ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker...

42
ASHRAE HQ NZE Renovation Shreshth Nagpal

Transcript of ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker...

Page 1: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

ASHRAE HQ NZE Renovation

Shreshth Nagpal

Page 2: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

OVERVIEW

01 Intro

02 Project

03 Baseline

04 Climate

05 Program

06 Envelope

07 Systems

08 Summary

09 Questions

Page 3: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

OVERVIEW

01 Intro

02 Project

03 Baseline

04 Climate

05 Program

06 Envelope

07 Systems

08 Summary

09 Questions

Page 4: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

ASHRAE HQ NZE RENOVATION

Design TeamHouser Walker Architecture | McLennan Design | Integral Group

Integral GroupCommitted to decarbonization & resilience in built environment

Design AnalyticsArchitects, building technologists, data scientists, UX designers

Energy ModelingDeep-knowledge practice supports broad-knowledge practices

Architect of Record

Interior Design: (SBE)

Houser Walker Architecture, LLC

Partner in Charge, Co-Lead Designer,

Overall Project Manager:

Gregory Walker, AIA, LEED AP

Project Architect:

(responsible for sub consultant

coordination, document production)

Tom Butler, LEED AP

Design Architect

Lead Sustainability Designer: (SBE)

McLennan Design

Partner in Charge, Co- Lead Designer,

Lead Sustainability Designer

Jason McLennan, LEED Fellow

Project Manager:

Dale Duncan, AIA LEED AP

Director of Regenerative Design:

(programming lead)

Phaedra Svec, AIA, LEED BD+C

Mechanical, Electrical, Plumbing,

Fire Protection Engineering Lighting

Consultant:

Integral Consulting Engineering

the Atlanta practice of Integral Group

Principal in Charge; Mechanical Principal:

Stanton Stafford, PE, LEED BD+C

Net Zero Advisor:

John Andary, PE, LEED AP

Electrical Principal:

Spencer Phillips PE, LEED AP BD+C

Plumbing and Fire Protection Team Lead:

Benjamin Byerson, CPD, CET

Lighting Design:

Kera Lagios, LEED AP BD + C, Assoc. IALD, MIES

Energy Modeling:

Shreshth Nagpal, HBDP, BEMP, CPHD, CEM,

LEED AP BD+C

Building Envelope Consulting:

Niall Byrne, P.Eng., Ph.D. CxA

Page 5: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

10+

110+

18

600+

20+

6+

100+

100+

ASHRAE HQ NZE RENOVATION

Design TeamHouser Walker Architecture | McLennan Design | Integral Group

Integral GroupCommitted to decarbonization & resilience in built environment

Design AnalyticsArchitects, building technologists, data scientists, UX designers

Energy ModelingDeep-knowledge practice supports broad-knowledge practices

Page 6: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

Mechanical

Engineering

Electrical

Engineering

Energy &

Climate Policy

Performance

Engineering

Health &

Wellness

Lighting &

Daylight Design

Sustainability

Consulting

Energy Modeling

& Analysis

Design Analytics

ASHRAE HQ NZE RENOVATION

Design TeamHouser Walker Architecture | McLennan Design | Integral Group

Integral GroupCommitted to decarbonization & resilience in built environment

Design AnalyticsArchitects, building technologists, data scientists, UX designers

Energy ModelingDeep-knowledge practice supports broad-knowledge practices

Page 7: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

ASHRAE HQ NZE RENOVATION

Design TeamHouser Walker Architecture | McLennan Design | Integral Group

Integral GroupCommitted to decarbonization & resilience in built environment

Design AnalyticsArchitects, building technologists, data scientists, UX designers

Energy ModelingDeep-knowledge practice supports broad-knowledge practices

Page 8: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

OVERVIEW

01 Intro

02 Project

03 Baseline

04 Climate

05 Program

06 Envelope

07 Systems

08 Summary

09 Questions

Page 9: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

CHALLENGE

ASHRAE future global headquartersRenovating a 67,000 ft2 building from 1978 near Atlanta, GA

