Arca news iss86 autumn14 final

44
AUTUMN 2014 · ISSUE 86 THE JOURNAL FOR THE ASBESTOS MANAGEMENT INDUSTRY in this issue www.arca.org.uk www.atac.org.uk TERRY JAGO A tribute to one of ARCA’s founders TRAINING NEEDS ANALYSIS So what happens next? GUIDANCE ON Asbestos licensing and employment status

description

ARCA News Issue 86 October 2014 - The Journal for the Asbestos management Industry

Transcript of Arca news iss86 autumn14 final

Page 1: Arca news iss86 autumn14 final

A U T U M N 2 0 1 4 · I S S U E 8 6

T H E J O U R N A L F O R T H E A S B E S T O S M A N A G E M E N T I N D U S T R Y

in this issue

w w w. a rc a . o r g . u k w w w. a t a c . o r g . u k

TERRY JAGOA tribute to one ofARCA’s founders

TRAINING NEEDS ANALYSISSo what happens next?

GUIDANCE ONAsbestos licensing and employment status

Page 2: Arca news iss86 autumn14 final
Page 3: Arca news iss86 autumn14 final

contents

ARCA & ATAC NEWS 03

ARCA Contact details

Steve Sadley, Chief ExecutiveARCA, Unit 1, Stretton Business Park 2,Brunel Drive, Stretton, Burton upon Trent,Staffordshire DE13 0BYT: 01283 566467 F: 01283 505770 E: [email protected]: www.arca.org.uk or www.atac.org.uk

Editorial & Advertising Contacts

EditorialSteve Sadley, ARCAEmail [email protected] 505777 ext 206

Advertising Details & Media InformationLaura Rankin-Smith, ARCAEmail: [email protected] 505775 ext 200

ProductionStocks Design 0116 259 7264

Subscription DetailsSue Goodwin, ARCAEmail: [email protected] 505779 ext 202

ARCA News is published by ARCA Limited. Reproduction in part or whole of any item may only be undertaken with the prior written agreement of the Editor or ARCA. Opinions, comments, reviews and articles included in ARCA News are not necessarily those of the Association and no warranty for goods and services described or advertised is implied. Contributions are included in part or in whole at the sole discretion of the Association.

Advertising ContributorsG J Bowmer page 2Windsor Waste page 7Miles Smith page 9Acumen Waste page 9Erith page 13SMH pages 17 & 29Teams page 21Fiberlock Technologies page 25Prime Safety page 31Howden Insurance Brokers page 21

chief executive’s comment 4

asbestos in the news 5-6

web stats 7

arca tribute 8

arca history 10-11

hse news 12-15

rawg news 16

training update 18

employment news 20-23

product news 24

management update 26-27

member news 28

member update 30

training dates 32-34

arca member list 35-41

atac member list 41-43

contents

Page 4: Arca news iss86 autumn14 final

and objectives for both the long term and the short term. There will be an article in the next issue of ARCA News providing greater detail on ARCA’s strategic plan for the future.

To date the new accounting package, Microsoft NAV 2013, has been installed and is now operational. To complement the Microsoft NAV 2013 accounting software ARCA have selected a customer relationship management solution provided by TSG Ltd, which is Microsoft CRM 2013. However, we have now been advised that this will not be available for installation until January 2015.

The sad loss of Terry is particularly poignant at this time of year as the ARCA Annual General Meeting is once again upon us. This event, probably more than any other is associated with Terry, and the fact that he will not be there will make this year’s AGM a strange experience for me, as I am sure it will for many others. Nonetheless I look forward to seeing as many members as possible at the AGM to both reflect on the life of Terry Jago and all the good work he has done for the association, and to look to the future to continue the good work that was initiated and promoted by Terry.

Steve Sadley Chief Executive

A s most of you will undoubtedly know Terry Jago passed away on Sunday 3RD

August 2014 after a long battle against prostate cancer. A memorial service for Terry took place on the 15th August 2014 at St Mary’s church in Terry’s adopted home town of Atherstone, Warwickshire. Amongst others the service was attended by many representatives from the ARCA Governing Council, association members as well as friends and colleagues.

Terry remained active within the association right up until the end of May 2014 when finally his state of health prevented him from taking an active part in the association any longer. Earlier this year January / February time I recall Terry telling me that when visiting new members he took great delight in telling the story of ARCA through the years, and that one member had said ‘you ought to write this down’. This prompted Terry to propose a series of articles for ARCA News chronicling ‘the story of ARCA’. I think on reflection Terry was keen that the story was documented for the future as he was only to aware that time was running out for him. Terry managed to complete the first two articles. The series continues within this edition of ARCA news from 2000 to 2008.

Readers will recall that I mentioned the production of an ARCA Strategic Plan in the Chief Executives comment in the previous edition of ARCA News. I am pleased to report that at the time of writing this report the plan is almost complete and will be launched at the Annual General Meeting. I will give an outline of the association’s mission and vision for the future along with an overview of the association’s aims

Remembering the Past whilstLooking to the Future

Welcome to Issue 86 of ARCA News.All Member companies can submit articles for inclusion in the publication and all articles will be considered. We are keen to run a ‘Letters Page’ in the next issue so if you do have a burning issue to raise with the industry, please put pen to paper or email the ARCA News Editor at the address below.

Steve Sadley, ARCA News Editor,[email protected]

ARCA, Unit 1, Stretton Business Park 2,Brunel Drive, Stretton,Burton upon Trent, Staffordshire DE13 0BYwww.arca.org.uk or www.atac.org.uk

ARCA & ATAC NEWS04

chief executives comment

Chairman’s Message

This has been a memorable first year for me in my role as Chairman. To have

had the opportunity to work alongside the association’s cornerstone, Terry Jago, was a privilege.

As late as July, Terry was attending and as always, contributing in strategic meetings to develop Arca over the forthcoming years. Terry’s legacy will live a long time with Arca and I suspect a lot longer with his many friends.

I have and remain committed to work with our Chief Executive, Stephen Sadley, and Governing Council to develop Arca to best support our members in the future. The strategic plan to meet these needs has been drawn up and will be explained at the AGM on the 3rd October. I hope

as many members as possible can attend the AGM and take part in our associations’ and industries’ future development.

As I set out at last year’s AGM, I would like to ensure our liaison with major client sector groups are improved and our association is in tune with client requirements. I am pleased that we have made progress in this area. Very importantly, the acknowledgement of our Client contacts to our training and audit schemes has been very complimentary.

I was pleased that during my first year we marked our 300th Governing Council meeting. As an acknowledgement of this significant milestone, this meeting was held in Ireland and coincided with a meeting with some of our Ireland members.

I would like to congratulate Andy Jackson for his term as Atac Chairman. Andy has continued with the great development of Atac over the last 2 years and the increased training courses provided

by Atac, along with additional membership, a testament to his success.

The Governing Council, along with the various Committees and the Arca Team, are committed as ever to support our members in every way possible. I would personally like to thank Grant Beglan for his solid and unwavering Stewardship of the Arca Training Committee and his knowledgeable and uncompromising support of Arca.

This is a very feisty industry where we are often seen as spectres of doom and pilloried at every turn. We never seem to be given the credit of the good work we do and the lives we save. Let’s turn this around as we move forward and shout out the benefits of our members work and of this great association.

John Horsfall, Association Chairman

Page 5: Arca news iss86 autumn14 final

ARCA & ATAC NEWS 05

asbestos in the news

T wo Stoke-on-Trent brothers with little or no experience of building and

construction work have been given prison sentences after they exposed workers to asbestos.

At least seven workers are known to have been exposed to asbestos – one aged just 17 at the time – by Akram Hussain, 52, of City Road, and Inam Hussain, 47, of Boughey Road, during refurbishment work at a former print works on Scotia Road, Burslem, since February 2012.

Stafford Crown Court was told today (20 August) that neither was qualified or experienced in construction, demolition or refurbishment work; nor were they licensed to remove asbestos.

Brothers given custodial sentence for exposing workers to asbestos

Akram Hussain is a snooker hall manager and Inam Hussain a taxi driver, although they have been carrying out the work on the building for around ten years.

The Health and Safety Executive (HSE) prosecuted the brothers after an investigation found work was being carried out without the necessary asbestos surveys and without a Construction, Design and Management Co-ordinator (CDM) in place, which is required if work is to take more than 30 days.

Despite repeated visits from HSE inspectors and numerous enforcement notices warning them of their failings, the brothers continued to refurbish the building and disturb asbestos material – putting workers at risk.

A Prohibition Notice was issued on 17 February 2012 stopping all work with, or liable to disturb, asbestos. A ‘Direction to Leave Undisturbed’ was also issued for the building until HSE had provided written confirmation that work could continue.

However, several lorry-loads of waste contaminated with asbestos were removed from the site and taken to an unlicensed waste disposal site in Stoke-on-Trent. Workers were also witnessed exiting the site covered in dust and not wearing the correct protective clothing.

A further Prohibition Notice and an Improvement Notice were served on Akram Hussain on 25 February 2012 when inspectors

again found work being carried out without an asbestos survey or a CDM.

A separate Prohibition Notice was also served on Inam Hussain on 18 May 2012 for the non-licensed removal of the asbestos from the building. An Improvement Notice was served at the same time for the ongoing failure to appoint a CDM.

An asbestos survey was later carried out, but work inside the building continued to disturb materials containing asbestos.

The court heard that HSE is aware of at least seven workers being exposed to asbestos in the building. Many more could have been exposed during the course of the refurbishment project.

Akram Hussain and Inam Hussain both pleaded guilty to breaching section 3(2) of the Health and Safety at Work etc Act 1974. Akram Hussain was given a custodial sentence of 22 weeks and ordered to pay costs of £43,000. Inam Hussain was given a custodial sentence of 14 weeks.

Speaking after the hearing, HSE inspector Lindsay Hope said:

“The Hussains have shown a willful disregard for the health and safety of workers and others. Our investigation uncovered a catalogue of serious errors, safety failings and a disregard of the laws around the safe and correct removal of asbestos.

“This was an appalling case of failing to

20 August 2014 http://press.hse.gov.uk/2014/brothers-given-custodial-sentence-for-exposing-workers-to-asbestos/

properly plan, manage and resource this project, which led to workers being exposed to risks to their health from asbestos.

“It is essential at the outset of a building refurbishment to first seek specialist advice regarding the possible presence of asbestos within that building. Only with the full knowledge of what is present, or not, can any asbestos then be dealt with safely.

“Failure to identify and deal with any asbestos can lead to it being damaged and people then breathing in the fibres. The Hussains failed in their duty by choosing to ignore the dangers of this hidden killer.

Page 6: Arca news iss86 autumn14 final

asbestos in the news

ARCA & ATAC NEWS06

A n NHS Trust has been fined after it was found likely to have exposed workers to

potentially fatal asbestos material for more than a decade at its three hospitals in Hertfordshire.

Between April 2000 and December 2011, the estates team at West Hertfordshire Hospitals NHS Trust was maintaining buildings at Watford General Hospital, Hemel Hempstead Hospital and St Albans Hospital without knowing that asbestos was present or being trained to identify and control exposure.

The estates team, whose work is to carry out small repairs and maintenance projects where external contractors are not needed, could have disturbed asbestos fibres in the course of a job, but would have had no way of knowing or of protecting themselves.

St Albans Crown Court was told that over the 11-year period, the Trust had identified some of the asbestos materials at their sites but did not have a management or monitoring plan in place to control the risks associated with the deadly fibre.

