BATHOPELE MINE AMRE 12 February 2015

Transcript of BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access &...

Page 1: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

BATHOPELE MINE AMRE

12 February 2015

Page 2: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

TABLE OF CONTENTS

1. Introduction to the mine

2. CMSS project overview

3. Lamp Room Management System

4. Asset Tracking

5. Collision Warning System

Page 3: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

3

LOCATION OF UG2 RUSTENBURG MINES

Page 4: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

4

UNDERGROUND PLAN

Concentrator Silo

East # Central #

Surface Silo

6 Km

±30m BS

±500m BS

±350m BS

±200m BS

Joy Cutter

Page 5: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

5

BUSINESS OVERVIEW – QUICK FACTS

• Mine started in 1999. Full Investment Proposal (IP)

production was reached in 2003 at 220ktpm.

• Life of Mine at current mining rates is until 2028.

• The mine applies a fully mechanised bord and pillar mining

method.

• Consists of two decline shafts namely East and Central

shafts.

• Low Profile mining between 195cm and 220cm stope width

delivers 90% of total tonnage.

• Extra Low Profile mining at 120cm stope width delivers the

remaining 10% of tonnage.

• Ultra Low Profile mining at 100cm stope width currently in

project phase.

• Approximately 31% and 22% of total Rustenburg tonnage

and platinum ounce production respectively are produced by

Bathopele.

Page 6: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

6

BORD AND PILLAR LAYOUT– LOW PROFILE SUITE

East#

Central #

Page 7: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

7

• 1 Section = 27 People

• 9 People per shift

• 2 x 11 ½ hr shifts/day

• 2400m²/Crew/Month @ 2.77g/t

• 89m²/TSE

• 32 Pt oz’s/TSE

LOW PROFILE EQUIPMENT

20 Holes/Hour 10 Loads/Hour

7 Bolts/hour

Page 8: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

8

MINING LAYOUT FOR XTRA LOW PROFILE SUITE

Central #

Page 9: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

9

XTRA LOW PROFILE SUITE EQUIPMENT

• 1 Section = 48 People

• 16 People per shift

• 2 x 11 ½ hr shifts/day

• 3000m²/Crew/Month @ 3.53g/t

• 63m²/TSE

• 29 Pt oz’s/TSE

Page 10: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

10

OVERVIEW

Page 11: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

11

LAMP ROOM MANAGEMENT

Page 12: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

12

INNOVATION BUSINESS IMPROVEMENT

Detail – Cap lamp warning system

Lamp room management

• Ensures every U/G employee is

issued with a lamp, and assists with

shift clearance

• Messaging function

• Automatic Download of data

• Tracking function.

• Enhanced light & sound warning

function

Page 13: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

13

PHASE I – LAMP ROOM MANAGEMENT

Required safety equipment will be

allocated to the person at the Auto

Allocation Bay

Safety Equipment Allocated?

No

Yes

CAS Test Unit

Lamp has LCD screen enabling PTC messaging (both directions) as well as distress call

Frames will block underground access if person not carrying all required allocated

safety equipment

Page 14: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

14

ASSET TRACKING

Page 15: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

15

PHASE II – IM INFRASTRUCTURE

Underground network: − Central and East Shafts − Declines and all active

strikes − Redundancy link

Underground network: − network enclosures installed every 200m in all

active strikes – hosts Schauenburg controllers which provide approximately 100m radius line-of-sight RFI coverage

− will be monitored 24/7 by IIT − will host all systems requiring underground

network connectivity − is “expansion ready” for any future requirements

Page 16: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

16

PHASE I – PEOPLE TRACKING

Surface and

Underground

Antennas

and

Controllers

use RFI to

track assets

Surface Asset Tracking

Underground Asset Tracking

PTC Messaging (both directions) and Distress Call

Page 17: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

17

COLLISION WARNING SYSTEM

Page 18: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

LEGAL ASPECTS TMM • Implementation drive from DMR– Regulation

• 8.10.1.2 All underground diesel powered trackless mobile machines must be provided with means:

• 8.10.1.2(a) to automatically detect the presence of any pedestrian within its vicinity. Upon detecting the presence of a pedestrian, the operator of the diesel powered trackless mobile machine and the pedestrian shall be warned of each other’s presence by means of an effective warning; and

• 8.10.1.2(b) in the event where no action is taken to prevent potential collision, further means shall be provided to retard the diesel powered trackless mobile machine to a safe speed where after the brakes of the diesel powered trackless mobile machine are automatically applied. The system on the diesel powered trackless mobile machine must fail to safe without human intervention.

