DELHI JAL BOARD OFFICE OF MEMBER (WATER SUPPLY) VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI No. DJB/M (WS)/A-97/2017/ Date: 01.07.21 WATER PRODUCTION REPORT Normal Up Stream Pond Level At Wazirabad Today’s Figure of U/S and D/S Wazirabad Pond Level (in Feet) Discharge (Cusec.) Gate Opening (Feet) Raw Water Turbidity (NTU) 674.50 Feet 674.50/664.40 200 6” 82 Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.) 710.0 5.6,4.8 PRODUCTION DETAILS TOTAL PRODUCTION : 945.47 MGD Water Treatment Plant Peak Production Capacity (MGD) Raw Water Source Today‘s Production Remarks YAMUNA WATER i) Chandrawal 98 Wazirabad Pond 89.62 ii) Wazirabad 124 -Do- 123.81 iii) Haiderpur 220 WJC Canal 219.26 iv) Nangloi 40 -Do- 43.67 v) Okhla 20 Recycled Process waste from Chandrawal & R. W. 21.85 vi) Dwarka WJC Canal 51.06 vii Bawana WJC Canal 20.02 GANGA WATER vii) Bhagirathi 100 Upper Ganga Canal 109.71 viii) Sonia Vihar 144 -Do- 140.35 1) Production of Water Treatment Plants 819.35 RECYCLING /PROCESS WASTE WATER PLANTS i) Wazir\bad 11 Recycled process waste at Wzd. Plant 10.29 ii) Haiderpur 16 Recycled process waste at Wzd. Plant 16.20 iii) Bhagirathi 10 Recycled process waste at Wzd. Plant 4.63 iv) Chandrawal 08 Recycled process waste at Wz. Plant 2) Production from Recycling Plants 31.12 GROUND WATER SOURCES 3) Production from Ranney wells & Tube wells 95.00 Total (1+2+3) 945.47 5. MAJOR UGRs’ LEVELS IN METERS. Location Normal Level (in Meters ) at 6.00 am Today’s Level Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04 Jhandewalan 4.11 4.14 Greater Kailash (O) 5.12 4.14 Greater Kailash (N) 4.80 3.04 Deer Park 4.50 4.00 Janak Puri 3.00 3.40 Kalka Ji 3.65 4.51

Transcript of bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur...

Page 1: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 01.07.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 200 6” 82

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 5.6,4.8

PRODUCTION DETAILS TOTAL PRODUCTION : 945.47 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 89.62

ii) Wazirabad 124 -Do- 123.81

iii) Haiderpur 220 WJC Canal 219.26

iv) Nangloi 40 -Do- 43.67

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

21.85

vi) Dwarka WJC Canal 51.06

vii Bawana WJC Canal 20.02

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 109.71

viii) Sonia Vihar 144 -Do- 140.35

1) Production of Water Treatment Plants 819.35

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.29

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.20

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.63

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 31.12

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 945.47

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.14

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 4.00

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.51

Page 2: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

m6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 31.06.21----------945.47 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor

2. P.S. to Chief Minister, Delhi

3. P.S. to Chief Secretary, Delhi

4. Principal Secretary (UD) Govt., of NCT of Delhi

5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

7. CE(WW)

8. CE (East)

9. Dir F & A

10. E.E. (EDP) for uploading on Website

11. Office copy

Page 3: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 02.07.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 70

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 6.1

PRODUCTION DETAILS TOTAL PRODUCTION : 944.64 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 88.13

ii) Wazirabad 124 -Do- 123.85

iii) Haiderpur 220 WJC Canal 220.32

iv) Nangloi 40 -Do- 51.05

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

20.00

vi) Dwarka WJC Canal 51.05

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 108.88

viii Sonia Vihar 144 -Do- 140.29

1) Production of Water Treatment Plants 818.76

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.25

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.00

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.63

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 30.88

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 944.64

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 3.04

Greater Kailash (N) 4.80 4.00

Deer Park 4.50 3.40

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.26

Page 4: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected

Note :- Total supply of water in last 24 hours i.e. 01.07.2021 ----------944.64 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor 2. P.S. to Chief Minister, Delhi 3. P.S. to Chief Secretary, Delhi 4. Principal Secretary (UD) Govt., of NCT of Delhi 5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi 6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009 7. CE(WW) 8. CE (East) 9. Dir F & A 10. E.E. (EDP) for uploading on Website 11. Office copy

Page 5: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 03.07.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 66

