bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur...

56
DELHI JAL BOARD OFFICE OF MEMBER (WATER SUPPLY) VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI No. DJB/M (WS)/A-97/2017/ Date: 01.06.21 WATER PRODUCTION REPORT Normal Up Stream Pond Level At Wazirabad Today’s Figure of U/S and D/S Wazirabad Pond Level (in Feet) Discharge (Cusec.) Gate Opening (Feet) Raw Water Turbidity (NTU) 674.50 Feet 674.50/664.40 45 Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.) 710.0 8.4 PRODUCTION DETAILS TOTAL PRODUCTION : 948.50 MGD Water Treatment Plant Peak Production Capacity (MGD) Raw Water Source Today‘s Production Remarks YAMUNA WATER i) Chandrawal 98 Wazirabad Pond 94.17 ii) Wazirabad 124 -Do- 123.86 iii) Haiderpur 220 WJC Canal 218.86 iv) Nangloi 40 -Do- 43.61 v) Okhla 20 Recycled Process waste from Chandrawal & R. W. 21.72 vi) Dwarka WJC Canal 51.05 vii Bawana WJC Canal 20.00 GANGA WATER vii) Bhagirathi 100 Upper Ganga Canal 107.98 viii) Sonia Vihar 144 -Do- 142.98 1) Production of Water Treatment Plants 822.42 RECYCLING /PROCESS WASTE WATER PLANTS i) Wazir\bad 11 Recycled process waste at Wzd. Plant 10.31 ii) Haiderpur 16 Recycled process waste at Wzd. Plant 16.00 iii) Bhagirathi 10 Recycled process waste at Wzd. Plant 4.77 iv) Chandrawal 08 Recycled process waste at Wz. Plant 2) Production from Recycling Plants 31.08 GROUND WATER SOURCES 3) Production from Ranney wells & Tube wells 95.00 Total (1+2+3) 948.50 5. MAJOR UGRs’ LEVELS IN METERS. Location Normal Level (in Meters ) at 6.00 am Today’s Level Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04 Jhandewalan 4.11 4.14 Greater Kailash (O) 5.12 4.51 Greater Kailash (N) 4.80 3.04 Deer Park 4.50 4.00 Janak Puri 3.00 3.40 Kalka Ji 3.65 4.54

Transcript of bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur...

Page 1: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 01.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 45

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 8.4

PRODUCTION DETAILS TOTAL PRODUCTION : 948.50 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 94.17

ii) Wazirabad 124 -Do- 123.86

iii) Haiderpur 220 WJC Canal 218.86

iv) Nangloi 40 -Do- 43.61

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

21.72

vi) Dwarka WJC Canal 51.05

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 107.98

viii) Sonia Vihar 144 -Do- 142.98

1) Production of Water Treatment Plants 822.42

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.31

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.00

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.77

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 31.08

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 948.50

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.51

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 4.00

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 2: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

m6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 31.05.21----------948.50 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor

2. P.S. to Chief Minister, Delhi

3. P.S. to Chief Secretary, Delhi

4. Principal Secretary (UD) Govt., of NCT of Delhi

5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

7. CE(WW)

8. CE (East)

9. Dir F & A

10. E.E. (EDP) for uploading on Website

11. Office copy

Page 3: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 02.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 8

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 8.4

PRODUCTION DETAILS TOTAL PRODUCTION : 941.22 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 94.00

ii) Wazirabad 124 -Do- 122.27

iii) Haiderpur 220 WJC Canal 217.92

iv) Nangloi 40 -Do- 40.86

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

21.54

vi) Dwarka WJC Canal 51.03

vii Bawana WJC Canal 19.02

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 107.43

viii Sonia Vihar 144 -Do- 142.10

1) Production of Water Treatment Plants 816.17

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

9.37

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.10

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.58

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 30.05

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 941.22

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.26

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 3.80

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 4: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected

Note :- Total supply of water in last 24 hours i.e. 01.06.2021 ----------941.22 MGD

Member (WS)