Demonstrate a replicable processFor retrofitting a mid-century building

Achieve net-zero energy performanceWhile providing an exceptional workplace

Target maximum EUI 24.1 kBtu/ft2/yrBefore renewable energy. Aspirational target 15 kBtu/ft2/yr

Page 10: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

VISION

Showcase for latest technologyDestination venue for industry visitors

Superior efficiencyWhile providing a healthy and comfortable environment

Represent sustainability valuesThat ASHRAE has long held

Have a net-zero energy operationAnd a zero-carbon footprint

Page 11: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

PRINCIPLES

Climate and place inform designEnvelope tailored to task and orientation

Daylight as primary lighting sourceMinimal reliance on electric lighting

Expanded thermal comfort rangeNatural ventilation when appropriate

Low energy use systemsSpaces zoned thermally and acoustically

Page 12: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

36

30

24

22

19

1716

0

5

10

15

20

25

30

35

40

EXISTING BUILDING

CONSTRUCTIONS

ASHRAE PROJECT

REQUIREMENTS

RECOMMENDED

CONSTRUCTIONS

PROGRAM LAYOUT

COMFORT CRITERIA

PROPOSED ENVELOPE

CONFIGURATION

OPTIMIZED

ALL-AIR SYSTEM

DECOUPLED

HYDRONIC SYTEMS

20%

SAFETY FACTOR

FANS PUMPS COOLING HOT WATER HEATING LIGHTING PLUG LOADSANNUAL SITE ENERGY USE

EU

I k

BT

U/f

t2/y

rPATH TO NET ZERO ENERGY

36

30

24

22

19

1716

0

5

10

15

20

25

30

35

40

EXISTING BUILDING

CONSTRUCTIONS

ASHRAE PROJECT

REQUIREMENTS

RECOMMENDED

CONSTRUCTIONS

PROGRAM LAYOUT

COMFORT CRITERIA

PROPOSED ENVELOPE

CONFIGURATION

OPTIMIZED

ALL-AIR SYSTEM

DECOUPLED

HYDRONIC SYTEMS

20%

SAFETY FACTOR

FANS PUMPS COOLING HOT WATER HEATING LIGHTING PLUG LOADSANNUAL SITE ENERGY USE

EUI kBTU/ft2 /yr

Target Maximum 24.1 EUI

Page 13: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

OVERVIEW

01 Intro

02 Project

03 Baseline

04 Climate

05 Program

06 Envelope

07 Systems

08 Summary

09 Questions

Page 14: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

SENSITIVITY ANALYSIS

Evaluate a series of envelope measuresTo understand the sensitivity of individual characteristics

X-axes show incremental improvementIn the specific studied parameter over baseline values

Y-axes show associated impactof improvement on annual energy use intensity

R-17 walls, R-35 roof, U-0.4 windowsTargets based in diminishing returns

Page 15: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

PARAMETRIC STUDY

Parallel coordinates plotTo better understand the effect of different parameters

Left axes each represent a parameterAnd the different evaluated properties

Right axis presents energy use intensityResulting from the selected parameter combination(s)

Energy and surrogate model resultsLighter lines are results from statistical surrogate models

Page 16: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

ENERGY USE CHARACTERIZATION

Breakdown of energy by end useTo identify opportunities to improve overall performance

Windows largest heat loss componentHeating ~25% of total energy use

Solar gains largest cooling componentCooling ~25% of total energy use

Fenestration offers largest opportunityBy further reducing conductive losses and solar gains