It was only when additional surveys were carried out in December 2011 that the Trust

realised more asbestos was present at all three hospitals than initially identified. Neither the newly identified asbestos nor the material that had originally been identified were being managed. The Trust alerted the Health and Safety Executive (HSE), which investigated and brought a prosecution for health and safety breaches against the Trust today (20 August).

The court heard the NHS Trust immediately put control measures in place after the survey results came back. Unfortunately, the extended lack of awareness reiterated that it had caused workers to potentially be exposed over a significant period of time, which constituted a major failure on its part.

West Hertfordshire Hospitals NHS Trust, of Vicarage Road, Watford, Hertfordshire, was fined £55,000 and ordered to pay £ 34,078 in costs after pleading guilty to four breaches of the Control of Asbestos Regulations 2006 and a single breach of the Health and Safety at Work etc Act 1974.

Speaking after the hearing, HSE Inspector

Sandra Dias said: “Employers have a duty to protect their staff from the long term health risks associated with asbestos, which include lung cancer and mesothelioma.

“This duty includes finding out whether the premises contains asbestos, assessing the risks and making a plan to manage that risk and act on it.

“West Hertfordshire Hospitals NHS Trust did not adequately manage the risk over an 11-year period. As a result, a number of its employees will now have to spend the rest of their lives not knowing whether they have been exposed. We all hope that none will suffer as a result.”

Around 4,500 people die every year as a result of breathing in asbestos fibres, making it the biggest single cause of work-related deaths in the UK. Airborne fibres can become lodged in the lungs and digestive tract, and can lead to lung cancer or other diseases, but symptoms may not appear for several decades.

20 August 2014 http://press.hse.gov.uk/2014/nhs-trust-in-court-after-workers-potentially-exposed-to-asbestos/

A Hove-based firm has been fined after it flouted asbestos regulations and removed

some of the dangerous material just three weeks after being refused a licence to carry out such work.

Asbestos Damage Limitations Ltd, trading as ADL, was prosecuted at Brighton Magistrates’ Court (28 Aug) for safety breaches following the work undertaken at premises in Dyke Road, Hove, between 22 and 25 October 2013.

The case was brought by the Health and Safety Executive (HSE) after investigating a complaint that an unlicensed contractor was carrying out asbestos removal work.

The court was told that ADL had possessed a

Hove firm prosecuted after flouting asbestos laws

licence to remove asbestos – a known carcinogen – but that this had expired in September 2013. The firm had applied for a renewal of the licence and had been for a renewal interview with HSE on 1 October. However this had resulted in an outright refusal based on inadequate performance.

Asbestos Damage Limitations Ltd, Coleridge Street, Hove, East Sussex, was fined £15,000 and ordered to pay £4,000 in costs after admitting breaching Regulation 8(1) of the Control of Asbestos Regulations 2012.

After the hearing, HSE Inspector Denis Bodger said:

“ADL obviously decided to ignore the fact that its asbestos licence had expired and also that the

application to renew had been refused. Instead it carried on regardless and went ahead with work at the premises, removing a ceiling that contained asbestos insulation board.

“When ADL’s licence expired, the firm should have ceased to carry out any work with asbestos-containing materials that is required by licence. ADL was fully aware of what types of activities are covered and knew perfectly well that it was illegal to undertake the work they did.

“Work with asbestos requires a high degree of regulatory control. It involves working with a category one carcinogen, with asbestos-related diseases causing some 4,500 deaths each year in the UK, as well as many serious illnesses. When this type of work is undertaken by an unlicensed company, HSE has no ability to ensure it is done safely.

“Non-compliance with asbestos-licensing requirements is not acceptable and HSE will continue to enforce the law to protect both workers and members of the public.”

29 August 2014 http://press.hse.gov.uk/2014/hove-firm-prosecuted-after-flouting-asbestos-laws/

NHS Trust incourt after workers potentially exposed to asbestos

Page 7: Arca news iss86 autumn14 final

ARCA & ATAC NEWS 07

web stats

VISITS % NEW VISITS

Sept 13 2,061 74%Oct 13 2,411 79%Nov 13 2,120 78% Dec 13 1,415 79%Jan 14 2,311 80%Feb 14 2,111 83%Mar 14 1,915 70%Apr 14 1,759 67%May 14 1,776 69%June 14 2,022 85%July 14 2,188 85%Aug 14 2,096 83%

2500

2000

1500

1000

500

0 Sept 13 Oct 13 Nov 13 Dec 13 Jan 14 Feb 14 Mar 14 Apr 14 May 14 Jun 14 Jul 14 Aug 14

www.atac.org.uk

ARCA/ATaCONLINE TRAFFIC STATISTICS

We are now monitoring the traffic to both the ARCA (www.arca.org.uk) and ATAC websites (www.atac.org.uk). We will publish the traffic stats in all future issues of ARCA News. If you wish to advertise in the ‘find a member’ of the ARCA Website please email [email protected]

Dec10 Jan11 Feb11 Mar11 Apr11 May11 June 11 July 11 Aug 11 Sept 11 Oct 11 Nov 11

VISITS % NEW VISITS

Sept 13 12,356 59%Oct 13 13,294 60%Nov 13 11,309 60%Dec 13 7,503 59%Jan 14 12,926 62%Feb 14 11,537 68%Mar 14 9,160 63%Apr 14 8,840 51%May 14 8,955 52%June 14 12,583 71%July 14 13,698 71%Aug 14 12,698 72%

16000

12000

8000

4000

0

www.arca.org.uk

Sept 13 Oct 13 Nov 13 Dec 13 Jan 14 Feb 14 Mar 14 Apr 14 May 14 Jun 14 Jul 14 Aug 14

Page 8: Arca news iss86 autumn14 final

ARCA & ATAC NEWS08

arca tribute

As the majority of readers will be aware Terry Jago sadly passed away on the 3rd of August

2014. Anyone who has been associated with ARCA over the past 35 years will be only too aware of the contribution Terry has made to the association.

Terry was one of the founder members of ARCA (representing Cape Contracts) when a handful of asbestos removal companies came together in 1979 to form the Asbestos Removal Contractors Association. From that point onward Terry remained active within the association, initially as the representative of several member companies, Cape, Kitsons and Asbestech. During his time with these companies Terry served as an ARCA Governing Council member, including the period 1998-1990 when he served as Chairman of the ARCA Governing Council. In 1995 Terry was appointed as the associations Development Director, and commenced his direct employment with ARCA on July 3rd that year, before becoming the associations Chief Executive in 1996, a post he held until January 2009. Aged 67 Terry stepped down from his role as Chief Executive and continued in a part time role with the association, as Director of Training, right up until the end of May 2014 when he became too ill to continue and reluctantly had to retire from his duties with the association.

During the 35 years that Terry has been linked with the association, either as a representative of an active member or as a direct employee of the association, his vison and goals coupled with his enthusiasm and drive, in addition to his genuine love of the industry, and the people within it, have been the foundations on which the association has been built.

Terry’s tireless work visiting asbestos removal contractors during his years with ARCA, and particularly during the early years following his appointment, has led to the significant number of members ARCA now has.

Terry was instrumental in ARCA introducing practical training to the industry as well as suggesting to the HSE in January 1999 that an industry ‘forum’ would be a good idea. This suggestion led to the formation of the Asbestos

Liaison Group (ALG) which first met in December 2000. This group is a forum of key stakeholders which continues meet three times a year with the aim to work together in a constructive way to promote best standards and practice in relation to control and work with asbestos. The ALG aims to promote measures that will bring about a reduction in the level of asbestos related diseases. The ALG publishes guidance material, in the form of ALG memos concerning work with asbestos.

Terry was instrumental in establishing the ARCA Insurance Scheme in 1996, which continues to provide ARCA members with reliable insurance cover as well as discounts for members and sponsorship of the Site Audit Accreditation Scheme which enables members twice yearly audits to be heavily subsidised. The aim of the association has always been to raise standards of professionalism, workmanship and safety and health within the asbestos removal industry. Terry oversaw the introduction of the associations Site Audit Accreditation Scheme (SAAS) which now sets the standard that members have to achieve and maintain in order to remain members of the association.

The foundations for the successful association we have today were laid during Terry’s term as Chief Executive of the association and those foundations remain the cornerstones of the association today. Practical training, Site Audit Accreditation Scheme, Asbestos Liaison Group, regional meetings are all part of the legacy left by Terry.

I first met Terry in 1999 when I was working for ARCA member company, Detech Environmental Ltd. I was the Asbestos Manager at Detech and

Terry was a regular visitor to the company offices. My memories from that time are that he seemed to know everyone, and everyone seemed to know him. I remember that he always seemed busy and was always on some sort of mission. In 2000 I applied for the position of Business Development Manager with ARCA and commenced work with ARCA on July 3rd, exactly 5 years to the day after Terry commenced direct employment with ARCA. During the next 14 years I enjoyed some of the best years of my working career working alongside Terry. In particular I remember the period when the association moved its headquarters from Chelmsford in Essex to Burton on Trent in Staffordshire. Initially Terry and myself were the only members of staff running the association from a small flat above the intended ARCA premises while they were being refurbished. It was a delight to work with Terry to develop the association into what it has become today. I will always be thankful to Terry, firstly for giving me the opportunity to work for ARCA and for his help, support and assistance over the years, both before and after I was appointed Chief Executive.

We will remember Terry for his confidence, his consummate ability, his professionalism and mainly because he was ‘a really good bloke’ who was liked and respected by all. I will look back on the times we shared together with fond memories. It was a mark of his popularity that so many in the industry gathered to attend his funeral. Terry will be sadly missed by all.

Stephen SadleyChief Executive.

Terrya tribute to

Jago

Page 9: Arca news iss86 autumn14 final

ARCA & ATAC NEWS 09

www.arca.org.uk & www.atac.org.uk

Page 10: Arca news iss86 autumn14 final

ARCA & ATAC NEWS10

arca history

2000 saw Steve Sadley join the ARCA staff as Business Development Manager, ARCA

relocate its offices from Chelmsford in Essex to Burton upon Trent in the Midlands, and the Consultative Document for the Control of Asbestos at Work Regulations 2002 issued. Significantly the Consultative Document proposed a major amendment to the preceding Control of Asbestos at Work Regulations 1987 with the inclusion of the ‘Duty to Manage Asbestos in Non Domestic Premises’ for the first time.

In addition the Associations Site Audit Accreditation Scheme (SAAS) was launched in 2000. At the time it was stated the ARCA Site Audit Accreditation Scheme ‘could not make perfect contractors but could set a standard and ensure that contactors can do it properly and consistently’. At the ARCA Annual General Meeting in October 2000 the first 4 ARCA members to receive the Site Audit Accreditation

award were presented with their certificates, as current members will know the ARCA Site Audit Accreditation Scheme is now central to gaining and maintaining ARCA membership.

Following prior representations by ARCA to the HSE the first Asbestos Liaison Group (ALG) meeting was held in December 2000. The first issues discussed were ‘Scaffolding and work with asbestos’, ‘Short duration work (disapplication from holding a licence)’ and ‘Site documentation’.

Peter Dolan of Kitsons Environmental (Europe) Ltd completed his two years as ARCA Chairman in 2001 and Jason Davy of Rhodar Ltd took over the Chairmanship for the period 2001 -2003. MDHS 100, the forerunner to ‘Asbestos: the survey guide’, was published in 2001. In 2002 the industry experienced difficult times as far as obtaining asbestos specific insurance was concerned. The demise of the Independent Insurance Company, followed by the events of September 11th 2001, meant that the cost of renewing insurance cover rose dramatically, and there were fewer underwriters willing to offer cover. ARCA worked closely with Miles Smith during this period to ensure that insurance cover was available for ARCA members.

