2 ASME Student Section Advisor Webinar, June 2010 ASME Knowledge & Community Sector.
ASME-B30developments-webinar-0912
-
Upload
andres-alvarez -
Category
Documents
-
view
218 -
download
0
Transcript of ASME-B30developments-webinar-0912
-
8/13/2019 ASME-B30developments-webinar-0912
1/122
1
The views expressed in this presentation are that of ITI and are not necessarily the views of the ASME or any of its committees
ASME B30 & P30Developments
Host: Mike Parnell
ITI President/CEO
ASME B30 Vice Chair (Cranes & Rigging)
ASME P30 Chair (Lift Planning)
-
8/13/2019 ASME-B30developments-webinar-0912
2/122
2
A world leader in crane and rigging
training and consulting.
WHO WE ARE
We Rig It Right!
-
8/13/2019 ASME-B30developments-webinar-0912
3/122
3
Serves a Variety of Industries
• Aerospace
• Chemicals
• Construction
•
DOD• DOE
• Electric Utility
• Hydro
• Manufacturing
WHO WE ARE
• Maritime
• Mining
• Nuclear
•
Oil & Gas• Pulp & Paper
• Railroad
• Shipbuilding
• Wind Energy
-
8/13/2019 ASME-B30developments-webinar-0912
4/122
4
The World's
Greatest
Organizations
Trust ITI's
Expertise with their
Crane & Rigging
Operations
OUR CUSTOMERS
-
8/13/2019 ASME-B30developments-webinar-0912
5/122
5
ITI SHOWCASE WEBINAR SERIES
Past Presentations:
• Cranes, Rigging & Your Organization• Effective Crane & Rigging Training Methods for Your Employees
• Heavy Intermodal Lift & Transport – Engineering Considerations
• ITI Master Rigger Course: Interactive Demo
Today's Presentation: ASME B30 & P30 Developments
(Friday, September 7, 2012 - 1pm EST)
Upcoming Presentations:
10 Audit Points for Your Crane & Rigging Operations: An HSE PerspectiveTackling the Challenges of Training Site Supervisors, Lift Directors,and Other Leaders
-
8/13/2019 ASME-B30developments-webinar-0912
6/122
6
Mr. Parnell has a wealth of knowledge regarding cranes,
rigging, and lifting activities throughout a variety of industries• 30+ years learning about wire rope, rigging, load handling,
and lifting activities
• Vice Chair of the ASME B30 Main Committee which sets
the standards in the US for cranes and rigging
• Chair of the ASME P30 Main Committee which sets thestandards for lift planning
ASME standards are also adopted by many countries around
the world
MIKE PARNELL – ABOUT YOUR HOST
The views expressed in this presentation are that of ITI and are not necessarily the views of the ASME or any of its committees.
-
8/13/2019 ASME-B30developments-webinar-0912
7/1227
• ASME B30.1 through B30.30
• New Volumes Under Development
• Major Standard Updates, 2008-to-Date
• Interpretation of Standards
• ASME P30 Lift Planning
TODAY'S AGENDA
-
8/13/2019 ASME-B30developments-webinar-0912
8/1228
• Interactive Discussion
• Long-Term Mindset – Think aboutExpansion, Consolidation, and Preparingfor Tomorrow
• Questions are Welcomed
• Utilize the Control Panel to:• - Type Questions into the Chat Box
• - Answer Poll Questions
• Q & A Session after Presentation
QUICK TIPS
-
8/13/2019 ASME-B30developments-webinar-0912
9/1229
• American Society of Mechanical
Engineers
• The ASME B30 standards aredeveloped under proceduresaccredited by American National
Standards Institute
• A collection of 30 volumes which address safetyissues related to equipment usage in the
workplace
WHAT IS ASME?
