BOND ST Bicycle Route Connection

Presented to Brooklyn Community Board 2, Transportation Committee January 19, 2017

1

Page 2: BOND ST - nyc.gov€¦ · Bond Street bicycle route was established in 2014 and upgrade through 2016 between 3. rd. Av and Schermerhorn St . To connect from the existing bike lane

1. Background 2. Proposal 3. Summary

2

Bond St Bicycle Route Connection

Page 3: BOND ST - nyc.gov€¦ · Bond Street bicycle route was established in 2014 and upgrade through 2016 between 3. rd. Av and Schermerhorn St . To connect from the existing bike lane

3

1 Background

Page 4: BOND ST - nyc.gov€¦ · Bond Street bicycle route was established in 2014 and upgrade through 2016 between 3. rd. Av and Schermerhorn St . To connect from the existing bike lane

PROJECT TIMELINE

4

Proposed Project Limits: • DeKalb Av: Flatbush Av – Fulton St • Bond St: Fulton St – Schermerhorn St

BICYCLE NETWORK

No bike route connection to Downtown Brooklyn

Bond Street bicycle route was established in 2014 and upgrade through 2016 between 3rd Av and Schermerhorn St

To connect from the existing bike lane on DeKalb Av to the bike lanes on Schermerhorn St cyclists have to travel contra-flow between Livingston St and Schermerhorn St

The DeKalb Av bike lane installed in 2008 ends at Flatbush Av; cyclists typically continue south

Page 5: BOND ST - nyc.gov€¦ · Bond Street bicycle route was established in 2014 and upgrade through 2016 between 3. rd. Av and Schermerhorn St . To connect from the existing bike lane

BIKE NETWORK – Citi Bike

5

Project Area

Legend

Page 6: BOND ST - nyc.gov€¦ · Bond Street bicycle route was established in 2014 and upgrade through 2016 between 3. rd. Av and Schermerhorn St . To connect from the existing bike lane

STREET NETWORK CHANGES

6

Pre-2010 Traffic Circulation Diagram Post 2010 Traffic Circulation Diagram

Northbound Bond St vehicles could continue to DeKalb Av

Bond St between Livingston St and Fulton St was converted to one-way southbound

In 2010 the Albee Square Capital Project removed DeKalb Av west of Bond St

At Bond St and Livingston St a head-on condition was created

Prior to 2010 DeKalb Av continued to Gold St

Page 7: BOND ST - nyc.gov€¦ · Bond Street bicycle route was established in 2014 and upgrade through 2016 between 3. rd. Av and Schermerhorn St . To connect from the existing bike lane

VEHICULAR NETWORK – Existing Traffic Volumes

7

Existing Street Direction Existing Peak Hour (5pm – 6pm) Traffic Volume

130 vehicles travelling northbound during peak hour.

Page 8: BOND ST - nyc.gov€¦ · Bond Street bicycle route was established in 2014 and upgrade through 2016 between 3. rd. Av and Schermerhorn St . To connect from the existing bike lane

VEHICULAR NETWORK - Projected Peak Hour Traffic Volume

8

Proposed Street Direction Projected Peak Hour (5pm – 6pm) Traffic Volume

Reverse the direction of Bond St between Schermerhorn St to Livingston St from northbound to southbound.

Projected traffic volume increases along Schermerhorn St..

Projected traffic volume is 160 vehicles.

Page 9: BOND ST - nyc.gov€¦ · Bond Street bicycle route was established in 2014 and upgrade through 2016 between 3. rd. Av and Schermerhorn St . To connect from the existing bike lane

9 Looking north from Schermerhorn St to Livingston St. The proposal is to change the direction of this block to southbound.

Page 10: BOND ST - nyc.gov€¦ · Bond Street bicycle route was established in 2014 and upgrade through 2016 between 3. rd. Av and Schermerhorn St . To connect from the existing bike lane

10 Looking south from Fulton St to Livingston St.

Page 11: BOND ST - nyc.gov€¦ · Bond Street bicycle route was established in 2014 and upgrade through 2016 between 3. rd. Av and Schermerhorn St . To connect from the existing bike lane

Existing Parking Regulations

11

Page 12: BOND ST - nyc.gov€¦ · Bond Street bicycle route was established in 2014 and upgrade through 2016 between 3. rd. Av and Schermerhorn St . To connect from the existing bike lane

Proposed Parking Regulations

12

Bike lane to be located on the south side of De Kalb Av.

Bike lane to be located on the east side of Bond Street..

Bike lane to be located on the south side of De Kalb Av.

Bike lane to be located on the east side of Bond Street..

Page 13: BOND ST - nyc.gov€¦ · Bond Street bicycle route was established in 2014 and upgrade through 2016 between 3. rd. Av and Schermerhorn St . To connect from the existing bike lane

13

2 Proposal

Page 14: BOND ST - nyc.gov€¦ · Bond Street bicycle route was established in 2014 and upgrade through 2016 between 3. rd. Av and Schermerhorn St . To connect from the existing bike lane

De Kalb Av (Flatbush Av to Bond St)

14

Proposal

Page 15: BOND ST - nyc.gov€¦ · Bond Street bicycle route was established in 2014 and upgrade through 2016 between 3. rd. Av and Schermerhorn St . To connect from the existing bike lane

PHOTO ILLUSTRATION – DeKalb Av

15

Proposal

DeKalb Av: Looking east towards Flatbush Av

Page 16: BOND ST - nyc.gov€¦ · Bond Street bicycle route was established in 2014 and upgrade through 2016 between 3. rd. Av and Schermerhorn St . To connect from the existing bike lane

Bond St (DeKalb Av to Schermerhorn St)

16

Proposal

Page 17: BOND ST - nyc.gov€¦ · Bond Street bicycle route was established in 2014 and upgrade through 2016 between 3. rd. Av and Schermerhorn St . To connect from the existing bike lane

PHOTO ILLUSTRATION – Bond St

17

Proposal

Bond St: Looking north towards Fulton Mall

Page 18: BOND ST - nyc.gov€¦ · Bond Street bicycle route was established in 2014 and upgrade through 2016 between 3. rd. Av and Schermerhorn St . To connect from the existing bike lane

3 Summary

18

Page 19: BOND ST - nyc.gov€¦ · Bond Street bicycle route was established in 2014 and upgrade through 2016 between 3. rd. Av and Schermerhorn St . To connect from the existing bike lane

SUMMARY • Creates connection from

DeKalb Av to Downtown Brooklyn

• Improves a safe, convenient cycling route connecting neighborhoods and destinations

• Provides dedicated space for bicyclists

• Organizes traffic on roadway