Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations
-
Upload
juliekannai -
Category
Environment
-
view
101 -
download
1
Transcript of Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations
![Page 1: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/1.jpg)
![Page 2: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/2.jpg)
Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovation
![Page 3: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/3.jpg)
construction strategy and collaboration
introduction to Constitution Center
architectural vision and strategic planning
HVAC system design and coordination
![Page 4: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/4.jpg)
PROJECT LOCATION
S I T E
U.S. CAPITOLU.S. CAPITOLNATIONAL MALLNATIONAL MALL
WASHINGTON MONUMENT
WASHINGTON MONUMENT
WASHINGTONCHANNEL
WASHINGTONCHANNEL
U.S. CAPITOL BUILDING
U.S. CAPITOL BUILDING
CONSTITUTION CENTER
CONSTITUTION CENTER
![Page 5: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/5.jpg)
COLONIAL PERIOD & THE L’ENFANT PLAN
WHITE HOUSEWHITE HOUSE
CONSTITUTION CENTER
CONSTITUTION CENTER
WHITE HOUSEWHITE HOUSE
CONSTITUTION CENTER
CONSTITUTION CENTER
U.S. CAPITOLU.S. CAPITOL
![Page 6: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/6.jpg)
THRIVING COMMUNITY, 1800s – 1940s
POTOMACRIVER
POTOMACRIVER
WASHINGTON MONUMENT
WASHINGTON MONUMENT
U.S. CAPITOLU.S. CAPITOL
ANACOSTIA RIVER
ANACOSTIA RIVER
![Page 7: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/7.jpg)
URBAN RENEWAL
1952 URBAN RENEWAL PLAN 4,800 STRUCTURES DEMOLISHED
1952 URBAN RENEWAL PLAN 4,800 STRUCTURES DEMOLISHED
S I T E
![Page 8: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/8.jpg)
RLA COMPETITION & DEVELOPMENT BY DNA, 1965 - 1970
![Page 9: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/9.jpg)
RLA COMPETITION & DEVELOPMENT BY DNA, 1965 - 1970
![Page 10: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/10.jpg)
DAVID NASSIF BUILDING OPENS, 1970
![Page 11: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/11.jpg)
ORIGINAL PENTHOUSE & AIR-COOLED ROOFTOP UNITS (x40)
![Page 12: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/12.jpg)
ORIGINAL PENTHOUSE & AIR-COOLED ROOFTOP UNITS (x40)
![Page 13: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/13.jpg)
DAVID NASSIF BUILDING, 2007
![Page 14: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/14.jpg)
DIRECT ACCESS TO METRO WITHIN THE FOOTPRINT
![Page 15: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/15.jpg)
15 ACRES OF PARKING BELOW GRADE
![Page 16: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/16.jpg)
DAVID NASSIF BUILDING, 2007
![Page 17: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/17.jpg)
HYSTERISIS IN ACTION
![Page 18: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/18.jpg)
architectural vision and strategic planning
![Page 19: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/19.jpg)
• Most Secure private building in DC• Greenest private building in DC• Flexible for the future• Total transformation into Class A+
OWNERSHIP GOALS
And, by the way – stay on budget!