Page 17: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

PATH TO NET ZERO ENERGY

36

30

24

22

19

1716

0

5

10

15

20

25

30

35

40

EXISTING BUILDING

CONSTRUCTIONS

ASHRAE PROJECT

REQUIREMENTS

RECOMMENDED

CONSTRUCTIONS

PROGRAM LAYOUT

COMFORT CRITERIA

PROPOSED ENVELOPE

CONFIGURATION

OPTIMIZED

ALL-AIR SYSTEM

DECOUPLED

HYDRONIC SYTEMS

20%

SAFETY FACTOR

FANS PUMPS COOLING HOT WATER HEATING LIGHTING PLUG LOADSANNUAL SITE ENERGY USE

EU

I k

BT

U/f

t2/y

r

36

30

24

22

19

1716

0

5

10

15

20

25

30

35

40

EXISTING BUILDING

CONSTRUCTIONS

ASHRAE PROJECT

REQUIREMENTS

RECOMMENDED

CONSTRUCTIONS

PROGRAM LAYOUT

COMFORT CRITERIA

PROPOSED ENVELOPE

CONFIGURATION

OPTIMIZED

ALL-AIR SYSTEM

DECOUPLED

HYDRONIC SYTEMS

20%

SAFETY FACTOR

FANS PUMPS COOLING HOT WATER HEATING LIGHTING PLUG LOADSANNUAL SITE ENERGY USE

EUI kBTU/f

t2 /yr

Target Maximum 24.1 EUI

25

Page 18: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

OVERVIEW

01 Intro

02 Project

03 Baseline

04 Climate

05 Program

06 Envelope

07 Systems

08 Summary

09 Questions

Page 19: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

30% - 40% WWR+SHADESBased on Orientation

SOLAR ORIENTATION

Summer: May to SeptemberExtreme hot period: Jul 6-12 | Max Temp 98°F (37°C)

Winter: December to FebruaryExtreme cold period: Jan 6-12 | Min Temp 9°F (-13°C)

Orientations to avoid: East/WestHigh summer solar exposure | Low solar angles

Windows to orient: North/SouthPassive winter gains | Controllable summer exposure

Page 20: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

17%-19%Hrs in Comfort Range

27%-40%Hrs in Comfort Range

Daytime Ventilation / No RH Limit

No Natural Ventilation

Day & Night Ventilation / No RH Limit

42%-56%Hrs in Comfort Range

19%-28%Hrs in Comfort Range

Daytime Ventilation / 60% RH Limit

Indoor Operative Temperature

Indoor Operative Temperature

Indoor Operative Temperature

Indoor Operative Temperature

NATURAL VENTILATION

Natural ventilation alternates Daytime | Night purge | RH limits

605 hours with 60% RH high limit Indoor Air Temp > 70⁰F | Outdoor Air Temp < 81⁰F

1264 hours without RH limitDaytime operation only

3043 hours with night purgeFan assisted nighttime economizer operation

Page 21: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

CUMULATIVE ANNUAL INSOLATION(KWH/M²)

1850

0

15-17kBtu/ft2/yr

EUI Offset

ONSITE RENEWABLES

12,000-14,000 ft2 rooftop PV areaAssuming ~50% of 28,000 ft2 roof available for PV array

210-260 kWp PV system capacityAssuming 19.5% PV module efficiency

290-341 MWh annual energy generationAssuming 15% inverter losses, 4% system losses

15-17 kBtu/ft2/yr potential EUI offsetAssuming 68,000 ft2 floor area for EUI calculations