-
8/13/2019 ASME-B30developments-webinar-0912
10/12210
• Jacks, Rollers, etc
• Overhead Cranes
• Tower Cranes
• Mobile Cranes
• Drum Hoists
• Floating Cranes
• Slings & Hooks
•
Underhung Hoists
• Handling Loads from Rotorcraft
• Storage/Retrieval Machines
• Side Boom Tractors
• Stacker Cranes
• Cableways
• BTH Lifting Devices
WHAT EQUIPMENT IS COVERED IN ASME B30?
-
8/13/2019 ASME-B30developments-webinar-0912
11/12211
• Manually Operated Lever
Hoists
• Articulating Boom Cranes
• Personnel Lifting Systems
• Container Cranes
• Scrap Handlers
• Rigging Hardware
• Material Placement Systems
• Balance Lifting Units
• Self-Erecting Tower Cranes
• Ropes
WHAT EQUIPMENT IS COVERED IN ASME B30?
-
8/13/2019 ASME-B30developments-webinar-0912
12/12212
WHAT'S NEW?
-
8/13/2019 ASME-B30developments-webinar-0912
13/12213
It takes patience to write a National Standard?
-
8/13/2019 ASME-B30developments-webinar-0912
14/12214
B30.1 - 2009JACKS, ROLLERS, AIR CASTERS, AIR LIFTING BAGS, THGS
-
8/13/2019 ASME-B30developments-webinar-0912
15/12215
B30.1 – 2009 JACKS
• Mechanical and Hydraulic Jacks
• Air Lifting Bags
• Air Casters
• Industrial Rollers
• Telescopic Hydraulic Gantry Systems
• Considering adding Strand Jacks
• Next publication date 2014
-
8/13/2019 ASME-B30developments-webinar-0912
16/122
-
8/13/2019 ASME-B30developments-webinar-0912
17/122
17
B30.2 – 2011 OVERHEAD and GANTRY CRANES
• Defined/Inserted Minimum Breaking Force
• Clarified labeling required for Basic Controls/Master Switches
• Maintenance separated from Inspection and Testing adding Chapter 4,
Maintenance Training and Maintenance
• Operational Training requirement
• Management Responsibilities
• Next revision 2015
-
8/13/2019 ASME-B30developments-webinar-0912
18/122
18
B30.2 – 2011 OVERHEAD and GANTRY CRANES
Request for Interpretation
Q: Do the load test requirements in
Sec. 2-2.2.2.2 address the load test of the
underlying support structure?
-
8/13/2019 ASME-B30developments-webinar-0912
19/122
19
B30.2 – 2011 OVERHEAD and GANTRY CRANES
Request for Interpretation
Q: Do the load test requirements in
Sec. 2-2.2.2.2 address the load test of the
underlying support structure?
A: No.
-
8/13/2019 ASME-B30developments-webinar-0912
20/122
20
B30.2 – 2011 OVERHEAD and GANTRY CRANES
Request for Interpretation
Q: Can the load test be conducted using
test weights equal to 100% of the rated
capacity?
-
8/13/2019 ASME-B30developments-webinar-0912
21/122
21
B30.2 – 2011 OVERHEAD and GANTRY CRANES
Request for Interpretation
Q: Can the load test be conducted using
test weights equal to 100% of the rated
capacity?
A: Yes.
-
8/13/2019 ASME-B30developments-webinar-0912
22/122
22
B30.2 – 2011 OVERHEAD and GANTRY CRANES
Request for Interpretation
Q: If the test weights are 100% of the RC
can the load rating be certified at 100% of
the test weights/rated capacity?
-
8/13/2019 ASME-B30developments-webinar-0912
23/122
23
B30.2 – 2011 OVERHEAD and GANTRY CRANES
Request for Interpretation
Q: If the test weights are 100% of the RC
can the load rating be certified at 100% of
the test weights/rated capacity?
A: ASME does not certify any activity,
however the load rating can be verified at100% of the rated capacity.