![Page 20: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/20.jpg)
SECURITY: DESIGNING IN LAYERS
ALL HVAC INTAKES & EXHAUSTS AT ROOF LEVEL
GARAGE INTAKES FROM PRIVATE COURTYARDGARAGE INTAKES FROM PRIVATE COURTYARD
M
MM
HARDENED LOBBIES
PROTECTED LOADING
INDEPENDENT TENANTLOBBIES
PROTECTED RAMPS
ENTRANCE CONTROLS
PROTECTED METRO PUBLIC SPACE
![Page 21: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/21.jpg)
THREAT
SECURITY: ADAPTING EXISTING CONSTRUCTION
UNPROTECTED EXISTING WAFFLE SLAB ABOVE GARAGE
![Page 22: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/22.jpg)
WEIDLINGER & ASSOCIATES
THREAT
PROTECTED EXISTING WAFFLE SLAB ABOVE GARAGE
2 LAYERS OF CARBON FIBER2 LAYERS OF CARBON FIBER
SECURITY: ADAPTING EXISTING CONSTRUCTION
![Page 23: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/23.jpg)
FINITE ELEMENT ANALYSIS
PROTECTED COLUMNEXISTING CONCRETE COLUMNWEIDLINGER & ASSOCIATES
½” STEEL JACKET½” STEEL JACKET
![Page 24: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/24.jpg)
SUSTAINABILITY: LARGE SCALE URBAN ADVANTAGES
19.6% Energy Savings22.4% Cost Savings
tonnage of waste diverted
tonnage of waste diverted
% of all waste diverted
% of all waste diverted
![Page 25: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/25.jpg)
FLEXIBILITY: CURRENT MARKET VS. FUTURE-PROOFING
AMENITIES & CIRCULATIONGROUND FLOOR
MULTIPLE OFFICE TYPOLOGIESTYPICAL FLOOR
CENTRALIZED INFRASTRUCTUREPENTHOUSE & BASEMENT
90 FT WIDTH90 FT WIDTH
METROMETRO
FOOD SER VICESFOOD SER VICESCONFERENCE CTRCONFERENCE CTRLOBBYLOBBY
LOADINGLOADINGEMPLOYEE ENTRYEMPLOYEE ENTRY 4 CORNER CORES4 CORNER CORES HEATINGHEATING
COOLINGCOOLING AHU’SAHU’S
AHU’SAHU’S
![Page 26: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/26.jpg)
TRANSFORMATION: 1960s MONUMENTAL FEDERAL VOCABULARY
![Page 27: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/27.jpg)
TRANSFORMATION: 21ST CENTURY REBIRTH
![Page 28: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/28.jpg)
FINAL IMAGES
![Page 29: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/29.jpg)
FINAL IMAGES
![Page 30: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/30.jpg)
FINAL IMAGES
![Page 31: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/31.jpg)
FINAL IMAGES
![Page 32: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/32.jpg)
FINAL IMAGES
![Page 33: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/33.jpg)
FINAL IMAGES
![Page 34: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/34.jpg)
FINAL IMAGES
![Page 35: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/35.jpg)
FINAL IMAGES
![Page 36: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/36.jpg)
HVAC system design and coordination
![Page 37: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/37.jpg)
Introduction To Chilled Beams
A Chilled Beam is a sensible cooling or heating device utilizing hydronic technology.
Types of Chilled Beams Include:
Passive Chilled Beams (Cooling Only)
Active Chilled Beams (Cooling and Heating)
Multiple Service Beams (Passive or Active)
![Page 38: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/38.jpg)
Air Flow Pattern
![Page 39: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/39.jpg)
Passive Beams – Advantages / Disadvantages
• Does not use primary air to cool (ventilation separately supplied)• Lowest energy use for cooling due to no fans• Silent operation• Suits high rooms – Limited to approximately 20 feet (so down draft is not prevalent)• Air flow path required above• Not suited to return air plenums• Can not be used to heat – cooling only
![Page 40: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/40.jpg)
Active Chilled Beams
Cooling / Heating
![Page 41: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/41.jpg)