The Control of Asbestos Regulations 2002 (CAR 2002) were finally introduced when the Minister for Work and Pensions signed the new legislation on the 24th October. The signing

the history of

ARCAand the asbestos removal industry

The series of

ARCA history

started by Terry

Jago continues

with this, the

third part which

brings us to 2008.

part 3: 2000 to 2008

Page 11: Arca news iss86 autumn14 final

ARCA & ATAC NEWS 11

arca history

of the Regulations by the Minister was not the end of the matter as Conservative Lords tried unsuccessfully to annul the introduction of the legislation in a further debate in the House of Lords on the 5th of December. The Association assisted Baroness Gibson by providing detailed information on the necessity for the new duty, which the baroness referred to during the debate.

2003 saw insurance premiums still rising for asbestos removal companies. In order to soften the blow for ARCA members, ARCA negotiated a 10% discount in insurance premiums with Miles Smith for those ARCA members who had successfully achieved Site Audit Accreditation status. The introduction of CAR 2002, which included the Duty to Manage Asbestos in Non Domestic Premises led to ATaC members reporting record numbers of request for surveys to be carried out.

During 2003 membership of the association’s Site Audit Scheme was made a requirement of membership and Grant Beglan was appointed Chairman of the association. May 21st saw the lead in period for CAWR 2002 Regulation 4 The Duty to Manage Asbestos in Non Domestic Premises come to an end and the Regulation coming in to force. With further problems regarding the availability of Employers Liability Insurance specific to asbestos and the introduction of the Landfill Regulations

2002 likely to reduce the number of landfill sites available for asbestos waste by 95%, times were not getting any easier for asbestos removal contractors. In order to further ease the burden of excessive insurance premiums ARCA negotiated an additional 10% discount for members subject to a satisfactory claims history, this discount was in addition to the 10% discount applicable to those members achieving Site Audit accreditation.

Early in 2005 ARCA was notified that the European Asbestos Worker Protection Directive was due to be introduced in 2006. The result of the implementation of this Directive would mean that work on textured coatings containing asbestos would be removed from the licensing regime, something ARCA was strongly opposed to. Whilst ARCA recognised that various asbestos containing materials offered varying degrees of risk, there was no material containing asbestos which could be classified as no risk. Removing these materials from the licensing regime would encourage the inadequately trained and inadequately insured to expose people to asbestos. Tony Darsey was appointed Chairman of the association for the period 2005-2007.

The Consultative Document containing the proposals for the Control of Asbestos Regulations 2006 (CAR 2006) was issued in late

2005. ARCA began a campaign to oppose the removal of textured coatings from the asbestos licensing regime. Despite ARCA’s campaign to make industry aware that the proposed changes would do little to improve worker protection with regard to asbestos removal within the UK, despite 115 MP’s signing an Early Day Motion expressing their concerns and despite HSE receiving over 500 responses to the consultation, of which 65% opposed the deregulation of textured coating, HSC recommended the proposals to Government for implementation later in the year.

The Control of Asbestos Regulations 2006 were implemented on the 13th November 2006 including the removal of asbestos textured coatings from the licensing regime.

As a result of the introduction of the Control of Asbestos Regulations 2006, ARCA felt that the Regulations did not correctly transpose the European Directive and therefore began a long process of making a formal complaint to the European Commission.

In spring 2007 ARCA moved in to its new Training Centre at Rayleigh, Essex. Satish Patel was appointed as ARCA’s new Training Manager. Steve Watts was appointed Chairman of ARCA in 2007 and Terry Jago stood down as Chief Executive at the end of the year and took the position of Director of Training for ARCA. Steve Sadley was appointed Chief Executive in January 2008.

Page 12: Arca news iss86 autumn14 final

ARCA & ATAC NEWS12

On the 10th September 2014 ARCA were visited by Clive Johnson, Land Securities

Group Head of Health & Safety. Clive was visiting ARCA’s Headquarters in Burton upon Trent to meet with the ARCA Training team to demonstrate the training presentations that Land securities are currently delivering with regards to Work at Height and Safety Behaviour.

In the morning Clive spent several hours delivering the ‘work at height’ presentation. Whilst all the ARCA trainers have already attended a PASMA (Prefabricated Access Suppliers and Manufacturers Association) Certificate of Competence, at user level for both Low Level and Tower categories, it was still extremely interesting to get a Clients perspective. Clive delivered a presentation which sets the standard that Land Securities demand from their own sub-contractors

in relation to work at height. Clive impressed upon the trainers the fact that falls from height remain the single biggest cause of fatalities on UK construction sites.

In the afternoon Clive delivered the Land Securities ‘Safety Behaviour’ presentation that has been developed over many years and is once again delivered to Land Securities subcontractors. The presentation is thought provoking and challenges the delegates to examine their own relationship with Safety and Health. The presentation requires the delegates to consider the life changing results that can follow from an accident at work and the affects that this can have on the quality of life of the injured worker, both physically and financially, and the corresponding effects on the injured workers family and their quality of life. The presentation impresses upon the delegates

‘Work at Height Awareness’ and ‘Behavioural Safety’

hse news

Land Securities Clive Johnson and ARCA Working Together to Promote the need to follow health and safety rules, and that by taking risks by cutting corners, they are gambling with their future and their family’s future. The presentation really hits home and convinces delegates that taking short cuts and ignoring health and safety procedures is really not worth the risk, and that too many people have already paid too high a price by either being killed or seriously injured.

Much of what was learned during the presentations will be incorporated in to ARCA’s current training programmes. Clive is keen that the health and safety messages that Land Securities are dedicated to promoting are spread far and wide, and will therefore be working with ARCA to develop the Land Securities presentations into presentations that can be offered to the ARCA members.

All the ARCA trainers were grateful to Clive for taking time out of his busy schedule to spend the day at ARCA’s headquarters. Feedback from the ARCA trainers following the presentations was that all of the ARCA trainers had taken a great deal from the presentations that Clive delivered on the day, both in terms of the style of delivery and the presentations content. Once again we are very grateful to Clive Johnson for his help and assistance.

Page 13: Arca news iss86 autumn14 final

ARCA & ATAC NEWS 13

www.arca.org.uk & www.atac.org.uk

Page 14: Arca news iss86 autumn14 final

ARCA & ATAC NEWS14

hse news

There has been a large uptake of “behavioural safety” approaches over the past decade

or so, in a wide range of industries. These approaches are based on the premise that a significant proportion of accidents are primarily caused by the behaviour of front line staff, such as pilots, drivers, production operators or maintenance technicians. There is a wide range of such programmes available, but they generally involve (i) the definition of safe/unsafe behaviours, (ii) observations of behaviours by trained observers and (iii) feedback/reinforcement of behaviours.

These approaches can be successful in reducing unsafe behaviours in the workplace. Due to the nature of these approaches, there are a number of other less tangible benefits, including:

1. management demonstrate their commitment to improving safety;

2. the workforce and management talking to each other about safety;

3. increased profile of health and safety;

4. increased visibility of management in the workplace;

5. employee engagement in safety;

6. managers/supervisors learn to act promptly on unsafe acts (and have a legitimate mechanism for doing so);

7. managers/supervisors may improve their safety leadership;

8. managers/supervisors learn to think about aspects of human factors.

In justifying behavioural interventions, it is often claimed that 70-80% of incidents are caused by ‘human error’. However company management usually see the ‘human’ in human error as referring to front line personnel. Therefore, behavioural safety interventions tend to focus on the behaviours of front line staff.

Safety culture/climate surveys have been

very popular in recent years and these initiatives are also usually aimed at understanding and optimising the attitudes of front line personnel rather than investigating management attitudes and behaviours. Discussing the focus on front line staff in reported ‘causes’ of accidents, Trevor Kletz states that: ‘Managers and designers, it seems, are either not human or do not make errors’ (Kletz 2001, p.317).

A focus on individual operators ignores latent conditions that underlie incidents and implies that incidents can be prevented simply by operators “taking more care”. However, as Andrew Hopkins, an expert witness in the inquiry into major fires and explosion at the Longford facility in 1998, points out:

‘creating the right mindset is not a strategy which can be effective in dealing with hazards about which workers have no knowledge and which can only be identified and controlled by management’ (2000, p. 75).

Management and organisational factors have a large influence on accidents and incidents, either directly or through their impact on the behaviours of employees. It is these management decisions etc. that are usually excluded from behavioural safety approaches (and usually not included in other safety initiatives). In fact, the management decision to initiate a behavioural approach may itself be flawed.

Although the immediate causes of major incidents frequently involve ‘human error’ of operators or maintenance personnel, the reasons that these errors occurred in the first place are usually the responsibility of those more senior in the organisation. Management and organisational failures, such as inadequacies in competency assurance systems, poorly designed equipment, or a lack of resources, have the potential to influence the behaviours of everyone in the organisation.

Major hazard or safety critical industries such as refineries, chemical plants, nuclear facilities and offshore installations should consider exactly

As stated in the previous article Clive Johnson, Group Health and Safety Manager of Land Securities, visited ARCA’s Head Office Training centre at Burton upon Trent to deliver Land Securities in house ‘Working at Height’ and ‘Behavioural Safety’ presentations. The recent HSE focus on the competency of asbestos removal operatives working for HSE Licensed asbestos removal companies brings the subject of ‘Safety Behaviour’ into sharp focus. The Pye Tait report commissioned by the HSE on ‘A Commentary on Routes to Competence in the Construction Industry’ concludes that the construction industry’s current understanding of ‘competence’ may warrant extension to develop an ‘industry-specific’ definition and broadening to encompass both situational awareness and the sustaining of appropriate behaviours.The following article is adapted from an article taken from the HSE Web site and talks about safety behaviour in general within high risk occupations. As asbestos removal companies are now focussing more than ever on the competency of their staff we thought that this article may provide food for thought when considering the safety culture within your own organisation.

References1. Kletz, T. (2001). Learning from accidents. Butterworth-Heinemann Ltd, Oxford. ISBN 0 7506 4883 X

2. Hopkins, A. (2000). Lessons from Longford: The Esso Gas Plant Explosion. CCH Australia Ltd, ISBN 1 86468 422 4

3. Step Change (2000). Changing minds: a practical guide for behavioural change in the oil and gas industry. http://stepchangeinsafety.net/stepchange/News/StreamContentPart.aspx?ID=540

behaviouralthinkingabout safety

Page 15: Arca news iss86 autumn14 final

ARCA & ATAC NEWS 15

which aspects of “health and safety” a behavioural intervention may be able to influence.

Behavioural safety interventions tend to focus on behaviours relating to personal health and safety; such as the wearing of Personal Protective Equipment (PPE), positioning of the body in relation to hazardous equipment, and issues relating to working at height (e.g. wearing of harnesses, proper use of ladders). Behavioural interventions may be able to demonstrate improvements, for example, in the wearing of PPE, but this is of little relevance if those wearing the PPE do not have the underlying knowledge to respond appropriately to a developing incident, or if there are insufficient operators available. Hi-visibility jackets and hard hats offer little protection in a major fire or explosion.