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 4.2

PRODUCTION DETAILS TOTAL PRODUCTION : 935.90 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 85.08

ii) Wazirabad 124 -Do- 123.55

iii) Haiderpur 220 WJC Canal 215.30

iv) Nangloi 40 -Do- 44.39

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

21.70

vi) Dwarka WJC Canal 51.03

vii Bawana WJC Canal 20.02

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 109.50

viii) Sonia Vihar 144 -Do- 139.19

1) Production of Water Treatment Plants 809.76

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.27

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.10

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.77

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 31.14

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 935.90

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.05

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 4.40

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 6: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e..02.07.21 ----------935.90 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor

2. P.S. to Chief Minister, Delhi

3. P.S. to Chief Secretary, Delhi

4. Principal Secretary (UD) Govt., of NCT of Delhi

5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

7. CE(WW)

8. CE (East)

DELHI JAL BOARD

Page 7: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 04.07.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/665.30 200 0’.6” 54

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 6.6

PRODUCTION DETAILS TOTAL PRODUCTION : 944.92 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 89.68

ii) Wazirabad 124 -Do- 123.88

iii) Haiderpur 220 WJC Canal 218.94

iv) Nangloi 40 -Do- 43.95

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

21.60

vi) Dwarka WJC Canal 51.04

vii Bawana WJC Canal 19.50

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 109.69

viii) Sonia Vihar 144 -Do- 140.26

1) Production of Water Treatment Plants 818.54

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.28

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.30

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.80

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 31.38

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95

Total (1+2+3) 944.92

5. MAJOR UGRs’ LEVELS IN METERS.

m6. TRANSMISSION MAIN

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.05

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 3.40

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.26

Page 8: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 03.07.21 ----------944.92 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor 2. P.S. to Chief Minister, Delhi 3. P.S. to Chief Secretary, Delhi 4. Principal Secretary (UD) Govt., of NCT of Delhi 5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi 6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company, 7. Hudson Lane, Civil Lines ,Delhi-110009 8. CE(WW) 9. CE (East) 10. Dir F & A 11. E.E. (EDP) for uploading on Website 12. Office copy

Page 9: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 05.07.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 76

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 6

PRODUCTION DETAILS TOTAL PRODUCTION : 944.24 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 89.11

ii) Wazirabad 124 -Do- 123.88

iii) Haiderpur 220 WJC Canal 218.32

iv) Nangloi 40 -Do- 44.54

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

21.50

vi) Dwarka WJC Canal 51.02

vii Bawana WJC Canal 20.01

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 109.40

viii Sonia Vihar 144 -Do- 140.30

1) Production of Water Treatment Plants 818.08

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.26

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.20

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.70

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 31.16

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 944.24

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 3.44

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 4.00

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 10: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected

Note :- Total supply of water in last 24 hours i.e. 04.07.2021 ----------944.24 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor 2. P.S. to Chief Minister, Delhi 3. P.S. to Chief Secretary, Delhi 4. Principal Secretary (UD) Govt., of NCT of Delhi 5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi 6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009 7. CE(WW) 8. CE (East) 9. Dir F & A 10. E.E. (EDP) for uploading on Website 11. Office copy

Page 11: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 06.07.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 54

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 6

PRODUCTION DETAILS TOTAL PRODUCTION : 946.67 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 90.11

ii) Wazirabad 124 -Do- 123.84

iii) Haiderpur 220 WJC Canal 219.35

iv) Nangloi 40 -Do- 44.72

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

21.70

vi) Dwarka WJC Canal 51.06

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 109.41

viii) Sonia Vihar 144 -Do- 140.27

1) Production of Water Treatment Plants 820.46

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.27

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.10

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.84

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 31.21

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 946.67

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 3.59

Greater Kailash (N) 4.80 3.35

Deer Park 4.50 4.00

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 12: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

m6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 05.07.21----------946.67 MGD

Member (WS)

Copy to: -

12. Pr. Secretary to Lt. Governor

13. P.S. to Chief Minister, Delhi

14. P.S. to Chief Secretary, Delhi

15. Principal Secretary (UD) Govt., of NCT of Delhi

16. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

17. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

18. CE(WW)

19. CE (East)

20. Dir F & A

21. E.E. (EDP) for uploading on Website

22. Office copy

Page 13: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 07.07.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 47

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 6.0,4.0

PRODUCTION DETAILS TOTAL PRODUCTION : 943.95 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 87.76

ii) Wazirabad 124 -Do- 123.47

iii) Haiderpur 220 WJC Canal 219.13

iv) Nangloi 40 -Do- 44.51

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

21.74

vi) Dwarka WJC Canal 51.04

vii Bawana WJC Canal 20.02

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 109.54

viii Sonia Vihar 144 -Do- 140.41

1) Production of Water Treatment Plants 817.62

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.26

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.10

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.97

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 31.33

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 943.95

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.05

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 4.00

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 14: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected

Note :- Total supply of water in last 24 hours i.e. 06.07.2021 ----------943.95 MGD

Member (WS)

Copy to: -

12. Pr. Secretary to Lt. Governor 13. P.S. to Chief Minister, Delhi 14. P.S. to Chief Secretary, Delhi 15. Principal Secretary (UD) Govt., of NCT of Delhi 16. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi 17. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009 18. CE(WW) 19. CE (East) 20. Dir F & A 21. E.E. (EDP) for uploading on Website 22. Office copy

Page 15: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 08.07.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 66

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 6.1

PRODUCTION DETAILS TOTAL PRODUCTION : 933.59 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 84.42

ii) Wazirabad 124 -Do- 116.83

iii) Haiderpur 220 WJC Canal 219.45

iv) Nangloi 40 -Do- 43.43

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

23.02

vi) Dwarka WJC Canal 51.07

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 109.15

viii) Sonia Vihar 144 -Do- 140.43

1) Production of Water Treatment Plants 807.80

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

9.91

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.00

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.88

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 30.79

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 933.59

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.05

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 3.90

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.26

Page 16: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e..07.07.21 ----------933.59 MGD

Member (WS)

Copy to: -

9. Pr. Secretary to Lt. Governor

10. P.S. to Chief Minister, Delhi

11. P.S. to Chief Secretary, Delhi

12. Principal Secretary (UD) Govt., of NCT of Delhi

13. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

14. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

15. CE(WW)

16. CE (East)

Page 17: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 09.07.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 48

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 5.5

PRODUCTION DETAILS TOTAL PRODUCTION : 932.50 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 83.00

ii) Wazirabad 124 -Do- 117.09

iii) Haiderpur 220 WJC Canal 219.04

iv) Nangloi 40 -Do- 44.46

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

22.45

vi) Dwarka WJC Canal 51.04

vii Bawana WJC Canal 20.02

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 109.51

viii) Sonia Vihar 144 -Do- 139.68

1) Production of Water Treatment Plants 806.29

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.23

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.20

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.78

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 31.21

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 932.50

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.05

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 4.10

Janak Puri 3.00 3.60

Page 18: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e..08.07.21 ----------932.50 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor

2. P.S. to Chief Minister, Delhi

3. P.S. to Chief Secretary, Delhi

4. Principal Secretary (UD) Govt., of NCT of Delhi

5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

7. CE(WW)

8. CE (East)

Kalka Ji 3.65 4.26

Page 19: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 10.07.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 58

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 8.0,4.2

PRODUCTION DETAILS TOTAL PRODUCTION : 869.67 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 70.72 Raw water storage

ii) Wazirabad 124 -Do- 88.41 Raw water storage

iii) Haiderpur 220 WJC Canal 211.83

iv) Nangloi 40 -Do- 42.25

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

14.49

vi) Dwarka WJC Canal 49.21

vii Bawana WJC Canal 17.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 109.45

viii) Sonia Vihar 144 -Do- 140.17

1) Production of Water Treatment Plants 743.53

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.27

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.10

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.77

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 31.14

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 869.67

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.20

Greater Kailash (N) 4.80 3.50

Deer Park 4.50 3.70

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 20: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

m6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 09.06.21----------869.67 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor

2. P.S. to Chief Minister, Delhi

3. P.S. to Chief Secretary, Delhi

4. Principal Secretary (UD) Govt., of NCT of Delhi

5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

7. CE(WW)

8. CE (East)

9. Dir F & A

10. E.E. (EDP) for uploading on Website

11. Office copy

Page 21: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 11.07.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 45

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 7.4

PRODUCTION DETAILS TOTAL PRODUCTION : 839.18 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 64.61 Raw water storage

ii) Wazirabad 124 -Do- 76.59 Raw water storage

iii) Haiderpur 220 WJC Canal 207.13

iv) Nangloi 40 -Do- 40.30

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

12.93

vi) Dwarka WJC Canal 48.21

vii Bawana WJC Canal 16.50

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 109.32

viii Sonia Vihar 144 -Do- 137.36

1) Production of Water Treatment Plants 712.95

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.36

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.10

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.77

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 31.23

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 839.18

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.26

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 4.10

Janak Puri 3.00 3.40

Kalka Ji 3.65 3.96

Page 22: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected

Note :- Total supply of water in last 24 hours i.e. 10.07.2021 ----------839.18 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor 2. P.S. to Chief Minister, Delhi 3. P.S. to Chief Secretary, Delhi 4. Principal Secretary (UD) Govt., of NCT of Delhi 5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi 6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009 7. CE(WW) 8. CE (East) 9. Dir F & A 10. E.E. (EDP) for uploading on Website 11. Office copy

