Automation

1
Automation Welding Journal, June 2003, Cover Welding Design and Fabrication, November 2003, Tandem GMAW Offers Quality Weld Deposits, High Travel Speeds, Pages 28-31 (picture on page 31) A chief responsibility during my tenure at McClain E-Z Pack was a Tandem torch welding robot. It was the first tandem system Lincoln installed and at the time had the Largest footprint of any robot Lincoln had installed. I implemented a system load and remove the parts safer and more efficiently, trained several operators, maintained the program files and trouble shooted any welding issues that arose.

Transcript of Automation

Page 1: Automation

Automation

Welding Journal, June 2003, Cover Welding Design and Fabrication, November 2003, Tandem GMAW Offers Quality Weld Deposits, High Travel Speeds, Pages 28-31 (picture on page 31)

A chief responsibility during my tenure at McClain E-Z Pack was a Tandem torch welding robot. It was the first tandem system Lincoln installed and at the time had the Largest footprint of any robot Lincoln had installed. I implemented a system load and remove the parts safer and more efficiently, trained several operators, maintained the program files and trouble shooted any welding issues that arose.