The regulations, except sub-regulations 8.10.1.2(b) and 8.10.2.1(b), will come into force 3 months after the date of publication;

A further notice will be published at some time in the future to indicate when sub-regulations 8.10.1.2(b) and 8.10.2.1(b) will come into force;

The requirement to have PDS systems applies only in respect of: (i) mines where there is a significant risk of pedestrians being injured as a result of collisions between TMMs and pedestrians and (ii) opencast and open pit mines where there is a significant risk of injury as a result of collisions between diesel TMMs. It will therefore be important for mines to do proper risk assessments and have copies of them available at the mine to substantiate any decision as to whether or not PDS systems are required at the mine in terms of the regulations.

Page 19: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

19

Incident Analysis Site Risk Assessment and

Safeguard Analysis

Scenario Evaluation

Define and Sign-off on

Collision Management Strategy

Implementation

Use the Group Specification as

the starting point

Risk Matrix

Recommended Process For CWS Implementation

Page 20: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

20

SCENARIOS

Page 21: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

21

COAL, SOUTH AFRICA UG

Scenario

#in

cid

ents

Wei

ghte

d

Ris

k

Rev

: 3

-10

Rev

: 0

-3

Stat

ion

ary

Fwd

: 0

-3

Fwd

: 3

-10

Fwd

: 1

0-3

0

184 30005 720 2523 5565 8485 5726 6986

P1-Person (direct) 113 19642 630 1800 5211 7622 4109 270

V4-Loss of Control 21 7030 0 133 324 193 810 5570

P3-Person (indirect) 44 2990 90 580 30 643 507 1140

O1-Obstacle 4 310 0 10 0 27 270 3

L5-Passing Head-on 1 30 0 0 0 0 30 0

V1-Void 1 3 0 0 0 0 0 3

Interactor

#in

cid

ents

We

igh

ted

R

isk

Person Equip-ment

Infra-structure

Un-controlled

PUE1 PUE2 PUE3 PUE4

184 30005 19588 1791 1099 7100

Continuous Miner 20 9644 9580 27 37 0

LHD Unit 65 7385 5548 1417 307 103

LDV 20 5805 93 40 56 5616

Shuttle Car / Hauler 26 3184 2478 27 282 37

Tractor 23 2589 694 270 344 1224

Roofbolter 15 777 734 0 43 0

Other 15 621 461 10 30 120

(N=119) (N=65)

Page 22: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

22

COAL, AUSTRALIA UG

Scenario

#in

cid

ents

Wei

ghte

d

Ris

k

Rev

: 3

-10

Rev

: 0

-3

Stat

ion

ary

Fwd

: 0

-3

Fwd

: 3

-10

Fwd

: 1

0-3

0

92 1213 97 15 271 495 241 94

P1-Person (direct) 7 479 0 0 90 380 9 0

V4-Loss of Control 19 221 3 0.3 0.9 102 24 91

P4-Access & Egress 2 180 0 0 180 0 0 0

L5-Passing Head-on 10 128 0 0 0 0.9 123 3

T3-Intersection 13 125 91 1.1 0 0.9 33 0

L8-Blind Approach 9 33 1 0.9 0 3.3 28 0

V6-Congested Area 18 31 0.9 4.8 0 5.1 20 0

Other 14 16 0.9 7.5 0.3 2.2 3.9 0

Interactor

#in

cid

ents

Wei

ghte

d

Ris

k

Person Equip-ment

Infra-structure

Un-controlled

PUE1 PUE2 PUE3 PUE4

92 1213 758 320 130 5

Shuttle Car 8 470 460 0.4 10 0

LHD Unit 47 302 99 88 114 2

Continuous Miner* 2 180 180 0 0 0

Coal Hauler 6 111 9 101 0.9 0

Ramcar 3 92 0 92 0 0

Personnel Transporter 14 37 0 34 3.24 0

Feeder Breaker 1 10 10 0 0 0

Other 11 10 0 4.5 2.2 3

Page 23: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

23

PLATINUM, SOUTH AFRICA UG

(N=84) (N=34)