Page 22: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

PATH TO NET ZERO ENERGY

36

30

24

22

19

1716

0

5

10

15

20

25

30

35

40

EXISTING BUILDING

CONSTRUCTIONS

ASHRAE PROJECT

REQUIREMENTS

RECOMMENDED

CONSTRUCTIONS

PROGRAM LAYOUT

COMFORT CRITERIA

PROPOSED ENVELOPE

CONFIGURATION

OPTIMIZED

ALL-AIR SYSTEM

DECOUPLED

HYDRONIC SYTEMS

20%

SAFETY FACTOR

FANS PUMPS COOLING HOT WATER HEATING LIGHTING PLUG LOADSANNUAL SITE ENERGY USE

EU

I k

BT

U/f

t2/y

r

36

30

24

22

19

1716

0

5

10

15

20

25

30

35

40

EXISTING BUILDING

CONSTRUCTIONS

ASHRAE PROJECT

REQUIREMENTS

RECOMMENDED

CONSTRUCTIONS

PROGRAM LAYOUT

COMFORT CRITERIA

PROPOSED ENVELOPE

CONFIGURATION

OPTIMIZED

ALL-AIR SYSTEM

DECOUPLED

HYDRONIC SYTEMS

20%

SAFETY FACTOR

FANS PUMPS COOLING HOT WATER HEATING LIGHTING PLUG LOADSANNUAL SITE ENERGY USE

EUI kBTU/f

t2 /yr

NZE Target 17 EUI

Target Maximum 24.1 EUI

25

Page 23: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

OVERVIEW

01 Intro

02 Project

03 Baseline

04 Climate

05 Program

06 Envelope

07 Systems

08 Summary

09 Questions

Page 24: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

PROGRAM ORGANIZATION

Level 2

Level 1

A B C

First principles approachAdapted to accommodate program criteria flexibility

A - MixedGood inter-department workflow

B - Stratified ✓Best daylight | All staff on one level | Good thermal zoning

C - StackedGood thermal zoning | Better proportion of program areas

Page 25: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

ATRIUM ENCLOSURE

Existing atrium is a greenhouseExample of exactly what not to do

New opaque roof Provide area for additional photovoltaic panels

Deep shading on southFor optimal solar control

Insulated interior glass wallsAtrium to act as a thermal interstitial zone

Page 26: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

OR +

+

75

EXPANDED COMFORT RANGE

Separate sensible load controlHydronic radiant or chilled beam systems

Remove heat using convectionUsing ceiling fans and natural ventilation

Maintain operative temperaturesUse higher air temperature setpoints

Higher chilled water temperatureAllow improved energy efficiency at plant

Page 27: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

PATH TO NET ZERO ENERGY

36

30

24

22

19

1716

0

5

10

15

20

25

30

35

40

EXISTING BUILDING

CONSTRUCTIONS

ASHRAE PROJECT

REQUIREMENTS

RECOMMENDED

CONSTRUCTIONS

PROGRAM LAYOUT

COMFORT CRITERIA

PROPOSED ENVELOPE

CONFIGURATION

OPTIMIZED

ALL-AIR SYSTEM

DECOUPLED

HYDRONIC SYTEMS

20%

SAFETY FACTOR

FANS PUMPS COOLING HOT WATER HEATING LIGHTING PLUG LOADSANNUAL SITE ENERGY USE

EU

I k

BT

U/f

t2/y

r

36

30

24

22

19

1716

0

5

10

15

20

25

30

35

40

EXISTING BUILDING

CONSTRUCTIONS

ASHRAE PROJECT

REQUIREMENTS

RECOMMENDED

CONSTRUCTIONS

PROGRAM LAYOUT

COMFORT CRITERIA

PROPOSED ENVELOPE

CONFIGURATION

OPTIMIZED

ALL-AIR SYSTEM

DECOUPLED

HYDRONIC SYTEMS

20%

SAFETY FACTOR

FANS PUMPS COOLING HOT WATER HEATING LIGHTING PLUG LOADSANNUAL SITE ENERGY USE

EUI kBTU

/ft2 /yr

NZE Target 17 EUI

25

Page 28: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

OVERVIEW

01 Intro

02 Project

03 Baseline

04 Climate

05 Program

06 Envelope

07 Systems

08 Summary

09 Questions

Page 29: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

FENESTRATION CONFIGURATION

Several window option studiesLocation and sizes with respect to interior planning

IGUs in aluminum frameStrategically designed to leave existing precast panels in place

