Architekten von Gerkan, M arg und Partner FIFA WM 2014 ... · PDF fileFIFA WM 2014...

11
Architekten von Gerkan, Marg und Partner FIFA WM 2014 Estádio Nacional de Brasília, Brasilien FIFA WC 2014 Estádio Nacional de Brasília, Brazil Pressevorabinformation Press advance information gmp

Transcript of Architekten von Gerkan, M arg und Partner FIFA WM 2014 ... · PDF fileFIFA WM 2014...

Architekten von Gerkan, Marg und Partner FIFA WM 2014 Estádio Nacional de Brasília, Brasilien FIFA WC 2014 Estádio Nacional de Brasília, Brazil

PressevorabinformationPress advance information

gmp

FIFA WM 2014 Estádio Nacional de Brasília „Mané Garrincha“, Brasilien

FIFA WC 2014 Estádio Nacional de Brasília “Mané Garrincha”, Brazil

Brasília is the only city dating from the 20th century that has been declared a UNESCO World Heritage Site. With its range of public buildings, the “ideal city” built between 1956 and 1960 is one of the icons of the Moderne style. In this context gmp Archi-tects, in cooperation with schlaich bergermann und partner (sbp), produced the design of the Brasília national stadium for Castro Mello Arquitetos (São Paulo). It was constructed in the place of the former Mané Garrincha stadium. Eduardo Castro Mello was responsible for the design of the 72,000-seat bowl; gmp and sbp produced the elevations of the esplanade as a characteristic “for-est of columns”, and a double-skin suspension roof. The objective of the design was a solution that does justice to the architectural history of the place, with a clear reference to the city’s tradition, and yet has its own distinct contemporary style. As the city’s largest building, located on Brasília’s central axis, the composition was developed as a monumental building volume which integrates seamlessly into the urban design context. To achieve this, the stadium bowl is surrounded by an esplanade which comprises all access elements and supports the roof on its “forest of columns”. This clear gesture is emphasized by the mini-malist, almost archetypal design of the components – the key material being concrete. The circular suspension roof is a double-skin structure – the upper skin consists of a PTFE-coated glass fiber fabric while the lower membrane is made up of an open-mesh, back-lit fabric.

FIFA WM 2014 Estádio Nacional de Brasília „Mané Garrincha“, BrasilienFIFA WC 2014 Estádio Nacional de Brasília „Mané Garrincha“, Brazil

Brasília ist die einzige Stadtgründung des 20. Jahrhunderts, die zum UNSECO-Weltkulturerbe erklärt wurde. Die von 1956–1960 gebaute Idealstadt zählt mit ihren öffentlichen Bauten zu den Ikonen der Moderne. In diesem Kontext erarbeiteten die gmp-Architekten mit schlaich bergermann und partner (sbp) für Castro Mello Arquitetos (São Paulo) den Entwurf des Nationalstadions Brasília. Es wurde an der Stelle des bisherigen Stadions Mané Garrincha errichtet. Eduardo Castro Mello zeichnet für die Pla-nung der 72.000 Zuschauer fassenden Bowl verantwortlich; gmp und sbp erarbeiteten das Erscheinungsbild der Esplanade als cha-rakteristischen „Stützenwald“ und ein zweischaliges Hängedach.Ziel des Entwurfs war eine der architekturhistorischen Bedeutung des Ortes angemessene Lösung mit klarem Bezug zur Tradition des Ortes und gleichzeitig als eigenständige, zeitgenössische Ge-stalt. Als größtes Gebäude der Stadt an der zentralen Achse Brasí-lias wurde die Komposition als monumentaler Baukörper entwi-ckelt, der sich schlüssig in den städtebaulichen Kontext einfügt. So ist die „Stadionschüssel“ von einer Esplanade umgeben, die alle Erschließungselemente beinhaltet und auf deren „Stützen-wald“ das Dach liegt. Diese klare Geste wird durch eine reduzierte, fast archetypische Gestaltung der Bauteile unterstrichen – we-sentliches Material ist Beton. Das kreisrunde Hängedach besitzt als zweischalige Struktur eine obere Lage aus PTFE beschichtetem Glasfasergewebe, während die untere Membran aus hinterleuch-tetem offenmaschigen Gewebe besteht.