Copy to: -

12. Pr. Secretary to Lt. Governor

13. P.S. to Chief Minister, Delhi

14. P.S. to Chief Secretary, Delhi

15. Principal Secretary (UD) Govt., of NCT of Delhi

16. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

17. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

18. CE(WW)

19. CE (East)

20. Dir F & A

21. E.E. (EDP) for uploading on Website

22. Office copy

Page 5: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 03.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 53

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 7.9

PRODUCTION DETAILS TOTAL PRODUCTION : 947.97 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 94.18

ii) Wazirabad 124 -Do- 123.83

iii) Haiderpur 220 WJC Canal 217.83

iv) Nangloi 40 -Do- 44.03

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

21.25

vi) Dwarka WJC Canal 51.04

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 107.96

viii) Sonia Vihar 144 -Do- 141.68

1) Production of Water Treatment Plants 821.80

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.44

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.20

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.53

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 31.17

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 947.97

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.26

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 4.00

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 6: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e..02.06.21 ----------947.97 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor

2. P.S. to Chief Minister, Delhi

3. P.S. to Chief Secretary, Delhi

4. Principal Secretary (UD) Govt., of NCT of Delhi

5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

7. CE(WW)

8. CE (East)

Page 7: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 04.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 45

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 7.5

PRODUCTION DETAILS TOTAL PRODUCTION : 942.25 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 93.28

ii) Wazirabad 124 -Do- 118.79

iii) Haiderpur 220 WJC Canal 218.03

iv) Nangloi 40 -Do- 44.07

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

22.14

vi) Dwarka WJC Canal 51.06

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 108.04

viii) Sonia Vihar 144 -Do- 141.06

1) Production of Water Treatment Plants 816.49

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.47

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.00

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.29

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 30.76

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95

Total (1+2+3) 942.25

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.11

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 3.80

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 8: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

m6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 03.06.21 ----------942.25 MGD

Member (WS)

Copy to: -

23. Pr. Secretary to Lt. Governor

24. P.S. to Chief Minister, Delhi

25. P.S. to Chief Secretary, Delhi

26. Principal Secretary (UD) Govt., of NCT of Delhi

27. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

28. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

29. CE(WW)

30. CE (East)

31. Dir F & A

32. E.E. (EDP) for uploading on Website

33. Office copy

Page 9: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 05.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 48

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 6.9

PRODUCTION DETAILS TOTAL PRODUCTION : 931.38 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 91.26

ii) Wazirabad 124 -Do- 113.46

iii) Haiderpur 220 WJC Canal 217.00

iv) Nangloi 40 -Do- 42.95

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

21.64

vi) Dwarka WJC Canal 51.05

vii Bawana WJC Canal 20.01

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 107.67

viii Sonia Vihar 144 -Do- 141.14

1) Production of Water Treatment Plants 806.18

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

9.70

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.10

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.40

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 30.20

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 931.38

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.14

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 3.90

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.26

Page 10: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected

Note :- Total supply of water in last 24 hours i.e. 04.06.2021 ----------931.38 MGD

Member (WS)

Copy to: -

34. Pr. Secretary to Lt. Governor

35. P.S. to Chief Minister, Delhi

36. P.S. to Chief Secretary, Delhi

37. Principal Secretary (UD) Govt., of NCT of Delhi

38. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

39. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

40. CE(WW)

41. CE (East)

42. Dir F & A

43. E.E. (EDP) for uploading on Website

44. Office copy

Page 11: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 06.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 46

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 6.3

PRODUCTION DETAILS TOTAL PRODUCTION : 944.28 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 94.51

ii) Wazirabad 124 -Do- 122.11

iii) Haiderpur 220 WJC Canal 216.89

iv) Nangloi 40 -Do- 43.79

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

21.93

vi) Dwarka WJC Canal 51.04

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 107.74

viii) Sonia Vihar 144 -Do- 141.37

1) Production of Water Treatment Plants 819.38

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

9.16

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.20

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.54

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 29.90

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 944.28

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.29

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 4.00

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 12: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e..05.06.21 ----------944.28 MGD

Member (WS)

Copy to: -

9. Pr. Secretary to Lt. Governor

10. P.S. to Chief Minister, Delhi

11. P.S. to Chief Secretary, Delhi

12. Principal Secretary (UD) Govt., of NCT of Delhi

13. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

14. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

15. CE(WW)

16. CE (East)

Page 13: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 07.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 200 6” 55