-
8/13/2019 ASME-B30developments-webinar-0912
24/122
24
B30.3 – 2009 TOWER CRANES
-
8/13/2019 ASME-B30developments-webinar-0912
25/122
25
B30.3 – 2009 TOWER CRANES
• Responsibilities section under consideration
• Signal system upgrade
• Next Revision 2012
-
8/13/2019 ASME-B30developments-webinar-0912
26/122
26
TOWER CRANES subcommittee to develop new
signal and communication system.
-
8/13/2019 ASME-B30developments-webinar-0912
27/122
27
B30.4 – 2010 PORTAL and PEDESTAL CRANES
-
8/13/2019 ASME-B30developments-webinar-0912
28/122
28
B30.4 – 2010 PORTAL and PEDESTAL CRANES
• Responsibilities, PM program, planned for 2015
• Tower Crane removed from this Volume
• Defined “Boom Stop” and “Buffer/Bumper”
• Expanded Operator Qualifications
-
8/13/2019 ASME-B30developments-webinar-0912
29/122
29
B30.5 – 2011 MOBILE and LOCOMOTIVE CRANES
-
8/13/2019 ASME-B30developments-webinar-0912
30/122
-
8/13/2019 ASME-B30developments-webinar-0912
31/122
31
B30.5 – 2011 MOBILE and LOCOMOTIVE CRANES
• Added definitions of “Critical Lift” and “Minimum Breaking Force”
• Requires labeling of controls
• “Minimum Breaking Force” replaces “Minimum Breaking Strength”
• Sheave size for boom hoists clarified
• “Load Rating Chart” replaces “Load Capacity Chart”
• Next revision 2016
-
8/13/2019 ASME-B30developments-webinar-0912
32/122
32
B30.5 – 2011 MOBILE and LOCOMOTIVE CRANES
• Added definitions of “Critical Lift” and “Minimum Breaking Force”
• Requires labeling of controls
• “Minimum Breaking Force” replaces “Minimum Breaking Strength”
• Sheave size for boom hoists clarified
• “Load Rating Chart” replaces “Load Capacity Chart”
• Next revision 2016
30 20 O OCO O C S
-
8/13/2019 ASME-B30developments-webinar-0912
33/122
33
B30.5 – 2011 MOBILE and LOCOMOTIVE CRANES
Request for Interpretation
Q: Is a crane owner required to provide a
qualified rigger for lifting operations? (paraphrased)
B30 5 2011 MOBILE d LOCOMOTIVE CRANES
-
8/13/2019 ASME-B30developments-webinar-0912
34/122
34
B30.5 – 2011 MOBILE and LOCOMOTIVE CRANES
Request for Interpretation
Q: Is a crane owner required to provide a
qualified rigger for lifting operations? (paraphrased)
A: No.
B30 5 2011 MOBILE d LOCOMOTIVE CRANES
-
8/13/2019 ASME-B30developments-webinar-0912
35/122
35
B30.5 – 2011 MOBILE and LOCOMOTIVE CRANES
Request for Interpretation
Q: Is the crane operator allowed to acceptthe load weight information provided to him
by the site? (paraphrased)
B30 5 2011 MOBILE d LOCOMOTIVE CRANES
-
8/13/2019 ASME-B30developments-webinar-0912
36/122
36
B30.5 – 2011 MOBILE and LOCOMOTIVE CRANES
Request for Interpretation
Q: Is the crane operator allowed to acceptthe load weight information provided to him
by the site? (paraphrased)
A: Yes.
B30 5 2011 MOBILE d LOCOMOTIVE CRANES
-
8/13/2019 ASME-B30developments-webinar-0912
37/122
37
B30.5 – 2011 MOBILE and LOCOMOTIVE CRANES
Request for Interpretation
Q: Is the crane operator not responsible
for improper rigging, that is out of his view?(paraphrased)
B30 5 2011 MOBILE d LOCOMOTIVE CRANES
-
8/13/2019 ASME-B30developments-webinar-0912
38/122
38
B30.5 – 2011 MOBILE and LOCOMOTIVE CRANES
Request for Interpretation
Q: Is the crane operator not responsible
for improper rigging, that is out of his view?(paraphrased)
A: Yes. The crane operator is not
responsible for hazards or conditions not
under his direct control. (paraphrased)
B30 6 2010 DERRICKS
-
8/13/2019 ASME-B30developments-webinar-0912
39/122
39
B30.6 – 2010 DERRICKS
-
8/13/2019 ASME-B30developments-webinar-0912
40/122
40
DERRICKS subcommittee
proposes new equipment.