Konzept und Entwurfsplanung Dach + Esplanade sowie Ausführungsplanung Esplanade Castro Mello arquitetos mit Consulting durch gmp und schlaich bergermann und partner Ausführungsplanung Dach gmp und schlaich bergermann und partner Planung Bowl Castro Mello arquitetos, São PauloConcept and scheme design of roof + esplanade as well as detailed design of esplanade Castro Mello arquitetos with consultancy service provided by gmp and schlaich bergermann and partners Detailed design of roof gmp and schlaich bergermann and partnersDesign of bowl Castro Mello arquitetos, São Paulo

Design Volkwin Marg and Hubert Nienhoff with Knut Göppert, 2008

Project Manager Martin Glass

Project Manager, Brazil Robert Hormes

Director of gmp do Brazil Ralf Amann

Team members (alphabetical) Ante Bagaric, Holger Betz, Rebecca Born-

hauser, Carsten Borucki, Lena Brögger, Martina Maurer-Brusius, Kacarzyna

Ciruk, Laura Cruz Lima da Silva, Stefanie Eichelmann, Ruthie Gould, Florian

Illenberger, Jochen Köhn, Martin Krebes, Helge Lezius, Tobias Mäscher, Adel

Motamedi, Burkhard Pick, Jutta Rentsch Serpa, Lucia Martinez Rodriguez,

Maryna Samolyuk, Florian Schwarthoff, Sara Taberner Bonastre

In cooperation with schlaich bergermann and partners, Stuttgart; Castro

Mello arquitetos, São Paulo

Structural design of roof and esplanade schlaich bergermann and partners

– Knut Göppert with Knut Stockhusen and Miriam Sayeg

Team members (alphabetical) Andreas Bader, Tiago Carvalho, Arnaud Deil-

lon, Uli Dillmann, Stefan Dziewas, Hansmartin Fritz, Alberto Goosen, Hartmut

Grauer, Jochen Gugeler, Andreas Hahn, Achim Holl, Hubert Kunz, Christoph

Paech, Jana Pavlovic, Bernd Ruhnke, Tilman Schober, Klaus Straub, Cornelia

Striegan, Peter Szerzo, Hiroki Tamai, Augusto Tiezzi, Feridun Tomalak, Chih-

Bin Tseng, Gerhard Weinrebe, Rüdiger Weitzmann, Andrzej Winkler, Markus

Wöhrbach, Kai Zweigart

Structural design of stadium bowl Etalp, São Paulo

Services engineering – roof (concept and scheme design) b.i.g. Bechtold

Ingenieurgesellschaft mbH; mha, São Paulo

Light concept – roof (concept and scheme design) Conceptlicht, Taunreut;

Peter Gaspar, São Paulo; mha, São Paulo,

Seats approx. 72,800

Construction period 2010–2013

Entwurf Volkwin Marg und Hubert Nienhoff mit Knut Göppert, 2008

Projektleitung Martin Glass

Projektleitung Brasilien Robert Hormes

Direktor gmp do Brasil Ralf Amann

Mitarbeiter (alphabetisch) Ante Bagaric, Holger Betz, Rebecca Bornhauser,

Carsten Borucki, Lena Brögger, Martina Maurer-Brusius, Kacarzyna Ciruk,

Laura Cruz Lima da Silva, Stefanie Eichelmann, Ruthie Gould, Florian Illenber-

ger, Jochen Köhn, Martin Krebes, Helge Lezius, Tobias Mäscher, Adel Motame-

di, Burkhard Pick, Jutta Rentsch Serpa, Lucia Martinez Rodriguez, Maryna

Samolyuk, Florian Schwarthoff, Sara Taberner Bonastre

Arbeitsgemeinschaft mit schlaich bergermann und partner, Stuttgart;

