Barney Circle Concept Cross Sections 2

1
Bu ff e r 10’ 5’ 24’ 20’ Trail M. P. 10’ Bu ff e r 24’ 5’ Trail M. P. PROPOSED BUS FACILITY FUTURE LAND USES / REDEVELOPMENT 225’ PROPOSED SOUTHEAST BOULEVARD 60 55 50 45 40 35 30 25 20 M STREET 13TH STREET LOOKING EAST TOWARDS BARNEY CIRCLE SOUTHEAST BOULEVARD TYPICAL SECTION AT 13TH STREET WITH CONCEPT No. 2 L STREET Existing 35’ Bu ff e r 10’ 10’ Bu ff e r 5’ 24’ 20’ 24’ 5’ Trail M. P. Trail M. P. 120’ PROPOSED BUS FACILITY FUTURE LAND USES / REDEVELOPMENT PROPOSED SOUTHEAST BOULEVARD M STREET 60 55 50 45 40 35 30 25 20 LOOKING EAST TOWARDS BARNEY CIRCLE SOUTHEAST BOULEVARD TYPICAL SECTION AT 15TH STREET w/ CONCEPT No. 3 Exist. L ST. 35’ 21’ Clearance 35’ 21’ Clearance CSX RAILROAD CSX RAILROAD DRAFT - For Comments Only. Not for Engineering or Construction 2/21/13

description

Concept Cross Sections 2

Transcript of Barney Circle Concept Cross Sections 2

Page 1: Barney Circle Concept Cross Sections 2

Buffer

10’ 5’ 24’ 20’

Trail

M. P.

10’

Buffer

24’ 5’

Trail

M. P.

PROPOSED BUS FACILITY

FUTURE LAND USES / REDEVELOPMENT

225’

PROPOSED SOUTHEAST BOULEVARD

60

55

50

45

40

35

30

25

20

M STREET

13TH STREET

LOOKING EAST TOWARDS BARNEY CIRCLE

SOUTHEAST BOULEVARD TYPICAL SECTION AT 13TH STREET WITH CONCEPT No. 2

L STREET

Existing

35’

Buffer

10’ 10’

Buffer

5’ 24’ 20’ 24’ 5’

Trail

M. P.

Trail

M. P.

120’

PROPOSED BUS FACILITY

FUTURE LAND USES / REDEVELOPMENT

PROPOSED SOUTHEAST BOULEVARD

M STREET

60

55

50

45

40

35

30

25

20

LOOKING EAST TOWARDS BARNEY CIRCLE

SOUTHEAST BOULEVARD TYPICAL SECTION AT 15TH STREET w/ CONCEPT No. 3

Exist. L ST.35’

21’ Clearance

35’

21’ Clearance

CSX RAILROAD

CSX RAILROAD

DRAFT - For C

omments

Only.

Not for E

ngineerin

g or Constr

uction

2/21/1

3