Many supporters of behavioural safety programmes state that large improvements in safety have been made in the past decade or so in engineering and safety management systems; and that new approaches are required to encourage further improvement. Although large advances have been made in these areas, major accidents are still occurring due to failures in these aspects. It is therefore not appropriate to conclude that we have ‘solved’ engineering causes of accidents, nor to assume that no further focus on management systems is required. A publication by the Step Change initiative in the offshore oil and gas industry acknowledges that:

‘addressing behaviours must not be seen as an alternative to ensuring that adequate engineering design and effective safety management systems are in place’ (Step Change, 2000, p.5).

Cultural or behavioural interventions will only be successful if engineering, technical and systems aspects are in place and adequately managed. Therefore, before sites (particularly those that manage major hazards) embark on a behavioural safety programme, they need to ensure that they have satisfied the following conditions:

w all hazards have been identified;

w human performance issues have been identified and managed (particularly in relation to safety critical roles and activities);

w the “hierarchy of control” has been applied to prevent the realisation of identified hazards, or minimise their consequences should they occur;

w the site has the required engineering, operating and maintenance capability and experience (including appropriate staffing levels;)

w accurate operating procedures are available for all eventualities, including process upsets and emergencies;

w operators are fully prepared to deal with all conditions, including process abnormalities. This will include identification of training needs, training, assessment, rehearsal and re-assessment. This training should include underlying knowledge of the process, so that operators can ‘troubleshoot’ -identify and respond to abnormal situations as they develop – it should not just provide the minimum knowledge required to operate the plant. This will help to manage ‘residual risk’ arising from hazards that were not identified, or effectively addressed;

w lessons have been learnt from site, company and industry experience;

w succession planning ensures that corporate knowledge is retained;

w safety management arrangements and risk control measures have been reviewed to ensure that they remain usable and relevant.

Once the above technical and systems issues have been addressed, the site then needs to ask whether a behavioural approach is the right approach at this time. Only when the above issues have been addressed can it be assumed that accidents are due to cultural or behavioural factors. In order for a behavioural intervention to prosper, there are several aspects that must be considered, including that:

w there exists an appropriate balance between production and safety;

w there is visible and real management to health and safety;

w there is management commitment and the resources to see it through;

w there is a high level of trust between management and employees.

Finally, once all of the above criteria are in place, if a site decides to embark on a behavioural intervention, the following general advice may be useful (much of which also applies to other health and safety interventions):

w don’t underestimate the resources required – it is not a one-off exercise, but a new way of working that must be maintained for any positive results to be sustained;

w don’t be over-optimistic – not all interventions are completely successful in their main aim. High expectations may lead to later disillusionment;

w be clear about what you want to achieve and how you will know that you have achieved it;

w pilot the intervention (e.g. to ensure that the approach is workable, that the facilitators/ observers understand what’s required and that the appropriate data is being recorded);

w talk to other similar companies/trade associations about their interventions and experiences;

w as with all interventions, listen to your employees and use the process to improve dialogue – involve employees early in the choice of programme;

w make the language, style etc. of the package your own (off-the-shelf packages may not be appropriate for your site/needs);

w use strong site facilitators – the success of such interventions is greatly helped by personable, experienced and respected site personnel as facilitators;

w ensure that the focus is on the root causes of behaviours;

w on major hazard sites, don’t neglect process safety; (beware ‘what gets measured gets done’).

On major hazard sites, there is a danger that behavioural programmes may draw resources and attention away from process safety issues. Organisations embarking on behavioural programmes should retain a balanced approach between personal safety and major accident safety, and to consider whether a behavioural intervention is right for their company at this time.

The key messages from this article are:

1. behavioural interventions are only one aspect of ‘human factors’,

2. these programmes are only one tool in the safety practitioners toolbox,

3. know the limits of such interventions, and

4. prepare the ground before attempting such an intervention.

hse news

Page 16: Arca news iss86 autumn14 final

ARCA & ATAC NEWS16

rawg news

T he inaugural conference of the Retail Asbestos Working Group (RAWG) was

held at the ASDA Merchandising Centre of Excellence in Leeds on 4th September. ARCA made representation as both an exhibitor and conference attendee, and further practical displays were erected by ARCA members Rhodar Ltd and Shield Environmental Services Ltd, together with an exhibition stand from ATaC member Environmental Essentials Ltd.

The conference was attended by over 400 delegates from the UK retail sector, and attendees included directors, project managers, quantity surveyors, supply chain partners, compliance managers and safety managers. Presentations were made by key players in the development of the Working Group, and covered a range of topics including an introduction to asbestos and it’s uses, properties and health risks; significance of asbestos in the retail sector; consequences of getting it wrong; asbestos surveys, removal and air monitoring; licensing requirements; emergencies; and acquisitions. The close out was a question and answer session with the presenters, who answered questions raised by delegates during the course of the day.

A common recurring theme throughout the day was the imperative need for meticulous planning in managing the many and varied issues surrounding asbestos in buildings. The necessity of accurate surveys, updated at every change of circumstance, to exemplary standards of asbestos abatement – values at the heart of the objectives of ARCA and ATaC – were clearly addressed. The conference was organised

to continue to emphasise the importance of correctly managing asbestos containing materials in retail properties, and followed the launch in 2013 of the RAWG publication ‘The management of asbestos-containing materials in the retail sector’. This guidance was prepared by the retail industry to provide clarity about managing asbestos and about removing or working with ACM’s (Asbestos Containing Materials) in trading stores and shops. It outlines the steps that should be taken by clients, employers and others in the construction sector such as principal contractors, licensed asbestos removal contractors and other sub-contractors, who have a duty to ensure asbestos is removed or worked on safely. The publication is available for free download at www.brc.org.uk/asbestos-guidance

The retail sector faces particular challenges in managing ACM’s in an environment where there is little downtime in terms of store closure. There is a daily interface with the public, with millions of shoppers entering stores every week of the year. Thousands of contractors may also be required to undertake seemingly straightforward tasks such as repairing a leak, or rectifying damage following a break-in – tasks that become more complicated and specialised with the presence of ACM’s, and potentially disastrous if the presence of the ACM’s is unknown, unclear, or not fully communicated to the contractor.

Several enforcement officers were in the audience, and while enforcement has a role in the asbestos industry, the attitude towards working to exemplary standards was epitomised

in the concluding remarks of ASDA’s Vice President of Construction and Faculties, Will Smith, who stated that ‘standards enforced don’t work half as well as standards embraced’. He stressed the importance of all retailers working and sharing experiences together to ensure all retail colleagues, customers and contractors remain safe at all times.

The Retail Asbestos Working Group was set up in 2012 by a number of like-minded retailers who wanted to improve the management of ACM’s in the retail sector. Health & Safety Managers and Directors from Asda, Boots, Land Securities, Marks & Spencer and Tesco set up the group with this aim in mind, and on the back of a number of high profile HSE prosecutions. The group wanted to share good practice standards for the sector and publish free guidance targeted at all retailers. The group intends to continue working with HSE and other stakeholders to continue to be at the forefront of good practice for this sector, influencing policy and providing technical expertise.

Over 400 retail delegates attend first conference

Page 17: Arca news iss86 autumn14 final

ARCA & ATAC NEWS 17

www.arca.org.uk & www.atac.org.uk

Page 18: Arca news iss86 autumn14 final

ARCA & ATAC NEWS18

training update

Training needs analysis has taken

a fair share of the industry spotlight

in 2014 and is set to continue as the

key element for 2015.

Previously, in the last edition of

ARCA news, I set out the key steps

we can follow to implement a

training needs analysis approach

into ARCA members companies.

Here’s a quick recap of the

TNA cycle (Fig 1).

Once you get to ‘Produce training needs analysis’ segment what then? To this end the ARCA Training Committee

have set a number of goals to ensure that:

a. Members can provide ARCA with the training needs analysis training information in a simple and easy to understand format. Preferably electronically, but available in print, if neccessary.

b. ARCA receive training needs analysis and can translate this information into an effective training delivery for each individual.

c. Both ARCA and its members have a level of understanding as to the level of training that is required for each individual, for example, what is their current base level of knowledge?

d. Some form of assessment is undertaken to ensure that the knowledge has been retained and understood.

A diagrammatical example of the process between ARCA and its members is illustrated below (Fig 2).

So what do you have to do?Initially, complete the TNA form and booking

form and return to ARCA. Both forms can be submitted either electronically or printed off and sent back in the post or faxed. The actual form itself, forms part of a booklet that provides guidance on how to complete it and where TNA information can be sourced. The modules are based on the familiar modules stated in HSG 247 – The licensed contractors guide, Chapter 4.

What happens when ARCA get the form back?We’ll book your employee onto the course

you’ve specified or we’ll contact you with alternative dates. The form will also produce a detailed lesson plan for the ARCA Trainer.

so I have a training needs analysis...

...what next?

Fig 1

Fig 2

Page 19: Arca news iss86 autumn14 final

ARCA & ATAC NEWS 19

training update

Do I have to complete a TNA form?ARCA are supporting members to move from

the previously generic approach to refresher training. The industry used for training and to a Training Needs Analysis approach which provides a detailed training solution to training for ARCA members.

ARCA will be delivering three types of courses for members:

1. New Operatives; New Supervisors.These are standard courses for those individuals new to the role and needing comprehensive training.

2. Industry Refresher for Operatives or Supervisors.The industry refresher will be available to members as a stop gap in providing training for operatives and supervisors. It will be delivered using industry information gathered by ARCA from a number of sources, such as, Site audit Accreditation Scheme findings; feedback from our Level 2 Operatives and Level 3 Supervisors Competency assessments and feedback from other industry sources such as HSE. This course will enable members to access training that is specific to the industry as they implement a Training Needs Analysis approach to into their business.

3. TNA based Refresher for Operatives and Supervisors.This course is designed for those ARCA member companies that have a TNA that has been given to ARCA and we will deliver that training along with some of the elements from the industry refresher. However, the key focus of training will be on the training needs of the individual.

What do the knowledge/skills scales on the form signify?To ensure that we provide the focussed

training for the employee we’re using a scale to show us how much the employee already understands and how much we’ve got to impart to them to bring them up to speed.

This is what the points on the scale represent:

1. Unacceptable.Employees’ performance at this level is consistently below the expectations for the role. Employee does not demonstrate necessary knowledge or skill to perform in this area and will require significant close supervision to complete the tasks. This level may also be given to someone who is operating in a new role and is unfamiliar with an area.

2. Needs improvement Employee demonstrates fundamental grasp of competency and is beginning to incorporate its principles into their work. However, the employee consistently demonstrates that there is opportunity to develop further. Note: Many new employees find themselves in this category for at least the first six months to a year on the job. This point could also be used when a promotion has been given and the individual is in a learning phase with regard to his/her new role.

3. Meets some of the expected performance standards.The employee has met some of the required performance and expectations of the job but may not have reached all of the agreed-upon performance standards. An employee performing at this level may be described as able and competent in particular areas, but needs training in other areas to bring their performance up to the desired level.

4. Meets expectationsEmployee meets expectations in this area, using ability and experience to produce the desired results for their role. However, they are not using all the skills and knowledge on a regular

basis and need to ‘refresh’ their knowledge to maintain their competency. Suitable for those employees going for promotion or maintaining the knowledge levels on the role through a continual professional development programme.

The form also has an additional text box next to each module and current performance scale. Please provide additional detail within this section to assist in the training delivery.

Will the individual still get atraining certificate?The straight forward answer is yes and the

certificate will state what training the individual has received. If they have undertaken ‘New’ training then they will be given a certificate detailing out the full syllabus of elements they have undertaken. With ‘Industry Refresher’ training then the certificate will state what was covered as identified by ARCA as industry training needs. The ‘TNA based Training’ certificate will reflect some elements of the industry refresher and only those additional modules the individual has covered as part of their identified training needs.