Tuned to desired area ratios30% on east and west | 40% on north and south

Exterior shading devicesHorizontal and vertical on east and west | Horizontal on south

Page 30: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

67% Percentage of

regularly occupied

workspaces with

useful daylight

illuminance

(>300 lux)

36% Percentage of

regularly occupied

workspaces with

useful daylight

illuminance

(>300 lux)

Short WindowsNo Skylights

Tall Windows18 Skylights

SKYLIGHTS AND DAYLIGHT

Cloud ceilings over workstationsHost ceiling fans and radiant panels

Skylights over circulation zonesMore ideal than having skylights directly over a workstation

Closed offices to be glass enclosedAllow borrowed light to permeate with little obstruction

Centralized restrooms and storage Opaque areas clustered in the center of floorplate

Page 31: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

WALL AND ROOF INSULATION

Two-dimensional heat transfer modelLBNL THERM platform

Assess options for wall assemblyTarget wall R value | Condensation potential

3.5” XPS added to interior: R-10Thermal bridging | Condensation risk | Not recommended

3.5” XPS added to exterior: R-24Exceeds target| Recommended

Page 32: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

36

30

24

22

19

1716

0

5

10

15

20

25

30

35

40

EXISTING BUILDING

CONSTRUCTIONS

ASHRAE PROJECT

REQUIREMENTS

RECOMMENDED

CONSTRUCTIONS

PROGRAM LAYOUT

COMFORT CRITERIA

PROPOSED ENVELOPE

CONFIGURATION

OPTIMIZED

ALL-AIR SYSTEM

DECOUPLED

HYDRONIC SYTEMS

20%

SAFETY FACTOR

FANS PUMPS COOLING HOT WATER HEATING LIGHTING PLUG LOADSANNUAL SITE ENERGY USE

EU

I k

BT

U/f

t2/y

r

25

PATH TO NET ZERO ENERGY

36

30

24

22

19

1716

0

5

10

15

20

25

30

35

40

EXISTING BUILDING

CONSTRUCTIONS

ASHRAE PROJECT

REQUIREMENTS

RECOMMENDED

CONSTRUCTIONS

PROGRAM LAYOUT

COMFORT CRITERIA

PROPOSED ENVELOPE

CONFIGURATION

OPTIMIZED

ALL-AIR SYSTEM

DECOUPLED

HYDRONIC SYTEMS

20%

SAFETY FACTOR

FANS PUMPS COOLING HOT WATER HEATING LIGHTING PLUG LOADSANNUAL SITE ENERGY USE

EUI kB

TU/ft2 /yr

NZE Target EUI 17 kBtu/ft2/yr NZE Target 17 EUI

Page 33: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

OVERVIEW

01 Intro

02 Project

03 Baseline

04 Climate

05 Program

06 Envelope

07 Systems

08 Summary

09 Questions

Page 34: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

New skylight

Light colored ceiling

to reflect daylight

External shades

Roof monitor

REDUCED LOADS

Insulated Walls and RoofsR-17 Walls | R-35 Roof

Optimized FenestrationU-0.4 | SHGC-0.25 | ~32% WWR | Min 1’ overhangs

Airtight Construction0.1 cfm/ft2 façade infiltration @ 75 pa

Maximized DaylightHigh windows | Skylight monitors | Atrium clerestories

Page 35: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

Mixed Mode SystemOperable windows | Atrium exhaust | Ceiling fans

Night-flush EconomizerPrecool building thermal mass

Effective VentilationEnthalpy heat recovery | Demand controlled ventilation

Optimized Air DistributionOverhead mixed air | Overhead displacement

Packaged Rooftop

Unit

Ceiling fans

(bidirectional)

Overhead air

distribution

Operable

windows

OPTIMIZED CONDITIONING

Page 36: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

DOAS distributionDOAS

Radiant Sails

Ceiling fans

(bidirectional)

