This document contains a selection of our completed projects.

Transcript of Betts Townsend Track Record

Page 1: Betts Townsend Track Record

Bet

ts T

ow

nsen

d t

ra

ck

rec

or

d

Page 2: Betts Townsend Track Record

Umhlanga Sands refurbishment

PROFESSIONAL TEAM

Client

Southern Sun Hotels & Resorts

Quantity Surveyors MLC Quantity Surveyors

Architects Falconer

Electrical Engineers CKR

Mechanical Engineers ACAS

Health and Safety C&M Safety Consultants

Wet Services Wet Management Services

Umhlanga Sands resort overlooks the Umhlanga Rocks beachfront and is a pop-

ular destination for local and international holidaymakers.

The Resort closed on 14 January 2012 to commence with the refurbishment of

237 hotel rooms and corridors. Teams started with demolition works on 18 Jan-

uary 2012.

Demolition works included removing of all furniture of 237 rooms, doors, door-

frames, bathroom ceilings and wood and glass panels.

New installations will include cretestone plastering of all walls, state of the art

LED down lighters set in a flush skimmed ceiling and new doors and frames

with the latest electronic Vingcard locks to give the rooms a luxurious finish.

The plumbing infrastructure will be completely replaced including hot and cold

water supply. The fire hydrant feeder pipe is also replaced. The rooms will be

fitted with a new airconditioning fancoil unit, grills and control panel.

Corridor walls will be smooth plastered and new carpets will be laid, bulkhead

ceilings and LED down lights will be giving the curved corridors a new look.

In the public areas and restaurants all wooden shopfronts and doors will be re-

placed with aluminium shopfronts.

The tight programme is a challenge to the team, but with Betts Townsend’s ex-

cellent time management skills the completion date of 5 April 2012 will be

achieved and the hotel will be open in time to welcome their guests for the East-

er weekend.

KEY INFORMATION

Value ZAR 55 million • Completion Date April 2012 • Size 237 rooms • Location: Durban, KwaZulu Natal

Project Managers

Betts Townsend (Pty) Ltd

leis

ur

e

Page 3: Betts Townsend Track Record

PARK INN FORESHORE HOTEL

PROFESSIONAL TEAM

Client

Seick Properties Limited &

One Vision Investments 486 (Pty) Ltd

Quantity Surveyor

MLC Quantity Surveyors

Interior Designer

Arkiteckto Design

Architect

Lightspace Architects

Electrical & Mechanical Engineer

4EM Consulting Engineers

Civil Engineer

BVI Consulting Engineers

Town Planner

Tommy Brummer Town Planners

Health and Safety

Eppen-Burger & Associates

Acoustic Engineer

McKenzie-Hoy & Associates

Park Inn Foreshore is a 120 room, 4 star hotel with conference facilities branded

under the Rezidor Hotel Group. The hotel consist of a ground floor incorporat-

ing RBG, the food & beverage component to the hotel along with associated

front of house and back of house facilities.

The hotel is centrally and strategically positioned in Cape Town CBD on the

corner of Heerengracht Street and Hans Strijdom Avenue. Level 1 and Level 2

hosts the parking (accommodating 41 parking bays) as well as technical BOH,

storerooms, staff canteen and general operational areas. Park Inn Foreshore em-

ploys a valet service to cater for conferencing and functions.

Levels 3 through to level 10 are populated with general room arrangement of

varying room types. A 70%-30% split of double to king room types form the

mix accompanied with pause-like breakaway meeting rooms to allow informal

meetings on each level. The signature of the hotel is the roof top area. Confer-

ence/banqueting facilities is housed at roof level, further allowing for a roof top

entertainment platform, plunge pool and associated pause areas. Further to this a

roof top bar and boutique gymnasium.

The building underwent a radical façade upgrade, making use of Hula bond pan-

eling and infill paneling with a complete new window installation to both

Heerengracht street and Tulbagh square side.

A full consultant design team was in place including an MEP appointment inter-

nally with Rezidor offering valuable expertise with regards to sustainable initia-

tives along with life cycle costing experience. Trade commenced on 04 Novem-

ber 2011. The hotel had a 100% occupancy rate in the first week of opening

and is a successfully completed project.

KEY INFORMATION

Value R170 million • Completion Date November 2011 • Size 13 Storey • Location Cape Town

leis

ur

e

Development Manager

Betts Townsend (Pty) Ltd

Project Manager

Betts Townsend (Pty) Ltd

Construction Manager

Betts Townsend (Pty) Ltd

Page 4: Betts Townsend Track Record

FAIRMONT ZIMBALI RESORT

PROFESSIONAL TEAM

Client

IFA Hotels & Resorts

Hotel Operator

Fairmont Hotels & Resorts

Electrical Engineers

CKR

Quantity Surveyors

MLC Quantity Surveyors

Civil and Structural Engineers

Aurecon

Health and Safety

C&M Safety Consultants

Architects

RSL Architects

Interior Design

Keith Designs

Mechanical Engineers

Aurecon

Fire Consultants

Aurecon

Landscape Architects

Landmark

Land Surveyor

Baker & Associates

In October 2009 the Fairmont contract at Zimbali in Durban, South Africa came

to a standstill due to legal matters.

Betts Townsend’s proven track record and capability in delivering Construction

Management type contracts were then approached by the client body and thus

the basis for the appointment. Betts Townsend were mutually appointed in both

a Project Management and Construction Management capacity to fast track the

internal fit and external works completion of the Fairmont Zimbali Resort.