Scenario

#in

cid

ents

Wei

ghte

d

Ris

k

Rev

: 3

-10

Rev

: 0

-3

Stat

ion

ary

Fwd

: 0

-3

Fwd

: 3

-10

Fwd

: 1

0-3

0

118 17527 1000 1824 667 1803 6887 5346

P1-Person (direct) 62 7450 1000 1810 547 1601 2492 0

V4-Loss of Control 16 6655 0 3 0 103 1540 5009

L1-Head-on 4 1003 0 0 0 2.7 1000 0

L4-Dovetailing 1 1000 0 0 0 0 1000 0

P3-Person (indirect) 17 885 0 0 90 3 455 337

T3-Intersection 3 270 0 0 0 0 270 0

O1-Obstacle 8 132 0 10 10 2.7 110 0

L8-Blind Approach 3 100 0 0 0 90 10 0

P4-Access & Egress 2 20 0 0 20 0 0 0

L7-Overtaking 1 10 0 0 0 0 10 0

Interactor

#in

cid

ents

Wei

ghte

d

Ris

k

Person Equip-ment

Infra-structure

Un-controlled

PUE1 PUE2 PUE3 PUE4

118 17527 8596 2439 1008 5485

LDV 16 6776 183 1010 400 5183

LHD Unit 70 6291 5435 390 434 32

MPV 17 3056 2694 28 64 270

Personnel transporter 5 1120 90 1010 20 0

Roofbolter 8 194 194 0 0 0

Hydraulic drill rig 2 90.9 0 0.9 90 0

Page 24: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

24

INNOVATION BUSINESS IMPROVEMENT

PDS/VDS/CAS

• Persons U/G are warned of

approaching vehicles.

• Vehicle operators are warned

of pedestrians.

• Vehicles are warned of other

vehicles.

• Vehicles are slowed down

and/or stopped automatically

within certain zones.

Page 25: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

25

INNOVATION BUSINESS IMPROVEMENT

PDS / CAS JOURNEY

• URS were drafted during 2012 and final approval of the project was in Nov 2013

• 2014 Development/Testing of technology

• During integration tests interference issues were picked up

• The mine requested vendors to conduct extensive independent tests at ITC and GEROTEK

• Vendor solutions was also piloted underground to verify the outcome of the independent tests