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 6.5

PRODUCTION DETAILS TOTAL PRODUCTION : 940.44 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 93.61

ii) Wazirabad 124 -Do- 116.59

iii) Haiderpur 220 WJC Canal 218.02

iv) Nangloi 40 -Do- 44.13

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

20.42

vi) Dwarka WJC Canal 51.06

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 107.48

viii) Sonia Vihar 144 -Do- 141.42

1) Production of Water Treatment Plants 814.73

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.12

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.00

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.59

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 30.71

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 940.44

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.05

Greater Kailash (N) 4.80 3.35

Deer Park 4.50 4.10

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 14: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

m6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 06.06.21----------940.44 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor

2. P.S. to Chief Minister, Delhi

3. P.S. to Chief Secretary, Delhi

4. Principal Secretary (UD) Govt., of NCT of Delhi

5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

7. CE(WW)

8. CE (East)

9. Dir F & A

10. E.E. (EDP) for uploading on Website

11. Office copy

Page 15: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 08.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 100 0.3” 50

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 6.6

PRODUCTION DETAILS TOTAL PRODUCTION : 939.27 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 91.12

ii) Wazirabad 124 -Do- 118.95

iii) Haiderpur 220 WJC Canal 217.92

iv) Nangloi 40 -Do- 42.92

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

22.44

vi) Dwarka WJC Canal 51.02

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 107.77

viii) Sonia Vihar 144 -Do- 141.30

1) Production of Water Treatment Plants 813.44

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.15

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.10

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.58

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 30.83

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 939.27

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.05

Greater Kailash (N) 4.80 3.35

Deer Park 4.50 4.00

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 16: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

m6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 07.06.21----------939.27 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor

2. P.S. to Chief Minister, Delhi

3. P.S. to Chief Secretary, Delhi

4. Principal Secretary (UD) Govt., of NCT of Delhi

5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

7. CE(WW)

8. CE (East)

9. Dir F & A

10. E.E. (EDP) for uploading on Website

11. Office copy

Page 17: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 09.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 200 6” 52

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 6.7,5.4

PRODUCTION DETAILS TOTAL PRODUCTION : 919.59 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 67.53

ii) Wazirabad 124 -Do- 121.38

iii) Haiderpur 220 WJC Canal 218.05

iv) Nangloi 40 -Do- 43.65

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

22.27

vi) Dwarka WJC Canal 51.04

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 108.18

viii) Sonia Vihar 144 -Do- 141.49

1) Production of Water Treatment Plants 793.59

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.17

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.20

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.63

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 31.00

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 919.59

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.35

Greater Kailash (N) 4.80 3.35

Deer Park 4.50 4.00

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 18: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

m6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 08.06.21----------919.59 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor

2. P.S. to Chief Minister, Delhi

3. P.S. to Chief Secretary, Delhi

4. Principal Secretary (UD) Govt., of NCT of Delhi

5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

7. CE(WW)

8. CE (East)

9. Dir F & A

10. E.E. (EDP) for uploading on Website

11. Office copy

Page 19: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 10.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 48

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 6.8

PRODUCTION DETAILS TOTAL PRODUCTION : 940.24 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 86.86

ii) Wazirabad 124 -Do- 122.59

iii) Haiderpur 220 WJC Canal 218.24

iv) Nangloi 40 -Do- 43.12

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

22.24

vi) Dwarka WJC Canal 51.05

vii Bawana WJC Canal 20.01

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 108.86

viii) Sonia Vihar 144 -Do- 141.41

1) Production of Water Treatment Plants 814.38

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.22

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.00

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.64

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 30.86

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 940.24

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 3.96

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 4.50

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 20: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

m6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 09.06.21----------940.24 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor

2. P.S. to Chief Minister, Delhi

3. P.S. to Chief Secretary, Delhi

4. Principal Secretary (UD) Govt., of NCT of Delhi

5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

7. CE(WW)

8. CE (East)

9. Dir F & A

10. E.E. (EDP) for uploading on Website

11. Office copy

Page 21: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 11.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 52