Betts Townsend were further charged with an internal fit-out appointment to all

finishes including approximately 120 rooms, 2 Royal Suites (both +300m²), 2

fine dining restaurants, tea room, all pause and formal lounges, main entrance

foyer, spiral “feature” staircase, banqueting hall, pre-assembly, public toilets, lift

lobbies, spa, gymnasium – 92 Cores on 6 Levels, Sales Office and Related BOH

to all areas.

The dry run on the resort took place on the 1st May 2010 with practical com-

pletion scheduled on the 31st May 2010.

Betts Townsend’s direct labour force was in excess of 800 personnel driving the

project to completion.

External works included all hard and soft landscaping, 5 private external luxury

suites, totalling 25 rooms, main pool area, deli, main entrance and pool area.

Programme Management was the critical part of the delivery process, having

reduced the initial fit out delivery programme substantially to safeguard the sales

and pre-opening original target date. Betts Townsend’s effective programme and

resource management ensured that the Hotel opened its doors on time and at

the original programme date.

Betts Townsend, having reduced the delayed programme by over 3 months, re-

confirmed to all that no matter the complexity or timeframe, it can be done!

KEY INFORMATION

Value R 750 million • Completion Date May 2010 • Size 120 rooms • Location Durban

leis

ur

e

Construction Managers

Betts Townsend (Pty) Ltd

Project Managers

Betts Construction (Pty) Ltd

Page 5: Betts Townsend Track Record

PETER MOKABA FOOTBALL STADIUM

PROFESSIONAL TEAM

Client

Polokwane Municipality

Quantity Surveyors KCM Quantity Surveyors

Civil / Structural Engineers AFRICON

Safety & Security Imvula Risk Management

Traffic Engineers Siyazi

Landscape Architect NLA Bagale /Mohlolo JV

Traffic Engineers Siyazi

EIA EnviroXcellence I W Terblanche JV

Main Contractor WBHO/Pauls Building JV

The Peter Mokaba Football Stadium now stands as one of the most iconic Stadi-

ums in South Africa completed for the 2010 FIFA World Cup.

FIFA rules and regulations called for an extremely stringent execution with no

room for programme delay or quality concerns. Our appointment was based on

our PM capacity and successful track record.

Interface with Government structures together with management implementa-

tion of the Municipal Procurement Act was a requirement from the Limpopo

Province and Polokwane Minucipality, being the client.

A comprehensive pre-contract programming exercise took place to ensure that

the master programme deliverables were delivered flawlessly. Early budget con-

straints resulted in a redesign of a substantial portion of the stadium, however

positively adding to the final product.

Construction of the stadium boasts some of the most technologically advanced

techniques and operational systems available. Specialized consultants were con-

tracted from a global panel to ensure that the stadium would meet the FIFA re-

quirements.

In a project of this nature, the management of a global team makes for both a

resource and procurement challenge. All aspects of procurement complied with

the Municipal Procurement Act requiring effective program, quality and budget

management.

The Peter Mokaba stadium was delivered on time. The delivery well within the

mandate and criteria ensured that BT secured the ongoing facilities management

contract as well as the precinct management upgrade. BT prides themselves in

delivering a project of this nature with FIFA having commended the team on an

above the norm delivery.

KEY INFORMATION

Value ZAR 1.1 billion • Completion Date May 2010 • Size 41 733 seats • Location Polokwane, Limpopo

leis

ur

e

Project Managers

Betts Townsend (Pty) Ltd & SECO

Page 6: Betts Townsend Track Record

SOUTHERN SUN HYDE PARK HOTEL

PROFESSIONAL TEAM

Client

Hyprop Investments / Southern Sun

Hotels & Resorts

Electrical Engineers

KKA Consulting Engineers

Quantity Surveyors

MLC Quantity Surveyors

Interior Designer

Source IB Architects

Wet works

WSP Group

Structural Engineers

WSP Structures

Health and Safety

Comprac Holdings

Architects

LKA Architects

Fire Consultants

Specialised Fire Technologies

Mechanical Engineers

WSP Group Africa

Acoustic Engineer

Mtshali-Moss Projects Africa

Betts Townsend were appointed as Project Managers to the construction of a

Southern Sun Premier Brand (4*) hotel of 132 keys located at the exclusive

Hyde Park Shopping Centre in Johannesburg on behalf of Hyprop Investments

Ltd.

The hotel is constructed primarily on top of the existing main public parking

garage on the north western corner of the property. The main hotel structure

consists of 3 floors of guest rooms (mixture of standard king rooms, executive

rooms, suites and disabled rooms) and a public, mezzanine floor all located on

top of the parking garage with excellent views to the north and east of Sandton

and Randburg. The main hotel reception is located at ground level and guests

access the main hotel facilities via north facing scenic shuttle lifts. Dedicated

hotel parking is provided within the existing parking garage.

The public facilities include an international a la carte restaurant, with sushi bar,

island bar and a whiskey/cigar bar overlooking the pool terrace. In addition there

is a business centre, boardroom and conference facilities and a rooftop gymnasi-

um with breathtaking views of the surrounding environs.

The extent and complexity of the structural alterations required within the exist-

ing structure proved challenging especially whilst maintaining continuous access

to the parkade and the shopping centre. The nature of the work undertaken, in a

‘live’ up market retail environment, brought the issues of cleanliness, noise con-

trol, access and traffic control and, of course, safety to the forefront. Effective

time management and continuous communications with the various contractors,

the shopping centre's management and their service providers was required to

minimize disruption to the centre's operations and to address the public's ques-

tions and concerns.

