AHK: Energy Efficiency in Greenhouse IndustriesDen Haag, 16.02.2011 – Andreas Jenne REHAU AG+Co.
REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag 16.02.2011
MARKET SITUATIONENERGY SUPPLY FOR THE GREENHOUSE INDUSTRY – MULTIPLE POSSIBILITIES
> Wood Chip Plants > Heat Pumps
> Biogas Plants > Biomass Boiler
REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag 16.02.2011
RAUTHERMEX Pre-insulated pipe for large district heating networks, heat transport with great distances
- Permanently sealed connection with REHAU compression sleeve
- Excellent heat insulation
- Rapid, simple and reliable RAUTHERMEX insulation sleeve technology
REHAU Support• Feasibility study for community heating schemes• Design and delivery of district heating networks• Local site support
RAUTHERMEX – PRE-INSULATED PIPE SYSTEM
REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag 16.02.2011
RAUVITHERMPre-insulated pipe for small community heating schemes, installation in narrow site conditions
- Permanently sealed connection with REHAU compression sleeve
- Easy, fast and safe installation through flexible pipe characteristics and easy shrout technology
- Best thermal insulation
REHAU Support• Feasibility study for community heating schemes • Design and delivery of district heating networks• Local site support
RAUVITHERM – PRE-INSULATED PIPE SYSTEM
REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag 16.02.2011
RAUBIO DIGESTER HEATINGPE-Xa heating system with protective film for fermenter heating directly in the biomass or in the digester wall
- No microbiological corrosion as stainless steel
- High acid, temperature and pressure resistance
- Fastest heating-up through direct installation
REHAU Support• Design of digester heating• Delivery of complete system and internat. site support• Matching with Biogas Plant Contractors
RAUBIO – DIGESTER HEATING SYSTEM
REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag 16.02.2011
Efficient heating concept for the flower grower Pfann, Nuremberg / South Germany
Challenge: Cost efficient heating of a new 100.000m² greenhouse area with a heat consumption of 1.5 Mio KWh / year for flower growing
Solution:Transport connection to a CHP-Unit of an existing biogas plant in the nearby area
REHAU Support• Design of pre-insulated piping• Delivery of the heating system• Site support for the heating installation
REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag 16.02.2011
Polytunnel heating scheme for Cobrey Farms, Wales / Ross on Whye
Challenge: Extend the growing period of asparagus crops on an area of 40.000 m² inside a polytunnel
Solution:Constant temperature of 13,5°C inside the polytunnel through the winter and spring time period (water temperature 35°C)
REHAU Support• Design of the subsurface heating system• Delivery of the complete heating system• Site support for the heating installation
REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag 16.02.2011
Biogas Plant for a the tomato grocery Biotec, United Kingdom
Challenge: Production of renewable heat and power by using the tomato waste of an existing tomato grocery.
Solution:Build of a horizontal anaerobic digestion plant using a vertical fermenter heating system
REHAU Support• Design of the fermenter heating• Design of the connected pre-insulated piping• Site and installation support
REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag 16.02.2011
Challenge: Ice and snow free lawn area during winter period for the Wankdorf Stadium in Switzerland
Solution:Subsurface lawn heating and drainage systemfrom REHAU
REHAU Support• General expertise and consultancy• Design of underground heating system• Delivery and site support for the installation
Subsurface lawn heating for the Wankdorf Stadium, Wankdorf / Switzerland
REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag 16.02.2011
Heating of the new greenhouse area Biokraft Hennstedt by CHP, North Germany
Challenge: Cost efficient heating of a new 600.000m²
greenhouse area including delivery of CO2 to
improve the tomato growing
Solution:Construction of a biogas plant and additional installation of a wood chip boiler with ORC-Process
(power generation) to generate heat, power and CO2
for the tomato greenhouse
REHAU AG+Co. Andreas Jenne, Business Team Bioenergy AHK Netherlands, Den Haag 16.02.2011
Community heating scheme for Bioenergy village Waldmünchen, Bavaria
Challenge: Renewable heat supply for a small community in an existing housing area with limited space between the dwellings
Solution:Heating network with a flexible pre-insulated piping system with connection to a CHP-Unit of an existing biogas plant in the nearby area
REHAU Support• Design of heating network• Delivery of the heating transport system• Site support for the heating installation