When will the form bemade available?The form is available now and we’re making it

available to all members from our webpages and it’s free to download.

Go to www.arca.org.uk/publications.

Page 20: Arca news iss86 autumn14 final

ARCA & ATAC NEWS20

From 1st July 2014 the green Construction Site Operative (CSO) card is no longer

being issued. There is a new green CSCS card only available for people working in labouring occupations.

The Contruction Skills Certification Scheme (CSCS) provides a means to verify that people who want to work on construction sites have the neccessary training and qualifications for the type of work they carry out. Many site workers who are carrying out skilled occupations have been

employment news

Skilled Worker (blue card and the recommended card for those within the asbestos removal industry working at operative level)

If you have achieved S/NVQ level 2 or QCF* equivalent or (for the purposes of asbestos operatives this is either the RSPH Level 2 Certificate in Asbestos Removal for Operatives or the Removal of Hazardous and Non-Hazardous Waste(Construction)Level 2) or completed an employer sponsored apprenticeship which included a City and Guilds Craft Certificate.

This card is valid for 5 years.

All applicants must pass the appropriate CITB Operatives or Specialists Health, Safety and Environment Test depending on your occupation.

Advanced Craft / Supervisory (gold card and the recommended card for those working in the asbestos removal industry at supervisor level)

If you have achieved S/NVQ level 3 or QCF* equivalent or completed an approved indentured apprenticeship (for the purposes of asbestos supervisors this is the RSPH Level 3 Certificate in Asbestos Removal for Supervisors) or completed an employer sponsored apprenticeship which included achievement of a City and Guilds Advanced Craft Certificate.

This card is valid for 5 years.

All applicants must pass the CITB Operatives, Specialists or Supervisory Health, Safety and Environment Test depending on your occupation.

Manager (black card and the recommended card for those working in the asbestos removal industry at Contracts Manager level or above)

If you have achieved S/NVQ levels 4/5 or QCF* equivalent in a relevant occupation (for the purposes of asbestos contracts managers RSPH Level 4 Certificate in Asbestos Removal for Contract Managers).

This card is valid for 5 years.

All applicants must pass the CITB Managers and Professionals Health, Safety and Environment Test.

Experienced Worker (red) If you have on the job experience (normally at least one year in the last 3).This card is issued on a temporary basis while a QCF* qualification is being undertaken. It is non-renewable and should be replaced by a blue, gold or black skilled card shown above on achievement of an appropriate vocational qualification.

All applicants must pass the relevant CITB Health, Safety and Environment Test depending on your occupation.

Card

The following table summarises the requirements for CSCS cards with regards to asbestos removal contractors:

important information for existing

applying for the green CSO card as the easiest route to gain access to construction sites. This makes it difficult for contractors to use CSCS cards as a reliable method of checking that site workers have the appropriate skills to work on construction sites safely and effectively.

From 1st July 2014 the Construction Site Operative (CSO) green card is no longer available. The information here explains which CSCS cards are available depending on the type of work you carry out and/or the qualifications you have achieved.

More details on CSCS cards can be found at www.cscs.uk.com/cardfinder and for more information about changes to the green card visit www.cscs.uk.com/greencard. If you need any further help or advice regarding CSCS cards do not hesitate to contact ARCA on 01283 566467 and speak to Satish Patel.

CSCSGreen Card Holders

* SQCF for Scottish Qualifications

Page 21: Arca news iss86 autumn14 final

ARCA & ATAC NEWS 21

www.arca.org.uk & www.atac.org.uk

Page 22: Arca news iss86 autumn14 final

ARCA & ATAC NEWS22

1) This guidance note is intended for members engaged in notified, licensable work carried out under the terms of a licence granted by the Health & Safety Executive; it is intended to clarify legal and organisational constraints.

2) All licence holders will already be aware that asbestos licensing is a permissioning regime, one of only a very few that operate in the United Kingdom. The Health and Safety Commission’s (HSC) Policy Statement ‘Our approach to permissioning regimes’ is available from the Health and Safety Executive’s (HSE) website at http://www.hse.gov.uk/enforce/permissioning.pdf. Licensing is an addition to the general framework of health and safety law. It is expected to be relatively resource intensive for both duty holders and the enforcing authorities and it is therefore reserved for situations of particular hazard and public concern, where a high degree of regulatory control is appropriate.

3) Regulation 8 of the Control of Asbestos Regulations 2012 requires an employer to hold a licence, granted by HSE, in order to undertake “licensable work with asbestos” (as defined in regulation 2). It follows that those workers carrying out the work will be employees of that employer.

4) Health and Safety law is most likely to consider a notifying licence holder to be the employer for the following reasons (see links for

references and sources of further information):

a) the licence holder has direct and immediate control over the way the work is done i.e. the work follows a “suitable and sufficient” plan of work, prepared by the licence holders’ senior management prior to notification;

b) the licence holder has the power to select and appoint workers;

c) the licence holder provides equipment for the work;

d) the licence holder controls the time/location of the work.

Genuinely self-employed persons would be working under their own control and direction; in such cases, those individuals would need their own personal licence to undertake the work with asbestos and would notify their work in accordance with standard licence conditions.

5) Tax matters are enforced by HM Revenue and Customs (HMRC) and are not an area HSE is likely to explore. However, HMRC tests of employment status appear to be very similar to those used by HSE when considering duties under health and safety law. The HMRC website can be found here: http://www.hmrc.gov.uk/calcs/esi.htm and the Construction Industry Scheme (CIS) is explained here: http://www.hmrc.gov.uk/cis/intro/whatis-cis.htm. This guidance suggests that anyone working under the control of a licence holder on a notified asbestos job is extremely unlikely to be eligible for CIS as they could not be described as genuinely self-employed. If licence holders have any doubt about the employment status of staff working on licensed jobs, clarification should be sought from HMRC. Breaches of legislation enforced by HMRC may be “reputational issues” relevant when HSE is considering licence action.

on asbestos licensingand employment status

employment news

This guidance is a reissue of a previous ALG memo, which was withdrawn shortly after being issued in 2012 because it overlapped with more general HSE Construction industry guidance being developed at that time. ARCA understands that the ALG memo’s interpretation of employment issues was correct, but re-publication has proved difficult due to strict government guidelines on the role of government agencies in publishing ‘new’ guidance material. This government-wide policy continues to delay the publication of new material and places greater reliance on industry creating and publishing its own guidance. As this is recognised as an important issue for members, ARCA has decided to publish the following as a Guidance Note.

Background

guidanceProvide RPE and other necessary equipment

Employers have a basic duty to provide all necessary safety equipment (PPE and RPE) and ensure face fits etc are carried out and subject to a defined, effective maintenance regime.

If a member of staff has their own RPE and insists on using it, the licence holder will need to carry out their own thorough maintenance and examination tests to ensure that the RPE meets the licence holder’s standards. Given the importance of RPE, it is reasonable for this to be a thorough visual examination by the licence holders’ own competent staff.

Check paperwork is valid, in date and relevant for the proposed role (training certification, medicals, face fits etc).

Fig 1: Checks prior to andduring employment

Page 23: Arca news iss86 autumn14 final

ARCA & ATAC NEWS 23

employment news

6) ALU/HSE seek evidence of effective management control from licence holders. This will mean licence holders need to (a) establish the competency of any staff working under the terms of their licence, (b) have effective arrangements for worker involvement, (c) ensure that all staff are provided with relevant equipment, information, instruction and training and (d) monitor their actual performance on site.

7) Employees on permanent contracts are more likely to have an affinity with the long term interests of an employer. Permanent staff are more likely to be fully aware of company’s expectations and polices/procedures: reliable management control and real worker engagement will be more easily achieved. Effective arrangements for worker consultation and engagement may be difficult to demonstrate where the employer-employee relationship is temporary. Where employers choose to employ staff on temporary contracts, HSE/ALU may seek a high degree of reassurance about company systems for establishing and monitoring competence.

8) Where the use of temporary staff is required, it is strongly advisable to use labour supply organisations who can demonstrate a good working knowledge of the licensed asbestos industry: it is crucial that the labour supplier and licence holder communicate clearly with each other to ensure risks and responsibilities are well defined. Labour supplier and licence

holder will need to work together to enable appropriate competency checks, equipment checks and record keeping are done. The main responsibility for staff is likely to rest with the notifying licence holder but a knowledgeable, well-organised labour supplier should save time and provide a degree of confidence and reassurance via pre-qualification checks and an understanding of licence holders’ TNA and competency requirements. In addition to the comments above (paragraph 5 on HMRC and tax status), legitimate labour supply organisations will work with client licence holders to ensure that operatives are not contracted on a ‘false’ self-employed status.

9) In general terms, the notifying licence holder must:

a) ensure the competence of staff;

b) provide appropriate health and safety equipment, instruction, training and supervision;

c) ensure that the operative is subject to appropriate medical surveillance and that appropriate exposure records are maintained;

d) ensure the operative has been inducted and trained in company procedures and policies;

e) provide a suitable method of work and effective supervision to ensure that general procedures and site specific methods are followed.

f) ALU has been encouraging inspectors at assessment, and during the licence period, to seek evidence (such as invoices) that the applicant is providing training/medicals/RPE for all staff.

10) The Fig 1 above provides further guidance.

Licence holder duties(prior to and during employment)

Employment status and supervisors- additional comments

11) There is no special legal status for the employment status of supervisors, but members should refer to the existing ALG memo on supervision (see below for references). This describes the crucial importance of the supervisor role. The issues of competence and management oversight are particularly significant.

References and sources offurther informationControl of Asbestos Regulations 2012

Health and Safety at Work etc Act 1974

The Safety Representatives and Safety CommitteesRegulations 1977

The Health and Safety (Consultation with Employees) Regulations 1996

The Approved Code of Practice to the Regulations(HSE publication L143)

1. Asbestos Liaison Group web pages(including link to ALG memos) - hse.gov.uk/aboutus/meetings/committees/alg/index.htm

2. HSE web pages on asbestos licensing -hse.gov.uk/asbestos/licensing/index.htm

3. HSE web pages on worker involvement -hse.gov.uk/involvement/index.htm

4. HSE web pages on contracts of employment -http://www.hse.gov.uk/enforce/enforcementguide/investigation/status-contract.htm#p19

5. HMRC web pages on the CIS scheme -http://www.hmrc.gov.uk/cis/intro/whatis-cis.htm

Worker consultation

Worker consultation and involvement means the full participation of the workforce in the management of health and safety. All employers are required to work together with employees to develop, maintain and promote effective measures that ensure health and safety at work. Effective consultation will result in an open and blame-free culture, which positively encourages and uses employees’ input. If licence holders choose to employ staff on a casual or temporary basis this may be more difficult to demonstrate. Enforcing authorities are likely to look for evidence that consultation is working in practice.

Monitor and measure performance All licence holders are expected to have well-defined policies, procedures and arrangements for monitoring and measuring the work of site teams. This will cover the entire range of the licence holder’s work. For example, it will encompass the performance of contracts managers who plan work and oversee site teams. The level of supervision and monitoring will vary greatly depending on the competency of staff. This will be reflected in job planning, resourcing and assignment of supervisors.

Where staff are new to the organisation, senior managers/directors/contracts managers should have very close oversight of the work until the company can be satisfied about basic competencies, compliance with company procedures and the standards of work being achieved on site.