The hotel currently stands as an iconic trendy entertainment platform, a signa-

ture Hotel that has transformed the Hyde Park Skyline.

KEY INFORMATION

Value R 220 million • Completion Date September 2009 • Size 5 800 GLA • Location Johannesburg, Gauteng

leis

ur

e

Project Managers

Betts Townsend (Pty) Ltd

Page 7: Betts Townsend Track Record

SOUTHERN SUN ELANGENI HOTEL REFURBISHMENT

PROFESSIONAL TEAM

Client

Southern Sun Hotels and Resorts

Electrical Engineers

RWP

Quantity Surveyors

MHS Consulting

Interior Designer

Blacksmith interior Inspiration

Electrical Engineers

RWP

Mechanical Engineers

RPP

FF&E Removal/Installation

Moosewood

Betts Townsend were charged with the Project Management and Construction

Management of the refurbishment of the signature multi-storey Southern Sun

Elangeni Hotel in Durban, South Africa. Betts Construction, a division of Betts

Townsend (Pty) Ltd were responsible for the construction management of the

Refurbishment.

The refurbishment required a total upgrade of the entire Hotel, including re-

modeling of the internal, WC’s of the 449 rooms, including all King and Junior

suites, Conference Centers, Lift Lobbies and Lift Car Upgrade, Pre-assembly

areas and all public areas as well as alterations to BOH and FOH administration

areas.

Betts Townsend’s experience in the leisure industry, with specific reference to a

live environment and public interface control was the basis of the appointment.

The Elangeni Hotel’s incredibly high occupancy levels proved to be a challeng-

ing exercise to ensure a zero impact on fit out.

Betts Townsend’s team spearheaded by lead Project Manager John Townsend

and Construction Manager George Betts were responsible for the build procure-

ment and logistics management as well as Programme Management of the refur-

bishment.

Project commencement commenced in early 2007 and the refurbishment was

completed in December 2008 on time and within budget.

Examples of this nature have ensured repeat business with the Southern Sun Ho-

tels and Resorts.

KEY INFORMATION

Value R 78.6 million • Completion Date December 2008 • Size 449 rooms • Location Durban

leis

ur

e

Project Managers

Betts Townsend (Pty) Ltd

Construction Managers

Betts Construction (Pty) Ltd

Page 8: Betts Townsend Track Record

OPRAH WINFREY LEADERSHIP ACADEMY FOR GIRLS

The Oprah Winfrey Leadership Academy for Girls is synonymous with the lead-

ers of the future . As the leading South African Construction Project Manage-

ment firm Betts Townsend were appointed as Project Managers on behalf of the

Oprah Winfrey Foundation to safeguard the project spend and programme man-

agement to ensure that the institution was delivered to the highest standard on

time and within budget.

Amenities and facilities were built to the highest standard encompassing six dor-

mitories totalling 450 rooms, a fully furnished library and archive centre, an Au-

ditorium linked via streaming audio and video conference (for online lecturing

via Chicago), fully equipped theatre with modelling ramp and dance studio. Ex-

ternal sporting facilities include tennis courts, netball courts, sports fields and an

Olympic swimming pool. The facilities make the school one of the most ad-

vanced schools in the world.

Procurement administration was overseen by Betts Townsend with a direct per-

sonal involvement and approval process via Chicago with direct selection by

Oprah Winfrey herself. All FF&E and OS&E was procured and manufactured in

South Africa making the school a proudly South African product.

The Oprah Winfrey Leadership Academy for Girls opened gates on the 1st Janu-

ary 2007, following an 18 month build programme.

KEY INFORMATION

Value ZAR 351 million • Completion Date July 2007 • Size 450 stands • Location Henley-on-Klip

PROFESSIONAL TEAM

Client

The Oprah Winfrey Leadership Academy

Interior Designers

Wilson & Associates

Quantity Surveyors

AIM

Civil Engineers

Africon

Structural Engineers

Themba Consultants

Architects

Mashabane Rose Architects

Electrical Engineers

MMA/Ubunye JV

Mechanical Engineers (HVAC)

MMA/Ubunye JV

Fire Consultant

International Fire

Landscape Architects

Cave Klapwijk

Environmental Officer

BKS (Pty) Ltd

Safety Consultant

Africon

Acoustic Consultants

Pro Acoustic

Systems Consultants

Neil Butcher & Associations

inst

itu

tio

na

l

Project Managers

Betts Townsend (Pty) Ltd

Page 9: Betts Townsend Track Record

HEMINGWAYS SHOPPING CENTRE

PROFESSIONAL TEAM

Client Billion Property Group

Electrical Engineers

Quad Africa

Quantity Surveyors

QS Two

Civil Engineers

PDNA

Bridge Engineers

PDNA

Structural Engineers

PDNA

Safety

Cairnmead Consulting

Architects

LPA Architects

Traffic Engineers

PDNA

Mechanical Engineers

Charles Pein & Partners

Environmental

Arcus Gibb

Main Contractors

Billion Construction

Betts Townsend’s project management appointment of the Hemingways Shop-

ping Mall was at the time one of the largest construction commissions in South

Africa.

Betts Townsend’s function began with a substantial bulk earthworks contract,

which ran concurrently with an equally substantial piling operation (an excess of

1400 piles). The project ran from September 2007 until the opening in Septem-

ber 2009. It was a challenge to meet the originally programmed opening date,

and required a huge input and commitment from the Betts Townsend team and

the contracting teams.

