Asset final

12
Assets deterioration is a natural phenomenon over time. This happens due to various reasons through corrosion, weakening of materials, natural disaster damage, etc. A way of managing and inspecting the quality and quantity of deterioration is called a condition assessment. Conditioning Moniterning of Builduing. Asset management of properties Rahul Singh, NICMAR Pune

Transcript of Asset final

Page 1: Asset final

Assets deterioration is a natural

phenomenon over time. This happens due to

various reasons through corrosion,

weakening of materials, natural disaster

damage, etc. A way of managing and

inspecting the quality and quantity of

deterioration is called a condition

assessment.

Conditioning Moniterning of Builduing.

Asset management of properties

Rahul Singh, NICMAR Pune

Page 2: Asset final

1

Condition Monitoring of Academic Block Building (NICMAR)

Asset Management of Properties

Submitted By:

Rahul Dhanik (RP14068)

National Institute of Construction Management and Research, Pune

Page 3: Asset final

2

Contents:

S.No Topic Page No.

1. Introduction 3

2. Description of the asset 3

3. Literature review 4

3.1 Need for condition monitoring 4

3.2 Techniques of condition monitoring 4

4. Condition monitoring of the asset 4

4.1 Methodology used 4

4.2 Questionnaire 5

4.3 Data Collection 6

4.3.1 Secondary data 6

4.3.2 Primary data 7

5. Analysis 11

6. Conclusion 11

7. References 11

List of images and tables:

S.No Name Page No

1 Image 1: Life of building 3

2 Image 2: Live condition of the asset 10

3 Table 1: Rating criteria 7

4 Table 2: Rating of rooms 8

Page 4: Asset final

3

1. Introduction

Assets deterioration is a natural phenomenon over time. This happens due to various reasons through

corrosion, weakening of materials, natural disaster damage, etc. A way of managing and inspecting the

quality and quantity of deterioration is called a condition assessment. Inspection and investigation of

technical condition of buildings and its structures has become one of the most important activities of

construction nowadays. Ensuring reliability of buildings, to conduct the repair work, as well as the

development of project documentation for reconstruction buildings and structures is known as asset

management of buildings.

2. Description of the Asset

NICMAR's Pune Campus is situated at Balewadi, 14 kmsaway from the Pune Central Railway Station and

7 kms away from Pune University. The Campus started its operation in year 2004 and is spread across 11

acres of land and is constructed using the latest materials and technologies and having numerous

The structure which is taken for the research purpose is Academic Block. This is an institutional building

where the scope of wear and tear is not much. The NICMAR structure was constructed in 2 phases, first

phase in 2005 (library side up to Deans’ office) and Phase 2 in 2009(current DG office and class rooms

above the new faculty block). If we take lifecycle of this building to be 50 years then the building is in its

childhood stage (only 5, 10 years old)

The building consists of ground, first and second floors where various classes, faculty rooms and offices

are located.

Image 1: Life of Building

Source:http://www.choa.bc.ca/_resources/Bulletin04_Life_of_Buildings.pdf

Page 5: Asset final

4

3. Literature Review

Condition monitoring involves the continuous or periodic assessment of the condition of an asset while it is in its lifecycle. Basically condition monitoring is the process of monitoring some parameters from the asset, such that a significant change in the parameter can give information about the health of the asset. It involves the continuous or periodic assessment of the condition of an asset while it is in its life cycle.

3.1 Needfor Condition Monitoring Systems

The need to predict Asset failures

The need for a holistic view of equipment condition

The need for greater accuracy in failure prediction

The need to reduce the cost of Condition Monitoring

The need to improve Assets and its component reliability

The need to optimiseAsset performance

3.2 Techniques of Conditioning Monitoring

Visual inspection – Operational performance.

Vibration Measurement and Analysis.

Infrared Thermography.

Oil Analysis and Tribology.

Ultrasonic.

Motor Current Analysis.

Acoustic based analysis.

Non destructive test techniques.

Lubrication Sample Management and Analysis.

4. Condition Monitoring of Asset

4.1 Methodology used

The most basic form of conditioning monitoring is visual inspection and we followed the same for our project.

We have divided every room into five parts i.e. flooring, painting, ceiling, furniture and electrical components. Then according to visual look of these items we have given them different ratings.

We don’t have any quantifiable parameters to support our inspection. So we have four ratings to every item by four individuals.

Then for final data we have took average of those four ratings.

