LEGEND€¦ · b. future nokia mpr-9500 radio shelf c. nokia 7705 sar-18 router d. dsx jackfield...

6
Nokia 7705 T1 Aggregation S-1 SHEET NO. SR6 NETWORK DIAGRAMS STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION SICN SITE NAME FINANCIAL PROJECT ID COUNTY \\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\3-Spur Sites\S-Spur Sites 20180920.vsd 424401-2-93-03 FLORIDA DEPARTMENT OF TRANSPORTATION 605 SUWANNEE ST. MS 90 TALLAHASSEE, FL 32399-0450 PH.(850)-410-5600 FAX.(850)-410-5501 CONTRACT PLANS RECORD REV. DATE DESCRIPTION REV. DATE DESCRIPTION SR6 AS-BUILT Microwave Radio A Falmouth DVM6-45 Repeater 28-T1 TDM Multiplex A M12 1 A M23 16 1 8 9 2 1 3 4 2 1 3 4 2 1 3 4 5 4 12 13 A 2 1 3 4 P11 34567 Access 60 Channel Bank Nortel ASN Router BPS 2000 Nortel BayStack 106 12- Port 10BaseT Hub Site Equipment P12 Microwave Radio A Falmouth DVM6-45 Repeater 28-T1 TDM Multiplex A M12 1 A M23 16 1 8 9 2 1 3 4 2 1 3 4 2 1 3 4 5 4 12 13 A 2 1 3 4 P11 34567 Access 60 Channel Bank P12 Site Equipment SR6 PROPOSED EQUIPMENT TO BE INSTALLED EQUIPMENT TO BE REMOVED EXISTING FDOT EQUIPMENT LEGEND: NOTES: 1. INSTALL NOKIA 7705 SAR-18, SEE SHEET S-2. 2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS. M12 2 M12 2 (6) T1 to Falmouth Attachment 1 50

Transcript of LEGEND€¦ · b. future nokia mpr-9500 radio shelf c. nokia 7705 sar-18 router d. dsx jackfield...

Page 1: LEGEND€¦ · b. future nokia mpr-9500 radio shelf c. nokia 7705 sar-18 router d. dsx jackfield – 28 ckts e. din rail with t-1 spds – 28 ckts a. b. c. 9500 mpt-hlc 9500 mpt-hlc

Nokia 7705

T1 Aggregation

S-1

SHEET NO.

SR6 NETWORK DIAGRAMS

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICN

SITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\3-Spur Sites\S-Spur Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

SR6 – AS-BUILT

Microwave

Radio A

Falmouth

DVM6-45 Repeater

28-T1 TDM

Multiplex A

M12

1

A

M23

16

1

8

9

21 3 4 21 3 4 21 3 4

5

4 12

13

A 21 3 4

P11

3 4 5 6 7

Access 60

Channel Bank

Nortel ASN

Router

BPS 2000Nortel BayStack 106 12-

Port 10BaseT Hub

Site Equipment

P12

Microwave

Radio A

Falmouth

DVM6-45 Repeater

28-T1 TDM

Multiplex A

M12

1

A

M23

16

1

8

9

21 3 4 21 3 4 21 3 4

5

4 12

13

A 21 3 4

P11

3 4 5 6 7

Access 60

Channel Bank

P12

Site Equipment

SR6 – PROPOSED

EQUIPMENT TO BE INSTALLED

EQUIPMENT TO BE REMOVED

EXISTING FDOT EQUIPMENT

LEGEND:

NOTES:

1. INSTALL NOKIA 7705 SAR-18, SEE SHEET S-2.

2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT

INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC

7705 CONFIGURATION PARAMETERS.

M12

2

M12

2

(6) T1 to Falmouth

Attachment 1 50

Page 2: LEGEND€¦ · b. future nokia mpr-9500 radio shelf c. nokia 7705 sar-18 router d. dsx jackfield – 28 ckts e. din rail with t-1 spds – 28 ckts a. b. c. 9500 mpt-hlc 9500 mpt-hlc

S-2

SHEET NO.

SR6 SHELTER FLOOR PLAN

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICN

SITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\3-Spur Sites\S-Spur Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

District

Fiber

Channel

Bank

Rack

DVM6-45

RACK

Reserved

Rack

-48 VDC

Distributi

on

Rack

DS-1 CABLE

NOTE 1

-48VDC CABLES A/B

NOTE 3

NOTE 2

SR6 - RESERVED RACKSR6 – SHELTER FLOOR PLAN

PENSACOLA 7705 RACK:

A. FUSE PANEL WITH

APPROPRIATELY SIZED

FUSES

B. FUTURE NOKIA MPR-9500

RADIO SHELF

C. NOKIA 7705 SAR-18

ROUTER

D. DSX JACKFIELD – 28 CKTS

E. DIN RAIL WITH T-1 SPDS –

28 CKTS

A

B

C

9500 MPT-HLC

9500 MPT-HLC

9500-

MPT

XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12

7705 SAR-18

o I

IoONOFF

IoONOFF

Batt A

Batt B

Sta

t

Pw

r

Act

CS

M-2

Co

mp

act F

lash

#1

Co

mp

act F

lash

#2

Mg

mt P

ort

Co

nso

leU

SB

2D

CL

EI

Sta

t

Pw

r

Act

CS

M-2

Co

mp

act F

lash

#1

Co

mp

act F

lash

#2

Mg

mt P

ort

Co

nso

leU

SB

2D

CL

EI

Fan

Batt A

Batt B

Critical

Major

Minor

BIT S1

BIT S2

Alarm

Module

External

Alarms

ACO

Alarms

7705 DSX-1 PANEL D

E

EQUIPMENT TO BE INSTALLED

FUTURE INSTALLATION

EXISTING FDOT EQUIPMENT

LEGEND:

NOTES:

1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1

PANELS, AND SPDS IN RESERVED RACK.

2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45

DSX-1 PANEL LOCATED IN DVM6-45 RACK.

3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND

WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL

BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.

4. AFTER FINAL CUT-OVER, REMOVE THE NORTEL ASN ROUTER,

NORTEL BPS2000 AND BAYSTACK HUB LOCATED IN THE

CHANNEL BANK RACK.

NOTE 3

Attachment 1 51

Page 3: LEGEND€¦ · b. future nokia mpr-9500 radio shelf c. nokia 7705 sar-18 router d. dsx jackfield – 28 ckts e. din rail with t-1 spds – 28 ckts a. b. c. 9500 mpt-hlc 9500 mpt-hlc

S-3

SHEET NO.YULEE NETWORK

DIAGRAMS

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICN

SITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\3-Spur Sites\S-Spur Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

Microwave Radio

DVM6-45

Jacksonville

A

M12

1M12

2M12

3M12

4M12

5

1

21 3 44 8

21 3 4

5 9

21 3 412 16

21 3 4

13 17

20

21 3 4

21

21 3 424 28

21 3 4

25

M12

6M12

7

A

M23

28-T1 TDM

Multiplex A

P12

Access 60

Channel Bank

Nortel ASN

Router

BPS 2000Nortel BayStack 106 12-

Port 10BaseT Hub

Site Equipment

YULEE – AS-BUILT

Microwave Radio

DVM6-45

Jacksonville

A

M12

1M12

2M12

3M12

4M12

5

1

21 3 44 8

21 3 4

5 9

21 3 412 16

21 3 4

13 17

20

21 3 4

21

21 3 424 28

21 3 4

25

M12

6M12

7

A

M23

28-T1 TDM

Multiplex A

Nokia 7705

T1 Aggregation

Site Equipment

P12

Access 60

Channel Bank

(27) T1 to

Jacksonville

YULEE – PROPOSED

EQUIPMENT TO BE INSTALLED

EQUIPMENT TO BE REMOVED

EXISTING FDOT EQUIPMENT

LEGEND:

NOTES:

1. INSTALL NOKIA 7705 SAR-18, SEE SHEET S-4.

2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT

INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC

7705 CONFIGURATION PARAMETERS.

Attachment 1 52

Page 4: LEGEND€¦ · b. future nokia mpr-9500 radio shelf c. nokia 7705 sar-18 router d. dsx jackfield – 28 ckts e. din rail with t-1 spds – 28 ckts a. b. c. 9500 mpt-hlc 9500 mpt-hlc

S-4

SHEET NO.YULEE SHELTER FLOOR

PLAN

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICN

SITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\3-Spur Sites\S-Spur Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

DVM6-45

Radio

Channel

Bank Rack

MAS

Call Box

United Water

-48 VDC

Distribution

Rack

Reserved

Rack

A

B

C

9500 MPT-HLC

9500 MPT-HLC

9500-

MPT

XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12

7705 SAR-18

o I

IoONOFF

IoONOFF

Batt A

Batt B

Sta

t

Pw

r

Act

CS

M-2

Co

mp

act F

lash

#1

Co

mp

act F

lash

#2

Mg

mt P

ort

Co

nso

leU

SB

2D

CL

EI

Sta

t

Pw

r

Act

CS

M-2

Co

mp

act F

lash

#1

Co

mp

act F

lash

#2

Mg

mt P

ort

Co

nso

leU

SB

2D

CL

EI

Fan

Batt A

Batt B

Critical

Major

Minor

BIT S1

BIT S2

Alarm

Module

External

Alarms

ACO

Alarms

7705 DSX-1 PANEL D

E

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Mgmt

Con

A B C D E F G H J K L M

A B C D E F G H J K L M

YULEE RESERVED RACK:

A. FUSE PANEL WITH

APPROPRIATELY SIZED

FUSES

B. FUTURE NOKIA MPR-9500

RADIO SHELF

C. NOKIA 7705 SAR-18 ROUTER

D. DSX JACKFIELD – 28 CKTS

E. DIN RAIL WITH T-1 SPDS –

28 CKTS

YULEE – SHELTER FLOOR PLAN

YULEE – RESERVED RACK

DS-1 CABLE

NOTE 1

-48VDC CABLES A/B

NOTE 3

NOTE 2

EQUIPMENT TO BE INSTALLED

FUTURE INSTALLATION

EXISTING FDOT EQUIPMENT

LEGEND:

NOTES:

1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1

PANELS, AND SPDS IN RESERVED RACK.