Hemingways stands as the first regional shopping center in East London, and has

a prime location on the N2 freeway, and located directly next door to the luxuri-

ous Hemingways Hotel and Casino complex. The building is constructed with

two retail levels, each approximately 500m in length owing to the narrowness of

the site. The parking is primarily located on basement, mezzanine and roof lev-

els that translate to five storey's of building area, making up the GBA of

150,000m2. The GLA is 74,000m2.

A Caribbean-like architecture was employed by the architects to match the adja-

cent hotel and casino, with a bold and contemporary design on the interior

providing a unique and very distinctive appearance.

The tenant mix is varied, and amongst the 206 line shops, the anchors are Wool-

worths, Edgars and Pick n Pay.

The project was delivered one month ahead of schedule off the back of an in-

credibly fast tracked building programme.

KEY INFORMATION

Value ZAR 1.3 billion • Completion Date August 2009 • Size 74 000 GLA • Location East London

reta

il

Project Managers

Betts Townsend (Pty) Ltd

Page 10: Betts Townsend Track Record

CANAL WALK SHOPPING CENTRE RETAIL PODS EXTENSION

PROFESSIONAL TEAM

Client

HyProp / Ellerine Bros

Electrical Engineers Solution Station

Quantity Surveyors MLC Quantity Surveyors

Civil Engineers Bigen-Africa

Structural Engineers Bigen-Africa

Health and Safety Eppen-Burger and Associates

Architects KMH Architects

Traffic Engineers Arup Transport Management

Mechanical Engineers Basil Nair and Associates

Environmental Planning in Balance

Fire Consultants Solution Station

Main Contractor

WBHO

Betts Townsends’ ongoing project management function at Canal Walk Shop-

ping Center most recent mandate was to deliver the Retail Pods Extension pro-

ject on behalf of Hyprop Investment Limited and Ellerine Bros.

The build involved an additional 16 000m2 of Retail GLA with an approximate

structured parking build of a further 50 000m², taking the total center to the

largest Retail Center in South Africa to 151 000m².

The “Lanterns” as coined by the press was the 1st of it’s kind in South Africa as a

strip retail offering. A very sensitive and technical build across all accesses to the

existing shopping center made for a challenging interface with both public and

tenants alike.

Traffic Management and Public Liability were two of the biggest challenges due

to surrounding ring road infrastructure that feeds the main artery from Century

City to the adjoining highways.

Betts Townsend (Pty) Ltd and associated team delivered the project on time and

under budget allowing for a smooth transition for Tenant Fit Out.

Following the success of the base build, Betts Townsend followed with the fit

out and tents fit outs with their tenant co-ordination appointment.

Canal Walk stands as the largest Retail Center in Africa, and Betts Townsend are

proud to retain the ongoing Project Management function at the center.

KEY INFORMATION

Value ZAR 275 million • Completion Date June 2009 • Size 16 000 GLA • Location Cape Town

reta

il

Project Managers

Betts Townsend (Pty) Ltd

Page 11: Betts Townsend Track Record

MDANTSANE CITY SHOPPING CENTRE

PROFESSIONAL TEAM

Client

Billion Property Group

Electrical Engineers

Quad Africa

Quantity Surveyors

QS Two

Civil Engineers

Ndodana Consulting Engineers

Structural Engineers

LC Consulting (WSP group)

Health and Safety

Cairnmead Consulting

Architects

Paragon Architects

Mechanical Engineers

Charles Pein & Partners

Fire Consultants

Specilised Fire Technology

Our function began once the bulk earthworks contract had been completed by

the Client. The project ran from a very muddy March 2007 until the opening

April 2008.

It was a challenge to meet the originally programmed opening date, and required

a huge input from our team and the contracting teams. The centre is the first of

its kind in Mdantsane (the second largest township in the country), and has a

prime location on a key arterial route with a substantial taxi ramp, for the con-

venience of the township dwellers.

The building is single storey for the most part, and the Architects have em-

ployed a contemporary design with high quality materials, that has resulted in a

well lit and extremely attractive mall. The tenant mix is varied, and amongst the

106 shops, the anchors are Woolworths, Shoprite and Pick n Pay. The GLA is

37,000m². Contract final account value R190m (September 2008).

KEY INFORMATION

Value ZAR 190 million • Completion Date March 2009 • Size 37 000 GLA • Location East London

reta

il

Project Managers

Betts Townsend (Pty) Ltd

Page 12: Betts Townsend Track Record

EASTGATE SHOPPING CENTRE

PROFESSIONAL TEAM

Client

Liberty Properties

Electrical Engineers BFBA Consulting Engineers

Quantity Surveyors NWS

Civil Engineers KAYP Consulting Engineers

Structural Engineers KAYP

Health and Safety CONSAFE

Architects Bental & Associates

Traffic Engineers N/A

Mechanical Engineers Design & Supply

Environmental N/A

Fire Consultants Building Code Consultants

Eastgate Shopping Center (101 000 GLA) is one of the premier Super Regional

Centers in South Africa servicing the East Rand of Johannesburg. It ranks as one

of the highest trading malls in South Africa, both in terms of foot-count and

turnover.

When Betts Townsend where appointed as Project Managers, a special request

was made that a Construction Management function was also facilitated due to

the sensitive nature of the refurbishment.

A live super regional refurbishment requires a strong team to manage the works

especially in view that a 24hr programme was required to limit and reduce im-

pact on tenant and mall trade.

Careful consideration on planning was required, with a heavy focus on contrac-

tor management and public liability in terms of high level refurbishment works

and general mall works.

