BAJA STATUS UPDATE November 9, 2011 FRAME & SUSPENSION Design Phase completed Analysis Phase 35%...
3
BAJA STATUS UPDATE November 9, 2011 FRAME & SUSPENSION • Design Phase completed • Analysis Phase 35% completed – Frame Design uploaded to PATRAN – Material Properties selected – Tubing Dimensions selected – Boundary Conditions established • Upcoming Tasks – PATRAN FEA under multiple load cases
-
Upload
darcy-pierce -
Category
Documents
-
view
220 -
download
4
Transcript of BAJA STATUS UPDATE November 9, 2011 FRAME & SUSPENSION Design Phase completed Analysis Phase 35%...
PowerPoint Presentation
BAJA STATUS UPDATENovember 9, 2011FRAME & SUSPENSION
Design Phase completed
Analysis Phase 35% completedFrame Design uploaded to PATRANMaterial Properties selectedTubing Dimensions selectedBoundary Conditions established
Upcoming TasksPATRAN FEA under multiple load cases
BAJA STATUS UPDATENovember 9, 2011GEARBOXCalculation Phase completedGearsShaftsBearings
Design Phase 60% completedGear train design completed
Upcoming TasksPackaging design in SolidWorksSolidWorks FEA
GANTT CHART 11/9/2011