ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor...

32
The ACE Mentor Program of Iowa 2020-2011 Final Presentation Team South ARCHITECTURE TEAM Junior Kemdirim Francisco Avila Joey Bahnsen Samantha Claman Overview Redeveloping the existing building with new construction and design elements.

Transcript of ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor...

Page 1: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

ARCHITECTURE TEAM

•Junior Kemdirim

•Francisco Avila

•Joey Bahnsen

•Samantha Claman

Overview

•Redeveloping the existing

building with new

construction and design

elements.

Page 3: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Page 4: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

To reveal traces of the past

building through the lens of

the new design.

Page 5: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Page 6: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Page 7: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Page 8: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Page 9: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

INSPIRATION

Page 10: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Page 11: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Second floor plan

Page 12: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Façade

Page 13: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Retaining Wall

Page 14: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Enlarged retail plan

Page 15: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Retail

Page 16: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Office

Page 17: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Enlarged gallery plan

Page 18: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Gallery

Page 19: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Enlarged café plan

Page 20: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Cafe

Page 21: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Engineering Team

• Matt Minnick

• Hans Messersmith Holth

• Zach Parsons

• Moises Contreras

• Overview

– Structural layout

– Mechanical and

Plumbing

– Deck

– Site

Page 22: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Structural Layout

Curtain Wall

• Three columns for

support.

• Two beams running

along the edge.

Page 23: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Structural Layout

Vestibule•Two Beams for elevator support.

Page 24: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Plumbing

Water

Fixture

Type

Count Fixture

Units

Total

Toilets 3 10 30

Sinks 2 2 4

Kitchen

Sinks

1 4 4

Sanitary

Fixture

Type

Count Fixture

Units

Total

Toilets 3 6 18

Sinks 2 1 2

Kitchen

Sinks

1 3 3

Page 25: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

HVAC

• 11,000 CFM Airflow

• 57”x 87”x 161” in

basement

• 30 tons of cooling

• Outside condensing

unit

• 371,000 BTU/hr

heating

• Boiler unit in

basement

boiler

Air

flow

unit

BASEMENT

Condensing unit

Page 26: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Deck Layout

•Joists are spaced out 16”

from each other

•Strength of deck relies on the

live and dead loads

•Black beams hold more

weight so they are thicker than

the other joists

Page 27: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Deck Footings

•Columns spaced out 16’ for

cars

•Columns in a row to make it

easy for beams to go across

Page 28: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

COLUMN

•The deck sits on 3-2”x12” beam

•Wood column sits on a 12”x12” concrete

base

•The base sits on a concrete footing that has to

be a minimum of 3’- 6” below the ground due

to the frost line

Page 29: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

DECK TO WALL

CONNECTION

•Joist is connected to a 2” X

16” Ledger by a Joist Hanger

•Ledger is connected to the

wall by Masonry Lag Bolts

Page 30: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

RETAINING WALL•Switchback Stairs

•Wall tapers off at the

end

•Back fill wall with rock

to help draining

Page 31: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

PARKING LOT

SITE PLAN

•Perpendicular parking

•3 Storm drains

•2 Handicap stalls

•Access to elevator on

parking level

Page 32: ARCHITECTURE TEAM - acementortools.org...2020-2011 Final Presentation Team South The ACE Mentor Program of Iowa COLUMN •The deck sits on 3-2”x12” beam •Wood column sits on

The ACE Mentor Program of Iowa2020-2011 Final Presentation Team South

Thanks to our Mentors!

-Kassi Colman – The Weitz Company

-TJ Meyerholz- The Weitz Company

-Brant Bristow- Tometich Engineering

-Ryan Morgan- Terracon

-Ron Barkey- Durrant

-Mike Dean- Invision

-Nic Forbes- Invision