The internal fit out scope of works included refurbishment of all mall areas and

void areas, WC Block Refurbishments, New WC Block creation, Food Court

Reconfiguration and Refurbishment, New Structural Canopies and Entrance Re-

configuration.

The total project was delivered in under 11months, in time and within budget.

The choice to partner with the client on a risk sharing basis on a CM function

attributed to the successful completion of the project.

KEY INFORMATION

Value ZAR 170 million • Completion Date November 2003 • Size 101 000 GLA • Location: Johannesburg

reta

il

Project Managers

Betts Townsend (Pty) Ltd

Construction Managers

Betts Townsend (Pty) Ltd

Page 13: Betts Townsend Track Record

SOUTH COAST MALL

PROFESSIONAL TEAM

Client

Hyprop Investment Ltd

Outward Investments

Structural Engineers

KAYP/AXIS

Civil Engineers

Kantey & Templer

Quantity Surveyors

Norval Wentzel Steinberg

Electrical Engineers

Rawlins Wales & Partners

Mechanical Engineers

Richard Pearce & Partners

Architect

Bentel Associates International

Environmental Consultants

DDV & LEE

Fire Consultants

WSP

Main Contractor

GRINAKER

With their longstanding relationship with Hyprop, Betts Townsend was the Pro-

ject Managers of choice for the construction of a new 32 000m² single level

shopping centre in Shelly Beach on the South Coast. The greenfields site is lo-

cated in a prime position alongside the main N2 road.

The construction process also included filling of 150 000m² of excavated area to

create the building platform.

The construction programme was extremely fast track with the actual build pro-

gramme being 11 months, without including 37 rain working days.

Anchor tenants include Game and Checkers Hyper on either side of the centre.

The entrance facing the Indian Ocean is an external piazza area surrounded by

restaurants with stunning sea views.

The structure of the building is a standard steel column and roof with infill

brickwork. Finishes are bright and in line with the sunny coastal feeling.

The mall currently stands as a destination shopping centre on the South Coast

area.

KEY INFORMATION

Value ZAR 309 Million • Completion Date October 2005 • Size 32 000m² • Location Durban

reta

il

Project Managers

Betts Townsend (Pty) Ltd

Page 14: Betts Townsend Track Record

THE PAVILION SHOPPING CENTRE EXTENSION

PROFESSIONAL TEAM

Client

Pareto Limited

Electrical Engineers Seboka Engineers cc

Quantity Surveyors J S & Associates

Concept Architects Enterprise I G

Structural Engineers REBCON Engineering

Architects Project Works

Betts Townsend (Pty) Ltd relationship with Pareto is longstanding and hence the

continuous repeat business with the fund.

With the demand for retail space outstripping supply Betts Townsend have been

involved with several on-going extensions at the Pavilion Shopping centre add-

ing in excess of 20 000m² of recent.

Phase 5 constituting the latest extension called for a further 10 000m² along with

the Truworths extension of a further 4512m² making the centre’s expansion pos-

sibility just shy of 5000m².

On all extensions to date Betts Townsend (Pty) Ltd have been appointed as both

Project Manager and Principle Agent and continue to serve Pareto on several

other developments around South Africa.

KEY INFORMATION

Value ZAR 303 Million • Completion Date December 2007 • Size 15 000 GLA • Location Durban

reta

il

Project Managers

Betts Townsend (Pty) Ltd

Page 15: Betts Townsend Track Record

LA LUCIA MALL EXTENSION & REFURBISHMENT PHASE 6

PROFESSIONAL TEAM

Client

Growthpoint Properties

Electrical Engineers RMP Consulting Engineers

Quantity Surveyors MLC Quantity Surveyors

Structural Engineers KAI Consulting Engineers

Architects DAI Architects

Mechanical Engineers RPP Consulting Engineers

Growthpoint (Pty) Ltd appointed Betts Townsend as Project and Construction

Managers on the refurbishment and extension of La Lucia Mall in Durban.

The lower level of 2 000m² was demolished and reconstructed into new retail

space of 2 500m² for Fruit & Veg City. The work included the removal of 2 es-

calators and closing of the openings, installation of reticulation and services.

The new extension also made provision for a new restaurant.

The upper level of approximately 5 000m² was demolished and reconstructed to

accommodate Mr. Price Sport who covered an area of 1 500m². Work included

relocating elevators to create a new entrance to the store from the parking area.

A new public lift was also installed in the basement parking area to provide cus-

tomers with easy access to the new store on the upper level.

The new public mall extension also provided retail space for Standard Bank, the

Post Office and Yamaha Music with a new public toilet block. A staircase and

lifts connecting the new extension to the upper level was also installed.

The structural modification of the centre proved to be a challenge with the cen-

tre continuously trading, but with Betts Townsend’s carefully planned pro-

gramme no trading was affected during the construction period.

The extension to La Lucia Mall transformed “dead” space into a viable solution

and impressive mix of tenants.

KEY INFORMATION

Value ZAR 42 million • Completion Date August 2008 • Size 10 000m² • Location Durban

reta

il

Project Managers

Betts Townsend (Pty) Ltd

Construction Managers

Betts Townsend (Pty) Ltd

Page 16: Betts Townsend Track Record

THE VILLAGE AT HORIZON VIEW

PROFESSIONAL TEAM

Client

ApexHi Properties

Electrical Engineers

Monty Miller Associates

Quantity Surveyors

Butheleng, Wallace, Raubenheimer

Civil Engineers

Sutherland Engineers

Structural Engineers

Sutherland Engineers

Health and Safety

Comprac

Architects

LP Architects / GL Architects

Mechanical Engineers

Mekan Consulting Engineers

Fire Consultants

Specialist Fire Technology

Traffic Engineers

Arup

Main Contractors

Stabilid Construction / Ruthcon

Betts Townsend were appointed as Project Managers and Tenant Coordinators

on this project.

