/A - N/A N/A N/A
Borescope Completed: Before After Offline Compressor Wash
Borescope Inspection Report Centaur 40 CED
Rev A - 01/24/13
Caterpillar Confidential: Green 160309 Fletcher HG85D93 Borescope Report Author : CS-TSTS Owner: CS-TS Manager Page 2 of 13
F
E
A
Air inlet Silencer
Air Inlet Duct Air Inlet Screen IGV
1st Stage Compressor Blades 2nd Stage Compressor VGV
D
B
C
Fuel Injector
Injectors Combustor Interior Torch Tube
1st Stage Turbine Nozzle 1st Stage Turbine Blades
Thermocouple Ports 2nd Stage Blages 3rd Stage Nozzle
3rd Stage Blades
Exhaust Collector 3rd Stage Blades
T2 Ports Compressor Exit GV
11th Stage Compressor Blades
RGB
Inspection Port Pinion & Star Gear Star
Gear 2nd stage Accessory Gear Low Speed Brg
VGV External Variable Guide Vanes
IGV 1st Stage VGV 2nd Stage VGV
External Exhaust Diffuser Diffuser
Borescope Inspection Report Centaur 40 CED
Rev A - 01/24/13
Caterpillar Confidential: Green 160309 Fletcher HG85D93 Borescope Report Author : CS-TSTS Owner: CS-TS Manager Page 3 of 13
Access location
Picture Description Inspection for Severity
Air inlet
A
Silencer Air Inlet Screen
a) Oxidation. Affected area
None
Air inlet
A
Air Inlet duct
a) Potential FOD. None
b) Corrosive Pitting.
None
c) Cracks. None
d) Excessive fouling.
None
The Field Service Representative is free to insert any additional pictures he/she deems necessary for the report.
Borescope Inspection Report Centaur 40 CED
Rev A - 01/24/13
Caterpillar Confidential: Green 160309 Fletcher HG85D93 Borescope Report Author : CS-TSTS Owner: CS-TS Manager Page 4 of 13
Access location
Picture Description Inspection for Severity
Air inlet
A
Inlet Guide Vanes a) Nicks and dents. Quantity and size.
None
b) Excess of fouling.
None
c) Corrosive pitting. Affected area.
None
Air inlet
A
1st Stage Compressor Blades
a) Nicks and dents. Quantity and size.
None
b) Excessive fouling.
None
c) Corrosive pitting. Affected area.
None
d) Tip rub. Gap width and metal curling.
None
Borescope Inspection Report Centaur 40 CED
Rev A - 01/24/13
Caterpillar Confidential: Green 160309 Fletcher HG85D93 Borescope Report Author : CS-TSTS Owner: CS-TS Manager Page 5 of 13
Air inlet
A
2nd stage Compressor VGV a) Nicks and
dents. Quantity and size.
None
b) Excessive fouling.
None
c) Corrosive pitting. Affected area.
None
The Field Service Representative is free to insert any additional pictures he/she deems necessary for the report.
Borescope Inspection Report Centaur 40 CED
Rev A - 01/24/13
Caterpillar Confidential: Green 160309 Fletcher HG85D93 Borescope Report Author : CS-TSTS Owner: CS-TS Manager Page 6 of 13
Access location
Picture Description Inspection for Severity
Fuel Injector
C
11th Stage Compressor Blades
a) Nicks and dents. Quantity and size.
None
b) Excessive fouling.
None
c) Corrosive pitting. Affected area.
None
d) Tip rub. Gap width and metal curling.
None
Fuel
Injector
C
Compressor Exit GV a) Nicks and dents. Quantity and size.
None
b) Excessive fouling.
None
c) Corrosive pitting. Affected area.
None
The Field Service Representative is free to insert any additional pictures he/she deems necessary for the report.
Borescope Inspection Report Centaur 40 CED
Rev A - 01/24/13
Caterpillar Confidential: Green 160309 Fletcher HG85D93 Borescope Report Author : CS-TSTS Owner: CS-TS Manager Page 7 of 13
Access location
Picture Description Inspection for Severity
Fuel Injector
C
Injectors a) Pilot Centerbody erosion.
None
b) Fuel hole contamination or blockage.
None
c) Cracks. Quantity and size
None
d) Liquid only: broken main fuel spokes
None
Fuel Injector
C
Combustor interior a) Cracks. Quantity and size.
None
b) Thermal Erosion.
None
c) Hot spots. None
d) Buckling or warpage.
None
The Field Service Representative is free to insert any additional pictures he/she deems necessary for the report.
Borescope Inspection Report Centaur 40 CED
Rev A - 01/24/13
Caterpillar Confidential: Green 160309 Fletcher HG85D93 Borescope Report Author : CS-TSTS Owner: CS-TS Manager Page 8 of 13
Access location
Picture Description Inspection for Severity
Fuel Injector
C
1st Stage Turbine Nozzle: - Leading edge - Airfoil surface - Trailing edge
a) Cracks. Quantity, length, and orientation.
None
b) Thermal erosion. Depth and affected area.
None
c) F.O.D. Affected area.