Air Flow Pattern
![Page 42: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/42.jpg)
Active Chilled Beams – Advantages / Disadvantages
• Higher Capacity than Passive Beams• Integrated Cooling and Ventilation• Heating Available • Integrates with Ceiling & RA Plenum• Controllable Discharge Air Pattern• More efficient than VAV or Fan-Coils• Accepts Lower Supply Water Temp• Higher First Cost
![Page 43: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/43.jpg)
Multi-Service Chilled Beams
![Page 44: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/44.jpg)
WaterPipe1-1/2” Diameter
Air ductFlow Cross Section
18”x18”
Energy comparison air/water
Cooling capacityTemperature difference
DensitySpecific thermal capacity
Volume flow rate
Velocity in the tubeFlow cross sectionDiameter
Capacity (=0,8 resp. 0,4)Pressure difference
Air Water Air/WaterAir Water Air/WaterKühlleistung W 1000 1000 1Temperaturdifferenz K 8.0 3.0 2.7Dichte kg/m³ 1.2 1000 0.0012spez. Wärmekapazität J/kgK 1000 4180 0.24Volumenstrom m³/h 375 0.287 1306
Geschwindigkeit im Rohr m/s 4.0 1.0 4.00Strömungsquerschnitt cm² 260 0.80 327Durchmesser mm 182 10.1 18Druckdifferenz kPa 0.8 50.0 0.02Förderleistung (=0.8 bzw.=0. 4) W 104 10.0 10
Cooling capacity
Temperature difference
DensitySpecific thermal capacityVolume flow rate
Velocity in the tubeFlow cross section
DiameterDiameterPressure difference
Capacity (=0,8 resp. 0,4)
1306:1
18
10:1
Energy Transport
Duct: 18”x18” ( 2,500 CFM ) = 54 MBH @ 20 F Delta
Pipe: 1-1/2” ( 22 GPM ) = 55 MBH @ 5 F Delta
![Page 45: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/45.jpg)
Chilled beams at Constitution CenterTYPICAL FLOOR W/MARKET-RATE CONVENTIONAL VAV SYSTEM
CORE MECHANICAL ROOMS + SHAFTSCORE MECHANICAL ROOMS + SHAFTS
SATELLITE HVAC ROOMS + O/A SHAFTSSATELLITE HVAC ROOMS + O/A SHAFTS
PERIMETER FANCOIL UNITSPERIMETER FANCOIL UNITS
RIBBON WINDOWS W/30” SILL HTRIBBON WINDOWS W/30” SILL HT
![Page 46: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/46.jpg)
TYPICAL FLOOR W/CHILLED BEAMS
SHAFTS & VALVES ONLY – NO ROOMSSHAFTS & VALVES ONLY – NO ROOMS
FLOOR-TO-CEILING GLASSFLOOR-TO-CEILING GLASS
UNENCUMBERED USABLE AREAUNENCUMBERED USABLE AREA
![Page 47: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/47.jpg)
Chilled beams at Constitution CenterANATOMY OF A SMALL CEILING PLENUM
![Page 48: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/48.jpg)
• SEPARATE PERIMETER AND INTERIOR ZONES
• MATCH AIRFLOW TO OUTSIDE AIR REQUIREMENTS
• USE LOW PRESSURE AIR DISTRIBUTION TO CHILLED BEAMS
• SCALE ENABLES ALL ENERGY RECOVERY OPTIONS
• Sensible Reheat
• Energy Recovery Wheels
LARGE-SCALE ENERGY RECOVERY INFRASTRUCTURE – AIRSIDE SYSTEMS
![Page 49: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/49.jpg)
CENTRALIZED PENTHOUSE INFRASTRUCTURE
AIRSIDE SYSTEMSEASY ACCESS
NO TENANT DISRUPTIONSSECURITY OF OUTSIDE AIR
LOWER NOISE
CHILLED WATER SYSTEMSSIMPLIFIED LOOPS
EASY ACCESS TO MAJOR PUMPS & VALVESSEPARATE CHILLED WATER DISTRIBUTION SYSTEMS
![Page 50: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/50.jpg)
Infrastructure Airside Systems
Chilled Water Systems
Condenser Water Systems
o Use Wet Bulb Properties for Free Cooling for Beams
o Consider Use of Plate & Frame Heat Exchangers
o Provide for Year Around Use of Cooling Towers
Constitution Center – Chilled Beam Design
![Page 51: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/51.jpg)
Infrastructure Airside Systems
Chilled Water Systems
Condenser Water Systems
Heating Water Systems
o Use Separate Heating Water Distribution System
o Hot Water or Steam may be the Source for Heating
o Beams will Utilize Lower Temperature HHWS ( 100 to110F)
Constitution Center – Chilled Beam Design
![Page 52: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/52.jpg)