The scope of the project consisted of demolition of the existing 17 000m² retail

shopping centre with anchor tenants such as Woolworths, Checkers and Mica.

Construction included a new 22 000m² GLA retail shopping centre, earthworks

and upgrade of a commercial Office Block, which houses the SARS offices.

One of the challenges of this project was to continue work in a live trade envi-

ronment, but with Betts Townsend’s careful planning and coordination this was

managed and planned successfully.

KEY INFORMATION

Value ZAR 231 million • Completion Date April 2009 • Size 22 000 GLA • Location Johannesburg

reta

il

Project Managers

Betts Townsend (Pty) Ltd

Tenant Coordinators

Betts Townsend (Pty) Ltd

Page 17: Betts Townsend Track Record

JUBILEE MALL PHASE 1, HAMMANSKRAAL

PROFESSIONAL TEAM

Client New Africa Developments

Electrical Engineers Watson Mattheus Consulting Electrical

Engineers

Quantity Surveyors QS2 Quantity Surveyors

Structural & Civil Engineers DG Consulting Engineers

Town Planner DLC Town Plan

Architects LP Architects

Traffic Engineers WSP SA Civil & Structural Engineers

Mechanical Engineers Charles Pein & Partners

Fire Consultant Specialised Fire Technologies

Main Contractor Beckers Building Contractor

Betts Townsend was appointed by New Africa Development (Pty) Ltd as Project

Managers on this new single storey retail development in Hammanskraal.

The first phase of the centre will be 38,000m²²and the design is an enclosed

mall providing for anchor tenants, Pick ‘n Pay, SuperSpar, Game, Edgars and

Cashbuild, accessible by three lead-in malls and one central mall.

Centre amenities include ample restroom facilities, security and centre manage-

ment offices, exhibition areas and a marketing help-desk. Sophisticated security

controls and CCTV cameras will ensure the safety of the customers in the mall

and parking areas.

Two access points for customer vehicles and separate access for deliveries is pro-

vided. The centre will have over 1 600 parking bays and drop off / collection

facilities for approximately 100 taxis.

This mall is situated in close proximity to Hammanskraal CBD and Temba and

located at a key high-volume local intersection.

KEY INFORMATION

Value ZAR 300 million • Completion Date April 2011 • Size 38 000 GLA

reta

il

Project Managers

Betts Townsend (Pty) Ltd

Page 18: Betts Townsend Track Record

CANAL WALK SHOPPING CENTRE

PROFESSIONAL TEAM

Client

Hyprop / Ellerine Bros

Quantity Surveyors MLC Quantity Surveyors

Architects KMH Architects

Electrical Engineers

Solution Station

Mechanical Engineers Basil Nair & Associates

Structural & Civil Engineers

Bigen-Africa

Health and Safety Eppen-Burger & Associates

Fire Consultants Solution Station

Betts Townsend has a longstanding relationship with Hyprop Investments Lim-

ited & Ellerine Bros. and acts as the residential project manager for all refurbish-

ments, additions and extensions at Canal Walk Shopping Centre in Cape Town.

Canal Walk is the 3rd largest and one of the most iconic shopping centres in

Africa and Betts Townsend (Pty) Ltd plays a significant role in the development

of this shopping centre.

Projects included the refurbishment of the La Piazza area Phases 1 and 2.

A reconfiguration to the Foodcourt area was also done, which involved demoli-

tion of sheer walls to open up the mall space to a view of the canal, while mak-

ing better use of dead space and still extending valuable GLA. Working in a live

environment, which is sensitive to noise and dust, especially when it came to

demolition of 4m² reinforced concrete walls was one of the many challenges we

faced, but the extension was a successful one, coming in under budget, having

limited disruption to tenant trade and impacting positively on the centre.

Betts Townsend managed the Tenant coordination function for several years be-

fore it was internalized by Centre Management and we have successfully com-

pleted and handed over well over 300 stores, assisting the tenants and Centre

Management in demolition, designing and refurbishing stores.

Other major store developments include the new Mr. Price Home store, Dion

Wired, extending and upgrading Dis-Chem pharmacy, Incredible Connection

and the extension of Woolworths.

There are several new projects in design stage, including extension to Edgars

and Mr. Price.

KEY INFORMATION

Value Various • Completion Date Ongoing • Size 141 000m² • Location Cape Town, Western Cape

reta

il

Project Managers

Betts Townsend (Pty) Ltd

Page 19: Betts Townsend Track Record

BUILDERS WAREHOUSE

PROFESSIONAL TEAM

Client

Redefine Income Fund/Madison Prop

Electrical Engineers Quad Africa Consulting Engineers

Quantity Surveyors BWR Quantity Surveyors

Civil Engineers Sutherland

Structural Engineers Sutherland

Health and Safety ComPrac

Architects Giannini Loizos Architects

Mechanical Engineers WSP Group

Fire Consultants Dorling & Associates

Main Contractors Abbeydale Building & Civils

The 8000m² Builders Warehouse was the first phase of the Festival Town Square

retail development in Kempton Park.

The site handover was in March 2009 and the Section 1 the pick-up yard and

internal was completed in August 2009.

Section 2, the delivery yard and Section 3, the garden centre was handed over in

August 2009.