Castro Mello arquitetos, São Paulo

Tragwerksentwurf und -planung Dach und Esplanade schlaich berger-

mann und partner – Knut Göppert mit Knut Stockhusen und Miriam Sayeg

Mitarbeiter (alphabetisch) Andreas Bader, Tiago Carvalho, Arnaud Deillon,

Uli Dillmann, Stefan Dziewas, Hansmartin Fritz, Alberto Goosen, Hartmut

Grauer, Jochen Gugeler, Andreas Hahn, Achim Holl, Hubert Kunz, Christoph

Paech, Jana Pavlovic, Bernd Ruhnke, Tilman Schober, Klaus Straub, Cornelia

Striegan, Peter Szerzo, Hiroki Tamai, Augusto Tiezzi, Feridun Tomalak,

Chih-Bin Tseng, Gerhard Weinrebe, Rüdiger Weitzmann, Andrzej Winkler,

Markus Wöhrbach, Kai Zweigart

Tragwerksplanung Stadionschüssel Etalp, São Paulo

Haustechnik Dach (Konzept-, Entwurfsplanung) b.i.g. Bechtold Ingenieur-

gesellschaft mbH; mha, São Paulo

Lichtkonzept Dach (Konzept-, Entwurfsplanung) Conceptlicht, Taunreut;

Peter Gaspar, São Paulo; mha, São Paulo,

Sitzplätze ca. 72.800

Bauzeit 2010–2013

Projektdaten Data of the project

309 m diameter50 m height

40,500 sqm PTFE coated glas fibre membrane

20,000 sqm concrete compression ring

67,000 sqm total roof surface

6,600 sqm polycarbonate

1.20 m diameter

Stadium

Roof supports

Roof

288 concrete roof supports

43 to 59 m high

Das Nationalstadion Brasília kurz vor seiner Fertigstellung. Das größte öffentliche Gebäude der Stadt liegt direkt an der zentralen Achse der städtebaulichen Grundfigur Brasílias. Die „Stadionschüssel“ umgibt eine kreisrunde Esplanade, die sämtliche Erschließungselemente beinhaltet und auf deren „Stützenwald“ das Dach ruht.Brasília National Stadium shortly before completion. The city’s largest public building is located directly at the central axis dissecting Brasília’s basic urban layout. The stadium bowl is surrounded by a circular esplanade which contains all access elements and includes a “forest of columns” which supports the roof.

Die Betonstützen haben einen Durchmesser von 1,20 Metern und eine Höhe von bis zu 59 Metern. Die reduzierte, fast archetypische Gestaltung der einzelnen Bauteile und das wesentliche Material Beton entsprechen der brasilianischen Baukultur.The concrete columns have a diameter of 1.20 meters and a height of up to 59 meters. The minimalist, almost archetypal design of the individual components, and concrete as the primary material, are representative of Brazilian construction methods.

In der von Eduardo Castro Mello geplanten „Stadionschüssel“ wird die filigran wirkende hängende Dachkonstruktion aus der Feder der deutschen Stadionplaner für die Besucher erlebbar und schafft optimale Sichtverhältnisse.In the stadium bowl designed by Eduardo Castro Mello, the filigree suspended roof construction created by the German stadium designers has a real presence and provides unrestricted views.

1 Lageplan 2 Grundriss Rangaufsicht 3 Schnitt Dach und Tribüne 4 Längsschnitt 5 Querschnitt1 Site plan 2 Floor plan level roof top view 3 Section through roof and grandstand 4 Longitudinal section 5 Cross section

