BIM: More than just an Information Model by @fairsnape

38
martin brown [email protected] @fairsnape more than just an INFORMATION MODEL

description

BIM presentation given to CIBSE yorkshire

Transcript of BIM: More than just an Information Model by @fairsnape

Page 1: BIM: More than just an Information Model by @fairsnape

martin brown

[email protected] @fairsnape

m o r e t h a n j u s t a n I N F O R M A T I O N

M O D E L

Page 2: BIM: More than just an Information Model by @fairsnape

m o r e t h a n j u s t a n I N F O R M A T I O N

M O D E L

M a r t i n B r o w n F a i r s n a p e

+ C o n s t r u c t i n g E x c e l l e n c e

C o l l a b o r a t i v e W o r k i n g C h a m p i o n +

C h a i r L a n c s C o n s t r u c t i o n B e s t P r a c t i c e C l u b

+ C o - F o u n d e r B E 2

martin brown [email protected]

@fairsnape

Page 3: BIM: More than just an Information Model by @fairsnape

“the total, collaborative and virtual modelling of all aspects of a facility prior to c o n s t r u c t i o n , d u r i n g construction and in use.”

M a r t i n B r o w n

Page 4: BIM: More than just an Information Model by @fairsnape

"BIM use requires skills and a mindset that allow us to work product ively and e f f e c t i v e l y i n a collaborative setting"

R a n d y D e u t s c h

Page 5: BIM: More than just an Information Model by @fairsnape

Empire State Building

Page 6: BIM: More than just an Information Model by @fairsnape

Ropemaker Place

Page 7: BIM: More than just an Information Model by @fairsnape

S o u r c e : R a f a e l S a c k s

Page 8: BIM: More than just an Information Model by @fairsnape

Increased building and component complexity

New (unnecessary?) complex building systems

Increased process complexity

Increased organisation complexity

Complex production systems

Factors:

Page 9: BIM: More than just an Information Model by @fairsnape

Ineffective production systems … cause Waste: (MUDA)

• Waiting - information, materials, etc. • Reworking • Moving • Work in progress • Over-production • Unnecessary processing • Transfer of materials (double-handling) • Products that do not meet requirement

Page 10: BIM: More than just an Information Model by @fairsnape

Typical Project Efficiency Footprint

M a r t i n B r o w n

Page 11: BIM: More than just an Information Model by @fairsnape

BIM: a continuation of our collaborative working journey

Page 12: BIM: More than just an Information Model by @fairsnape

Building Down Barriers

Understand Value R e l a t i o n s h i p s Integrated Working Collaborative Costing Continuous Improvement People

Page 13: BIM: More than just an Information Model by @fairsnape

BUILT ENVIRONMENT IMPROVEMENT

SUSTAINABILITY

COLLABORATIVE WORKING

VALUE

t: @fairsnapemartin brown e: [email protected]

Page 14: BIM: More than just an Information Model by @fairsnape

BUILT ENVIRONMENT IMPROVEMENT

SUSTAINABILITY

COLLABORATIVE WORKING

VALUE

t: @fairsnapemartin brown e: [email protected]

Page 15: BIM: More than just an Information Model by @fairsnape

BUILT ENVIRONMENT IMPROVEMENT

SUSTAINABILITY

COLLABORATIVE WORKING

VALUE

t: @fairsnapemartin brown e: [email protected]

Page 16: BIM: More than just an Information Model by @fairsnape

BUILT ENVIRONMENT IMPROVEMENT

SUSTAINABILITY

COLLABORATIVE WORKING

VALUE

t: @fairsnapemartin brown e: [email protected]

Page 17: BIM: More than just an Information Model by @fairsnape
Page 18: BIM: More than just an Information Model by @fairsnape

Poor communications at

the root of most construction

problems?

Page 19: BIM: More than just an Information Model by @fairsnape
Page 20: BIM: More than just an Information Model by @fairsnape

... Better communication

Page 21: BIM: More than just an Information Model by @fairsnape

H o w c a n B I M e n a b l e collaboration with everyone?

Page 22: BIM: More than just an Information Model by @fairsnape

Comfortable with paperless projects, with sharing digitally

Page 23: BIM: More than just an Information Model by @fairsnape

Comfortable with sharing and engaging across social media?

Page 24: BIM: More than just an Information Model by @fairsnape

Project Process Control?

Page 25: BIM: More than just an Information Model by @fairsnape

Integrating BIM into existing process

Page 26: BIM: More than just an Information Model by @fairsnape

“getting fed up hearing about BIM, BIM, BIM, when no one r e a l l y understands it"

another industry fad, a brief encounter?

Page 27: BIM: More than just an Information Model by @fairsnape

Do you +ZAP energy

Do you -SAP energy

Page 28: BIM: More than just an Information Model by @fairsnape

Responses to BIM?

Architect? Providers? Advocates? Government?

Builders? Facilities Management? Services?

Page 29: BIM: More than just an Information Model by @fairsnape

French politician Alexandre Ledru-Rollin

“There go my people I must find out where they are

going so I can lead them.”

Page 30: BIM: More than just an Information Model by @fairsnape

HONDA "everything we do goes into everything we do"

Page 31: BIM: More than just an Information Model by @fairsnape

Virtual Worlds, Games, Second Life "a social dimension to BIM?"

Page 32: BIM: More than just an Information Model by @fairsnape

The majority of BIM-related literature and events have been focused on technology, not on people who use it. People issues and attitudes are the main impediment to the collaborative work processes enabled by the technology.

http://www.di.net/articles/bim_beyond_boundaries/

Randy Deutsch

BIM beyond Boundaries

Page 33: BIM: More than just an Information Model by @fairsnape

Human issues, issues of communication and collaboration, firm culture, motivation, and workflow — all exacerbated by the advent of BIM into the workplace — are an even greater challenge than the admittedly considerable software application and technical problems associated with BIM’s use.

http://www.di.net/articles/bim_beyond_boundaries/

Randy Deutsch

BIM beyond Boundaries

Page 34: BIM: More than just an Information Model by @fairsnape

1. Collaborative Mindset

2. Technical Capabilities

3. Maturity of the client

4. Procurement route

5. Programme v model detail

BIM Constraints

Page 35: BIM: More than just an Information Model by @fairsnape

1. Enhanced collaboration 2. Improved project understanding 3. More accurate and efficient cost management 4. Virtual design and construction 5. Client engagement and relationships 6. Elimination of MUDA (waste and non-value adding activities)

BIM Benefits

Page 36: BIM: More than just an Information Model by @fairsnape

1. Enhanced collaboration 2. Improved project understanding 3. More accurate and efficient cost management 4. Virtual design and construction 5. Client engagement and relationships 6. Elimination of MUDA (waste and non-value adding activities)

BIM Benefits

Page 37: BIM: More than just an Information Model by @fairsnape

martin brown

[email protected] @fairsnape

m o r e t h a n j u s t a n I N F O R M A T I O N

M O D E L

Page 38: BIM: More than just an Information Model by @fairsnape

Design and PreConstruction

Evening events 10th Oct and 7th Nov

Conference: 5th Dec 1pm

#TBim Tweetchat: 26 Nov 8pm

THINK BIM www.thinkbim.org