Barney Circle Concept Cross Sections 2
-
Upload
anacostiawaterfront -
Category
Documents
-
view
789 -
download
3
description
Transcript of Barney Circle Concept Cross Sections 2
Buffer
10’ 5’ 24’ 20’
Trail
M. P.
10’
Buffer
24’ 5’
Trail
M. P.
PROPOSED BUS FACILITY
FUTURE LAND USES / REDEVELOPMENT
225’
PROPOSED SOUTHEAST BOULEVARD
60
55
50
45
40
35
30
25
20
M STREET
13TH STREET
LOOKING EAST TOWARDS BARNEY CIRCLE
SOUTHEAST BOULEVARD TYPICAL SECTION AT 13TH STREET WITH CONCEPT No. 2
L STREET
Existing
35’
Buffer
10’ 10’
Buffer
5’ 24’ 20’ 24’ 5’
Trail
M. P.
Trail
M. P.
120’
PROPOSED BUS FACILITY
FUTURE LAND USES / REDEVELOPMENT
PROPOSED SOUTHEAST BOULEVARD
M STREET
60
55
50
45
40
35
30
25
20
LOOKING EAST TOWARDS BARNEY CIRCLE
SOUTHEAST BOULEVARD TYPICAL SECTION AT 15TH STREET w/ CONCEPT No. 3
Exist. L ST.35’
21’ Clearance
35’
21’ Clearance
CSX RAILROAD
CSX RAILROAD
DRAFT - For C
omments
Only.
Not for E
ngineerin
g or Constr
uction
2/21/1
3