Enforcing authorities are likely to expect to see evidence of such a system and evidence that, in practice, it is working. For example the system will be described in company procedures and policies and there will be records showing how it is working in practice (in site files, personnel files, audit documentation etc).

Establish competenceCompetence does NOT simply mean that the operative/supervisor/manager has a current training certificate. A competent individual has the experience, training and personal characteristics appropriate for the job at hand. Asbestos specific training will have been delivered in accordance with a training needs analysis: this means that the employer will have monitored an individual’s actual performance and identified what training is required. This may be more difficult to demonstrate where the licence holder chooses to employ staff on a casual or temporary basis.

Staff should only be employed in situations appropriate to their experience, skills and training. In practice, new staff (or temporary staff) are likely to require a higher degree of monitoring and supervision in addition to pre-start competency checks. The notifying licence holder will always need to verify competence by on-site performance monitoring (see below).

Page 24: Arca news iss86 autumn14 final

ARCA & ATAC NEWS24

product news

F or over 35 years, Fiberlock Technologies, Inc. has been the leading manufacturer of

products used to address environmental, safety and health hazards in the USA and Canada. Primarily focused on the asbestos abatement industry, Fiberlock has expanded into many other environmental remediation markets including lead abatement, mold remediation and disaster restoration--markets that are served by our diverse portfolio of over 80 products.

For the past 10 years, Fiberlock has increased its overseas footprint into Asia, Australia and Eastern Europe and we are now expanding into the United Kingdom.

The asbestos contracting industry in the United Kingdom is a market that has always been on our radar but we recognised that we needed to make a significant commitment to enter the market if we want to succeed: A commitment in terms of product testing, active industry participation and local product availability. That is why we thoroughly tested our asbestos encapsulants to British Standards and achieved Building Regulations class 0 ratings, joined ARCA as an

associate member, and set up a local distribution warehouse in the UK (located Northeast of London in Romford). We are confident that the asbestos contracting community will benefit from the additional product options that we bring to the table both now and in the future.

Fiberlock is currently offering two core asbestos encapsulant products in the United Kingdom: SerpiCoat is an easy to apply interior/exterior white semi-gloss finish asbestos encapsulant. SerpiMastic is an ultra durable interior/exterior off-white asbestos encapsulant. SerpiMastic is available in either a “sprayable” version or a thicker “trowelable” version. Both SerpiCoat and SerpiMastic have achieved Building Regulations Class 0 ratings. SerpiMastic Sprayable is ideally suited for use as an encapsulant for asbestos cement board on exterior roofs and siding. Asbestos cement board is a common material throughout the UK and SerpiMastic can be applied to extend the life of these materials and limit the release of harmful asbestos fibers. SerpiMastic used to coat asbestos cement roofing is a much less expensive option than removal.

Ultimately, our message to the asbestos contracting community in the United Kingdom is that we want to be a partner for growth. In North America we have been actively involved in many emerging environmental industries. From our beginnings in the asbestos abatement industry over 35 years ago, to lead abatement, mold remediation, crime and trauma scene cleanup, nuclear decommissioning and dust containment. We are constantly expanding our innovative portfolio of solutions and the markets we serve.

We are confident that our unique industry specific products with a proven track record worldwide will play an important role in the UK asbestos contracting market and we look forward to working with many of you in the near future.

Products will be available from leading distributors nationwide by January 2015. For more information please contact Angus Junkin at [email protected] or by phone at 001-978-623-9987 extension 242 (US based phone number).

Available in the UK by January 2015

Leading US encapsulation product achieves Class 0 Building Regs

Page 25: Arca news iss86 autumn14 final

ARCA & ATAC NEWS 25

www.arca.org.uk & www.atac.org.uk

Page 26: Arca news iss86 autumn14 final

ARCA & ATAC NEWS26

Everyone invests a great deal of time and effort in producing ‘paperwork’: how can we make

sure that we get the most benefit out of it? In this article, I take a brief look at the planning process and the paperwork associated with it.

There are legal requirements dictating the provision of written plans and providing ‘suitable and sufficient’ plans is also a condition of any work carried out under the terms of a licence. Licence conditions explicitly demand that plans are followed on site; in other words, the written plan is seen as an important part of management control. Given the amount of effort that goes into generating paperwork, it’s worth questioning whether these documents really work for you and help the way your business works? Do they genuinely help site teams and their managers work safely and efficiently?

Planning is central to any management approach; apart from immediate safety management, it touches on a wide range of issues and potential benefits, such as:

w accurately pricing works;w ensuring efficient methods are chosen;w demonstrating control and professionalism to clientsw demonstrating a sensible site / job assessment;w engaging and involving the workforce;w reviewing the performance of estimators, contracts managers and site teams.

The table below shows the multiple elements associated with planning, and suggests what each element might look like, when done well.

A number of people/roles are likely to be involved with these elements and there should be good communication and feedback between all those using or producing plans.

INITIAL ENQUIRIES, PRICINGTechnical knowledge is clearly very important

in the early stages: accurate estimates need to weigh up the most efficient (and safest) methods and decide what resources will be required for this client in these particular circumstances. In order to make accurate judgements there needs to be a thorough risk assessment, a full consideration of industry standards, legal requirements and the restrictions that might follow from licensing.

Whilst a fully-fledged ‘written’ plan of work might not be finished at this stage, crucial decisions and assessments will have been decided. Does the person in this role have the experience and knowledge to make judgements that could have a

knock on effect for the rest of the project, whether big or small? When it is being done well, enquiries are handled in an accurate, timely and polite way, leading to successful bids. The accuracy of initial scoping makes successful completions more likely, to time and budget and to the highest industry standards.

PLANNING, DURING ANDAFTER WORKThe ALG memo on planning emphasises

the need for written plans to be practical and useful. Most importantly, a plan will help guide the site team in working safely and it sets out what management expects to happen. The ALG memo suggests that a visiting manager (or client representative, HSE or LA inspector, analyst etc.) should be able to measure a site team against the plan. Where a plan is practical and useful, interested visitors would be able to compare the intentions of company managers (as written in the plan) against the reality of what is in front of them on site.

Where plans are useful and genuinely helping site teams, this should be clear during visits and audits. Anyone checking the quality of a plan should clearly recognise that it describes a realistic method for a particular situation and is not cluttered with generic ‘cut and paste’ information and procedures that could apply to every job and every situation. The plan will clearly explain the scope, sequence, and method of working that is expected on this particular site.

There is great scope for demonstrating management control and quality standards through technology. Good use of technology could link photographic (or video) records of key

management update

stages and hold-points, or of a plan’s particular removal and set-up tasks being carried out. Daily checks might be electronically linked to the plan. An electronic planning and site diary system could enable any manager to see what is being done, when and how even remotely. These kinds of approaches to planning could be used to actually show clients the high levels of guidance and control that are being achieved, as standard.

Any of the features mentioned above would also be useful for job reviews. On completion, the plan could help operatives and supervisors give structured feedback about things that worked well (or badly) on a particular project. And in the longer term, patterns and trends could be analysed by comparing the performance of estimators, contracts managers, supervisors and operatives against the work documented by clear plans.

This is a brief overview of the subject. ARCA intends to produce further guidance on the issue in the near future, supported by new workshops and seminars and building on the existing ARCA management, risk assessment and planning training.

In the meantime, ARCA can offer advice on planning and any other aspects of safety management. We can use our collective health and safety, asbestos and management expertise to meet your requirements in a confidential, impartial and professional manner. In terms of planning, this might range from a ‘desk top review’ of a plan of work, advice on particular jobs/problems/sites, or more extensive reviews of planning and general management systems.

For further information [email protected]

at the heart of licensed workPutting plans

Elements associated with planning Measures of ‘success’

1 & 2 ENQUIRY / SITE APPRAISAL:communications are timely, polite, professional.

3 PRICE & RISK ASSESS:estimates and costs are accurate; significant risks have been assessed and addressed.

4 WRITTEN PLAN & NOTIFICATION:notifications are accurate; the plan reflects site reality.

5 DURING WORK:the (followed) plan ensures work is safe and efficient; Supervisors, Contracts Managers and Directors are able to check progress against the plan.

6 ON COMPLETION:a range of feedback, positive and/or negative (e.g. clients, site teams, assessors and Managers, analysts etc.)

7 REVIEW:senior managers collect and use the above to look at overall performance.

Page 27: Arca news iss86 autumn14 final

ARCA & ATAC NEWS 27

management update

Membership of the asbestos industry’s only professional body, the Asbestos Removal

Management Institute (ARMI), is not only based on qualifications, but requires members to demonstrate knowledge and understanding of their roles and responsibilities, and in particular how they provide management and leadership to those they are responsible for managing.

Thorough examination of a candidate’s suitability to join ARMI is assessed via the professional interview. The pilot assessments have now been completed. The 5 pilot assessments were dual assessed by Mike Wilkes and Jim Skilling. 4 of those who attended the pilots were successful in their interview and granted membership of the Institute. In future professional interviews will now be conducted by one assessor. The interview will be recorded should anyone wish to appeal against any decision to grant membership of the institute or not. The interview can then be reviewed by an independent assessor in order to satisfy any appeal process.

The first members of the Asbestos Removal Management Institute (ARMI) are:

Name Membership Grade

Mr Andrew Dart Fellow

Mr Gerrard Maguire Fellow

Mr Scott Murray Fellow

Mr Gareth Sharvin Member

ARMI Amendment toRules of Membership.

The aim of ARMI was always to increase the standards of leadership and management within the asbestos removal industry. The intention was to motivate managers and leaders within the industry to acquire formal qualifications in leadership and management and then demonstrate how they applied the knowledge gained by attending the professional interview. It is apparent that the current membership process is not sufficient to motivate the majority of managers and leaders in the industry to acquire recognised leadership and management qualifications. In order to try and address this the ARMI Rules of Membership have been modified. Applications for membership are now accepted for the Member and Affiliate grade of membership from those applicants who have enrolled on a suitable leadership and management qualification. The application will be accepted subject to proof of enrolment being provided. In order to maintain membership any applicants applying under this rule must be able to demonstrate year on year progress to achieving their qualification and the qualification must be achieved within 3 years

ARCA Offering Institute of Leadership and Management (ILM) Qualifications.

ARCA Members who have attended the ARCA regional meetings over the past year or so will have heard the updates regarding ARMI and

may remember me saying that ARCA had no intentions of offering leadership and management qualifications unless the industry specifically wanted them delivered by ARCA. This was because ARCA felt there were a lot of providers of the Institute of Leadership and Management (ILM) and Chartered Management Institute (CMI) courses and there probably was not sufficient demand for ARCA to provide these qualifications. However it appears that members would be interested in ARCA providing the qualifications for three main reasons.

1) The qualifications can be delivered over 3 years which will give delegates sufficient time to achieve their qualification as many are very busy and spare time is at a premium

2) Delegates can attend the tutorial sessions and learn with their peers which means that the course material can be tailored specifically for leadership and management within the asbestos removal industry

3) Gaining their qualifications by the ARCA route means that by enrolling on the ARCA qualification meets the qualification requirement for ARMI membership.

ARCA are currently in the process of applying for Institute of Leadership and Management (ILM) Centre Approval which will then allow ARCA to deliver ILM qualifications. We are planning to commence delivery of ILM qualifications from January 2015

update

Page 28: Arca news iss86 autumn14 final

the heart of Vilamoura. The pair’s matches were played on the Saturday at Vila Sol Golf Resort. The scenery consists of pine, almond and fig trees, plants, flowers, lakes and streams, which all add to the pleasure and challenge of competing at this championship golf course. The weather was warm and sunny and after a fiercely fought contest the scores at the end of the first day showed the northern team had a distinct advantage going in to day 2, with the score at 8 points to the north and 3 to the south.