2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45

DSX-1 PANEL LOCATED IN DVM6-45 RACK.

3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND

WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL

BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.

4. AFTER FINAL CUT-OVER, REMOVE THE NORTEL ASN ROUTER,

NORTEL BPS2000 AND BAYSTACK HUB LOCATED IN THE

CHANNEL BANK RACK.

NOTE 4

Attachment 1 53

Page 5: LEGEND€¦ · b. future nokia mpr-9500 radio shelf c. nokia 7705 sar-18 router d. dsx jackfield – 28 ckts e. din rail with t-1 spds – 28 ckts a. b. c. 9500 mpt-hlc 9500 mpt-hlc

S-5

SHEET NO.TAMPA DOT/FHP

NETWORK DIAGRAMS

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICN

SITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\3-Spur Sites\S-Spur Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

Microwave Radio

DVM10-8T

Tampa Maintenance

C

M12

1M12

2

1

21 3 44 8

21 3 4

5 9

21 3 412 16

21 3 4

13 17

20

21 3 4

21

21 3 424 28

21 3 4

25

A

M23

28-T1 TDM

Multiplex A

P12

Access 60

Channel Bank

Nortel ASN

Router

BPS 2000Nortel BayStack 106 12-

Port 10BaseT Hub

Site Equipment

Nokia 7705

T1 Aggregation

Site Equipment

Access 60

Channel Bank

(7) T1 to Tampa

Maintenance

Microwave Radio

DVM10-8T

Tampa Maintenance

C

M12

1M12

2

1

21 3 44 8

21 3 4

5 9

21 3 412 16

21 3 4

13 17

20

21 3 4

21

21 3 424 28

21 3 4

25

A

M23

28-T1 TDM

Multiplex A

P12

TAMPA DOT/FHP – AS-BUILTTAMPA DOT/FHP – PROPOSED

EQUIPMENT TO BE INSTALLED

EQUIPMENT TO BE REMOVED

EXISTING FDOT EQUIPMENT

LEGEND:

NOTES:

1. INSTALL NOKIA 7705 SAR-18, SEE SHEET S-6.

2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT

INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC

7705 CONFIGURATION PARAMETERS.

Attachment 1 54

Page 6: LEGEND€¦ · b. future nokia mpr-9500 radio shelf c. nokia 7705 sar-18 router d. dsx jackfield – 28 ckts e. din rail with t-1 spds – 28 ckts a. b. c. 9500 mpt-hlc 9500 mpt-hlc

S-6

SHEET NO.TAMPA DOT/FHP

SHELTER FLOOR PLAN

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICN

SITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\3-Spur Sites\S-Spur Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

7705

RACK

Desk

FDOT 47 MHz

Simplex Base

Station -48 VDC

Distribution

Rack

DVM10-8T

Rack

F/O Patch

Panel Rack

Channel Bank

Rack

Suncoast

MAS

Rack

NOTE 3

NOTE 1

-48VDC CABLES A/B

DS-1 CABLENOTE 2

TAMPA DOT/FHP

7705 RACK:

A. FUSE PANEL WITH

APPROPRIATELY SIZED

FUSES

B. FUTURE NOKIA MPR-9500

RADIO SHELF

C. NOKIA 7705 SAR-18

ROUTER

D. DSX JACKFIELD – 28 CKTS

E. DIN RAIL WITH T-1 SPDS –

28 CKTS

F. 19 INCH RELAY RACK

A

B

C

F

9500 MPT-HLC

9500 MPT-HLC

9500-

MPT

XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12

7705 SAR-18

o I

IoONOFF

IoONOFF

Batt A

Batt B

Sta

t

Pw

r

Act

CS

M-2

Co

mp

act F

lash

#1

Co

mp

act F

lash

#2

Mg

mt P

ort

Co

nso

leU

SB

2D

CL

EI

Sta

t

Pw

r

Act

CS

M-2

Co

mp

act F

lash

#1

Co

mp

act F

lash

#2

Mg

mt P

ort

Co

nso

leU

SB

2D

CL

EI

Fan

Batt A

Batt B

Critical

Major

Minor

BIT S1

BIT S2

Alarm

Module

External

Alarms

ACO

Alarms

7705 DSX-1 PANEL D

E

TAMPA DOT/FHP – 7705 RACK

TAMPA DOT/FHP – SHELTER FLOOR PLAN

EQUIPMENT TO BE INSTALLED

FUTURE INSTALLATION

EXISTING FDOT EQUIPMENT

LEGEND:

NOTES:

1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1

PANELS, AND SPDS IN NEW RACK.

2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM10-8T

DSX-1 PANEL LOCATED IN DVM10-8T RACK.

3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND

WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL

BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.

4. AFTER FINAL CUT-OVER, REMOVE THE NORTEL ASN ROUTER,

NORTEL BPS2000 AND BAYSTACK HUB LOCATED IN THE

CHANNEL BANK RACK.

NOTE 4

Attachment 1 55