• The pilot results supported the independent test results

Page 26: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

COLLISION AVOIDANCE SYSTEM

Legal Aspects

Cost

Change Management

Production Impact

Interface

Reliability Collision

Avoidance System

Page 27: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

27

RELIABILITY: EXTERNAL RELIABILITY TESTS

Page 28: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

28

RELIABILITY: INTERNAL RELIABILITY TESTS

Page 29: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

RELIABILITY: URS Specification

Phase 3 CAS – VDS/PDS

Warning fields tested 25m

Slowdown tested 15m & 12m UG

Stop tested 5-7m

Side fields can be set close to vehicle Large

Space required for antennas Small

Susceptible to interference and therefore not always reliable No problem

Field setting reliable – tested same distance repeatedly Good

Field range adjustability Electronic

Future enhancements (e.g. machine diagnostics) can be easily incorporated

Yes

Radiative tests complete Yes

Phase 1 Lamp Room Management & Employee and Asset Tracking

People and Vehicle Tracking Yes

Employee PTC (Page/Tracking/Comms) Yes

Light Weight LED – Lithium Type Lamps Yes

Employee safety equipment blocking at turnstiles Yes

Page 30: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

COLLISION AVOIDANCE SYSTEM

Legal Aspects

Cost

Change Management

Production Impact

Interface

Reliability Collision

Avoidance System

Page 31: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

31

COST

NB! ALL NEW VEHICLES PROCURED SHOULD BE CAS READY

CAPEX COST % Total Cost Machine

Installation cost per TMM 2%

TMM CAS Ready Costs 4%

OPEX COST Running Cost

Maintenance Contract Dependant on Maintenance Contract

Page 32: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

COLLISION AVOIDANCE SYSTEM

Legal Aspects

Cost

Change Management

Production Impact

Interface

Reliability Collision

Avoidance System

Page 33: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

CHANGE MANAGEMENT • OEM and Mine Risk Assessment

• Design Risk Assessment

• Specifications/Standards/ COP Adoption

• Training and Induction Videos

• Traffic Management Plan to be revised:

‒ Impact on production ‒ Artisan override

• Culture (dependency on CAS)

• Phasing out old VDS/PDS System

• Ergonomics ‒ Cluttering of operator cabin ‒ Visibility chart per OEM had to be revised ‒ SBI

• Implementation Methodology

Page 34: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

34

CHANGE MANAGEMENT: ERGONOMICS

Cluttering of Operator Cabin

Page 35: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

35

CHANGE MANAGEMENT: ERGONOMICS

Visibility chart per OEM had to be revised and bracket fitment had to be approved per OEM

Page 36: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

36

CHANGE MANAGEMENT: IMPLEMENTATION METHODOLOGY

Phased approach Target Date Step 1 : Multiple vendor implementation (fast-moving) Dec 2014 Step 2 : Training Dec 2014 Step 3 : Commission SCAS II (fast-moving) Dec 2014 Step 4 : Lamp room changeover Dec 2014 Step 5 : Activate VDS / PDS Dec 2014 Step 6 : Implementation and commissioning of slow-moving Mar 2015 Step 7 : Tracking and Monitoring Mar 2015 Step 8 : Messaging and Distress Calls Mar 2015 Step 9 : Asset management (turnstile blocking) Mar 2015 Step 10: Section approach to SCAS ready Aug 2015

Page 37: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

COLLISION AVOIDANCE SYSTEM

Legal Aspects

Cost

Change Management

Production Impact

Interface

Reliability Collision

Avoidance System

Page 38: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

INTERFACE • CAS / OEM

• Intelligent type vehicles

‒ OEM resistance due to legal implications

• Non-intelligent type vehicles

‒ Fourth party equipment needs to provide interface

• Communication between suppliers

‒ Digital / Manual Inputs

Page 39: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

COLLISION AVOIDANCE SYSTEM

Legal Aspects

Cost

Change Management

Production Impact

Interface

Reliability Collision

Avoidance System

Page 40: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

LEGAL ASPECTS: ACCOUNTABILITY

OEM vs Third Party (Schauenburg) vs Fourth party (Engine owner)

OEM

Third Party (CAS

System)

Fourth Party(Non Intelligent Machines)

Operator

Page 41: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

COLLISION AVOIDANCE SYSTEM

Legal Aspects

Cost

Change Management

Production Impact

Interface

Reliability Collision

Avoidance System

Page 42: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

42

PRODUCTION IMPACT

Page 43: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

43

THE WAY FORWARD – SLOWDOWN OR STOP

The following operating environmental conditions should be considered for stop: • Temperature (Hydraulics) • Roadway conditions

• Inclination • Wet vs Dry

• Tramming speed of LHD • Rock strata affecting

radio frequency • Tyre conditions • Break efficiency • Legal implications when

serious incident occurs (operator will have no accountability)

Page 44: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

44

PHASE III – VIDEO CLIPS

− Surface slow down and stop tests

− Underground slow down and stop tests

Page 45: BATHOPELE MINE - amre.org.za€¦ · V4-Loss of Control 19 221 3 0.3 0.9 102 24 91 P4-Access & Egress 2 180 0 0 180 0 0 0 L5-Passing Head-on 10 128 0 0 0 0.9 123 3 T3-Intersection

THANK YOU