Biomass gasification overview

16
Biomass gasification overview Conference of the European Biogas Association 2014 Ilkka Hannula, Esa Kurkela VTT Technical Research Centre of Finland

description

Talk held at the European Biogas Association's Conference in 2014.

Transcript of Biomass gasification overview

Page 1: Biomass gasification overview

Biomass gasification overview

Conference of the European Biogas Association 2014Ilkka Hannula, Esa KurkelaVTT Technical Research Centre of Finland

Page 2: Biomass gasification overview

217/09/2014 2

Page 3: Biomass gasification overview

3

1995 2000 2005 2010 2015 20201985 2025 2030

LAHTI II, 160 MW WASTE-TO-ENERGY

WASTE-TO-ENERGY PLANTSWITH MATERIAL RECOVERYo HIGH ELECTRIC EFFICIENCYo RECOVERY OF VALUABLE METALS

WASTE-TO-ENERGY PLANTSWITH MATERIAL RECOVERYo HIGH ELECTRIC EFFICIENCYo RECOVERY OF VALUABLE METALS

LIME-KILNGASIFIERS

REPLACEMENT OFFOSSIL FUELSIN BOILERS AND KILNSo WOOD, AGROBIOMASSo 10-200 MW FUEL

BIOMASS/WASTEGASIFIERS FOR POWER

CBF/BFBGASIFICATION R&DAND PILOTING

R&D ono HOT GAS FILTRATIONo WASTE AND STRAW

GASIFICATION

R&D NEEDS 2013 - 17o FILTER ASH UTILISATIONo RECOVERY OF METALSo IMPROVED GAS CLEANING

JOUTSENO LIME KILN 2012

Biomass and waste gasification for boilers and kilns

LAHTI 60 MW

Page 4: Biomass gasification overview

417/09/2014 4

Page 5: Biomass gasification overview

517/09/2014 5

Production of Synthesis Gas from Solid FuelsInitial step - two main approaches

Page 6: Biomass gasification overview

6

Biomass gasification for fuels and chemicals

PEAT AMMONIA PLANTOULU, FINLAND

SYNGAS R&D FOR BIOFUELSo GASIFICATION PROCESS DEVELOPMENTo CATALYTIC REFROMINGo FINAL GAS CLEANINGo TESTING OF SYNTHESIS CATALYSTS

GASIFICATIONR&D AND PILOTINGUSA, GERMANY,SWEDEN, FINLAND

2010 2015 20201985 2005 203020001995 2025

BIO-DME PLANTPITEÅ, SWEDEN

GTI PILOT, USA

NSE BIOFUELS, FINLAND

BIO-FUELS ANDCHEMICALSo DIESEL, MeOH, DME,

SNG, H2, GASOLINEo OLEFINS, OTHER CHEMICALSo FOREST & AGRO-INDUSTRY

INTEGRATIONo INTEGRATION TO HEAT

AND POWERo INTEGRATION TO SOLAR &

WIND ENERGYo NEW WASTE-TO-FUEL

CONCEPTS

SKIVE CHP, DENMARK

CEGABTL 2015 - 2017o IMPROVED LARGE-SCALE

GASIFICATION PROCESSo NEW PROCESSES FOR SMALLER SCALEo SIMPLER, CHEAPER GAS CLEANINGo NEW CONCEPTS FOR INTEGRATED

PRODUCTION OF FUELS, POWER AND HEAT

Page 7: Biomass gasification overview

Updated Techno-EconomicAssessment• Detailed evaluation of 20

individual plant configurations• MeOH, DME, FTL & MTG• Plant configurations technically

proven at pre-commercial scale• Impact of further R&D to the

overall economics estimated• Large scale: 300 MWth of

biomass (~1500 mtpd, dry)• Nth plant economics• Available for download:

http://bit.ly/192Vl3G

Page 8: Biomass gasification overview
Page 9: Biomass gasification overview

*Liquid transportation fuels via large-scale fluidised-bed gasification of lignocellulosic biomass, Hannula, Ilkka; & Kurkela, Esa 2013. VTT, Espoo. 114 p. + app. 3 p. VTT Technology: 91

• Mature technology• No investment support• No CO2 credits• No tax assumptions

Gasoline@150$/bbl

Gasoline@100$/bbl

Before taxRef.margin: 13.4$/bbl

1€ = 1.33$ (2010)

Levelised production cost estimates*300 MW biomass @ 17 €/MWh, 0.12 ann. factorElectricity 50 €/MWh, DH 30 €/MWh@5500 h/a

Page 10: Biomass gasification overview

DUAL-BED STEAM GASIFIERFeatures- No oxygen needed- Large steam consumption- Challenging to pressurise- Reactor size limited to

100MWth?

Biomass

Steam Air

Fluegas

~80 % ofcarbon to

product gasand tars

Page 11: Biomass gasification overview

Source: Göteborg Energi

Page 12: Biomass gasification overview

1217/09/2014 12

Fully indirectproduction route(no oxygen needed)

Page 13: Biomass gasification overview

1317/09/2014 13

Levelised production cost estimates100 MW biomass @ 18 €/MWh, 0.12 ann. factorElectricity 50 €/MWh, DH 30 €/MWh@5500 h/a

Fully indirectproduction route(no oxygen needed)

Page 14: Biomass gasification overview

1417/09/2014 14

Levelised production cost estimates100 MW biomass @ 18 €/MWh, 0.12 ann. factorElectricity 50 €/MWh, DH 30 €/MWh@5500 h/a

Fully indirectproduction route(no oxygen needed)

External costs not included- pressurisation- distribution- vehicle related costs

Page 15: Biomass gasification overview

1517/09/2014 15

Take home messages

Successful biomass gasification plants built continuously since late 1970Suitable technology depends on feedstock, scale and applicationMore demanding applications require cleaner gas –> increase in CAPEXLarge CAPEX calls for large scale and high on-stream factorsWaste gasification brings down feedstock costs but puts additionalrequirements for technologyNo clear answer to “what fuel to produce”. Solution is systemic.Technology for synthetic biofuels production technically demonstratedat precommercial scale –> near-term deployment possible

Page 16: Biomass gasification overview

TECHNOLOGY FOR BUSINESS