Mockup at Constitution CenterFULL SCALE MOCKUPS AND TESING PROTOCOLS
![Page 53: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/53.jpg)
ENERGY BENCHMARKING
![Page 54: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/54.jpg)
Chilled Beams: Energy Analysis
Baseline Building Energy Usage
Constitution Center Energy Usage
![Page 55: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/55.jpg)
0
2,000,000
4,000,000
6,000,000
8,000,000
10,000,000
12,000,000
14,000,000
1 2 3 4 5 6 7 8 9 10 11 12
kBtu
Month
Energy Usage
Modeled Actual
Chilled Beams: Energy Usage Analysis
![Page 56: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/56.jpg)
Chilled Beams: Energy Usage Analysis
Month Modeled Actual Difference Modeled Actual Difference Modeled Actual Difference
January 1,681,210 2,184,668 +503,458 25,822 41,300 +15,478 8,385,588 11,724,507 +3,338,919
February 1,526,758 1,445,851 -80,907 21,966 27,300 +5,334 7,463,022 7,756,064 +293,042
March 1,907,165 1,554,892 -352,273 12,939 18,878 +5,939 7,834,762 7,257,277 -577,485
April 1,687,718 1,936,648 +248,930 4,488 9,604 +5,116 6,218,948 7,600,897 +1,381,949
May 2,023,610 1,822,247 -201,363 0 7,000 +7,000 6,904,556 6,941,307 +36,751
June 2,175,771 2,307,942 +132,171 0 4,558 +4,558 7,423,732 8,345,995 +922,263
July 2,212,915 2,508,370 +295,455 0 5,247 +5,247 7,550,466 9,101,098 +1,550,632
August 2,391,555 2,243,556 -147,999 0 6,500 +6,500 8,159,986 8,327,113 +167,127
September 2,003,078 2,398,513 +395,435 0 14,200 +14,200 6,834,501 9,652,006 +2,817,505
October 1,849,576 2,072,523 +222,947 4,946 21,400 +16,454 6,818,184 9,284,208 +2,466,024
November 1,740,473 1,819,841 +79,368 7,772 22,400 +14,628 6,735,947 8,525,457 +1,789,510
December 1,620,316 1,806,982 +186,666 18,095 39,097 +21,002 7,385,089 10,208,052 +2,822,963
22,820,145 24,102,033 1,281,888 96,028 217,484 121,456 87,714,781 104,723,982 17,009,201
Total-kBtuGas-CCFElectricity-kWh
+6% +126% +19%
![Page 57: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/57.jpg)
MOISTURE ALARM – Not Needed!
MOCKUPS – Require Mockup of Typical Chilled Beams!
POWER MONITORING – Tracked Daily…Allows Optimization!
DEMAND CONTROL – Didn’t use…would use next time!
SUPPLY CHW TEMPERATURES – Push temperatures to optimize economizer mode!
RETURN CHW TEMPERATURE – Design for Return Chilled Water Temperature Control
Chilled Beams: Lessons Learned
![Page 58: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/58.jpg)
construction strategy and collaboration
![Page 59: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/59.jpg)
DEMOLITION: WORKING SAFELY IN STAGES TO RECYCLE MATERIALS EFFICIENTLY
![Page 60: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/60.jpg)
CURVEBALL: SCOPE CHANGES AS A RESULT OF PERCEIVED MARKET DEMAND
ADD 500-SEAT AUDITORIUMSHELL SPACE / SCIF-READY
ADD COMMERATIVE SCULPTURENEW SUPPORT STRUCTURE / EXTENSIVE SHORING
![Page 61: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/61.jpg)
TIGHT QUARTERS: CENTRALIZED PENTHOUSE INFRASTRUCTURE
![Page 62: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/62.jpg)
SURPRISES: ORIGINAL CONSTRUCTION NOT QUITE WHAT ANYONE EXPECTED
![Page 63: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/63.jpg)
TOLERANCE: ROUGH CONCRETE VS. BLAST-RESISTANT CURTAINWALL
INTENSIVE WORK AT CURTAINWALL ANCHORAGESCUSTOM SETTING DEVICES / PULL-TESTING FOR EVERY BOLT
LASER SCANNING FOR SLAB EDGE LOCATIONWIDE RANGE OF CONDITIONS REQUIRING CUSTOM BACKING PLATES
![Page 64: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/64.jpg)
ON-THE-FLY DETAILING: ALTERNATIVE SETTING STRATEGIES
• 8,750 ANCHORS
• 35,000 EPOXY BOLTS
• ZERO TOLERANCE
• UNCERTAIN REBAR LOCATIONS
• EXISTING SLAB DEFLECTION
• FANTASTIC SUBCONTRACTORS!