The Sunday singles matches were played on

ARCA & ATAC NEWS28

member news

Once again ARCA sent two teams representing the North and South of the

country to Vilamoura, Portugal, to contest the Glen Telford Memorial Trophy. This year the event took place between the 19th and 22nd of September, with the golf played on the 20th and 21st. The two teams were captained by Graham Gardner of Grade 3 Ltd (Northern Team) and Darren Wickins of Keltbray Environmental Services Ltd (Southern Team).

The golfers were once gain based at the Tivoli Marina Hotel located alongside the marina in

Southern Team retain the ARCA European Golf Titlethe Oceanico O’Connor course at Amendoeira takes full advantage of being situated in a fertile valley. Its various water features, both lakes and watercourses, that are spread throughout the entire course, demand accuracy and test all golfers, and the rich topsoil has been skilfully landscaped and planted with mature palm trees, affording a lush, ornamental setting like an extensive oasis. As the day progressed it became obvious that the southern team was beginning to claw back the lead that the northern team had established on the first day. This turned out to be the case, as when the scores were announced the southern team had won by a score of 17 ½ to 14 ½.

Graham Gardner, northern captain, presented the Glen Telford Memorial Trophy to Darren Wickins, southern captain to draw the event to a close. Next year’s event is set to be held once again in Portugal, based in Vilamoura. Early intelligence suggests that the northern team will be captained by Phil Mullins of Aspect Contracts Ltd, and the southern team will be captained by Ross Darsey of Erith Contractors Ltd.

There has been some correspondence recently causing confusion on the matter of licensed

contractor’s requirements and the need for a licence to be obtained by the scaffold contractor where the scaffold framework forms part of any enclosure.

This matter has been raised due to the wording in the recent Approved Code of Practice 143 from December 2013 that states on Regulation/ACOP 16 Paragraph 391:

391 Erecting scaffolding when it is foreseeable that the asbestos may be disturbed, and/or when the scaffold forms part of an enclosure will be licensable work.

This does not mean that all scaffold contractors that erect scaffolding framework require an asbestos licence and HSE’s expectations are unchanged. Industry guidance in Asbestos Liaison Group (ALG) Memo 01/10 remains valid. http://www.hse.gov.uk/aboutus/meetings/committees/alg/memo0110.pdf

A scaffold framework is not part of the enclosure. The enclosure is formed as a means of containing possible airborne fibres by means of fitting polythene sheeting and other means.The above is not what a scaffold framework is intended to do as the containment element is undertaken by the licensed removal contractor and the scaffold handed back to the contractor.

A scaffold contractor would only require an asbestos licence if it was foreseeable that exposure was to take place. An example of this would be during alterations or adaptions within a live enclosure.

The Control of Asbestos Regulations 2012 are very descriptive on the requirement for a licence and these clearly do not include work by a scaffold contractor erecting scaffolding framework where the risk of exposure is not foreseeable.

“Licensable work with asbestos” is work-

(a) where the exposure to asbestos of employees is not sporadic and of low intensity; or

(b) in relation to which the risk assessment cannot clearly demonstrate that the control limit will not be exceeded; or

(c) on asbestos coating; or

(d) on asbestos insulating board or asbestos insulation for which the risk assessment -

(i) demonstrates that the work is not sporadic and of low intensity, or

(ii) cannot clearly demonstrate that the control limit will not be exceeded, or

(iii) demonstrates that the work is not short duration work;

Existing requirements for workplace Risk Assessment and General Asbestos Awareness Training for employees will obviously remain.

Advice forScaffoldingContractors(Asbestos)

Page 29: Arca news iss86 autumn14 final

ARCA & ATAC NEWS 29

www.arca.org.uk & www.atac.org.uk

Page 30: Arca news iss86 autumn14 final

ARCA & ATAC NEWS30

member update

diary dates

association membership updateCompany Name Change:TES Asbestos Ltdbecomes ION Environmental Solutions Ltd – FullQube CMS Ltd becomesQube Construction Management Plc – FullQualsurv Environmental Services Ltd becomes Qualsurv International Ltd – ATACMJW Asbestos Removal Services becomesMJW Asbestos Removal & Re-insulation Services Ltd - Full

New ARCA Members:Addison Green LtdUnit 4 Brookfields Business Park,Clay Lane, Shiptonthorpe, York, YO43 3PUT: 01430 803045W: www.addisongreen.co.uk

Insul-Eight Environmental LtdCanal Yard, Cavendish Street,Ashton-under-Lyne OL6 7QLT: 0161 330 3131W: www.insul-eight.co.uk

WB Asbestos Consultancy Services Ltd (WBACS)WBACS Churchill House,27 Little Marlow Road, Marlow, Bucks SL7 1HAT: 01628 610953W: www.wbasbestos.com

Abbey Contracting LtdUnit 9 Wirrall Park, Glastonbury,Somerset BA6 9XET: 01458 833800W: www.abbeycontracting.co.uk

New ATAC Members:ManesteamUnit 5 New Ford Road Business CentreNew Ford Road, Waltham Cross, Hertfordshire EN8 7PGT: 01992 788417W: www.manestream.co.uk

The following companies are no longer members of the Association:

NAS Laboratories Ltd – ATACEuro Environmental UK Ltd – ATACSafer Space Ltd – ATACNATAS Environmental Ltd – Full non contracting ATAC memberClose Brothers Rail Ltd – FullFibrecheck Ltd – Full

ARCA Regional MeetingsSouth West and Wales Regional Meeting Nov 11th 2014 Almondsbury Hotel, Almondsbury

Midlands Regional Meeting Nov 12th 2014 ARCA Offices, Burton upon Trent

Northern Regional Meeting Nov 13th 2014 Pennine Manor Hotel, Huddersfield

East Anglian Regional Meeting Nov 27th 2014 Holiday Inn Express, Cambridge

Republic of Ireland Regional Meeting Dec 3rd 2014 Citywest Hotel, Dublin

Scottish Regional Meeting Dec 9th 2014 Holiday Inn Express, Glasgow Airport

South East Regional Meeting Dec 11th 2014 ARCA Training Centre, Rayleigh, Essex

Governing Council MeetingsGoverning Council Meeting Nov 18th 2014 ARCA Offices, Burton upon Trent

Governing Council Meeting Dec 16th 2014 The Naval Club, London

Social EventsARCA Greyhound Evening Nov 14th 2014 Romford Greyhound Stadium

ARCA Winter Ball Nov 29th 2014 The Grand Hotel, Brighton

ARCA AGMARCA Annual General Meeting October 3rd 2014 London Zoo Conference Centre

Page 31: Arca news iss86 autumn14 final

ARCA & ATAC NEWS 31

www.arca.org.uk & www.atac.org.uk

ATAC Member Vehicle Stickers

Now AvailableFollowing numerous requests from members we now have a stock of vehicle stickers which can be affixed to your vehicles to indicate that you are members of the association.

The stickers are printed full colour Laminated with XT Satin Laminate protective film on V250 White Gloss Fast Dry Vehicle Vinyl adhesive (8yr Outdoor) and are approximately 300mm x 210mm (see image adjacent).

The stickers are priced at £4.95 + VAT each including postage and packaging.

If you wish to place an order please contactSteve Platkiw – [email protected]

Page 32: Arca news iss86 autumn14 final

ARCA & ATAC NEWS32

2014Training Course DatesCourse Fees Member Non Member Exam

Please call for prices -

Please call for prices -

Course Fees (excl VAT)

Member Non Member Exam

£295.00 £365.00 -

£295.00 £365.00 -

£295.00 £365.00 -

£295.00 £365.00 -

£295.00 £365.00 -

£295.00 £365.00 -

Course Fees (excl VAT)

Member Non Member Exam

£155.00 £175.00 -

£155.00 £175.00 -

£155.00 £175.00 -

£155.00 £175.00 -

£155.00 £175.00 -

£155.00 £175.00 -

£155.00 £175.00 -

£155.00 £175.00 -

Course Fees (excl VAT)

Member Non Member Exam

£195.00 £230.00 -

£195.00 £230.00 -

£195.00 £230.00 -

£195.00 £230.00 -

Course Fees (excl VAT)

Member Non Member Exam

£95.00 - -

£95.00 - -

£95.00 - -

£95.00 - -

training dates

Course Fees (excl VAT)

Member Non Member Exam

£425.00 £475.00 -

£425.00 £475.00 -

£425.00 £475.00 -

£425.00 £475.00 -

£425.00 £475.00 -

£425.00 £475.00 -

£425.00 £475.00 -

Asbestos Awareness DURATION: HALF DAY

Oct Nov Dec

Burton 28

Rayleigh 24 3

Licensed Contractor Management DURATION: 2 DAYS

Oct Nov Dec

Burton

Dublin

Glasgow

Manchester 20

Newport

Rayleigh 10

Licensed Contractor Management Update DURATION: 1 DAY

Oct Nov Dec

Burton 29, 31

Dublin 10

Glasgow

Manchester 22

Newport

Oxford

Pennine Manor 23, 24

Rayleigh 1, 31 12

H&S Management for Senior Managers and Directors DURATION: 1 DAY

Oct Nov Dec

Burton

Manchester

Oxford 10

Rayleigh 8

HSE Asbestos Licensed Scaffolders DURATION: HALF DAY

Oct Nov Dec

Burton

Glasgow

Manchester

Oxford

Course Fees (excl VAT)

Member Non Member Exam

£695.00 - -

£695.00 - -

£695.00 - -

IOSH - Managing Safely in Construction DURATION: 4 DAYS , 1 DAY PER WEEK OVER 4 CONSECUTIVE WEEKS

Oct Nov Dec

Burton

Glasgow

Rayleigh

New Operative DURATION: 3 DAYS

Oct Nov Dec

Burton 13 3, 24

Dublin 11

Glasgow 1522,

Manchester 10

Middlesbrough

Oxford 13

Rayleigh 6, 27 17 1

Page 33: Arca news iss86 autumn14 final

ARCA & ATAC NEWS 33

training dates

Course Fees (excl VAT)

Member Non Member Exam

£155.00 £175.00 -

£155.00 £175.00 -

£155.00 £175.00 -

£155.00 £175.00 -

£155.00 £175.00 -

£155.00 £175.00 -

£155.00 £175.00 -

Course Fees (excl VAT)

Member Non Member Exam

£425.00 £475.00 -

£425.00 £475.00 -

£425.00 £475.00 -

£425.00 £475.00 -

£425.00 £475.00 -

£425.00 £475.00 -

£425.00 £475.00 -

Course Fees (excl VAT)

Member Non Member Exam

£600.00 £700.00

£600.00 £700.00

£600.00 £700.00

£600.00 £700.00

£600.00 £700.00

Includes £50.00

Exam Fee

Includes £50.00

Exam Fee

Includes £50.00

Exam Fee

Includes £50.00

Exam Fee

Includes £50.00

Exam Fee

New Supervisor DURATION: 3 DAYS

Oct Nov Dec

Burton 6

Dublin

Glasgow

Manchester 3

Middlesbrough

Oxford

Rayleigh 13 24

Operative Refresher DURATION: 1 DAY

Oct Nov Dec

Burton 3, 17 6, 28 5

Dublin 10 12

Glasgow 10 6

Manchester 2, 23 6, 14

Middlesbrough 3 3 3

Oxford 10, 24 5

Rayleigh 10, 22, 24, 31 6, 14, 21, 28 5

Course Fees (excl VAT)

