AS-1 Calibration

IRIS Kansas City WorkshopSeptember 19-21, 2007

John Lahr (with Kay Wyatt)

Page 2: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

Many of these calibrations and test need only be done once. Results of

the tests should be saved in SAC format files. If you have trouble in the future, you can repeat the tests

and compare them to the tests performed when you first received

your seismograph.

Page 3: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

Perhaps the easiest way to monitor the “general health” of your AS1

system is by comparing your records with those from other

schools. See: http://www.iris.edu/hq/ssn/events

for current records.

Page 4: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

SIDE NOTE

Keep in mind that the helicorder settings do not effect how the data are recorded on disk.

They just control how the data are displayed on the screen.

Page 5: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

1. Setting the zero level2. Check the system’s free period3. Damping adjustment4. Washer calibration5. Adjusting the gain based on the background noise6. Lift test calibration7. Electronic noise calibration8. Inductance calibration

CALIBRATIONS TO BE PERORMED

Page 6: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

Setting the zero levelSetting the zero level is probably the most difficult part of setting up an AS1 system. The knob on the AS1 “black

box” is VERY sensitive.

Use the “Show data values” feature under “Settings” to monitor the level while adjusting the knob on the “Black

Box”. Turn it slowly by hand to get within about 100 counts of zero and then make slight adjustments by

tapping lightly with a pencil until the numbers bounce equally above and below zero. It is helpful to put a piece

of tape on the “Black Box” and place a mark by the pointer on the black knob .

Page 7: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

Check the System’s Free Period

First, pull the magnet carrier away from the

copper damping vane.

Page 8: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

Check the System’s Free Period (cont’d)

Select one of the pulses and click the icon to display a single trace. The oscillations should

continue for at least three minutes

Page 9: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

Check the System’s Free Period (cont’d)

First, change the helicorder setting so that it displays one minute per

line.

Undamped oscillations look

like this.

Page 10: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

Check the System’s Free Period (cont’d)

Measure the time between two peaks or two troughs. This is the free or natural period of the system.

Here we measured 1.4 seconds.

1.4 sec

Page 11: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

We just saw that without damping the system will continue oscillating for a few minutes following a single pulse. For this reason it would be nearly impossible to see any phases after the first P arrival of an earthquake.

On the other hand, if the system is over damped, then the response will be attenuated.

DAMPING ADJUSTMENT

Page 12: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

Prepare to Mark the Location of Magnet Block

Tape a piece of paper to the area under the magnet block so that when the block has been positioned for

proper damping, its location can be saved. If the instrument needs to be moved later, the block can be

replaced in exactly the right spot.

DAMPING ADJUSTMENT (cont’d)

Page 13: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

Place a small ruler vertically next to the red magnet, perhaps holding it in place with some clay.

Note magnet’s equilibrium position.

Lift the magnet 10 mm, release it, and then note how much below the equilibrium position the magnet goes.

Adjust the position of the damping magnet block so that the overshoot is 0.5 mm, which gives the desired ratio of 20.

DAMPING ADJUSTMENT (cont’d)

Page 14: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

The more overlap between the magnet damping block and the copper vane, the

greater the damping.

DAMPING ADJUSTMENT (cont’d)

Page 15: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

If the damping is too little when the copper

vane is completely within the damping

block, then adjust nuts on the block so that

the magnets are closer together

DAMPING ADJUSTMENT (cont’d)

Page 16: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

Mark the final position of the magnet block.

DAMPING ADJUSTMENT (cont’d)

Page 17: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

Tie a thread to a washer and place it near the boom magnet and coil.

WASHER CALIBRATION

Page 18: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

Pulling the washer away suddenly creates this

calibration pulse: down, up, and then return to zero.

WASHER CALIBRATION (cont’d)

Page 19: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

The system is under damped on the left. The system on the right is correctly damped.

Too little damping Proper damping

WASHER CALIBRATION (cont’d)

Page 20: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

Note that the overshoot during a washer calibration is primarily

due to the AS-1 filters.

This overshoot will be much more than 1/20th of the first pulse,

as it should be.

WASHER CALIBRATION (cont’d)

Page 21: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

When the washer was pulled away, which way did the magnet move?

Which way did the seismogram trace move?

Why?

Save your calibration as a SAC file.

WASHER CALIBRATION (cont’d)

Page 22: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

When the ground moves down,the magnet will tend to remain fixed, which means it moves up with respect to the coil.

WASHER CALIBRATION (cont’d)

Page 23: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

As soon as your AS-1 is setup, perform a washer calibration.

Save this initial calibration for future reference in a SAC file in

case there is some question about the system’s operation.

WASHER CALIBRATION (cont’d)

Page 24: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

In the “Settings/Helicorder/Gain”set the helicorder display gain so that the

background noise is quite clear.

Adjusting the gain based on the background noise

Page 25: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

The gain on this record is too low. The gain may need to be reduced

during storms and increased during quiet times.

Adjusting the gain based on the background noise (cont’d)

Page 26: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

To do a lift-test calibration of your system, make a

5/16”-diameter hole in the top of the cover, near the

hinge end.

14.5 cm from the end and

7.7 cm from the side.

Lift Test Calibration

Page 27: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

Mark the location for the lift-test weight. Make a white patch on the boom with whiteout and then

draw a line across it 10 cm from the mast.

Lift Test Calibration (cont’d)

Page 28: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

A 0.034-gram weight is made

from a 2 cm x 1 cm piece of a manila

folder.

The weight is lowered onto the boom, ready for a lift-test calibration.

Lift Test Calibration (cont’d)

Page 29: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

Quickly lift the weight. Here is an example lift-test calibration pulse.

Be sure to save your test in a SAC file.

Lift Test Calibration (cont’d)

Page 30: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

To check for electronic noise, place a weight on the boom.

Electronic Noise Test

Page 31: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

The electronic noise when the boom is held fixed is just 3 counts peak-to-peak.

Electronic Noise Test (cont’d)

Page 32: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

For an “inductance” calibration, lift boom and place one loop of 32

gauge wire around the coil.

Inductance Calibration

Page 33: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

Here is a closer view

of the loop of wire.

Inductance Calibration (cont’d)

Page 34: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

A pulse is generated when a AAA battery (1.4 V measured) is attached and another pulse when the

battery is removed from the single loop of wire.

Inductance Calibration (cont’d)

Page 35: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

This calibration is independent of the AS1 spring and damping

system.

Again, save this calibration for comparison with future calibrations.

Inductance Calibration (cont’d)

Page 36: AS-1 Calibration IRIS Kansas City Workshop September 19-21, 2007 John Lahr (with Kay Wyatt)

For more information or help regarding these calibration tests, contact:

Kay [email protected]

CALIBRATION TESTS