LEVEL BOWL 1/2.000 10 50 100m

5025

050

0m

SECTION LONGITUDINAL 1/2.000 10 50 100m

SECTION TRANSVERSAL 1/2.000 10 50 100m

1/5002 10 20m

1

4

5

3

2

Stadienkompetenz weltweit Worldwide stadium builders

Berlin Olympic StadiumGermany

Commerzbank-Arena FrankfurtGermany

RheinEnergieStadium CologneGermany

Estádio Mineirão, Belo HorizonteBrazil

Estádio Nacional de BrasíliaBrazil

Arena da Amazônia, ManausBrazil

National Stadium, WarsawPoland

Olympic Stadium, KievUkraine

National Arena, BucharestRomania

Moses Mabhida Stadium, Durban South Africa

Cape Town Stadium, Cape TownSouth Africa

Nelson Mandela Bay Stadium, Port Elizabeth South Africa

Shanghai Oriental Sports CenterChina

Bao´an Stadium, ShenzhenChina

Sports Center, ShenzhenChina

“Stadium of Friendship” CottbusGermany

Sports and Concert Hall, BakuAzerbaijan

Jawaharlal Nehru Stadium, New Delhi India

Century Lotus Sports Park, FoshanChina

Basketball Center, DongguanChina

Swimming Stadium, New DelhiIndia

Geschäftsleitung Team

Hubert NienhoffPartner

Nikolaus GoetzePartner

Jürgen HillmerPartner

Stephan SchützPartner

Wu WeiPartner China

Meinhard von GerkanGründungspartnerFounding partner

Volkwin MargGründungspartnerFounding partner

The architectural practice von Gerkan, Marg and Partners was founded by

Meinhard von Gerkan and Volkwin Marg in 1965. Since its inception it has

grown to include four additional partners, one partner for China, eleven

associate partners and more than 500 employees in thirteen offices in Ger-

many and abroad. gmp is one of the few practices with a generalist position,

which takes responsibility for a project from the design idea and its realiza-

tion right through to the interior design.

In more than 45 years Meinhard von Gerkan, Volkwin Marg and their part-

ners have planned and constructed buildings in most major German cities.

They have designed small scale homes, hotels, museums, theaters and con-

cert halls, office buildings, commercial centers and hospitals as well as re-

search, educational and sports facilities, buildings for transportation, trade

and industry buildings and master plans.

gmp became internationally known as a team of airport architects when, in

1975, the Berlin Tegel building with its drive-in airplane terminal for “stacked

parking” was established. This innovative design has been further developed

to transform the departure and arrival halls at Stuttgart and Hamburg air-

ports. They are internationally recognized not only for their projects like the

New Trade Fair in Leipzig, the Rimini Exhibition Center or the Christ Pavilion

for the EXPO 2000, but also for their designs. Key examples are the designs

for the reconstruction and roofing of the Olympic Stadium in Berlin or Berlin

Central Station, which was completed in 2006.

gmp has succeeded in winning more than 590 prizes in national and inter-

national competitions, among them more than 290 first prizes and a large

number of awards for exemplary architecture. More than 350 buildings have

been constructed by gmp worldwide.

Amongst others in China, the exhibition and convention centers in Nanning

and Shenzhen, the Shanghai Pudong museum and the Zhongguancun Cul-

tural Center in Beijing as well as the Universiade Sports Center in Shenzhen

and the Oriental Sports Center in Shanghai have been built. Further buildings

are the opera houses in Chongqing, Qingdao and Tianjin as well as the Chi-

nese National Museum in Beijing and the new Tianjin West Railway Station.

In the year 2006 in Hanoi/Vietnam the National Conference Center was fin-

ished, the Hanoi Museum was realized in 2010. In South Africa three World

Cup stadiums, in Cape Town, Durban and Port Elizabeth were finished in

2009. For the 2014 FIFA World Cup in Brazil gmp realized the stadiums in

Brasília and Manaus. Von Gerkan, Marg and Partners have demonstrated

town-planning competence with their visionary proposals for “Stuttgart 21”

for the Deutsche Bahn, HafenCity Hamburg, and the urban master plan of

Bucharest/Romania, as well as many urban projects in China, including the

planning of Lingang New City for 800,000 inhabitants.

Aside from Germany gmp is currently involved in projects in China, India,

Vietnam, Brazil, Italy, Russia, Latvia, and Turkey to name but a few.