Final completion of the project including parking and landscaping was 31 August

2009.

The Builders Warehouse component include the trading floor, delivery cages,

full office fit out with all public toilets, staff toilets, boardroom and support are-

as.

Phase 2 is the retail area with a convenience centre with food store anchors,

banking, restaurants, takeaway and line shops.

Festival Town Square is anchored by a flagship 2 500m² Spar supermarket and

supported by a mix of convenience and service-related shops that make everyday

living easier, including banks, hair salons, a pharmacy and cell phone stores.

KEY INFORMATION

Value ZAR 88 million • Completion Date September 2009 • Size 8 000m² • Location Johannesburg

IND

UST

RIA

L

Project Managers

Betts Townsend (Pty) Ltd

Page 20: Betts Townsend Track Record

PICK ‘N PAY DISTRIBUTION WAREHOUSE

PROFESSIONAL TEAM

Client

Pick ‘n Pay Retailers

Operators

Unitrans

Electrical Engineers

Watson Mattheus

Quantity Surveyors

BWR Quantity Surveyors

Civil and Structural Engineers

BSM Baker

Architects

b-arc africa Architects

Mechanical Engineers

VMG Consultants

Fire Consultant

Building Code Consultants

Geotechnical Engineer

Watson Mattheus

Pick n Pay is the largest food retailer in South Africa.

Betts Townsend’s comprehensive knowledge and unmatched Retail experience in

both FOH and BOH were appointed to construct the new Longmeadow exten-

sion to cater for the national upsizing.

Not only was Betts Townsend appointed in a Project Management capacity but

Pick ‘n Pay’s decision was one of a risk sharing and trust approach whereby Betts

Townsend were further appointed in a Construction Management capacity.

The project brief was to extend the existing Distribution facility to accommo-

date an additional 34 000m² of Warehouse space.

The initial target programme was programmed over a 12 month period. Betts

Townsend’s construction management team delivered the project in under 9

months with a 6.5% saving on traditional programme and construction cost.

Added to the Warehouse extension, Betts Townsend were charged with addi-

tions and alterations to the existing Administration facility delivered and com-

pleted in the 1st quarter of 2010.

The Pick n Pay Longmeadow Distribution Centre stands as a prime example that

in sensitive yield driven times a joint PM / CM approach can be beneficial to the

client in both time and budget.

KEY INFORMATION

Value ZAR 150 million • Completion Date July 2010 • Size 34 000m² Warehouse Facility + Extension to

Administration Block

Location Johannesburg

ind

ust

ria

l

Project Managers

Betts Townsend (Pty) Ltd

Construction Managers

Betts Townsend (Pty) Ltd

Page 21: Betts Townsend Track Record

HARLEY DAVIDSON MIDDLE EAST & AFRICA HEAD OFFICE

PROFESSIONAL TEAM

Client

Harley Davidson Middle East and Africa

Electrical Engineers

4EM Electrical Engineers

Quantity Surveyors

LWA Quantity Surveyors

Structural Engineers

Biggen Africa

Health and Safety

Ted Rowan & Associates

Architects

Harley Davidson UK/LC Interiors

Mechanical Engineers

4EM Mechanical Engineers

Part of Harley Davidson’s global commercial expansion programme was to posi-

tion themselves in Cape Town to service both the Middle East and Africa.

Betts Townsend were appointed on a Project Management and Construction

Management basis with a co-ordination and interpretation of specification link

with the UK operation responsible for both Q&A and Design.

Harley Davidson nomination of their global marketing launch pad created a very

technical acoustic installation to allow for “start up of new motor cycles in the

marketing room”. Naturally with surrounding tenancies this was a very sensitive

matter. Betts Townsend’s input and procurement control of the acoustic design

team and installation made for a perfect installation and zero noise pollution.

With Harley Davidson’s main manufacturing arm being positioned in the United

States, integrated systems for procurement, VOIP, VC were required to support

the global ordering and procurement operations.

Betts Townsend’s experience in Commercial fit out of technical IT installations

made for a successful project using a raised access flooring system similar to their

global specification allowing for super duct cable tray systems and underfloor

reticulation of services.

Harley Davidson stands as an iconic commercial tenant space used as a bench-

mark in quality and technical interface.

KEY INFORMATION

Value ZAR 18 million • Completion Date December 2008 • Size 500m² • Location Cape Town

co

mm

er

cia

l

Project Managers

Betts Townsend (Pty) Ltd

Construction Project Managers

Betts Townsend (Pty) Ltd

Page 22: Betts Townsend Track Record

DEFINITIVE CAPITAL MANAGEMENT

PROFESSIONAL TEAM

Client

Definitive Capital Management

Electrical Engineers

4 EM Electrical Engineers

Quantity Surveyors

LWA Quantity Surveyors

Structural Engineers

Biggen Africa

Safety

Ted Rowan & Associates

Architects

LC Interiors

Mechanical Engineers

4EM Mechanical Engineers

Definitive Capital Management’s close link with their Swiss Clientele made for a

very clear mandate for their Cape Town based office: crisp, clean and functional.

The internal fit out was controlled through Betts Townsend’s Construction Man-

agement Division. Procurement was a joint client and Betts Townsend exercise

with the Project Management also through Betts Townsend.

The clients request for large open creative spaces called for a detailed controlled

design of the M&E as well as lighting design. Large glass facades in the South

African summer called for a close treatment to the loading co-efficient transfer of

heat and UV transfer.