Page 23: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 12.07.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 87

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 7.4,4.2

PRODUCTION DETAILS TOTAL PRODUCTION : 832.14 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 74.92 Raw water storage

ii) Wazirabad 124 -Do- 70.11 Raw water storage

iii) Haiderpur 220 WJC Canal 199.53

iv) Nangloi 40 -Do- 40.18

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

13.22

vi) Dwarka WJC Canal 48.23

vii Bawana WJC Canal 16.10

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 109.69

viii) Sonia Vihar 144 -Do- 136.32

1) Production of Water Treatment Plants 708.30

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

7.86

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.20

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.78

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 28.84

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 832.14

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.05

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 3.70

Janak Puri 3.00 3.40

Kalka Ji 3.65 3.96

Page 24: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e..02.07.21 ----------832.14 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor

2. P.S. to Chief Minister, Delhi

3. P.S. to Chief Secretary, Delhi

4. Principal Secretary (UD) Govt., of NCT of Delhi

5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

7. CE(WW)

8. CE (East)

Page 25: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 13.07.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/665.30 59

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 7.5

PRODUCTION DETAILS TOTAL PRODUCTION : 812.57 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 64.41

ii) Wazirabad 124 -Do- 61.06

iii) Haiderpur 220 WJC Canal 200.27

iv) Nangloi 40 -Do- 39.30

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

12.56

vi) Dwarka WJC Canal 48.22

vii Bawana WJC Canal 16.10

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 109.41

viii) Sonia Vihar 144 -Do- 135.01

1) Production of Water Treatment Plants 686.34

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.26

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.20

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.77

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 31.23

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95

Total (1+2+3) 812.57

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.05

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 3.90

Janak Puri 3.00 3.35

Kalka Ji 3.65 3.65

Page 26: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

m6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 12.07.21 ----------812.57 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor 2. P.S. to Chief Minister, Delhi 3. P.S. to Chief Secretary, Delhi 4. Principal Secretary (UD) Govt., of NCT of Delhi 5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi 6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company, 7. Hudson Lane, Civil Lines ,Delhi-110009 8. CE(WW) 9. CE (East) 10. Dir F & A 11. E.E. (EDP) for uploading on Website 12. Office copy

Page 27: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 14.07.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 42

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 8.1,4.2

PRODUCTION DETAILS TOTAL PRODUCTION : 813.07 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 76.58

ii) Wazirabad 124 -Do- 66.48

iii) Haiderpur 220 WJC Canal 193.40

iv) Nangloi 40 -Do- 39.34

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

12.16

vi) Dwarka WJC Canal 48.25

vii Bawana WJC Canal 16.11

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 109.79

viii Sonia Vihar 144 -Do- 125.04

1) Production of Water Treatment Plants 687.15

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.03

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.10

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.79

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 30.92

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 813.07

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 --

Greater Kailash (N) 4.80 --

Deer Park 4.50 3.60

Janak Puri 3.00 3.35

Page 28: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected

Note :- Total supply of water in last 24 hours i.e. 13.07.2021 ----------813.07 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor 2. P.S. to Chief Minister, Delhi 3. P.S. to Chief Secretary, Delhi 4. Principal Secretary (UD) Govt., of NCT of Delhi 5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi 6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009 7. CE(WW) 8. CE (East) 9. Dir F & A 10. E.E. (EDP) for uploading on Website 11. Office copy

Kalka Ji 3.65 3.65

Page 29: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 15.07.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 8800

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 8.4,4.8

PRODUCTION DETAILS TOTAL PRODUCTION : 837.27 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 84.59

ii) Wazirabad 124 -Do- 80.95

iii) Haiderpur 220 WJC Canal 186.67

iv) Nangloi 40 -Do- 37.50

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

14.38

vi) Dwarka WJC Canal 48.75

vii Bawana WJC Canal 19.10

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 109.91

viii) Sonia Vihar 144 -Do- 129.60

1) Production of Water Treatment Plants 711.45

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.31

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

15.80

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.71

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 30.82

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 837.27

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 3.96

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 3.90

Janak Puri 3.00 3.95

Page 30: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.07...2021/07/01  · Water Treatment Plant Peak Production Capacity

m6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 14.07.21----------837.27 MGD

Member (WS)

Copy to: -

12. Pr. Secretary to Lt. Governor

13. P.S. to Chief Minister, Delhi

14. P.S. to Chief Secretary, Delhi

15. Principal Secretary (UD) Govt., of NCT of Delhi

16. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

17. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

18. CE(WW)

19. CE (East)

20. Dir F & A

21. E.E. (EDP) for uploading on Website

22. Office copy

Kalka Ji 3.65 4.14