B30 7 2011 WINCHES
-
8/13/2019 ASME-B30developments-webinar-0912
41/122
41
B30.7 – 2011 WINCHES
B30 7 2011 WINCHES
-
8/13/2019 ASME-B30developments-webinar-0912
42/122
42
B30.7 – 2011 WINCHES
• Complete re-write
• Renamed “WINCHES”
• Allows for horizontal and vertical use
•Next revision 2016
-
8/13/2019 ASME-B30developments-webinar-0912
43/122
43
Efforts are being made to change the
Winches Volume to a more
“user friendly” standard.
Freedigitalphoto.com
Though it has been
greatly resisted!
B30 8 2010 FLOATING CRANES and FLOATING
-
8/13/2019 ASME-B30developments-webinar-0912
44/122
44
B30.8 – 2010 FLOATING CRANES and FLOATINGDERRICKS
B30 8 2010 FLOATING CRANES and FLOATING
-
8/13/2019 ASME-B30developments-webinar-0912
45/122
45
B30.8 – 2010 FLOATING CRANES and FLOATINGDERRICKS
• Added definitions for “Liquid Free Surface” and “Loadlines”
• Expanded criteria for load ratings to include land cranes and derricks
used on floating platforms
• Allows Structural Competence determination for Barges and Pontoons by
Qualified Person• Expands watertight integrity requirements
• Added “Off -Shore” barge requirements
• Next revision 2015
-
8/13/2019 ASME-B30developments-webinar-0912
46/122
46
New Method Proposed for Drying the
Clothes of Employees Working on Floating
Cranes Who Happen to Fall Overboard.
B30 9 2010 SLINGS
-
8/13/2019 ASME-B30developments-webinar-0912
47/122
47
B30.9 – 2010 SLINGS
B30 9 2010 SLINGS
-
8/13/2019 ASME-B30developments-webinar-0912
48/122
48
B30.9 – 2010 SLINGS
• Rated Load is based on symmetrical loading of sling legs and
specific sling angles
• Sling ID: rated load for one hitch type and angle on which it is based
• Repair of Chain Sling component Parts covered by other volumes
• Rated Load of Hand tucked WR Slings based on D/d of 15/1
Mechanical and Swaged splices based on 25/1 D/d
B30 9 2010 SLINGS
-
8/13/2019 ASME-B30developments-webinar-0912
49/122
49
B30.9 – 2010 SLINGS
• Record of periodic inspection must be retained, but not for individual
slings
• Broken wire removal criteria clarified for Cable laid WR Slings
• Terminology change: “Single/Double” Braid replaces “Hollow” Braid
• Rated loads for web Slings based on Pin diameter shown in
WSTDA-WS-1
• Next revision 2013
-
8/13/2019 ASME-B30developments-webinar-0912
50/122
50
The Slings Subcommittee
has been requested todevelop a rated capacity
table for dog slings.
Anticipate listing by
breed and bite.
B30 10 2009 HOOKS
-
8/13/2019 ASME-B30developments-webinar-0912
51/122
51
B30.10 – 2009 HOOKS
B30 10 2009 HOOKS
-
8/13/2019 ASME-B30developments-webinar-0912
52/122
52
B30.10 – 2009 HOOKS
• Change of deformation requirement from 10° twist or bend to 0°.
“Any visibly apparent bend or twist from the plane of the unbent hook”
• Change of hook spread requirement from 15% to 5%, not to exceed
¼", (or as recommended by the manufacturer)
-
8/13/2019 ASME-B30developments-webinar-0912
53/122
53
Hooks SC asked about heat damage.