Special attention was applied to the IT interface and Data communication side

with the company focus on global Stock Exchange operations.

KEY INFORMATION

Value ZAR 6 million • Completion Date September 2008 • Size 350m² • Location Cape Town

co

mm

er

cia

l

Project Managers

Betts Townsend (Pty) Ltd

Construction Project Managers

Betts Townsend (Pty) Ltd

Page 23: Betts Townsend Track Record

CORONATION FUND MANAGERS

PROFESSIONAL TEAM

Client

Coronation Fund Managers (Pty) Ltd

Electrical Engineers

4EM Consulting Engineers

Quantity Surveyors

LWA Quantity Surveyors

IT Consultants

Core Infrastructure Services

Health and Safety

Ted Rowen and Associates

Architects

DHK Architects

Mechanical Engineers

4EM Consulting Engineers

Risk Assessment

Alexander Forbes

The Coronation Fund Managers (CFM) move to the Montclare Building in

Claremont made for a very intensive IT infrastructure and co-ordination project.

Coronation Fund Managers is one of South Africa’s leading Fund Management

companies with global interests and operations.

Betts Townsend were appointed in both a PM and CM capacity and were

charged with the new build and relocation of the Coronation Fund Managers

Head Office and sub-divisions to the new premises.

As a technology and systems focused business, special attention and design was

placed on IT, VOIP and Data integration. A raised access anti-static requirement

in terms of flooring was implemented to assist with the ever-changing environ-

ment.

A disaster recovery site as well as line of site micro links were all part and parcel

of the move and implementation process. Coronation Fund Managers’ close

trade with the JSE/LSE/NYSE and the like made for a detailed and aggressive

management function.

Technically the site proved difficult both in deliveries and site logistics due to

the adjacent intersection of two main feeder routes into the Claremont/

Newlands Area. Betts Townsend were charged with the global site logistics as

well as security measures.

An incredibly fast track fit out process, Coronation Fund Managers’ 6 000 GLA

Office space went live in under 4 months with zero glitches.

KEY INFORMATION

Value ZAR 36 million • Completion Date August 2008 • Size 6 000 GLA • Location Cape Town

co

mm

er

cia

l

Project Managers

Betts Townsend (Pty) Ltd

Construction Project Managers

Betts Townsend (Pty) Ltd

Page 24: Betts Townsend Track Record

KING SHAKA INTERNATIONAL AIRPORT

PROFESSIONAL TEAM

Client

ACSA

Electrical Engineers

BFBA Electrical Engineers

Aviation & Airport Consultants

Airbiz

Civil Engineers

Afriscan

Biggar Engineering

BKS Consulting Engineers

Structural Engineers

Young & Satharia

Architects

Osmond Lange Architects

Ruben Reddy Architects

Mthulisi Msimang Architects

Shabangu Architects

Consulting Engineers

PDNA Consulting Engineers

Goba (Pty) Ltd

C A du Toit Consulting Engineers

Mechanical Engineers

BFBA

Biggar Engineering

Main Contractors

Ilembe Building JV

WBHO Contractors

To build a “greenfields” (from scratch) international airport is an unusual occur-

rence anywhere in the world and going live on a such an airport is an incredibly

daunting task

The passenger terminal building was designed to meet the International Air

Transport Association Level of Service C. This denotes a good level of service,

with conditions of stable flow, acceptable delays and good levels of com-

fort. Betts Townsend (Pty) Ltd was appointed to manage the full tenant installa-

tion thereby ensuring that the airport provided and delivered the necessary ser-

vices to achieve international recognition and, more importantly, impact on the

willingness of passengers to repeat the experience of both visiting and flying

through the new airport. Tenancies include national retail chains, food and

beverage outlets, government agencies, airline operators and services, car rental

operators, warehouse facilities and commercial space for ACSA Property ten-

ants. Special attention was paid to the airport lounges and external piazza

(which houses national food and beverage outlets) both areas identified for cus-

tomer comfort and convenience.

Ensuring that program demands were maintained and met have been extremely

challenging throughout this build as all ancillary services and supporting infra-

structure to the terminus were of equal importance in ensuring the successful

launch of such an auspicious airport. Over and above the customary pressure of

programme demands, the logistical exercise of moving the old Durban Interna-

tional Airport from 50 km away without disruptions to flight schedules, tenant

fit-outs and general airport operations, only added to the challenge.

KEY INFORMATION

Value ZAR 7 billion • Completion Date May 2010 • Size 45 000m² • Location Durban, KwaZulu Natal

Ten

an

t

co

or

din

at

ion

Tenant Coordination

Betts Townsend (Pty) Ltd

Page 25: Betts Townsend Track Record

GAUTENG / AFRICA

Woodmead Office Park, 22 Saddle Drive, Woodmead

Tel +27 11 656 2440 • Fax +27 11 656 2441

[email protected]

WESTERN CAPE

The Forum, Century City, Cape Town

Tel +27 21 555 4131 • Fax +27 21 555 0325

[email protected]

NORTHERN CAPE

Church Street, Hotazel

Tel +27 53 742 3200 • Fax +27 86 663 4730

[email protected]

KWAZULU-NATAL / EASTERN CAPE

Pencarrow, Armstrong Avenue East, La Lucia Ridge

Tel +27 31 566 4498 • Fax +27 31 566 4511

[email protected]

MAURITIUS

INCO Building, Royal Road, Arsenal, Mauritius

Tel: +2302 248 8021/2 • Fax 22302 248 8289

[email protected]

www.bettstownsend.co.za

(selected members only)

(selected members only)