Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final...
Transcript of Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final...
![Page 1: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/1.jpg)
Board of DirectorsOperations Committee April 16, 2020
![Page 2: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/2.jpg)
Opening CommentsJ.J. EdenExecutive Director
![Page 3: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/3.jpg)
February StatisticsTriangle Expressway
• Transactions – 4.5 million• 5.3% year-over-year increase
• Revenue - $5.1 million• 17.7% year-over-year increase
Monroe Expressway• Transactions – 2.7 million• Revenue - $1.8 million
Transponders• Over 18,500 distributed• Nearly 808,000 distributed program-to-date as of February 29, 2020
Opening Comments
3
![Page 4: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/4.jpg)
Complete 540 Construction UpdateDennis Jernigan, P.E. Director of Highway Operations
![Page 5: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/5.jpg)
Complete 540 Design
5
R-2828• 8.6 miles• 323 design submittals, including final roadway design plans, hydraulics
design plans, MOT plans, structure design plans• Construction plans roughly 85% complete
R-2721B• 4.9 miles• 129 design submittals, including final roadway design plans, hydraulics
design plans, structure design plans• Construction plans roughly 70% complete
R-2721A• 4.3 miles• 167 design submittals, including final roadway plans, hydraulics design plans,
culvert survey reports• Construction plans roughly 60% complete
Complete 540 Construction Update
![Page 6: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/6.jpg)
Complete 540 Right of Way
6
R-2721A- 211 parcels- 187 parcels settled- 24 parcels remaining
R-2721B- 221 parcels- 186 parcels settled- 35 parcels remaining
R-2828- 210 parcels- 105 parcels settled- 105 parcels remaining
Complete 540 Construction Update
![Page 7: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/7.jpg)
7
![Page 8: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/8.jpg)
8
![Page 9: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/9.jpg)
9
![Page 10: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/10.jpg)
10
![Page 11: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/11.jpg)
11
![Page 12: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/12.jpg)
12
![Page 13: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/13.jpg)
13
![Page 14: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/14.jpg)
14
Complete 540 Construction Update
First virtual neighborhood meetingApril 22nd
COVID-19 Responses
Resident communications
![Page 15: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/15.jpg)
Triangle Expressway Paint Contract UpdateDennis Jernigan, P.E. Director of Highway Operations
![Page 16: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/16.jpg)
Triangle Expressway Paint Contract Update
16
![Page 17: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/17.jpg)
Triangle Expressway Paint Contract Update
17
![Page 18: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/18.jpg)
18
Program Development Update
Andy Lelewski, P.E.Director of Program Development
![Page 19: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/19.jpg)
I-485 Express Lanes Progress
![Page 20: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/20.jpg)
Division 10 Construction Update
Program Development Update
20
• First Johnston Road direct connector bridge started construction on January 6, 2020.
• Over 25 miles of portable concrete barrier have been installed.
• Approximately 6,000 LF of pipe have been constructed.
Johnston Road DirectConnect Bridge
![Page 21: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/21.jpg)
Division 10 Construction Update
Program Development Update
• Over 5 miles of median widening is under construction.• Soil stabilization has begun with stone and asphalt to follow.
21
Segment C soil stabilization
![Page 22: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/22.jpg)
Division 10 Construction Update
Program Development Update
• John St. interchange has been cleared, and grading has begun.
22
![Page 23: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/23.jpg)
Toll Collection SystemProgram Development Update
Will provide:• Design, test, installation, operations, and
maintenance of the Roadside Toll Collection System (RTCS)
• Dynamic pricing system• Operations and maintenance of some components
of the Intelligent Transportation System (ITS)
23
![Page 24: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/24.jpg)
NCTA Activities
Program Development Update
Recent NCTA Accomplishments• Review of numerous Toll Zone Infrastructure, Intelligent Transportation
System, Toll Collection Signing/Pavement Marking submittals
Upcoming NCTA Work• Continue review of submittals• Monitoring of Early Work along the corridor• Development of RTCS Request for Proposals
Schedule• Spring 2020 – Release of RTCS Request for Proposals• Fall 2022 – Commencement of tolling
24
![Page 25: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/25.jpg)
Morrisville Parkway Interchange Construction
![Page 26: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/26.jpg)
NC-540 Mainline Toll Zones
Program Development Update
26
![Page 27: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/27.jpg)
Toll Zone Spanning Trusses
Program Development Update
27
![Page 28: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/28.jpg)
NCTA Activities
Program Development Update
Recent NCTA Accomplishments• Toll zones turned over to Roadside Toll System Manager on March 25• Intelligent Transportation System turned over to Roadside Toll System
Manager on April 3
Upcoming NCTA Work• Installation of spanning trusses• Installation of roadside and overhead toll equipment
Schedule• Spring 2020 – Begin truss and toll system installation• Summer 2020 – Commencement of tolling
28
![Page 29: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/29.jpg)
Wrong-Way Driver Detection Pilot
![Page 30: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/30.jpg)
Wrong-way Driver Detection Pilot
Program Development Update
Goal: To field evaluate wrong way detection systems for the possible implementation on NCTA facilities
Current deployments:• Tri-Ex – Davis Drive Off-Ramp (2018) • Tri-Ex – S. Salem Street Off-Ramp (2018)• Tri-Ex – Green Level West Mainline Toll Sites (2018)• Tri-Ex – NC-54 Off-Ramp (2018)• Monroe – Two Mainline Toll Sites (2019)
30
![Page 31: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/31.jpg)
Recent demonstration of a wrong way detection system on the Triangle Expressway
MH Corbin / Bosch Deployment
Program Development Update
31
Demonstration:• April 2, 2020 - At Green Level West
interchange• Coordination with NCTA Traffic
Management Center, Wake County Sherriff's office, MH Corbin, NCTA staff & consultants
• Numerous wrong way driver test scenarios including varying speeds and ramp corrections.