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 7

PRODUCTION DETAILS TOTAL PRODUCTION : 931.34 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 86.82

ii) Wazirabad 124 -Do- 121.96

iii) Haiderpur 220 WJC Canal 218.14

iv) Nangloi 40 -Do- 42.51

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

14.24

vi) Dwarka WJC Canal 51.06

vii Bawana WJC Canal 20.01

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 108.84

viii Sonia Vihar 144 -Do- 141.65

1) Production of Water Treatment Plants 805.23

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.29

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.10

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.72

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 31.11

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 931.34

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 --

Greater Kailash (N) 4.80 --

Deer Park 4.50 4.20

Janak Puri 3.00 3.40

Kalka Ji 3.65 3.96

Page 22: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected

Note :- Total supply of water in last 24 hours i.e. 10.06.2021 ----------931.34 MGD

Member (WS)

Copy to: -

12. Pr. Secretary to Lt. Governor

13. P.S. to Chief Minister, Delhi

14. P.S. to Chief Secretary, Delhi

15. Principal Secretary (UD) Govt., of NCT of Delhi

16. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

17. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

18. CE(WW)

19. CE (East)

20. Dir F & A

21. E.E. (EDP) for uploading on Website

22. Office copy

Page 23: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 12.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 52

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 6.6,5.0

PRODUCTION DETAILS TOTAL PRODUCTION : 943.31 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 90.50

ii) Wazirabad 124 -Do- 123.89

iii) Haiderpur 220 WJC Canal 218.14

iv) Nangloi 40 -Do- 43.45

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

20.00

vi) Dwarka WJC Canal 51.09

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 106.92

viii) Sonia Vihar 144 -Do- 141.43

1) Production of Water Treatment Plants 817.36

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.27

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.10

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.58

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 30.95

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 943.31

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.14

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 4.00

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.57

Page 24: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e..11.06.21 ----------943.31 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor

2. P.S. to Chief Minister, Delhi

3. P.S. to Chief Secretary, Delhi

4. Principal Secretary (UD) Govt., of NCT of Delhi

5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

7. CE(WW)

8. CE (East)

Page 25: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 13.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 47

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 6.6

PRODUCTION DETAILS TOTAL PRODUCTION : 941.67 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 90.40

ii) Wazirabad 124 -Do- 123.94

iii) Haiderpur 220 WJC Canal 218.05

iv) Nangloi 40 -Do- 43.97

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

21.92

vi) Dwarka WJC Canal 51.07

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 104.52

viii) Sonia Vihar 144 -Do- 141.86

1) Production of Water Treatment Plants 815.73

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.25

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.20

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.49

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 30.94

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95

Total (1+2+3) 941.67

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.14

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 3.70

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 26: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

m6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 12.06.21 ----------941.67 MGD

Member (WS)

Copy to: -

23. Pr. Secretary to Lt. Governor

24. P.S. to Chief Minister, Delhi

25. P.S. to Chief Secretary, Delhi

26. Principal Secretary (UD) Govt., of NCT of Delhi

27. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

28. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

29. CE(WW)

30. CE (East)

31. Dir F & A

32. E.E. (EDP) for uploading on Website

33. Office copy

Page 27: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 14.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 53

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 7.6,5.3

PRODUCTION DETAILS TOTAL PRODUCTION : 945.29 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 92.11

ii) Wazirabad 124 -Do- 123.92

iii) Haiderpur 220 WJC Canal 218.24

iv) Nangloi 40 -Do- 43.14

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

22.66

vi) Dwarka WJC Canal 51.04

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 107.72

viii Sonia Vihar 144 -Do- 141.32

1) Production of Water Treatment Plants 820.15

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.22

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.00

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

3.92

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 30.14

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 945.29

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 3.96

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 3.70

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 28: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected

Note :- Total supply of water in last 24 hours i.e. 13.06.2021 ----------945.29 MGD

Member (WS)

Copy to: -

34. Pr. Secretary to Lt. Governor

35. P.S. to Chief Minister, Delhi

36. P.S. to Chief Secretary, Delhi

37. Principal Secretary (UD) Govt., of NCT of Delhi

38. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

39. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

40. CE(WW)

41. CE (East)

42. Dir F & A

43. E.E. (EDP) for uploading on Website

44. Office copy

Page 29: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 17.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 102