B30 11 – 2010 MONORAILS and UNDERHUNG HOISTS
-
8/13/2019 ASME-B30developments-webinar-0912
54/122
54
B30.11 – 2010 MONORAILS and UNDERHUNG HOISTS
B30 11 – 2010 MONORAILS and UNDERHUNG HOISTS
-
8/13/2019 ASME-B30developments-webinar-0912
55/122
55
B30.11 – 2010 MONORAILS and UNDERHUNG HOISTS
• Separates Monorail Systems from Cranes
• Markings to include rated loads on separate components
• All sections affected
•
Next issue should be 2015
d
-
8/13/2019 ASME-B30developments-webinar-0912
56/122
56
ASME Ad-Hoc Committee to
help write a new definition for Overload.
B30 12 – 2011 HANDLING LOADS SUSPENDED from
-
8/13/2019 ASME-B30developments-webinar-0912
57/122
57
B30.12 – 2011 HANDLING LOADS SUSPENDED fromROTORCRAFT
B30 12 – 2011 HANDLING LOADS SUSPENDED from
-
8/13/2019 ASME-B30developments-webinar-0912
58/122
58
B30.12 2011 HANDLING LOADS SUSPENDED fromROTORCRAFT
• Use of long lines added to Standard
• Expanded maintenance requirement for primary hook and support
system
• Adds a spooling recommendation
• Next revision 2017
ROTORCRAFT b itt t P id
-
8/13/2019 ASME-B30developments-webinar-0912
59/122
59
ROTORCRAFT subcommittee to Provide
Interpretation about Hair Spray on the Blades.
Rotorcraft SC to Implement new
-
8/13/2019 ASME-B30developments-webinar-0912
60/122
60
Rotorcraft SC to Implement new
Static Charge Avoidance Requirements.
B30 13 – 2011 STORAGE/RETRIEVAL
-
8/13/2019 ASME-B30developments-webinar-0912
61/122
61
B30.13 2011 STORAGE/RETRIEVALMACHINES and
ASSOCIATED
EQUIPMENT
B30 13 – 2011 STORAGE/RETRIEVAL MACHINES and
-
8/13/2019 ASME-B30developments-webinar-0912
62/122
62
B30.13 2011 STORAGE/RETRIEVAL MACHINES and ASSOCIATED EQUIPMENT
•
Added requirements for riders on the carriage• Adds Belts to construction and inspection standards
• Makes allowance for other means of braking at limits other than bumpers
•
Requires controls to be labeled on operator ridden equipment• Requires Free-fall stops on carriages
• Inspections assign a “designated” person
•
Next revision 2017
STORAGE/RETRIEVAL i
-
8/13/2019 ASME-B30developments-webinar-0912
63/122
63
STORAGE/RETRIEVAL is a one man
subcommittee and he often requires rest
between 5-year revisions.
B30.14 – 2010 SIDE BOOM TRACTORS
-
8/13/2019 ASME-B30developments-webinar-0912
64/122
64
B30.14 2010 SIDE BOOM TRACTORS
B30.14 – 2010 SIDE BOOM TRACTORS
-
8/13/2019 ASME-B30developments-webinar-0912
65/122
65
B30.14 2010 SIDE BOOM TRACTORS
• Complete re-write
• Design, Construction, Inspection and Operation
• LMI incorporated
•
Next revision 2015
All new operators will be required
-
8/13/2019 ASME-B30developments-webinar-0912
66/122
66
All new operators will be required
to have special haircuts.
B30.16 – 2007 OVERHEAD HOISTS (Underhung)
-
8/13/2019 ASME-B30developments-webinar-0912
67/122
67
B30.16 2007 OVERHEAD HOISTS (Underhung)
B30.16 – 2007 OVERHEAD HOISTS (Underhung)
-
8/13/2019 ASME-B30developments-webinar-0912
68/122
68
B30.16 2007 OVERHEAD HOISTS (Underhung)
• Small changes proposed, not fully balloted or approved yet
• Next revision 2012
H i t b itt i i d b t it f t
-
8/13/2019 ASME-B30developments-webinar-0912
69/122
69
Hoist subcommittee is worried about its future
if gravity is no longer present at worksites.