![Page 65: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/65.jpg)
Construction Strategy – Building Transformation Methodology
![Page 66: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/66.jpg)
INSTALLATION: PLANNING PAYS OFF!
• 100% UNITIZED SYSTEMS
• DRY GLAZED
• 3 THICKNESS OF GLASS
• 1,236 2-STORY PANELS
• 17 UNITS/DAY INSTALLED (street)
• 1,762 1-STORY PANELS
• 30 UNITS/DAY INSTALLED (courtyd)
• ZONE TESTING FOR INFILTRATION
![Page 67: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/67.jpg)
OPTIMAL CONSTRUCTION STRATEGY: ON TIME
• 1,400,000 GSF OFFICE
• 700,000 GSF GARAGE
• 4 QUADRANTS
• METRO STATION CLOSURE
• HEART OF DOWNTOWN
• ON-SITE NURSING SERVICE
• LARGEST PRIVATE-SECTOR OFFICE IN D.C.
• LARGEST GOLD LEED PRIVATE-SECTOR OFFICE
• FULLY TENANTED
![Page 68: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/68.jpg)
LESSONS LEARNED (JUST A FEW!)
DESIGN• APPROVALS AGENCIES
CAN BE UNPREDICATBLE
• GET AHJs INVOLVED EARLY
• CHANGES IN SCALE NEED DESIGN LEADERSHIP
• TECHNOLOGY REPEATED 1,000s OF TIMES
• FIRST IMPRESSIONS ARE CRITICAL IN NEW WAYS
CONSTRUCTION• PRIDE IN TEAMWORK
ENCOURAGES SOLUTIONS
• BENCH DEPTH FOR UNFORSEEN CONDITIONS
• QUALITY CONTROL TIED TO INNOVATION
• SCALE = SAFETY FIRST
• CRITICAL LEED TOOLS
CLIENT• CHALLENGING IN ALL
DIRECTIONS = INNOVATION & RISK
• WILLING TO EXPLOREOPTIONS OTHERS DISCARD
• AS EXCITED AS WE ARE ABOUT DESIGN
• GENEROSITY GOES A LONG WAY
![Page 69: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/69.jpg)
VALUE ENGINEERING: NOT ALWAYS WHAT IT SEEMS
![Page 70: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/70.jpg)
3M lbs of structural steel
17.33 foot fields worth
of drywall
78000SF of metal panels5500 gallons of paint
101.2 miles of elevator cable
6624 chilled beams
18.9 miles of electrical conduit31 elevators
800 mini coopers worth of rebar
5000 board feet of lumber612 concrete trucks
4910CY of soil
50M lbs of recycled materials
1.4M manhours
collaborationand
teamwork
![Page 71: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/71.jpg)
3M lbs of structural steel
17.33 football fields worth of
drywall
78,000SF of metal panels5,500 gallons of paint
101.2 miles of elevator cable
6,624 chilled beams
18.9 miles of electrical conduit31 elevators
800 mini coopers worth of rebar
5000 board feet of lumber612 concrete trucks
4,910CY of soil
50M lbs of recycled materials
1.4M manhoursFUN WITH METRICS
![Page 72: Battles Won, Lessons Learned: Large-Scale Sustainable Office Building Renovations](https://reader031.fdocuments.in/reader031/viewer/2022030211/58a17bd11a28ab04278b6a71/html5/thumbnails/72.jpg)