Bengaluru Commuter Rail Presentation by Prajal

download Bengaluru Commuter Rail Presentation by Prajal

of 14

Transcript of Bengaluru Commuter Rail Presentation by Prajal

  • 7/31/2019 Bengaluru Commuter Rail Presentation by Prajal

    1/14

    Proposed

    BengaluruCommuter Rail Service

    ByPraja-RAAG

    1

  • 7/31/2019 Bengaluru Commuter Rail Presentation by Prajal

    2/14

    Praja-RAAG 2

    Praja-RAAGThe offline Research Analysis &Advocacy Group of Praja.in, an internetbased networking platform that aims tobe a bridge between the Praja andthose who serve them. RAAG takes upsome of the issues from the portal tonetwork with various stakeholders with

    a view to making the idea acceptable &mainstream.

  • 7/31/2019 Bengaluru Commuter Rail Presentation by Prajal

    3/14

    Praja-RAAG 3

    NAMMA BENGALURU TODAY

    JAMALURU?

    Photo Courtesy

    Bangalore Mirror

    Bangalore Traffic Police

  • 7/31/2019 Bengaluru Commuter Rail Presentation by Prajal

    4/14

    Praja-RAAG 4

    Increasing JamsGrid locks

    Limitations ofRoad Surface

    PhenomenalIncrease inPopulation

    Sudden Explosionof Private Vehicles

    HOW DID WE GET HERE?

    6.5

    9.5

    12

    15

    18

    0

    2

    4

    6

    8

    10

    12

    14

    16

    18

    20

    2001 2011 2015 2025 2030

    Population (in Millions)

    1.64

    6.9

    19.2

    30.3

    0

    5

    10

    15

    20

    25

    30

    35

    2001 2011 2015 2025 2030

    Vehicles (In Millions)

    Source 2012 RITES Report on CRSSource BTP, praja.in

  • 7/31/2019 Bengaluru Commuter Rail Presentation by Prajal

    5/14

    Praja-RAAG 5

    WHAT HAS IT DONE?

    Inside the CityConstant Jams, Grid Locks

    Hard to reach on timeExpensive housing, living

    At the Outskirts / SuburbsChoked city exit/entry points

    Expensive , longer commute

    Go through city pains to reach other end

    No more fun in living outside city

    Travel from/to Outer TownsLonger commute times

    From city limits to CBD, It takes 2 hrs

    Commute turns expensive

    Major bottleneck for taking up jobs in city

    Most settles for nearby, less wages

  • 7/31/2019 Bengaluru Commuter Rail Presentation by Prajal

    6/14

    Praja-RAAG 6

    PROPOSED

    BENGALURU COMMUTER RAIL SERVICE (CRS)

  • 7/31/2019 Bengaluru Commuter Rail Presentation by Prajal

    7/14

    Praja-RAAG 7

    BENGALURU CRS FEATURES

    405 Km in length

    70-100 Km in radius

    Connects Bengaluru City suburbs in alldirections

    Reach

    1-11/2 Hr commute times

    Exclusive Right of way

    No Road induced grid locks

    Reliability

    5-10 Minute Frequency

    On time Arrival & Departure

    Round the clock SchedulePredictability

  • 7/31/2019 Bengaluru Commuter Rail Presentation by Prajal

    8/14

    Praja-RAAG 8

    2012 RITES REPORT

    Rites has submitted a draft report on Implementation of Commuter Rail

    Service for Bangalore to DULT.

    Report Highlights

    CRS is a must for Bengalurus growing needs

    On completion will serve 20 lakh commuters / day

    Trains to cross city centers No termination at city edges

    CRS is possible with significant upgrades to IR infrastructure

    Will cost 8000 Crores over 7 Years

    To be planned over 3 Phases

    To be operational in 2 Years with completion of Phase 1A

    Will enable fastest travel option covering 70-100 Kms in 1-11/2 hr.

  • 7/31/2019 Bengaluru Commuter Rail Presentation by Prajal

    9/14

    Praja-RAAG 9

    CRS* Metro* Monorail HSRL

    Daily Ridership 20,00,000 10,50,000 1,50,000 30,000

    Length 405 Kms 115 Kms 60 Kms 35 Kms

    Total Cost Rs. 8,000 Cr Rs. 38,000 Cr Rs. 8,400 Cr Rs. 6000 Cr

    Construction Cost

    (Per Kilometer) Rs 15-20 Cr Rs. 200-400 Cr Rs. 150 Cr Rs. 180-200 Cr

    CRS IN COMPARISON

    Data Source

    * - 2012 RITES Report on CRS

    - News Media

  • 7/31/2019 Bengaluru Commuter Rail Presentation by Prajal

    10/14

    Praja-RAAG 10

    4 TIMES THE NETW0RK @ 1/5 OF THE COST

    Commuter Rail

    Coverage

    Network 405 KmsCost 8,000 Crs

    Namma Metro

    Coverage

    Network 115 Kms

    Cost 38,000 Crs

    Metro

    RoutesCRS

    Routes

  • 7/31/2019 Bengaluru Commuter Rail Presentation by Prajal

    11/14

    Praja-RAAG 11

    Rites through its report to DULT/GOK, gives high score toCRS in Bengaluru

    Frequency

    Reliability

    Cost to CommutersCost of Operations

    Reduction in CO2 Emission

    Decongestion on City Roads

    Growth Dispersion

    Socio-Economic Benefits

    RITES CRS IS SMART, SUSTAINABLE SOLUTION

  • 7/31/2019 Bengaluru Commuter Rail Presentation by Prajal

    12/14

    Praja-RAAG 12

    Time now for Govt. of Karnataka to actAccept RITES report in its entirety

    Make a proposal to Railways

    Start the process for CRS implementationFormal Project Scope

    Abstract Estimates

    Techno-Economic Survey Reports

    Propose and start process to form SPVIn interim get railways to start additional

    services on CRS routes immediately

    THE BALL IS NOW IN STATE GOVT COURT

  • 7/31/2019 Bengaluru Commuter Rail Presentation by Prajal

    13/14

    Praja-RAAG 13

    Time to demand CRS in Bengaluru

    Write to State Chief Minister, Transport Minister,

    Urban Development Ministry

    Write to Department Secretaries

    Call your MLA, MP, Councilor and demand CRSSpread the word at work place, RWAs

    Help publicize on Social Media

    CITIZENS YOUR TURN TO DEMAND CRS

    Come, Join, HelpPraja-RAAG campaign @ www.praja.in

  • 7/31/2019 Bengaluru Commuter Rail Presentation by Prajal

    14/14

    Praja-RAAG 14

    Transportation is not a technical problem. It is not an infrastructure

    problem. It is not even a financial problem. Most often it is a

    political problem