Australia & New Zealand - Safety Regulation
-
Upload
nemko-italy -
Category
Engineering
-
view
19 -
download
5
Transcript of Australia & New Zealand - Safety Regulation
![Page 1: Australia & New Zealand - Safety Regulation](https://reader036.fdocuments.in/reader036/viewer/2022081900/58ee07141a28ab72578b458b/html5/thumbnails/1.jpg)
AUSTRALIA & NEW ZEALAND
Electrical Regulatory Authorities Council (ERAC)
Essential Requirements:
Mandatory: Yes, for some products (Declared Articles)
Authority/Regulatory Body: Electrical Regulatory Authorities Council (ERAC)
Marking of Certification Logo required: Yes, C-Tick Mark Validity Period of Certification: 5 years
Local Representative: Yes In-country Testing Requirement: No, Nemko CB Certificate and Report accepted Language Requirements: English Estimated Lead Time: 2 - 3 weeks Additional information: Safety testing is required, EMC only for emission. Factory inspection is required for standards mark certification. The first factory inspection should be conducted by 3rd party and private Certification Body, for the other inspections Nemko reports are accepted.