Page 6: Asset final

5

4.2 Questionnaire Name of the project:Academic Block, NICMAR Pune. Detail of the respondent: S.D.JANGAM ( Maintenance Manager ) Q.1 When was the asset constructed/rehabilitated/replaced? Ans: Phase wise construction: Phase 1 in 2004 and phase 2 in 2009. Q.2 What is the asset’s theoretical effective life? Ans: 100 years. Q.3 Where is the asset in its lifecycle? Ans: 10 years. Q.4 Has the asset been inspected physically and by what process? Ans: Annual physical inspection is done by assigned committee during summer vacations. Q.5 How could planned maintenance prevent the asset’s failure or extend the time of failure? Ans: Routine maintenance helps determines the small and initials issues which when corrected timely helps prevent major failures. Q.6 Is the asset technically or commercially obsolete? Ans: No Q.7 Are asset condition grading appropriate and relevant? Ans: Yes Q.8 Are asset condition monitoring process effective? Ans: Yes Q.9 Type of asset. Ans: Fixed asset – Institutional building. Q.10 The criticality of the asset. Ans: Not very critical. Q.11 The relative age of the asset. Ans:5, 10 years. The building is in initial stage considering the life of building as 100 years. Q.12 Existing asset condition assessment practices? Ans:Visual inspection- Routine physical inspection which is done on yearly basis. Q.13 Available options/techniques. Ans:Visual inspection only. Q.14Condition assessment frequency. Ans: The building is inspected yearly and maintenance is done on the priority basis of the whole campus.

Page 7: Asset final

6

4.3 Data collection Primary data is collected by visual inspection and secondary data is collected by interviewing.

4.3.1 Secondary data

Maintenance of asset

Yearly planned maintenance is done to prevent the asset’s failure.

Maintenance cost is Rs. 2.25 Crore (for whole campus).

Yearly budget is decided for the maintenance.

Maintenance done on priority basis.

Substation:

Manual checking and cleaning of electrical switches is done yearly by alcohol.

Power failure:

800 to 1000 litre of diesel is required monthly. (for whole campus) Furniture:

Yearly physical checking of all the items like chair, desk, dice etc is done.

High priority is given to the furniture.

Backup furnitureis also available and can be replaced whenever required. Water cooler:

Cleaning of water tanks in every six months.

Water sample is sent for testing in every six months to government approved labs.

Civil work:

It includes tiles, paints, ceiling etc.

Depute civil people for major works and special budget is sanctioned from the board. Painting:

Painting is done annually but on phase wise.

Phase is selected on priority basis. UPS:

Manufacturer – DUBAS.

Annual maintenance contract with DUBAS.

Page 8: Asset final

7

Major work done in asset’s life cycle

I. Water proofing of roof

Water leakage problem in Room no S-14, S-16, S-17, S-18, S-19, S-20 and Accounts Departments.

Three year study by Path Work.

Bitumen sheet water proofing for whole roof is done in 2014.

II. Water supply connection

Water sources were insufficient in campus, dependent on Bore wells and water tankers.

There is no water connection before 2013.

In 2013, 2 inch water line connection was taken from PMC.

III. Construction of new staircase

There is an increase in number of students at campus.

An extra staircase is constructed near faculty staff room in 2009.

4.3.2 Primary data

We have divided each room into five parts i.e. flooring, painting, ceiling, furniture and electrical components. Then according to visual look of these items we have given them different ratings.

We don’t have any quantifiable parameters to support our inspection. So we have given ratings to each item by four individuals.

Then for final data we have took average of those four ratings.

Then sum of all the five parts will decide the condition of that particular room.

Total

1 to 5 Very Poor

5 to 10 Poor

10 to 15 Moderate

15 to 20 Good

20 to 25 Very Good Table 1: Rating criteria

Page 9: Asset final

8

SR. NO.

