Steps to create a simple LSMW using batch input recording Welcome Guest View C omments (0) A ttachments (30) I nfo Additional Features Added by Tarun Gambhir , last edited by Tarun Gambhir on Jan 08, 2009 (view change ) Labels: sap , tutorial Add Labels Enter labels to add to this page: Tip: Looking for a label? Just start typing. The LSM Workbench is an R/3-based tool that supports you when transferring data from non-SAP systems ("Legacy Systems") to R/3 once or periodically. The tool supports conversion of data of the legacy system in a convenient way. The data can then be imported into the R/3 system via batch input, direct input, BAPIs or IDocs. Furthermore, the LSM Workbench provides a recording function that allows to generate a "data migration object" in an entry or change transaction To start working with the LSM Workbench, use transaction LSMW:

description

ABAP BDC LSMW

Transcript of Bdc Lsmw Mm01

Page 1: Bdc Lsmw Mm01

Steps to create a simple LSMW using batch input recording

Welcome Guest

View C omments (0) A ttachments (30) I nfo

  Additional Features  

Added by Tarun Gambhir , last edited by Tarun Gambhir on Jan 08, 2009  (view change) Labels: sap, tutorial

Add LabelsEnter labels to add to this page:

Tip: Looking for a label? Just start typing.

The LSM Workbench is an R/3-based tool that supports you when transferring data from non-SAP systems ("Legacy Systems") to R/3 once or periodically.

The tool supports conversion of data of the legacy system in a convenient way. The data can

then be imported into the R/3 system via batch input, direct input, BAPIs or IDocs.

Furthermore, the LSM Workbench provides a recording function that allows to generate a "data

migration object" in an entry or change transaction

To start working with the LSM Workbench, use transaction LSMW:

Page 2: Bdc Lsmw Mm01

Click on the create button to create new project, subproject and the object. As shown below.

Page 3: Bdc Lsmw Mm01

 

Project, Subproject and Object:

On the initial screen, you can create a new project, corresponding subprojects and objects via

Edit -> Create new entry.

-          Project: An ID with a maximum of 10 characters to name your data transfer project. If you

want to transfer data from several legacy systems, you may create a project e.g. for every

legacy system.

-          Subproject: An ID with a maximum of 10 characters that is used as further structuring

attribute.

-          Object: An ID with a maximum of 10 characters to name the business object.

In the initial screen, All objects provides a list of all projects created already. My objects

displays a list of all objects you created personally. All objects of the project displays all

objects of the selected project as tree structure. Project documentation displays any

documentation written for the individual popups and processing steps. you can print the project

documentation out, send it and save it in various file formats.

Click on the execute button once the project, subproject and the object are created.

Page 4: Bdc Lsmw Mm01

Click Back.Now record usingBatch Input RecordingData Migration - Step by Stepvia Batch Input

Recording

Step 1: Maintain Object attributes

In this example, you will be updating the Material master records with the help of recording a

transaction (MM01). Choose radio buttonBatch Input Recordingand click on the recording

overview icon to record the R/3 transaction. Enter theRecordingname asMM01_REC2, the

Page 5: Bdc Lsmw Mm01

description asMM01 Recording method, and the transaction code asMM01.

 

Click on create to record the transaction.

Page 6: Bdc Lsmw Mm01

 

Click on Done.

Click on Done to actually start recording the transaction.

Enter the fields required for recoding a transaction successfully.

Page 7: Bdc Lsmw Mm01

 

Note that the fields are populated with default values. The values you entered when you

recorded the transaction are set by default.

*Double-click on the fieldRMMG1-MATNRand enter the name asMATNRand the description

asMATERIAL NUMBERand remove the default as shown below:

Page 8: Bdc Lsmw Mm01

Repeat this step for all fields.Similarly, double-click on all other fields with default values and

make appropriate changes. Once you have made changes, the recording overview screen looks

as shown below:

Page 9: Bdc Lsmw Mm01

Click on SAVE to save the recording. The click on BACK icon to the main screen. Save the while

going back to the main screen.

