BATH QUAYS WATERSIDE & RADIAL GATE...

13
BATH QUAYS WATERSIDE & RADIAL GATE STUDY Simon Martin 03/07/2014

Transcript of BATH QUAYS WATERSIDE & RADIAL GATE...

BATH QUAYS

WATERSIDE & RADIAL

GATE STUDY

Simon Martin

03/07/2014

PRESENTATION OVERVIEW

• Bath Quays Waterside Project

• Bath Radial Gate study

03/07/2014

FLOOD RISK

a

03/07/2014

BATH QUAYS WATERSIDE

Flood Mitigation and Defences: Technical Advice • B&NES:

– Lead Local Flood Authority: manage flood risk from surface water and

groundwater – Response to Core Strategy and NPPF

• ENVIRONMENT AGENCY – The River Avon is a Main River under our

jurisdiction – reduce the risks to people, households and

businesses from flooding

• TOGETHER COMMISSIONED Black & Veatch report;

– Improve flood conveyance – Raise development sites so

minimum floor levels above:

- 1 in 100 years probability - +20% on peak flows for climate change – Additional flood defence

measures to existing properties

03/07/2014

BATH QUAYS WATERSIDE

Green Infrastructure Strategy

• Core Strategy policy

• Requirement to protect &

enhance green infrastructure

• Identifies importance of River

Avon & Kennet & Avon Canal

corridors

• River ecology and habitats

• Flood solutions create clear

opportunities to deliver benefits

eg. creation of wetland habitats

& improved river access

03/07/2014

BATH QUAYS WATERSIDE: THE PROJECT

03/07/2014

BATH QUAYS WATERSIDE: THE PROJECT

Technical scope: Overview

03/07/2014

BATH QUAYS WATERSIDE

Creative ambition

Themes & Objectives

Bath Quays Waterside:

• Successful relationship between city

and river

• Community focus: an amenity for all

• a defining feature and experience of

Bath Quays

• Urban strolling and promenading

• Cycling

• Year round use and reasons to dwell

• Playfulness 1-100 yrs

• Generate life: pop up uses (eg kiosks,

cafes, stalls)

• Public art – temporary and permanent -

and performance

• Secure navigation

• River uses and animation eg:

o Boat trips & races

o Temporary moorings

o Water sports

• Fuse hard quayside, urban/civic space

and soft green landscape

• ‘Meanwhile uses’ for disused part of

Green Park Road area eg pop-up

activities

• Exemplar for partnership working and

innovative engagement with

stakeholders, local people and schools

03/07/2014

BATH QUAYS WATERSIDE: THE PROJECT

Emerging Landscape Design

03/07/2014

BATH QUAYS WATERSIDE: THE PROJECT

Emerging Landscape Design

03/07/2014

BATH QUAYS WATERSIDE: THE PROJECT

Programme Milestones

PROJECT FEASIBILITY STAGE

Feasibility Reports July 2013

Development of Project Strategic Brief July 2013

Client Sign Off (Gateway 3) August 2013

PROJECT SCHEME DESIGN

Pre-Application Consultation September 2013

Scheme Design Freeze May 2014

Planning Application Submission June 2014

PROJECT DETAILED DESIGN

Detailed Design February 2014

Planning Determination June 2014

Other Stat Consents (HA, EA, CRT) June 2014

PROCUREMENT

Construction Package Contracts Award July 2014

CONSTRUCTION

Start on Site Sept 2014

Construction Complete Sept 2015 03/07/2014

RADIAL GATE & TWERTIN SLUICE OPTION STUDY

• Existing flood infrastructure (radial gate) is nearing end of life

• B&NES and Environment Agency will jointly commission an options appraisal

• Options to include; – Gate removal + realign river – Weir – Modify + extend horseshoe weir – Lock (navigable feature) – How energy generation can be enabled – lowering the river - impacts

• Results to inform the Strategic Rivers

Group, Enterprise Area Masterplan & flood management 03/07/2014

Enterprise Area Masterplan

03/07/2014