BIFROST CABLE SYSTEM - Keppel Corporation
1
North Pacific Ocean INDONESIA JAPAN HONG KONG CHINA Tuas SINGAPORE GUAM Largest high-speed capacity data cable system across the Pacific Ocean from Singapore Length: > 15,000 km Completion: 2024 Keppel’s share of the total project cost is approximately US$350 million Celebes Sea NORTH AMERICA Java Sea AUSTRALIA BIFROST CABLE SYSTEM World’s first subsea fibre cable system directly connecting Singapore to the west coast of North America via Indonesia through the Java Sea and Celebes Sea South China Sea SOUTH KOREA To Japan To Australia Strategic landing in Guam for cross-connectivity with other cable systems to Japan and Australia BIFROST CABLE SYSTEM & ROUTE TRADITIONAL TRANS-PACIFIC ROUTE PHILIPPINES
Transcript of BIFROST CABLE SYSTEM - Keppel Corporation
North Pacific Ocean
INDONESIA
JAPAN
HONG KONG
CHINA
Tuas SINGAPORE
GUAM
Largest high-speed capacity data cable system
across the Pacific Ocean from Singapore
Length: > 15,000 km
Completion: 2024
Keppel’s share of the total project cost
is approximately US$350 million
Celebes Sea
NORTH AMERICA
Java Sea
AUSTRALIA
BIFROST CABLE SYSTEMWorld’s first subsea fibre cable system directly connecting
Singapore to the west coast of North America via Indonesia through the Java Sea and Celebes Sea
South China Sea
SOUTH KOREA
To Japan
To Australia
Strategic landing in Guam for cross-connectivity with other cable systems to Japan and Australia
BIFROST CABLE SYSTEM & ROUTE
TRADITIONAL TRANS-PACIFIC ROUTE
PHILIPPINES