Bidding and Proposals - Illinois Tollway
Transcript of Bidding and Proposals - Illinois Tollway
Bidding and Proposals
Po Collins, Gustavo Giraldo and Johnny Morcos
Agenda
2
Combination bidding
Electronic bidding
Submitting a winning proposal
Forms and requirements
IPG vendor portal
Disclosure forms
Subcontractor disclosures and Form A-15
NIGP codes
Combination Bidding
Johnny Morcos and Gustavo Giraldo
3
Flexible Bid Package Strategy
4
Competition fosters more competitive bid prices May attract additional prime bidders Provide new subcontracting opportunities
Optimize schedule Provide contractor flexibility
Means and methods Staging and operations Better coordination of operations in confined space
Potential cost savings Economy of scale Maximize efficiencies
Developing Flexible Bid Packages
5
Goal to meet schedule and maintain budget Considered lessons learned from previous work
Tri-State Tollway (I-294) Reconstruction and Widening Project I-90 Fox River Bridge Project Illinois Route 390/I-290 Interchange Project
Researched other agencies
Reviewed legal and procurement policies
Implementation process Identify viable locations Consider various bid package strategies Develop packages and goals Educate industry Advertise bids
Combination Bids Permitted
6
Chicago Department of Transportation Skyway Project (2002 and 2003)
Used combination bid option (same method the Tollway is recommending)
Average bid package was $20 million to $25 million
Estimated savings of six percent
Permitted by JCAR
Identifies rules governing combination bids
Provides legal ability to consider the combination bid approach
Eastern Segment Unique Challenges
7
Heavier daily travel volume during peak hours Three to four times more traffic than on western segment
Compact construction area
Compressed construction schedule with complex
projects Creation of new interchanges
Transit accommodations/coordination with Pace
Implementation of active traffic management
Challenging MOT
Complex logistics/coordination required Movement of equipment and materials in work zone
I-90 Construction Contract Packages
Subject to change 8
2015 Mainline Contracts (limits) Anticipated Bid Dates
Wolf Road to Mannheim Road
Oakton Street to Wolf Road
Roselle Road to Illinois Route 53
Higgins Road to Roselle Road
Illinois Route 53 to Arlington Heights Road
Arlington Heights Road to Oakton Street
Illinois Route 25 to Higgins Road 12/11/2014
Illinois Route 31 to Fox River Bridge 12/16/2014
Mannheim Road to Tri-State Tollway 12/18/2014
10/30/2014
10/30/2014
11/13/2014
11/13/2014
12/04/2014
12/04/2014
Combination Bidding Opportunity
9
Contractors will have the opportunity to bid on two specified adjacent contracts with a combination bid option
Bidding process Contractors have the opportunity to bid contracts as advertised Contractors have the opportunity to submit one combination bid, only
if they submit bids for the two specified contracts Unit prices for individual contracts to be prorated
Special provision in contract documents will specify award determination Look at lowest bid combination
(contract 1 and contract 2) $46 million + $49 million
= $95 million Lowest bid is $94 million
Bidder Contract 1 (millions)
Contract 2 (millions)
Combo Bid (millions)
Bidder A $50 $50 $98
Bidder B $46 -- n/a
Bidder C $47 $49 --
Bidder D $52 $53 $94
Diversity Requirements – Combination Bids
10
Requirements and DBE goals on contracts
Separate DBE Utilization Plan Form 2026 and DBE Participation Statement Forms 2025 MUST BE submitted for each contract
If a combination bid is submitted, primes have the option of revising 2025 forms for each contract; otherwise, the original 2025 forms submitted for each contract will be in effect
The DBE percentage on each contract will remain unchanged on a combination bid
Submitting Earned Credit Program (ECP) credits on multiple bids
Once ECP credits are redeemed, they are no longer available for use on subsequent bids
Electronic Bidding
Po Collins
11
Overview
12
Benefits of electronic bid submittals
Reduce bidder math errors and reduce bid preparation time
Decrease internal processing times
Allow bidders to submit, revise and resubmit multiple times prior to deadline
Plans and specifications also available through e-Builder
Goals
Transition to paperless system after test period
Construction bids and PSB proposals will be submitted in e-Builder
Realize efficiencies for all parties involved in Tollway procurement
Implementation Process
13
Worked with industry to identify functional requirements from bidder’s perspective