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 6.8

PRODUCTION DETAILS TOTAL PRODUCTION : 944.78 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 92.82

ii) Wazirabad 124 -Do- 123.93

iii) Haiderpur 220 WJC Canal 218.57

iv) Nangloi 40 -Do- 43.36

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

21.55

vi) Dwarka WJC Canal 51.03

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 108.10

viii) Sonia Vihar 144 -Do- 139.50

1) Production of Water Treatment Plants 818.86

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.25

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.10

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.57

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 30.92

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 944.78

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.14

Greater Kailash (N) 4.80 3.96

Deer Park 4.50 3.90

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 30: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

m6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 16.06.21----------944.78 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor

2. P.S. to Chief Minister, Delhi

3. P.S. to Chief Secretary, Delhi

4. Principal Secretary (UD) Govt., of NCT of Delhi

5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

7. CE(WW)

8. CE (East)

9. Dir F & A

10. E.E. (EDP) for uploading on Website

11. Office copy

Page 31: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 18.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 95

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 6.9

PRODUCTION DETAILS TOTAL PRODUCTION : 943.24 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 91.59

ii) Wazirabad 124 -Do- 123.88

iii) Haiderpur 220 WJC Canal 218.91

iv) Nangloi 40 -Do- 43.48

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

21.97

vi) Dwarka WJC Canal 51.05

vii Bawana WJC Canal 19.50

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 107.42

viii Sonia Vihar 144 -Do- 139.90

1) Production of Water Treatment Plants 817.70

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.20

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.00

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.34

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 31.54

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 943.24

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 3.65

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 3.90

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 32: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected

Note :- Total supply of water in last 24 hours i.e. 17.06.2021 ----------943.24 MGD

Member (WS)

Copy to: -

12. Pr. Secretary to Lt. Governor

13. P.S. to Chief Minister, Delhi

14. P.S. to Chief Secretary, Delhi

15. Principal Secretary (UD) Govt., of NCT of Delhi

16. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

17. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

18. CE(WW)

19. CE (East)

20. Dir F & A

21. E.E. (EDP) for uploading on Website

22. Office copy

Page 33: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 19.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 170

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 8.4

PRODUCTION DETAILS TOTAL PRODUCTION : 930.57 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 87.76

ii) Wazirabad 124 -Do- 122.24

iii) Haiderpur 220 WJC Canal 218.27

iv) Nangloi 40 -Do- 44.21

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

22.11

vi) Dwarka WJC Canal 51.04

vii Bawana WJC Canal 20.02

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 106.20

viii) Sonia Vihar 144 -Do- 133.25

1) Production of Water Treatment Plants 805.10

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.17

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.20

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.10

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 30.47

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 930.57

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 3.68

Greater Kailash (N) 4.80 3.35

Deer Park 4.50 4.00

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 34: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e..18.06.21 ----------930.57 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor

2. P.S. to Chief Minister, Delhi

3. P.S. to Chief Secretary, Delhi

4. Principal Secretary (UD) Govt., of NCT of Delhi

5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

7. CE(WW)

8. CE (East)

Page 35: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 20.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/665.30 900 2’.3” 96

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 8.1

PRODUCTION DETAILS TOTAL PRODUCTION : 920.42 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 85.10

ii) Wazirabad 124 -Do- 109.09

iii) Haiderpur 220 WJC Canal 218.13

iv) Nangloi 40 -Do- 44.02

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

20.00

vi) Dwarka WJC Canal 51.02

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 105.88

viii) Sonia Vihar 144 -Do- 139.46

1) Production of Water Treatment Plants 794.96

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.22

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.10

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.14

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 30.46

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95

Total (1+2+3) 920.42

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 3.68

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 4.10

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 36: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

m6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 19.06.21 ----------920.42 MGD

Member (WS)

Copy to: -

23. Pr. Secretary to Lt. Governor

24. P.S. to Chief Minister, Delhi

25. P.S. to Chief Secretary, Delhi

26. Principal Secretary (UD) Govt., of NCT of Delhi

27. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

28. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

29. CE(WW)

30. CE (East)

31. Dir F & A

32. E.E. (EDP) for uploading on Website

33. Office copy

Page 37: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 21.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 350