FCU

DECOUPLED SYSTEMS

Hydronic Terminal UnitsChilled beams | Radiant ceiling panels | DOAS boxes

Dedicated Outside Air SystemEnthalpy heat recovery | Demand controlled ventilation

High Efficiency PlantAir-to-water heat pumps | Water-to-water heat pumps

Potential Geo/Lake ExchangePotential ground source heat exchange

Page 37: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

36

30

24

22

19

1716

0

5

10

15

20

25

30

35

40

EXISTING BUILDING

CONSTRUCTIONS

ASHRAE PROJECT

REQUIREMENTS

RECOMMENDED

CONSTRUCTIONS

PROGRAM LAYOUT

COMFORT CRITERIA

PROPOSED ENVELOPE

CONFIGURATION

OPTIMIZED

ALL-AIR SYSTEM

DECOUPLED

HYDRONIC SYTEMS

20%

SAFETY FACTOR

FANS PUMPS COOLING HOT WATER HEATING LIGHTING PLUG LOADSANNUAL SITE ENERGY USE

EU

I k

BT

U/f

t2/y

r

25

PATH TO NET ZERO ENERGY

36

30

24

22

19

1716

0

5

10

15

20

25

30

35

40

EXISTING BUILDING

CONSTRUCTIONS

ASHRAE PROJECT

REQUIREMENTS

RECOMMENDED

CONSTRUCTIONS

PROGRAM LAYOUT

COMFORT CRITERIA

PROPOSED ENVELOPE

CONFIGURATION

OPTIMIZED

ALL-AIR SYSTEM

DECOUPLED

HYDRONIC SYTEMS

20%

SAFETY FACTOR

FANS PUMPS COOLING HOT WATER HEATING LIGHTING PLUG LOADSANNUAL SITE ENERGY USE

EU

I k

BT

U/f

t2/y

r

NZE Target EUI 17 kBtu/ft2/yr NZE Target 17 EUI

Page 38: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

OVERVIEW

01 Intro

02 Project

03 Baseline

04 Climate

05 Program

06 Envelope

07 Systems

08 Summary

09 Questions

Page 39: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

19.3kBtu/ft2/yr

EUI Offset

20% SAFETY FACTOR

14,000 ft2 rooftop PV areaAssuming ~50% of 28,000 ft2 roof available for PV array

258 kWp PV system capacityAssuming 19.5% PV module efficiency

341 MWh annual energy generationAssuming 15% inverter losses, 4% system losses

17.1 kBtu/ft2/yr potential EUI offsetAssuming 68,000 ft2 floor area for EUI calculations

16,000

292

378

19.3

17.1kBtu/ft2/yr

EUI Offset

Page 40: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

36

30

24

22

19

1716

0

5

10

15

20

25

30

35

40

EXISTING BUILDING

CONSTRUCTIONS

ASHRAE PROJECT

REQUIREMENTS

RECOMMENDED

CONSTRUCTIONS

PROGRAM LAYOUT

COMFORT CRITERIA

PROPOSED ENVELOPE

CONFIGURATION

OPTIMIZED

ALL-AIR SYSTEM

DECOUPLED

HYDRONIC SYTEMS

20%

SAFETY FACTOR

FANS PUMPS COOLING HOT WATER HEATING LIGHTING PLUG LOADSANNUAL SITE ENERGY USE

EU

I k

BT

U/f

t2/y

r

25

PATH TO NET ZERO ENERGY

Project16 EUI

PV 19 EUI

Page 41: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

OVERVIEW

01 Intro

02 Project

03 Baseline

04 Climate

05 Program

06 Envelope

07 Systems

08 Summary

09 Questions

Page 42: ASHRAE HQ NZE Renovation - nzeb.in · ASHRAE HQ NZE RENOVATION Design Team Houser Walker Architecture | McLennan Design | Integral Group Integral Group Committed to decarbonization

ASHRAE HQ NZE Renovation

Shreshth Nagpalsnagpal@elementaengineer ing.com