![Page 32: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/32.jpg)
Pole mounted LIDAR detection and Bosch “tracking” camera to detect and provide alert and seamless event video to NCTA traffic management operators.
MH Corbin / Bosch Deployment
Program Development Updateilot
32
![Page 33: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/33.jpg)
MH Corbin / Bosch Deployment
Program Development Update
33
Video 1: Motorcycle correcting by turning around
![Page 34: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/34.jpg)
MH Corbin / Bosch Deployment
Program Development Update
34
Video 2: Pickup truck correcting by jumping the median
![Page 35: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/35.jpg)
MH Corbin / Bosch Deployment
Program Development Update
35
Vehicle tracking snapshot show LIDAR Detection of wrong-way travel for previous video
![Page 36: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/36.jpg)
MH Corbin / Bosch Deployment
Program Development Update
36
Sample dashboard report showing definition of LIDAR detection zone
![Page 37: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/37.jpg)
Wrong-way Driver Detection Pilot
Program Development Update
37
Recent NCTA Accomplishments• MH Corbin / Bosch demonstration
Upcoming NCTA Work• Finalize report concluding the Tri-Ex and Monroe Pilot Program • Finalize report defining the rollout of the full Program on all facilities • Submit I-85 FAST BUILD grant to include NCTA Tri-Ex & Complete 540
ramp sites
Schedule• Issue Pilot Program report – May 2020• Submit BUILD Grant application – Mid-May 2020• Issue full Program report – Summer 2020
![Page 38: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/38.jpg)
38
Toll Technology Update
Manish ChoureyChief Technology Officer
![Page 39: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/39.jpg)
Toll Collection System Updates
Toll Technology Update
Morrisville Interchange Schedule• April 2020 – Begin truss and toll system installation• June 2020 – Completion of toll system testing• July 2020 – Commencement of tolling
I-485 Toll Collection System• Development of RTCS Request for Proposals• Summer 2020 – Release of RTCS Request for Proposals• Fall 2022 – Commencement of tolling
Back Office System Test Schedule• May 2020 – Continue Application Test • Summer 2020 – Interface and Performance Test• Fall 2020 – System cutover
39
![Page 40: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/40.jpg)
CSC Updates Toll Technology Update
Pandemic Update• Employees and Embedded Consultants working remotely• Website trends indicate 25%-30% reduction in traffic• New debt collections suspended effective 3/30/2020• NCTA suspended processing fees and civil penalties (4/3/2020)
CSC is still in Code Yellow• Walk-in Centers are shutdown since 3/18• CSR’s have been spaced out to meet social distancing (6+ feet)• Preparations underway to implement Remote work force• Keeping current with Image review, customer disputes and complaints
GC Services Transition • Key Staff hired and participating in transition activities• Daily / weekly coordination meetings • Transition date is 30-May-2020
40
![Page 41: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/41.jpg)
Transaction StatisticsToll Technology Update
41
Week over Week transaction count
decreased by 65-70%
Class 2 & Class 3 Vehicles
represents 5.21% of the total traffic
![Page 42: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/42.jpg)
Transaction StatisticsToll Technology Update
42
Week over Week transaction count
decreased by 40-45%
Class 2 & Class 3 Vehicles represents
16.68% of the total traffic
![Page 43: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/43.jpg)
Transaction Statistics
Toll Technology Update
43
Week over Week transaction count
decreased by 80-85%
![Page 44: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/44.jpg)
NCTA Quick Pass Site MetricesToll Technology Update
44
Month of February 2020 Month of March 2020
Statistics on NC Quick Pass users by Region, Metro and City
![Page 45: Board of Directors...2020/04/16 · • 4.9 miles • 129 design submittals, including final roadway design plans, hydraulics design plans, structure design plans • Construction](https://reader033.fdocuments.in/reader033/viewer/2022050611/5fb28eae443a5151586bfe64/html5/thumbnails/45.jpg)
Thank You!