FEBRUARY 2009
![Page 2: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/2.jpg)
OVERVIEWOBJECTIVESRIGGER’S CHECKLISTRIGGER QUALIFICATIONS &
RESPONSIBILITIESSLING SELECTIONSLING INSPECTION AND USESLING LOAD CAPACITYSAFE WORK PRACTICESRIGGING HARDWARESECTION REVIEW EXERCISE
![Page 3: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/3.jpg)
Types of SlingsSelecting SlingsInspecting SlingsCorrect Sling and Rigging Hardware
Uses
![Page 4: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/4.jpg)
Know the weight of the loadKnow the Centre of Gravity of the LoadMake the load attachment above the CoGKnow the rated capacities of the sling Inspect all rigging gearProtect the SlingProtect the loadDo not use hand-tucked slingsAllow for low D/d ratios on wire ropeEqualise loading on multiple legged slingsAllow for reductions when using choker
hitches
![Page 5: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/5.jpg)
Allow for sling angles when forcing the choker down
Use alloy or Grade 8 chainKeep personnel clear of the areaLift the load a few inches stop and
check riggingStart and stop all movements slowlyWatch for obstructions and power linesUse proper hand signalsMaintain load controlObserve the law of gravityBe on the alert at all times
![Page 6: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/6.jpg)
A RIGGER is anyone who attaches or detaches lifting equipment to load or lift devices.
To be considered a qualified Rigger, the person should have successfully completed a rigging training programme.
Crane load rigging should only be performed by a qualified RIGGER.
![Page 7: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/7.jpg)
Alloy Chain Slings Wire Rope Slings Synthetic Web Slings Fibre Rope Slings Consider the following
Right Size andRight Capacity of the rigging and hardwareRight materialMethod of attachmentPossibility of rigging damaging the objectPotential hazardsLength of sling
![Page 8: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/8.jpg)
Sling identification Material strength Design factor Type of hitch Angle of loading Diameter of curvature Fabrication efficiency
Types of Slings Alloy Steel Chain slings Synthetic web and round slings Wire rope slings Synthetic fibre rope slings
Sling bend
![Page 9: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/9.jpg)
Slings must be used within their rated load capacities.
Some factors can affect the rated capacities after a certain period of usage
Sling angle
![Page 10: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/10.jpg)
Ensure that hook is directly atop CoGCoG should always be below the lifting
pointsChoose the right type of slings for
irregularly shaped loadsCentre the load in the bowl of the load
hookUsing attachmentsSafe lifting and movingStoring equipment
![Page 11: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/11.jpg)
Shackles Hooks Rings, links and swivels Pad eyes, eyebolts and other attachment
points Turnbuckle Wire rope clips Spreader and equaliser beams Sheaves and blocks Cargo Nets All hardware should be
Identifiable InspectedProperly operated
![Page 12: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/12.jpg)
Attempt the exercises in pages 33 – 34.
![Page 13: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/13.jpg)
DETERMINING LOAD WEIGHTMETRIC CONVERSION CHARTWEIGHT CALCULATIONSMATERIAL WEIGHT ESTIMATIONCENTRE OF GRAVITY AND BALANCEWEIGHT DISTRIBUTIONSLING ANGLESRIGGING MATH EXERCISE
![Page 14: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/14.jpg)
You can find an item’s weight from:Data on the Manufacturer Label PlatesManufacturer documentationBlueprints or drawingsTechnical manualsShipping receiptsEngineering evaluationsWeigh the item
Basic rules for calculating weights
![Page 15: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/15.jpg)
Use the charts in pages 37 and 38
![Page 16: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/16.jpg)
Using area and volumeUse the right method for the right
itemFind the area first
![Page 17: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/17.jpg)
Use the table of weights on page 47 to determine the weight of the materials in the selection list 1 – 12.
Load weights calculating table in page 48
Attempt the exercises in pages 49 – 51.
![Page 18: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/18.jpg)
CoG is the place in all objects where the entire weight acts like it is concentrated in that one point.
The location of the CoG is the most important factor in rigging
For symmetrical objects it falls in the middle
For other objects irregularly shaped, the CoG must be calculated.
Ignoring the CoG can be very dangerous.
![Page 19: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/19.jpg)
Five step Processes to Finding the CoGSeparate the object into sections or by componentsDetermine the weight of each sections or
componentsForm a reference end, measure the distance to the
Centre of each component. It is mandatory to take the measurement from the same reference point or end.
Multiply each section weight by the section’s measured distance from the reference to its centre
Add together and divide by the total weight of all the sections.
The answer will give you the number of feet from the reference end to the CoG.
![Page 20: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/20.jpg)
Weight distribution is directly proportional to the horizontal distance between the object’s CoG and its attachment points or bearing points...
Determining the Weight Distribution following the steps in page 60 - 61
![Page 21: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/21.jpg)
Sling angle stressPerpendicular sling angleHorizontal sling angleThe Lift TriangleAngle factor chart
Determine the sling angleLocate angle on chartUse corresponding Angle factorMultiply angle factor by weight carried in
leg
![Page 22: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/22.jpg)
Formula for Sling Angle Stress: Points to considerCoG equal distance from attachment
pointsAttachment points relatively levelSling lengths are equal
Rigging Gear CapacitiesAttempt the Rigging Math Exercise in
pages 76 – 80.