B30.17 – 2006 OVERHEAD AND GANTRY CRANES
-
8/13/2019 ASME-B30developments-webinar-0912
70/122
70
(Top Running Bridge, Single Girder, Underhung Hoist)
B30.17 – 2006 OVERHEAD AND GANTRY CRANES
-
8/13/2019 ASME-B30developments-webinar-0912
71/122
71
(Top Running Bridge, Single Girder, Underhung Hoist)
• Small changes
• Tracks B30.2 Overhead & Bridge Cranes
• Next revision 2012
B30 17 subcommittee takes short recreational
-
8/13/2019 ASME-B30developments-webinar-0912
72/122
72
B30.17 subcommittee takes short recreational
break, with poor results for the Chairman.
B30.18 – 2011 STACKER CRANES
-
8/13/2019 ASME-B30developments-webinar-0912
73/122
73
B30.18 – 2011 STACKER CRANES
-
8/13/2019 ASME-B30developments-webinar-0912
74/122
74
• Established minimum bridge and trolley Bumper (Buffer)
requirement for all Stacker Cranes regardless of use or speed.Recommends higher capacity for higher speeds and situations
• Added Pendant Controller and Switch labeling requirements
• Adds requirement for Preventive Maintenance Program andkeeping Inspection Records
• Next revision 2014
Our plain-spoken STACKER CRANES chairman
-
8/13/2019 ASME-B30developments-webinar-0912
75/122
75
Our plain-spoken STACKER CRANES chairman
insists on clear language.
B30.19 – 2011 CABLEWAYS
-
8/13/2019 ASME-B30developments-webinar-0912
76/122
76
B30.19 – 2011 CABLEWAYS
-
8/13/2019 ASME-B30developments-webinar-0912
77/122
77
• Initial inspections/testing shall be accomplished by a qualified
person
• Establishes a requirement for a Preventive Maintenance Program
• Clarifies Maintenance Procedures
• Frequent Inspections Shall be performed by a designated person
• Wire Rope removal criteria expanded to include rotation resistant
ropes and removes exceptions for synthetic sheaves
• Added requirement for Lockout/Tagout program
• Next revision expected in 2016
CABLEWAYS to rule on request
-
8/13/2019 ASME-B30developments-webinar-0912
78/122
78
CABLEWAYS to rule on request
for cliff-side installations.
B30.20 – 2010 BELOW-THE-HOOK LIFTING DEVICES
-
8/13/2019 ASME-B30developments-webinar-0912
79/122
79
B30.20 – 2010 BELOW-THE-HOOK LIFTING DEVICES
-
8/13/2019 ASME-B30developments-webinar-0912
80/122
80
• Language changed throughout to cover alterations and
modifications
• Construction requirements refer to attached rigging components,
(slings, hooks and hardware) standards for construction and
inspection requirements
• Requires a maintenance program be established
• Next revision 2013
BTHLD Ch i
-
8/13/2019 ASME-B30developments-webinar-0912
81/122
81
BTHLD Chairman announces
he is above the bull.
B30.21 – 2010 MANUALLY LEVER OPERATED HOISTS
-
8/13/2019 ASME-B30developments-webinar-0912
82/122
82
-
8/13/2019 ASME-B30developments-webinar-0912
83/122
-
8/13/2019 ASME-B30developments-webinar-0912
84/122
84
New definition offered for Come-A-Long.