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 8.4,5.7

PRODUCTION DETAILS TOTAL PRODUCTION : 906.05 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 86.06

ii) Wazirabad 124 -Do- 92.14

iii) Haiderpur 220 WJC Canal 218.70

iv) Nangloi 40 -Do- 43.08

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

22.02

vi) Dwarka WJC Canal 51.03

vii Bawana WJC Canal 20.02

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 107.66

viii Sonia Vihar 144 -Do- 139.03

1) Production of Water Treatment Plants 779.74

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.28

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.20

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.83

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 31.31

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 906.05

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 3.84

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 4.00

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 38: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected

Note :- Total supply of water in last 24 hours i.e. 20.06.2021 ----------906.05 MGD

Member (WS)

Copy to: -

34. Pr. Secretary to Lt. Governor

35. P.S. to Chief Minister, Delhi

36. P.S. to Chief Secretary, Delhi

37. Principal Secretary (UD) Govt., of NCT of Delhi

38. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

39. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

40. CE(WW)

41. CE (East)

42. Dir F & A

43. E.E. (EDP) for uploading on Website

44. Office copy

Page 39: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 22.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 200 0.6” 92

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 7.7

PRODUCTION DETAILS TOTAL PRODUCTION : 944.12 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 90.67

ii) Wazirabad 124 -Do- 123.89

iii) Haiderpur 220 WJC Canal 218.70

iv) Nangloi 40 -Do- 43.47

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

21.98

vi) Dwarka WJC Canal 51.01

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 108.03

viii) Sonia Vihar 144 -Do- 140.23

1) Production of Water Treatment Plants 817.98

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.29

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.20

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.65

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 31.14

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 944.12

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.14

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 4.20

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.26

Page 40: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

m6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 24.06.21----------944.12 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor

2. P.S. to Chief Minister, Delhi

3. P.S. to Chief Secretary, Delhi

4. Principal Secretary (UD) Govt., of NCT of Delhi

5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

7. CE(WW)

8. CE (East)

9. Dir F & A

10. E.E. (EDP) for uploading on Website

11. Office copy

Page 41: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 23.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 140

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 8..5,5.0

PRODUCTION DETAILS TOTAL PRODUCTION : 946.71 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 91.58

ii) Wazirabad 124 -Do- 123.89

iii) Haiderpur 220 WJC Canal 218.70

iv) Nangloi 40 -Do- 44.45

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

21.84

vi) Dwarka WJC Canal 51.02

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 108.44

viii Sonia Vihar 144 -Do- 140.26

1) Production of Water Treatment Plants 820.18

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.26

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.20

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

5.07

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 31.53

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 946.71

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 --

Greater Kailash (N) 4.80 --

Deer Park 4.50 4.10

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.26

Page 42: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected

Note :- Total supply of water in last 24 hours i.e. 22.06.2021 ----------946.71 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor 2. P.S. to Chief Minister, Delhi 3. P.S. to Chief Secretary, Delhi 4. Principal Secretary (UD) Govt., of NCT of Delhi 5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi 6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009 7. CE(WW) 8. CE (East) 9. Dir F & A 10. E.E. (EDP) for uploading on Website 11. Office copy

Page 43: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 24.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.80 78

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 7.0,4.2

PRODUCTION DETAILS TOTAL PRODUCTION : 940.92 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 91.24

ii) Wazirabad 124 -Do- 123.90

iii) Haiderpur 220 WJC Canal 218.37

iv) Nangloi 40 -Do- 42.89

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

19.52

vi) Dwarka WJC Canal 51.04

vii Bawana WJC Canal 20.01

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 107.90

viii) Sonia Vihar 144 -Do- 140.15

1) Production of Water Treatment Plants 815.02

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.28

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.10

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.52

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 30.90

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 940.92

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.14

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 4.00

Janak Puri 3.00 3.40

Kalka Ji 3.65 3.84

Page 44: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e..23.06.21 ----------940.92 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor

2. P.S. to Chief Minister, Delhi

3. P.S. to Chief Secretary, Delhi

4. Principal Secretary (UD) Govt., of NCT of Delhi

5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

7. CE(WW)

8. CE (East)

Page 45: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 25.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.30 200 0’.6” 92