![Page 23: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/23.jpg)
OVERVIEWOBJECTIVESTYPES OF COMMUNICATIONHAND SIGNALSSTANDARD VOICE SIGNALSSPECIAL SIGNALSAUDIBLE TRAVEL SIGNALSAUDIBLE EMERGENCY SIGNALHAND SIGNAL EXERCISES
![Page 24: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/24.jpg)
The following will be covered in this sectionThe need for standard communicationsThe standard hand signals Using voice communicationsUsing other audible devices
![Page 25: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/25.jpg)
Hand signals on pages 85 – 88 have following merits:They are a standard methodThey are visible to allThey require no batteriesThey do not rely on frequency or wireless
signalRadio/Telephone or other voice devicesOther audible devices such as a horn or
siren
![Page 26: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/26.jpg)
Special signalsAudible travel Signals
STOPGO AHEADBACK UP
Audible Emergency SignalMobile Crane Hand Signal Exercises on
pages 91 – 93Overhead Crane Hand signal Exercises
on page 94
![Page 27: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/27.jpg)
OVERVIEWOBJECTIVESMAIN RIGGING HAZARDSELECTROCUTIONCRUSHINGSECTION REVIEW EXERCISE
![Page 28: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/28.jpg)
Case Studies highlight hazards in pages 96 -97Case 1: Hoisting Error Injures RiggerCase 2: An ironworker suffered a
fractured pelvis while performing lifting and rigging activities at a storage building construction project.
Case 3: Accident in a steelwork project site
![Page 29: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/29.jpg)
Section will coverHazards encountered in rigging operationsSteps to prevent accidentsEmergency procedures to follow when an accident
occurs Upon completion of the section you will be able to
Identify the electrical hazards in mobile crane operations
List the steps necessary to avoid accidents with electrical hazards.
Name the steps to follow in case of an accident resulting from each hazard
![Page 30: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/30.jpg)
These are usually caused byLoad instabilityLack of communicationElectrocution (electrical contact)Miscellaneous
The following attitudes are accident proneWe had to get the job doneWe have always done it that wayIt was the operator’s fault
![Page 31: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/31.jpg)
Powerline contactOverloadingFailure to use outriggers/soft ground
and structural failureTwo blockingPinchpointMoving partsUnsafe hooksObstruction of visionSheave caused cable damage
![Page 32: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/32.jpg)
Cable KinkingSide PullBoom BucklingAccess to cabsControl confusionTurntable failureRemovable or Extendible counter
weight systemsMachine not levelTravel upset in mobile hydraulic
cranes
![Page 33: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/33.jpg)
Loss of controlLoss of stowed jib boomsBoom disassembly on lattice work
boom cranesInadvertent loss of load on lattice
work boom cranesConductive cable for remove control
and controls accessible to an operator standing on the ground
Wind and long boom cranes
![Page 34: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/34.jpg)
Follow the Electrical Clearing Guide on page 104 Observations/activities before a lift Observations/activities during a lift If the Crane contact a power line:
Try to swing the crane away from the power line If this is not possible, stay in the cab Warn others to stay away from the crane Have the power shut off.
If the crane is on fire or another reason that you absolutely must leave the crane: Climb to the lowest step and jump clear from the
crane, landing with both feet together Do not step off the crane Hop or make small shuffle steps away from the crane
![Page 35: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/35.jpg)
Second greatest cause of deaths and injuries Can result from the crane falling over or a worker
getting caught in moving parts or structural failure
Before the lift Conduct a pre-operational inspection, making sure
that the following are trueCrane is properly set upThe wire rope is not wornAll required maintenance has been conductedThere are no adverse weather conditions
During the inspectionEnsure crane is not runningKeep hands away from moving partsHold a pre-lift meeting of all personnelInstruct riggers in the proper way to rig and handle loads
![Page 36: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/36.jpg)
During a Lift Lift the load slightly off the ground to ensure rigging
holds properly Use a tag line when the rotation of the load becomes
hazardous Handle the load carefully and smoothly Do not make any lift until the signal person gives the
proper signal Watch for pinchpoints between the load and the crane
or other items Refuse the lift if the load will be carried over anyone or
any critical equipment Never allow anyone to ride on or with a load while
lifting Know the weight of the load to be lifted
Section Review Exercise on page 111.
![Page 37: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/37.jpg)
CHAIN SLING INSPECTION
WIRE ROPE INSPECTION
SYNTHETIC SLING INSPECTION
WIRE ROPE BREAKING STRENGTH
LOAD PLANNING WORKSHEET
![Page 38: Basic Rigging Training (Brt)](https://reader030.fdocuments.in/reader030/viewer/2022033021/563dbbac550346aa9aaf3dd4/html5/thumbnails/38.jpg)
Thank you very much and I hope you have benefitted from the Training.
PROOFLOAD SERVICES LIMITED