After completing the recoding the system will automatically take you to the second step as

shown below:

Page 10: Bdc Lsmw Mm01

 Step 2. Maintain Source Structures

Click on CREATE to create a source structure. Give a name and a description to the source

structure as shown below:

 

Save the source structure and go to the main screen.

Step 3. Maintain Source Fields

In this step, you need to list what fields are present in the source structure. The easiest way is to

click on 'Table Maintenance' icon to enter Fieldname, Type and Length for each field as shown:

Page 11: Bdc Lsmw Mm01

Save while coming back to the main screen.

Step 4: Maintain Structure Relations

Execute a step to 'Maintain Structure Relations'. Since, there is only one Source and Target

Structure, the relationship is defaulted automatically.

Save while coming back to the main screen.

Step 5: Maintain field mapping and conversion rules

Keep cursor on field 'MATNR' and click on 'Assign Source field' icon to choose source field

MATERIAL from structure MM01V6 as shown

Page 12: Bdc Lsmw Mm01

Similarly, assign 'Source Field' rules to the remaining fields.

Once all the fields are mapped, you should have an overview screen as shown

Page 13: Bdc Lsmw Mm01

Save while coming back to the main screen.

Step 6: Maintain fixed values, translations, user-defined routines

You can also maintain re-usable translations and user-defined routines, which can be used across

conversion tasks. In this case, that step is not required.

Page 14: Bdc Lsmw Mm01

Step 7: Specify files

In this step, we define how the layout of the input file is. The input file is a [Tab] delimited with

the first row as field names. It is present on my PC (local drive) as C:\MM3.txt.

Double Click on the legacy data.

Save while going to main screen.

Create an Excel with your data and save it as a Tab-delimited text file on your local drive (C

and name it MM3.txt.

IMPORTANT

****The Structure of the flat file should be proper otherwise data will not be uploaded.. All the

Page 15: Bdc Lsmw Mm01

mandatory fields should be present in the flat file for the required transaction

Step 8: Assign files

Execute step 'Assign Files' and the system automatically defaults the filename to the source

structure.

Save while going to main screen.

Step 9: Read data

In this step, LSMW reads the data from the source file (from your PC's local drive). You have the

option to read only selected rows and convert data values to internal format.

Here 1 to 2 represents the number of rows to be read from the flat file. If you don't specify any

number the system will read all the rows from the flat file. We have 2 rows in the flat file hence

from 1 to 2.

 

After we execute the data read from the flat file is as shown below.

Page 16: Bdc Lsmw Mm01

Step 10: Display read data

This step is optional. If required, you can review the field contents for the rows of data read.

Page 17: Bdc Lsmw Mm01

Step 11: Convert data

This is the step that actually converts the source data (in source format) to a target format.

Based on the conversion rules defined, source fields are mapped to target fields.

Page 18: Bdc Lsmw Mm01

 

Click BACK to come back to main screen.

 

Step 12: Display Converted data

Again this is an optional step to view how the source data is converted to internal SAP format.

Page 19: Bdc Lsmw Mm01

Step 13: Create batch input session

Once the source data is converted in an internal format, you can create a batch session to

process updates.

Click EXECUTE button to execute a batch inout session.

Step 14: Run Batch Input Session

You can execute the BDC session by Run Batch input session. Executing a batch input session

is a standard SM35 transaction for managing BDC sessions. Once you have successfully executed

the batch input session, the Material master records are updated in the system. You can confirm

Page 20: Bdc Lsmw Mm01

this by viewing the Material master records (MM03).

Select the session and click on the PROCESS icon.

Page 21: Bdc Lsmw Mm01

You can Process the session in foreground or background or can only display errors.

Select the Processing Mode and then click on the PROCESS tab to executive the session.

After the session is completely processed you can confirm this by viewing the Material master

records (MM03) or in the table MARA.