ROOM FLOORING PAINT CEILING FURNITURE ELE.SWITCH

Total

1 F 11

5 5 5 5 5

5 5 5 5 5

4 4 4 4 4

4 4 5 4 5

4.5 4.5 4.8 4.5 4.8 23.0

2 F 14

5 4 5 4 4

4 4 4 4 5

3 3 4 3 4

4 4 4 4 4

4 3.75 4.25 3.75 4.25 20

3 F 15

3 3 5 4 5

4 3 5 4 4

3 3 4 3 3

4 3 5 4 4

3.5 3 4.75 3.75 4 19

4 F 17

2 3 5 4 5

4 4 5 4 5

3 4 4 4 4

3 3 5 4 4

3 3.5 4.75 4 4.5 19.75

5 F 21

4 4 5 4 3

4 4 4 4 5

4 4 3 3 4

4 4 5 4 3

4 4 4.25 3.75 3.75 19.75

6 S 11

3 5 4 3 5

3 4 3 3 5

3 4 3 4 3

4 5 4 4 5

3.25 4.5 3.5 3.5 4.5 19.25

7 S13

5 4 4 5 5

4 4 4 4 4

4 3 3 4 4

4 4 4 4 4

4.25 3.75 3.75 4.25 4.25 20.25

8 S 15

5 3 3 5 3

4 3 2 4 5

4 3 2 3 4

4 3 3 4 3

4.25 3 2.5 4 3.75 17.5

9 S 16

5 3 3 5 3

4 3 3 4 5

3 3 3 3 4

Page 10: Asset final

9

4 3 3 4 4

4 3 3 4 4 18

10 S 17

5 4 2 4 5

4 3 3 4 5

4 3 3 3 4

4 3 3 3 4

4.25 3.25 2.75 3.5 4.5 18.25

11 S 19

4 3 2 3 4

5 4 3 4 5

3 3 3 3 3

4 3 3 3 4

4 3.25 2.75 3.25 4 17.25

12 S 21

5 4 4 4 5

5 4 5 4 5

4 3 3 4 4

5 4 4 4 5

4.75 3.75 4 4 4.75 21.25

13 G-TOILET 1st F.

4 3 4 3 5

4 4 4 4 5

3 3 5 4 5

4 4 5 3 5

3.75 3.5 4.5 3.5 5 20.25

14 G-TOILET 2nd F.

4 2 4 4 5

4 2 4 3 4

3 2 3 2 3

4 3 4 3 4

3.75 2.25 3.75 3 4 16.75

15 L-TOILET 1st F

3 3 3 3 4

3 2 3 2 4

2 2 2 2 4

2 2 3 3 4

2.5 2.25 2.75 2.5 4 14

16 L-TOILET 2nd F

4 4 4 4 4

3 3 3 4 4

3 4 4 3 4

3 4 3 4 4

3.25 3.75 3.5 3.75 4 18.25

17 EXTERIOR

3 2 2 3 3

3 3 2 2 3

2 2 3 3 3

3 3 2 3 2

2.75 2.5 2.25 2.75 2.75 13

Table 2 : Rating of the rooms

Page 11: Asset final

10

Image 2 :Live condition of the asset

Page 12: Asset final

11

5. Analysis:

As the building is newly constructed ( 5 year ) , most of it is in good shape barring a few. Problem area: Some of the areas have deteriorated heavily like Girls Toilet and Roof of the Second floor. Solutions:

Regular maintenance and up keep will help reduce the chances of further deterioration and help have a longer life cycle and in turn save the cost.

6. Conclusion : NICMAR being a premier institute in Construction and Real Estate Management needs to maintain its reputation in terms of its own construction and maintenance of its buildings (Assets). Therefore it is utmost important that more focus is given to up keep and maintenance of the campus. We have observed and found out some problematic areas which need immediate attention. Our suggestion is to look and tackle those areas for better asset life cycle.

7. References

The Hillsborough County ,Florida Experience:U.S.Department of Transportation-2005

Using NI Hardware and Software to Build the CMS-1000 Combustion Dynamic Condition Monitoring System : Jordan Pritt, Turbine Technology Services Corporation

Model-based Framework for Oil Production Forecasting and Optimization-A Case Study in Integrated Asset Management:Cong Zhang, AbdollahOrangi, AmolBakshi, Will Da Sie, and Viktor K. Prasanna,University of Southern California, Los Angeles, CA 90089 USA

Using CompactRIO to Develop a Large-Scale Condition Monitoring and Management System: Chua SengHiap, Singapore Technologies Kinetics Ltd

Using LabVIEW to Design a Greenhouse Remote Monitoring System:- Fulu Wang, Northeast Agriculture University

On-Line Sensors for Condition Monitoring: Michel Murphy Condition Monitoring International LLC Roswell, GA, USA Thomas S Kent BEng, AMIMechE – Development Engineer Kittiwake Developments, Littlehampton U.K.( 61st STLE Annual Meeting Condition Monitoring Technical Session Calgary, AB Canada)

Remote Condition Monitoring of London Underground Track Circuits: Sam Etchell, London Underground Limited

Machine condition monitoring system using vibration analysis- Case Study of BamblePetrochemicalPlant,Norway :D.N.Brown&J.C.JorgensenBriiel&Kjsev