Barton CSO Project – Green Stormwater Infrastructure (GSI)
Sunrise Heights &
Westwood
Community Meeting
February 8, 2012
![Page 2: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/2.jpg)
Meeting Agenda
• Project background (Mary Wohleb)
• Update on fieldwork, findings, and how they inform project design (Peg Staeheli & Curtis Koger)
• Considerations for bioretention swale locations (Peg Staeheli)
• Next steps and community involvement in design phase (Mary Wohleb)
• Hear community perspectives, concerns, and questions (Team)
• Break-out Sessions: one-on-one opportunities
![Page 3: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/3.jpg)
What is a Combined Sewer Overflow (CSO)?
• Currently averages 4 overflows per year
• Dept. of Ecology requires no more than 1 overflow per year by 2015.
![Page 4: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/4.jpg)
Barton Basin Description and Requirements
• 1,111 acres
• Five sub-basins
• Historically surface
water flowed south
and east
• Constructed
Combined Sewer
system conveyed
flows to the Barton
Pump station then
on to West Point
Treatment Plant
Murray CSO
Barton CSO
Approximate location of Longfellow Creek
![Page 5: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/5.jpg)
Contribution to the Combined Sewer System
• 45% of stormwater flows entering the combined sewer come from the project area
• Stormwater runoff from the streets drain to combined sewer
PROJECT AREA
![Page 6: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/6.jpg)
Project Area Connection • 170 acres in the
Sunrise Heights and
Westwood
communities is
connected to the
CSS
• Reduce overall
volume of stormwater
entering the CSS
through GSI
![Page 7: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/7.jpg)
What is Green Stormwater Infrastructure (GSI)?
Engineered
infrastructure to
manage stormwater
quantity and quality
using soils and
vegetation (sometimes
in combination with
decentralized storage)
to capture, infiltrate,
evaporate or reuse
stormwater.
![Page 8: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/8.jpg)
GSI for CSO Control
High Point, Seattle Port Townsend
![Page 9: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/9.jpg)
Why this Neighborhood? • Predominately connected
• 45% flow contribution
• Initial high level analysis appears there were enough blocks connected to meet the CSO control target
• Many flat or slightly sloping streets
• Wide planter strips on many streets
• Can be constructed in the Right of Way
Project scope:
• Construct bioretention swales in the planter strips in the city owned right of way on up to 40 blocks to control CSOs
![Page 10: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/10.jpg)
![Page 11: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/11.jpg)
What We’ve Heard from You
• Existing Drainage Concerns
• Parking
• Access
• Vegetation and Trees
• Maintenance
![Page 12: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/12.jpg)
Setting the Stage for Design
• Research
• Select a Consultant Team
• Gather Data
• Develop Models
• Start Permitting Process
![Page 13: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/13.jpg)
Understanding the Conditions of Your Neighborhood
![Page 14: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/14.jpg)
Overview of Field Reconnaissance
• Understanding Above- and Below-Ground Features
• Geotechnical Testing
• Initial Land Survey
• Data Review
image courtesy Google
![Page 15: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/15.jpg)
Neighborhood Geology
• Soil types
• Soil layers
• How and where water flows underground
• Water table characteristics
![Page 16: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/16.jpg)
Testing Sites and Equipment
![Page 17: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/17.jpg)
What We Found Underground
![Page 18: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/18.jpg)
Initial Geotechnical Findings
• Surface soils have low infiltration (drainage) rates
• There are deeper soils that are excellent for conveying water in the Vashon advance outwash for stormwater infiltration
![Page 19: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/19.jpg)
![Page 20: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/20.jpg)
Bioretention Swale in Infiltrative Soils
![Page 21: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/21.jpg)
Bioretention with Pit Drains Design
![Page 22: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/22.jpg)
Bioretention with Deep Well Infiltration Design
![Page 23: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/23.jpg)
Bringing Together the Data
• Right-of-way (ROW) location
• Geotechnical combined with field survey
• Field reconnaissance
• Underground utilities
• Parking placement and use
• Community survey
• Assessment of trees and
vegetation
• Existing surface conditions
![Page 24: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/24.jpg)
Field Reconnaissance
![Page 25: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/25.jpg)
Catchment Areas and Modeling
SvR to ADD GRAPHIC:
showing block level
catchments.
![Page 26: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/26.jpg)
Evaluation of the Streets
32nd Ave SW (Webster to Holden) 31st Ave SW (Webster to Holden)
SW Kenyon St (34th to 31st) 34nd Ave SW (Trenton to Henderson)
![Page 27: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/27.jpg)
Characteristics We’re Looking For
• Residential Streets (not arterials)
• Right-of-way (ROW) location
• Wider Planters
• Flatter Roads
• Utility Locations
• Service Utilities
• Open Areas Without Mature Trees
• Existing Vegetation
• Fewer Driveways
• Cross Slope of Road (“Thrown” vs. “Crowned”)
• Bigger Catchment Areas
• On-Street Parking
• No Impact on Cultural Resources
• No Impact to Existing Drainage Conditions
• Suitable Soils
• Community Survey
• Access to Sidewalks
![Page 28: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/28.jpg)
![Page 29: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/29.jpg)
![Page 30: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/30.jpg)
Design Process
Survey Modeling
Geotechnical
Testing
Field
Recon.
Public
Feedback Design
&
Permitting
![Page 31: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/31.jpg)
Design and Permitting Process
• Perform Field Reconnaissance
• Develop Conceptual Layout for Streets
• Fit Bioretention Cells Into Planting Strips
• Begin Street Improvement Process with Seattle Dept. of Transportation (SDOT) & Seattle Public Utilities (SPU)
• Gather Community Input
• Design for Operations & Maintenance
• Design for Wise Use of Public Funds
• Prepare Bid Documents for Construction
![Page 32: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/32.jpg)
Next Steps
• Modeling to determine the number of blocks needed to control the CSO
• Select the blocks
• Notify selected blocks
• Work with some homeowners on further land surveying or locating utilities
• Community meeting in late March on block selection and begin work on final design
![Page 33: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/33.jpg)
![Page 34: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/34.jpg)
Break Out Sessions
• Geology
• Design Considerations
• Basin Drainage
• General Project Questions
![Page 35: Barton CSO Project Green Stormwater Infrastructure (GSI)...High Point, Seattle Port Townsend . Why this Neighborhood? •Predominately connected •45% flow contribution •Initial](https://reader033.fdocuments.in/reader033/viewer/2022050509/5f9a4b56ecbeaa1a0821fe74/html5/thumbnails/35.jpg)
For More Information
• Kristine Cramer, King County Community Relations
Email: [email protected]
Phone: (206) 263-3184
• Mary Wohleb, King County Project Manager
Email: [email protected]
Phone: (206) 296-8028
• Web: www.kingcounty.gov/environment/wtd/ construction/seattle/bartonCSO-GSI.aspx