Bolivia´s National Satellite Program Tupac Katari I …...AGENCIA BOLIVIANA ESPACIAL Bolivia´s...
Transcript of Bolivia´s National Satellite Program Tupac Katari I …...AGENCIA BOLIVIANA ESPACIAL Bolivia´s...
AGENCIA BOLIVIANA ESPACIALBolivia´s National Satellite Program
Tupac Katari I
ITU Satellite Communications Symposium 2017 - Bariloche, Argentina, 29-31 May 2017
J. Alexis Andrade RomeroOperations Director
BOLIVIA
• Demographic distribution estimation
0%
20%
40%
60%
80%
100%
2012 2016 2020 2025
67.3 68.4 70 71.4
32.7 31.6 30 28.6
Urban population Rural population
BOLIVIA
• Bolivia has three geographic zones: the mountains and Altiplano in the west, the semitropical and temperate valleys of the eastern mountain slopes, and the tropical lowlands or plains (llanos) of the eastern lowlands.
• Bolivia has many areas with difficult access (e.g. surrounded by mountains or by the amazons).
BOLIVIA
• The constitution of the State, adopted in February 2009, establishes as basic services the telecommunications access, establishing as a responsibility of the State the provision of this services, although it may be provided through private companies.
• Bolivian 2025 agendaestablishes universal access to basic services such as telecommunications.
TKSAT-1 Programme
• The Bolivian Space Agency (ABE) was created on February 10th, 2010.
• On December 11th, 2010, ABE signs the contract for the Tupac Katari satellite TKSAT-1 with China Great Wall Industries Corporation (CGWIC).
• On December 20th, 2013, the TKSAT-1 was launched from China.
• On Abril 1st, 2014, the TKSAT-1 begins commercial operations.
C band Ku FSS band
Ku BSS band Ka band
TKSAT-1 Programme Results
• Universal access to TV and radio channels (FTA), it is estimated that more than 100.000 homes receive the FTA channels.
• 2.500 “Telecentros” have been implemented in the last years. “Telecentros” are places where people have access to Internet, satellite TV and telephony services.
• Cellular Backhaul (more than 600 BTS connected)
TKSAT-1 Programme Results• A national programme of tele-education was implemented.
• A national programme of telehealth was implemented.
• Several projects implemented for modernize government services (Mobile ID offices along the country, Toll roads administration, Customs office at borders, among others)
TKSAT-1 Programme Results
• TKSAT-1 Capacity distribution
• As of May 2017, about 70% of the total capacity is occupied.
24%
37.60%
14%
24.40%
0%
5%
10%
15%
20%
25%
30%
35%
40%
DTH Cellular Backhaul Rural Connectivity(Telecentros)
Others
Future projects
• A second communications satellite (TKSAT-2). HTS for universal access to telephone and broadband internet services in remote and rural areas. To be launch between 2021 and 2025
• A remote sensing satellite, it will be named Bartolina Sisa, for now postponed until the next administration (2020).
Gracias por su atención!
J. Alexis Andrade [email protected] DirectorAmachuma Earth Station