B30.22 – 2010 ARTICULATING BOOM CRANES
-
8/13/2019 ASME-B30developments-webinar-0912
85/122
85
B30.22 – 2010 ARTICULATING BOOM CRANES
-
8/13/2019 ASME-B30developments-webinar-0912
86/122
86
• Calculation for Load Rating with
stabilizers partially extended• Load Charts require more
information and posting at all
operating stations
• Clarified wire rope usage in
cranes with hoists
• Adds wireless controls
• Requirement for Operational Aids
• Qualified Person replaces
Designated Person• Maintenance Programs are
required
• Operator Qualifications expanded
and Operational responsibilities
added
• Next revision 2015
B30.22 –
2010 ARTICULATING BOOM CRANES
-
8/13/2019 ASME-B30developments-webinar-0912
87/122
87
Request for Interpretation
Q: Do the load test requirements qualifythe support structure (truck) as well as the
crane itself? (paraphrased)
-
8/13/2019 ASME-B30developments-webinar-0912
88/122
B30.23 – 2010 PERSONNEL LIFTING SYSTEMS
-
8/13/2019 ASME-B30developments-webinar-0912
89/122
89
B30.23 – 2010 PERSONNEL LIFTING SYSTEMS
-
8/13/2019 ASME-B30developments-webinar-0912
90/122
90
• Expanded minimum forces for guard rails, barriers and access gates
•
More defined requirements for hoisting equipment• Qualified Persons to inspect and evaluate deficiencies
• Preventive Maintenance programs required
•
Prohibitions for Hoisting Equipment Operators• Incorporate standard terminology for positions; Lift Director, Site Supervisor
• Next revision 2015
PERSONNEL LIFTING SYSTEMS subcommittee
-
8/13/2019 ASME-B30developments-webinar-0912
91/122
91
P RSONN IFTING SYST MS subcommittee
to develop rigging method for new carrier.
B30.24 – 2008 CONTAINER CRANES
-
8/13/2019 ASME-B30developments-webinar-0912
92/122
92
B30.24 – 2008 CONTAINER CRANES
-
8/13/2019 ASME-B30developments-webinar-0912
93/122
93
• All new
•
Next revision 2013
Container Crane subcommittee issues new
-
8/13/2019 ASME-B30developments-webinar-0912
94/122
94
Container Crane subcommittee issues new
requirements about Notices.
B30.25 – 2007 SCRAP and MATERIAL HANDLERS
-
8/13/2019 ASME-B30developments-webinar-0912
95/122
95
B30.25 – 2007 SCRAP and MATERIAL HANDLERS
-
8/13/2019 ASME-B30developments-webinar-0912
96/122
96
• Elevated cabs have seatbelt or protective device in door opening
•
Door secured against unintentional opening• Next revision 2012
SCRAP and MATERIAL HANDLERS
-
8/13/2019 ASME-B30developments-webinar-0912
97/122
97
consider equipment with better teeth.
B30.26 – 2010 RIGGING HARDWARE
-
8/13/2019 ASME-B30developments-webinar-0912
98/122
98
B30.26 – 2010 RIGGING HARDWARE
-
8/13/2019 ASME-B30developments-webinar-0912
99/122
99
• Added Chapter called Detachable Load Indicating Devices (LID)
(i.e. dynamometers)
• Added metric ton values
• Added cautions to personnel
• Next publication date 2015
-
8/13/2019 ASME-B30developments-webinar-0912
100/122
B30.27 – 2009 MATERIAL PLACEMENT SYSTEMS
-
8/13/2019 ASME-B30developments-webinar-0912
101/122
101
B30.27 – 2009 MATERIAL PLACEMENT SYSTEMS
-
8/13/2019 ASME-B30developments-webinar-0912
102/122
102
• New standard addressing concrete pumper trucks with booms
• Next revision 2014
MATERIAL PLACEMENT SYSTEMS were called
-
8/13/2019 ASME-B30developments-webinar-0912
103/122
103
MATERIAL PLACEMENT SYSTEMS were called
to provide immediate consultation.