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 7.7

PRODUCTION DETAILS TOTAL PRODUCTION : 944.12 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 90.67

ii) Wazirabad 124 -Do- 123.89

iii) Haiderpur 220 WJC Canal 218.70

iv) Nangloi 40 -Do- 43.47

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

21.98

vi) Dwarka WJC Canal 51.01

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 108.03

viii) Sonia Vihar 144 -Do- 140.23

1) Production of Water Treatment Plants 817.98

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.29

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.20

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.65

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 31.14

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95

Total (1+2+3) 944.12

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 3.68

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 4.10

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 46: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

m6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 19.06.21 ----------920.42 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor 2. P.S. to Chief Minister, Delhi 3. P.S. to Chief Secretary, Delhi 4. Principal Secretary (UD) Govt., of NCT of Delhi 5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi 6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company, 7. Hudson Lane, Civil Lines ,Delhi-110009 8. CE(WW) 9. CE (East) 10. Dir F & A 11. E.E. (EDP) for uploading on Website 12. Office copy

Page 47: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 26.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 200 0.6” 64

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 7.3

PRODUCTION DETAILS TOTAL PRODUCTION : 947.04 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 92.90

ii) Wazirabad 124 -Do- 123.87

iii) Haiderpur 220 WJC Canal 218.59

iv) Nangloi 40 -Do- 43.81

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

21.85

vi) Dwarka WJC Canal 51.03

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 108.50

viii Sonia Vihar 144 -Do- 140.29

1) Production of Water Treatment Plants 820.84

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.27

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.10

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.83

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 31.20

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 947.04

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 3.59

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 4.00

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.54

Page 48: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected

Note :- Total supply of water in last 24 hours i.e. 25.06.2021 ----------947.04 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor 2. P.S. to Chief Minister, Delhi 3. P.S. to Chief Secretary, Delhi 4. Principal Secretary (UD) Govt., of NCT of Delhi 5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi 6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009 7. CE(WW) 8. CE (East) 9. Dir F & A 10. E.E. (EDP) for uploading on Website 11. Office copy

Page 49: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 27.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 72

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 6.3

PRODUCTION DETAILS TOTAL PRODUCTION : 946.67 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 93.15

ii) Wazirabad 124 -Do- 123.95

iii) Haiderpur 220 WJC Canal 218.46

iv) Nangloi 40 -Do- 43.35

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

21.81

vi) Dwarka WJC Canal 51.02

vii Bawana WJC Canal 20.02

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 109.21

viii) Sonia Vihar 144 -Do- 140.26

1) Production of Water Treatment Plants 821.23

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.28

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.00

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.16

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 30.44

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 946.67

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 3.59

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 4.30

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.26

Page 50: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

m6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 26.06.21----------946.67 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor

2. P.S. to Chief Minister, Delhi

3. P.S. to Chief Secretary, Delhi

4. Principal Secretary (UD) Govt., of NCT of Delhi

5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

7. CE(WW)

8. CE (East)

9. Dir F & A

10. E.E. (EDP) for uploading on Website

11. Office copy

Page 51: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 28.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.20 800 2

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 7.0,4.9

PRODUCTION DETAILS TOTAL PRODUCTION : 930.64 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 92.74

ii) Wazirabad 124 -Do- 110.10

iii) Haiderpur 220 WJC Canal 218.49

iv) Nangloi 40 -Do- 43.46

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

20.38

vi) Dwarka WJC Canal 51.05

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 111.33

viii) Sonia Vihar 144 -Do- 140.45

1) Production of Water Treatment Plants 808.00

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.30

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.20

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

1.14

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 27.64

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 930.64

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.05

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 4.10

Janak Puri 3.00 3.35

Kalka Ji 3.65 4.54

Page 52: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

m6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 27.06.21----------930.64 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor

2. P.S. to Chief Minister, Delhi

3. P.S. to Chief Secretary, Delhi

4. Principal Secretary (UD) Govt., of NCT of Delhi

5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

7. CE(WW)

8. CE (East)

9. Dir F & A

10. E.E. (EDP) for uploading on Website

11. Office copy

Page 53: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 29.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 95