None
Fuel Injector
C
1st Stage Turbine Blades: - Leading edge - Airfoil surface - Trailing edge - Blade Tip - Staking Pins
a) Cracks. Quantity, length, and orientation.
None
b) Thermal erosion. Depth
and affected area.
None
c) F.O.D. Affected area.
None
d) Tip rub. Gap width.
Some. Along the length of the blade.
e) Pins Oxidation None
The Field Service Representative is free to insert any additional pictures he/she deems necessary for the report.
Borescope Inspection Report Centaur 40 CED
Rev A - 01/24/13
Caterpillar Confidential: Green 160309 Fletcher HG85D93 Borescope Report Author : CS-TSTS Owner: CS-TS Manager Page 9 of 13
Access location
Picture Description Inspection for Severity
T5 Probe
D
2nd Stage Turbine Blades: - Leading edge - Airfoil surface - Trailing edge - Blade Tip - Staking Pins
a) Cracks. Quantity, length, and orientation.
None
b) Thermal erosion. Depth and affected area.
None
c) F.O.D. Affected area.
None
d) Tip rub. Gap width.
Some along the length of the blade
e) Pins Oxidation
None
T5 Probe
D
3rd Stage Turbine Nozzle: - Leading edge - Airfoil surface - Trailing edge
a) Cracks. Quantity, length, and orientation.
None
b) Cracks. None
c) Thermal erosion. Depth and affected area.
None
Borescope Inspection Report Centaur 40 CED
Rev A - 01/24/13
Caterpillar Confidential: Green 160309 Fletcher HG85D93 Borescope Report Author : CS-TSTS Owner: CS-TS Manager Page 10 of 13
T5 Probe
D
3rd Stage Turbine Blades: - Leading edge - Airfoil surface
- Trailing edge - Blade Tip
a) Cracks. Quantity, length, and orientation.
None
b) Thermal erosion. Depth and affected area.
Some white residue build up on blade
c) F.O.D. Affected area.
None
d) Tip rub. Gap width.
None
The Field Service Representative is free to insert any additional pictures he/she deems necessary for the report.
Borescope Inspection Report Centaur 40 CED
Rev A - 01/24/13
Caterpillar Confidential: Green 160309 Fletcher HG85D93 Borescope Report Author : CS-TSTS Owner: CS-TS Manager Page 11 of 13
Access location
Picture Description Inspection for Severity
Inspection Port
RGB
Pinion Double Helical & Star Gear
a) Gear wear. None
b) Teeth Cracks. None
Inspection Port
RGB
Star Gear 2nd Stage – Ring Gear
a) Gear wear. None
b) Teeth Cracks. None
Inspection Port
RGB
Accessory Gear
a) Gear wear. None
b) Teeth Cracks. None
Borescope Inspection Report Centaur 40 CED
Rev A - 01/24/13
Caterpillar Confidential: Green 160309 Fletcher HG85D93 Borescope Report Author : CS-TSTS Owner: CS-TS Manager Page 12 of 13
Access location
Picture Description Inspection for Severity
Inspection Port
RGB
Low Speed Bearing
a) Wear.
None
The Field Service Representative is free to insert any additional pictures he/she deems necessary for the report.
Borescope Inspection Report Centaur 40 CED
Rev A - 01/24/13
Caterpillar Confidential: Green 160309 Fletcher HG85D93 Borescope Report Author : CS-TSTS Owner: CS-TS Manager Page 13 of 13
Summary of Findings/Conclusion: The compressor section looked clean. The hot section looked in good condition, but the turbine blades showed signs of tip rub on all stages. The RGB looked in good condition.
Recommendation: Not knowing the engine hours poses a risk for the integrity of the internal components. Obtain the engine running hours and speak with engineering for further instruction to move forward.
3/9/2016
Solar Turbines Field Employee Signature / Date
Customer Signature / Date
Customer Name
Borescope Inspection of Gas Turbine Engine – General Review The gas turbine borescope inspection is an internal inspection performed by a trained specialist who assesses the condition of the gas turbine from the air inlet through to the exhaust, using an instrument specifically designed to examine the gas path via the access ports positioned along the engine. These inspections are one of the primary diagnostic methods for maintaining turbo-machinery. Both rigid and flexible fiberscopes are used in conjunction with especially formed guide tubes to inspect the internal stationary and rotating components and to detect early signs of wear or impending failure. The major benefits of the inspection include equipment condition awareness and effective scheduling of any necessary maintenance interventions. In addition, greater reliability / longevity can be achieved through internal inspections, as well as reducing the potential of severe equipment damage. The operating gas turbine engine by design is exposed to high temperatures and rotates at high speeds. Internal inspections are thus necessary to determine if wear or thermal erosion is evident. In addition, these inspections will quantify if any foreign object damage (FOD) or corrosion has occurred, as well as assessing internal components for thermal deterioration, cracking or distortion. Though every effort is made to examine all accessible parts of the engine, there are parts of the engine that are not accessible to a borescope inspection. Therefore, a borescope inspection should not be considered to be an exhaustive evaluation of an engine’s health. For example, corrosion of the under platform portion of a turbine blade cannot be seen in a borescope inspection. Thus, just because it was not seen in a borescope inspection doesn’t mean it cannot exist.