Determined process requirements and data elements for automating e-Builder
Formal user acceptance testing by internal users in early October
System testing via mocks bids by industry in mid/late October
Successful mock bids = November roll out
Submit a Winning Proposal
14
Tollway Seeks Qualified Firms
15
Tollway relies heavily on professional services
More than 200 professional services firms are working on the Move Illinois Program
Tollway values
Timing and schedule
High degree of independence
Quality designs and QA/QC process
Working through the design corridor managers and construction corridor managers
Professional Services Bulletin (PSB) Statistics
16
Receiving tremendous amount of interest in projects
PSB Overview Statements of Interest
13-1 23 items, worth approximately $90 million
126 firms submitted 540 Statements of Interest
13-2 Nine items, worth approximately $20.5 million
113 firms submitted 385 Statements of Interest
13-3 Two items, worth approximately $2.2 million
24 firms submitted 28 Statements of Interest
13-4 14 items, worth approximately $79 million
109 firms submitted 303 Statements of Interest
14-1 19 items, worth approximately $100 million
117 firms submitted 386 Statements of Interest
14-2 4 items, worth approximately $3.5 million
30 firms submitted 57 Statements of Interest
Top Five Reasons for Disqualification
17
11 – Disclosures not submitted
7 – Submitted late
6 – Incorrect naming conventions
5 – Did not fully address the Veterans Goal
3 – Tie
PRN not submitted
SOI Team Spreadsheet not submitted
Exhibit A incomplete or not submitted
PSB Preview
18
PSB 14-3 anticipated in fall 2014
Design contract for the Mile Long Bridge on the Tri-State Tollway
Design contract for the BNSF Railroad Bridge on the Tri-State Tollway
Master Plan, planning study for I-294 roadway reconstruction between 95th Street and Balmoral Avenue
Spring 2015 professional services needs include
General Engineering Consultant
Traffic Engineering Consultant
Forms and Requirements
19
IPG Vendor Portal
20
Open and accepting disclosures and certifications
Minimizes risk of vendor disqualification for administrative errors at the time of bid opening
Creates an electronic company record that may be updated at any time
Visit https://ipg.vendorreg.com/
About the New IPG Forms…
21
Forms A
Vendor uses if NOT registered in the IPG
Forms B
Vendor uses if registered in the IPG
Know which form set applies to you
Using the wrong form set could disqualify you
Tollway’s website (www.illinoistollway.com) includes
Links to Forms A and Forms B
Links to instructions for both Forms A and Forms B
For Vendors NOT Registered in the IPG
22
Forms A includes
Business and Directory information
Illinois Department of Human Rights Public Contracts Number
Authorization to Do Business in Illinois (SOS)
Standard Certifications
State Board of Elections
Disclosure of Business Operations in Iran
Financial Disclosures and Conflicts of Interest
Taxpayer Identification Number
For Vendors Registered in the IPG
23
Form B includes
Certification of Illinois Procurement Gateway Registration
Certification Timely to this Solicitation
Disclosure of Lobbyist or Agent
Disclosure of Current and Pending Contracts
Signature
Vendors will automatically be disqualified if they are NOT registered in the IPG and submit the Forms B only.
Know Your Disclosure Forms
24
Recommendation:
Know which form set applies to you
Using the wrong form set could disqualify you
Subcontractor Disclosures and A-15s
25
Prime is responsible
Submit certification/disclosure forms for sub-contractors
Of all tiers
Who are identified in the bid documents whose value exceeds $50,000
Includes material suppliers and truckers
Please submit
No later than 15 days following contract execution or
No later than 15 days after execution of the sub-contract
For multi-year contracts, submit revised certification/disclosure forms for both the prime and subs by July 1st
NIGP Codes and the IPB
26
NIGP codes used exclusively beginning July 1, 2014
NIGP codes provide more and better descriptions than the former class codes
Current Illinois Procurement Bulletin (IPB) users can update their profile based on the new NIGP codes
To re-register with the new codes, visit www.purchase.state.il.us
Vendors will not receive notifications if they are not registered with the new codes
All addenda and notices published after July 1 use the new codes
NIGP code list (PDF searchable) is on the IPB under “Reference Library” or “Registration”
Questions?
27
THANK YOU