Bamboo Housing Manufacturing Process
6
HIMALAYAN BAMBOO PVT.LTD MANUFACTURING PROCESS LOW COST BAMBOO HOUSING
-
Upload
praweshsth -
Category
Documents
-
view
662 -
download
3
Transcript of Bamboo Housing Manufacturing Process
HIMALAYAN BAMBOO PVT.LTD
MANUFACTURING PROCESS
LOW COST BAMBOO HOUSING
Primary Plinth Of The House
Basic foundation of the house.
15 days for the plinth to be ready for other construction.
Assembly of the house
The side assembling. The support to the side walls.
Roofing of the bamboo house
Support to the roof. Upper View
Plastering of the bamboo House
Plastering and support Controlling the plaster level
Varnishing/Painting/ Final Touch
Final Ready House Ready to Handover