Büroprofil

Die Architektensozietät gmp wurde 1965 von Meinhard von Gerkan und

Volkwin Marg gegründet. Mittlerweile sind vier weitere Partner, ein Partner

für China und elf assoziierte Partner hinzugekommen. Mit über 500 Mitarbei-

tern, die sich auf zwölf Büros verteilen, ist gmp im In- und Ausland aktiv. gmp

gehört zu den wenigen Büros mit einer generalistischen Position, die sich für

ein Projekt von seiner entwurflichen Idee und deren Realisierung bis hin zum

Interieurdesign verantwortlich fühlen.

Meinhard von Gerkan, Volkwin Marg und ihre Partner haben in über 45 Jah-

ren in nahezu allen großen Städten der Bundesrepublik geplant und gebaut.

Ihre Projekte reichen von Einfamilienhäusern, Hotels, Museen, Theatern und

Konzerthallen, Bürogebäuden, Handelszentren und Krankenhäusern bis hin

zu Forschungs-, Sport- und Bildungseinrichtungen sowie Verkehrsbauten,

Gewerbebauten und Masterplanungen.

Bekannt wurde gmp vor allem durch seine Flughafen-Architektur: 1975 wur-

de Berlin-Tegel als Drive-In-Airport eröffnet. Dieser innovative Entwurf ist

für die Abflug- und Ankunftebenen der Flughäfen Stuttgart und Hamburg

weiterentwickelt worden. Weltweite Beachtung finden nicht nur ihre Projekte

wie die Neue Messe Leipzig, die Messe Rimini oder der Christus-Pavillon für

die EXPO 2000, sondern auch ihre Entwürfe, z. B. für die Rekonstruktion und

Überdachung des Olympiastadions in Berlin oder den im Jahr 2006 fertigge-

stellten Berliner Hauptbahnhof.

Bei nationalen und internationalen Wettbewerben errang gmp über 590 Prei-

se, darunter mehr als 290 erste Preise sowie zahlreiche Auszeichnungen für

beispielhafte Architektur. Mehr als 350 Bauten sind bis heute realisiert.

In China sind unter anderem die Messe- und Kongresszentren in Nanning

und Shenzhen sowie das Museum in Shanghai-Pudong, das Zhongguancun

Kulturzentrum in Peking sowie das Universiade Sports Center und das Orien-

tal Sports Center in Shanghai realisiert. Weitere Bauten sind die Opernhäuser

in Chongqing, Qingdao und Tianjin sowie das Chinesische Nationalmuseum

in Peking und der neue Westbahnhof Tianjin. Im Jahr 2006 wurde in Hanoi/

Vietnam bereits das Nationale Kongresszentrum fertiggestellt. Das Hanoi

Museum wurde 2010 eingeweiht. In Südafrika wurden im Jahr 2009 drei

Weltmeisterschaftsstadien in Kapstadt, Durban und Port Elizabeth in Betrieb

genommen. Für die FIFA WM 2014 in Brasilien wurden die Stadien in Brasília

und Manaus realisiert.

Mit ihren städtebaulichen Studien für „Stuttgart 21”, die HafenCity Hamburg

und „Bukarest 2000“ sowie einer Vielzahl städtebaulicher Projekte in China,

darunter die neue Stadt Lingang New City für 800 000 Einwohner, haben

von Gerkan, Marg und Partner ihre Kompetenz auch auf diesem Gebiet unter

Beweis gestellt.

Zurzeit engagiert sich gmp mit Projekten außerhalb Deutschlands unter

anderem in China, Indien, Vietnam, Brasilien, Italien, Russland, Lettland und

der Türkei.

The practice

Pressekontakt Press Contact

Michael KuhnHead of CommunicationT: +49.40.88 151 [email protected]

gmp · Architekten von Gerkan, Marg und PartnerPublic Relations und KommunikationPublic Relations and CommunicationElbchaussee 139 · 22763 Hamburg · Germanywww.gmp-architekten.de

© gmp Februar February 2014

Bildnachweis Picture creditsgmp Titel titleMarcus Bredt 8/9, 10/11, 14, 15Leonardo Finotti 6/7Klaus Frahm 14Christian Gahl 15Heiner Leiska 14Alcides Netto 14Timmo Schreiber 16Knut Stockhusen 15

www.gmp-architekten.de