-
8/13/2019 ASME-B30developments-webinar-0912
104/122
-
8/13/2019 ASME-B30developments-webinar-0912
105/122
B30.29 – 20?? SELF-ERECTING TOWER CRANES
-
8/13/2019 ASME-B30developments-webinar-0912
106/122
106
B30.29 – 20?? SELF-ERECTING TOWER CRANES
-
8/13/2019 ASME-B30developments-webinar-0912
107/122
107
• New standard addressing Design, Construction, Inspection and
Operation
• New Volume to be introduced 2012?
SE Tower Cranes sometimes pray for
-
8/13/2019 ASME-B30developments-webinar-0912
108/122
108
SE Tower Cranes sometimes pray for
progress and speed, sometimes they don’t.
B30.30 – 20?
-
8/13/2019 ASME-B30developments-webinar-0912
109/122
109
SYNTHETIC ROPE
WIRE ROPE
B30.30 – 20?? ROPES
-
8/13/2019 ASME-B30developments-webinar-0912
110/122
110
• Purpose is to replace all rope
related information currently
addressed in all B30 equipmentVolumes
• One change concerning rope
inspection can take 9 years to beincluded in all Volumes
• Will result in a “one-stop”
shopping for all rope removal
criteria for users
• Currently Synthetic Ropes are
continuing to expand into the
marketplace
• Exist on digger derricks, some
winches
• Being considered for cranes
• Excellent track record with U.V.
Ray resistance
P30 LIFT PLANNING
-
8/13/2019 ASME-B30developments-webinar-0912
111/122
111
• Chapter 0 Definitions
•
Chapter 1 Classification / Considerations• Chapter 2 Personnel (Roles / Responsibilities)
• Chapter 3 Standard Lifts
• Chapter 4Critical Lifts
• Appendix Samples of Lift Plans
•
Publication proposed 2013
-
8/13/2019 ASME-B30developments-webinar-0912
112/122
QUIZ 1
How many ASME B30 Volumes do
-
8/13/2019 ASME-B30developments-webinar-0912
113/122
113
How many ASME B30 Volumes doyou see represented by the load
handling in this photo set?
B30.2 Overhead CranesB30.10 HooksB30.30 RopesB30.9 SlingsB30.26 Rigging HardwareB30.16 Hoists (hand chain)B30.21 Lever Hoists
QUIZ 2
How many ASME B30 Volumes do
-
8/13/2019 ASME-B30developments-webinar-0912
114/122
114
How many ASME B30 Volumes doyou see represented by the load
handling in this photo?
QUIZ 2
How many ASME B30 Volumes do
-
8/13/2019 ASME-B30developments-webinar-0912
115/122
115
How many ASME B30 Volumes doyou see represented by the load
handling in this photo?
B30.5 Mobile Cranes B30.26 Rigging HardwareB30.10 Hooks B30.16 Hoists (hand chain)B30.30 Ropes B30.9 Slings
QUIZ 3
-
8/13/2019 ASME-B30developments-webinar-0912
116/122
116
How many ASME B30Volumes do you see
represented by the loadhandling in this photo?
-
8/13/2019 ASME-B30developments-webinar-0912
117/122
-
8/13/2019 ASME-B30developments-webinar-0912
118/122
QUIZ 4
H ASME
-
8/13/2019 ASME-B30developments-webinar-0912
119/122
119
How many ASMEB30 Volumes do you
see represented bythe load handling inthis photo?
B30.2 Overhead Cranes
B30.10 Hooks
B30.30 Ropes
B30.9 Slings
B30.26 Rigging Hardware
B30.20 BTHLD
Scores
?
-
8/13/2019 ASME-B30developments-webinar-0912
120/122
120
?•
1-12 Correct = $15 Gift Certificate• 13-18 Correct = $20 Gift Certificate
• 19-22 Correct = $25 Gift Certificate
• 23-24 Correct = $50 Gift Certificate
Contact: [email protected] to use your Gift Certificate at the ITI Bookstore.
Q&A
-
8/13/2019 ASME-B30developments-webinar-0912
121/122
121
-
8/13/2019 ASME-B30developments-webinar-0912
122/122