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 6.0,4.0

PRODUCTION DETAILS TOTAL PRODUCTION : 917.98 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 91.62

ii) Wazirabad 124 -Do- 101.84

iii) Haiderpur 220 WJC Canal 217.49

iv) Nangloi 40 -Do- 42.37

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

17.92

vi) Dwarka WJC Canal 51.04

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 109.51

viii) Sonia Vihar 144 -Do- 140.24

1) Production of Water Treatment Plants 792.03

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.32

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.10

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.53

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 30.95

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 917.98

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 4.05

Greater Kailash (N) 4.80 3.35

Deer Park 4.50 3.90

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.26

Page 54: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

m6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 28.06.21----------917.98 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor

2. P.S. to Chief Minister, Delhi

3. P.S. to Chief Secretary, Delhi

4. Principal Secretary (UD) Govt., of NCT of Delhi

5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

7. CE(WW)

8. CE (East)

9. Dir F & A

10. E.E. (EDP) for uploading on Website

11. Office copy

Page 55: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

DELHI JAL BOARD

OFFICE OF MEMBER (WATER SUPPLY)

VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI

No. DJB/M (WS)/A-97/2017/ Date: 30.06.21

WATER PRODUCTION REPORT

Normal Up Stream Pond

Level At Wazirabad

Today’s Figure of U/S and D/S Wazirabad

Pond Level (in Feet)

Discharge

(Cusec.)

Gate Opening

(Feet)

Raw Water Turbidity

(NTU)

674.50 Feet 674.50/664.40 84

Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)

710.0 5.9,4.9

PRODUCTION DETAILS TOTAL PRODUCTION : 947.70 MGD

Water Treatment Plant Peak Production

Capacity (MGD)

Raw Water Source Today‘s

Production

Remarks

YAMUNA WATER

i) Chandrawal 98 Wazirabad Pond 90.98

ii) Wazirabad 124 -Do- 123.86

iii) Haiderpur 220 WJC Canal 219.23

iv) Nangloi 40 -Do- 45.21

v) Okhla 20 Recycled Process waste

from Chandrawal & R. W.

22.04

vi) Dwarka WJC Canal 51.03

vii Bawana WJC Canal 20.00

GANGA WATER

vii) Bhagirathi 100 Upper Ganga Canal 108.91

viii) Sonia Vihar 144 -Do- 140.54

1) Production of Water Treatment Plants 821.80

RECYCLING /PROCESS WASTE WATER PLANTS

i) Wazir\bad 11 Recycled process waste at

Wzd. Plant

10.27

ii) Haiderpur 16 Recycled process waste at

Wzd. Plant

16.00

iii) Bhagirathi 10 Recycled process waste at

Wzd. Plant

4.63

iv) Chandrawal 08 Recycled process waste at

Wz. Plant

2) Production from Recycling Plants 30.90

GROUND WATER SOURCES

3) Production from Ranney wells & Tube wells 95.00

Total (1+2+3) 947.70

5. MAJOR UGRs’ LEVELS IN METERS.

Location Normal Level (in Meters ) at 6.00 am Today’s Level

Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04

Jhandewalan 4.11 4.14

Greater Kailash (O) 5.12 3.96

Greater Kailash (N) 4.80 3.04

Deer Park 4.50 4.00

Janak Puri 3.00 3.40

Kalka Ji 3.65 4.45

Page 56: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01  · Water Treatment Plant Peak Production Capacity

m6. TRANSMISSION MAIN

S. No. Shut Down/Pipe Burst Duration of Closure Areas

Afected

Note :- Total supply of water in last 24 hours i.e. 29.06.21----------947.70 MGD

Member (WS)

Copy to: -

1. Pr. Secretary to Lt. Governor

2. P.S. to Chief Minister, Delhi

3. P.S. to Chief Secretary, Delhi

4. Principal Secretary (UD) Govt., of NCT of Delhi

5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi

6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,

a. Hudson Lane, Civil Lines ,Delhi-110009

7. CE(WW)

8. CE (East)

9. Dir F & A

10. E.E. (EDP) for uploading on Website

11. Office copy