Member Non Member Exam

£600.00 £700.00

£600.00 £700.00

£600.00 £700.00

£600.00 £700.00

£600.00 £700.00

Includes £50.00

Exam Fee

Includes £50.00

Exam FeeIncludes £50.00

Exam Fee

Includes £50.00

Exam Fee

Includes £50.00

Exam Fee

ARICS Operatives Assessment DURATION: 2 DAYS

Oct Nov Dec

Burton 6, 13, 20, 22, 27 3, 10, 17, 19, 24 1, 8

Glasgow 6, 27 17, 19 1

Manchester 13, 22 3, 24 8

Oxford 20 10 1, 8

Rayleigh 6, 13, 20, 22, 27 3, 10, 17, 19, 24 1, 8

Supervisor Assessment DURATION: 1 DAY

Oct Nov Dec

Burton 2, 9, 10, 16, 17,24, 29, 31

6, 12, 13, 21, 27 3, 4, 10, 11, 12

Glasgow 8, 9,29, 30

21 3, 4

Manchester 15, 24, 29 10, 26 1, 10

Oxford 1, 2 12, 13 3, 11

Rayleigh 2, 3, 10, 15, 17,20, 30

5, 7, 12, 13,21, 26

3, 4, 10, 11

Course Fees (excl VAT)

Member Non Member Exam

£195.00 £230.00 -

£195.00 £230.00 -

£195.00 £230.00 -

£195.00 £230.00 -

£195.00 £230.00 -

£195.00 £230.00 -

£195.00 £230.00 -

Supervisor Refresher DURATION: 1 DAY

Oct Nov Dec

Burton 16 7, 26, 27 4

Dublin 10 14 11

Glasgow 6 7

Manchester 3 7, 13

Middlesbrough 10, 31

Oxford 9, 23 5 4

Rayleigh 7, 8, 9, 16, 23, 29 7, 13, 20, 27 4

Course Fees (excl VAT)

Member Non Member Exam

£195.00 £250.00 -

£195.00 £250.00 -

£195.00 £250.00 -

£195.00 £250.00 -

Supervisors Update Course for UKCG Sites DURATION: 1 DAY

Oct Nov Dec

Burton 7

Glasgow

Manchester 10

Rayleigh 14

Page 34: Arca news iss86 autumn14 final

ARCA & ATAC NEWS34

training dates

Course Fees (excl VAT)

Member Non Member Exam

£95.00 £125.00 -

£95.00 £125.00 -

£95.00 £125.00 -

£95.00 £125.00 -

£95.00 £125.00 -

Course Fees (excl VAT)

Member Non Member Exam

£720.00 £770.00 £120.00

£720.00 £770.00 £120.00

£720.00 £770.00 £120.00

Course Fees (excl VAT)

Member Non Member Exam

£355.00 £405.00 £30.00

£355.00 £405.00 £30.00

£355.00 £405.00 £30.00

Course Fees (excl VAT)

Member Non Member Exam

£520.00 £570.00 £60.00

£520.00 £570.00 £60.00

£520.00 £570.00 £60.00

Course Fees (excl VAT)

Member Non Member Exam

£295.00 £395.00 £50.00

£295.00 £395.00 £50.00

£295.00 £395.00 £50.00

£295.00 £395.00 £50.00

£295.00 £395.00 £50.00

Course Fees (excl VAT)

Member Non Member Exam

£155.00 £175.00 -

£155.00 £175.00 -

£155.00 £175.00 -

£155.00 £175.00 -

£155.00 £175.00 -

Risk Assessment and Plans of Work DURATION: 1 DAY

Oct Nov Dec

Burton 9 14 5

Glasgow 4

Manchester 16 3

Oxford 20

Rayleigh 17 5 12

RPE Competent Person DURATION: 1 DAY

Oct Nov Dec

Burton 13

Glasgow 20

Manchester

Oxford

Rayleigh 9

RSPH Surveyor DURATION: 3 DAYS

Oct Nov Dec

Burton 8

Glasgow

Rayleigh 24

RSPH Analyst DURATION: 4 DAYS

Oct Nov Dec

Burton 21

Glasgow

Rayleigh 1

RSPH Project Manager DURATION: 2 DAYS

Oct Nov Dec

Burton 18

Glasgow

Rayleigh

RSPH Level 4 Contract Managers Assessment DURATION: 1 DAY

Oct Nov Dec

Burton 2

Glasgow

Manchester 2

Oxford 2

Rayleigh 2

Course Fees (excl VAT)

Member Non Member Exam

£720.00 £770.00 £60.00

£720.00 £770.00 £60.00

RSPH Asbestos Duty Holder DURATION: 4 DAYS

Oct Nov Dec

Burton

Rayleigh 3, 4, 10, 11

Page 35: Arca news iss86 autumn14 final

ARCA & ATAC NEWS 35

arca member list

South East Members

777 Environmental Limited158 Beddington Lane, Croydon, Surrey, CR0 4TE.T: 020 8689 6861W: www.777group.com

AA Woods (Asbestos Abatement)Woods House, River Way, Harlow, Essex, CM20 2DP.T: 01279 444630W: www.aawoods.com

AAR Environmental LimitedUnit 12 Langley Wharf, Railway Terrace, Kings Langley, Hertfordshire, WD4 8JE.T: 01923 260043W: www.aar.co.uk

Abastra Environmental LimitedRhoden Cottage, Lucks Lane, Paddock Wood,Kent, TN12 6PA.T: 01892 838698W: www.abastra.co.uk

ADS Asbestos LtdUnit 9 Britannia Court, Basildon, Essex SS13 1EUT: 01268 725484W: www.adsasbestos.co.uk

Allan Dyson Asbestos Services LimitedCagex House, Leyden Road, Stevenage,Hertfordshire, SG1 2BP.T: 01438 360656W: www.allandyson-asbestos.co.uk

Amstech Contracts LimitedUnit F, Rich Industrial Estate, Avis Way, Newhaven,East Sussex, BN9 0DU.T: 01273 510011W: www.amstechcontracts.co.uk

Arco Environmental Limited15 Rippleside Commercial Estate, Ripple Road, Barking, Ilford, Essex, IG11 0RJ.T: 0208 5922839W: www.arcoenvironmental.com

ARCS Environmental LimitedAlton, Harrow Road, North Benfleet, Wickford,Essex SS12 9JWT: 01268 725477W: www.arcsenvironmental.co.uk

ARG Europe LimitedNew Ford Road, Waltham Cross, Hertfordshire EN8 7PG.T: 0208 804 8008W: www.arggroup.org

Arton Monoseal Limited22 Hampton Grove, Epsom, Surrey KT17 1LAT: 0208 8730344

Asbestech LimitedUnit Q2 Penfold Industrial Estate, Imperial Way, Watford, Hertfordshire WD24 4YYT: 0845 680 0055W: www.asbestech.com

Asbestos FirstHall Wood Business Park, North Dane Way,Chatham, Kent, ME5 8YE.T: 01634 864550W: www.asbestosfirst.co.uk

Asbestoserve LtdUnit 14, Brook Road Industrial Estate, Rayleigh,Essex SS6 7XLT: 01268 772702W: www.asbestoserve.co.uk

Aspect Contracts LtdAspect House, Honywood Road, Basildon,Essex, SS14 3DS.T: 01268 534477W: www.aspectcontracts.co.uk

Brown & Mason LtdAnson House, Schooner Court, Dartford, Kent DA2 6QQ.T: 01322 277731W: www.brownandmason.co.uk

C Wood & Son (Luton) LimitedNewbury House, 1 London Road, Luton,Bedfordshire, LU1 3UE.T: 01582 722119W: www.cwoodandson.co.uk

Calder Insulations LimitedHilltop, High Road, Fobbing, Stanford le Hope,Essex, SS17 9HN.T: 01268 584731W: www.calderinsulations.co.uk

Caswell Environmental Services LimitedCaswell House, Cavendish Road, Stevenage,Hertfordshire, SG1 2ET.T: 01438 312504W: www.caswell-group.co.uk

Clifford Devlin LimitedClifford House, Towcester Road, Bow,London, E3 3ND.T: 0207 5388721W: www.clifford-devlin.co.uk

Cranegates Limited857 London Road, Grays, Essex, RM20 3ATT: 01708 895600W: www.cg-group.co.uk

Dorton Asbestos Removal Services LimitedStation Goods Yard, Station Road, Burgess Hill,West Sussex, RH15 9DGT: 01444 253333W: www.dortongroup.com

Econ Construction LtdEcon House, Old Maidstone Road, Ruxley, Sidcup,Kent, DA14 5AZ.T: 0208 300 2916W: www.econconstruction.co.uk

ECT Environmental LtdUnit 16 Hodgson Court, Hodgson Way,Wickford, Essex SS11 8XRT: 0844 8000 834W: www.ect.uk.com

Edenbeck Ltd,Thames Court, 1 Victoria Street, Windsor,Berkshire, SL4 1YB.T: 0845 073 8602W: www.edenbeck.co.uk

Environmental Asbestos Solutions LtdStation Road, Maldon, Essex, CM9 4LQT: 01621 840068W: www.envasbsol.com

Environmental Safety Partnership LtdUnit 20, Repton Court, Repton Close, Burnt Mills,Basildon, Essex SS13 1LNT: 0800 032 1715W: www.esp1ltd.co.uk

Erith Contractors LimitedErith House, 7 Queen Street, Erith, Kent, DA8 1RP.T: 0870 950 8800W: www.erith.com

Eurolag Group LimitedThe Coach House, Baddow Park, West Hanningfield Road, Chelmsford, Essex, CM2 7SY.T: 01245 478901W: www.eurolag.com

European Asbestos Services LtdInfinet House, 111 Windmill Road, Sunbury-on-Thames, Middlesex TW16 7EFT: 01932 773088W: www.european-asbestos.co.uk

Forest Environmental LimitedUnit 10 - 13 Urban Hive, Theydon Road, Upper Clapton,London, E5 9BQ.T: 0208 880 5050W: www.forestenvironmental.co.uk

Members List

GET YOUR LOGO PLACED WITH YOUR MEMBERSHIP LISTING - CALL LAURA ON 01283 566467

Page 36: Arca news iss86 autumn14 final

ARCA & ATAC NEWS36

arca member list

GTI Environmental Services LtdUnit 56 Horndon Industrial Park, Station Road,West Horndon, Brentwood, Essex CM13 3XLT: 01277 812861W: www.gti.uk.com

H Smith (Engineers) Limited1st Floor Offices, The Manor Gatehouse,Priory Road South, Dartford, Kent, DA1 2BJT: 01689 833581W: www.hsmith.co.uk

Hampshire Environmental Services LtdUnit 1 Withy Park, Dutton Lane,Eastleigh, Hants, SO50 6AB.T: 02380 011761W: www.hesgroup.org.uk

Horizon Environmental LtdOvenden House, Wilcox Close, Aylesham Industrial Estate,Aylesham, Canterbury, Kent, CT3 3EPT: 01304 849235W: www.horizon-uk.com

Inner City EnvironmentalSuite 36, 50 Churchill Square Business Centre, Kings Hill, West Malling, Kent, ME19 4YU.T: 0845 026 2065W: www.innercityenvironmental.co.uk

ION Environmental Solutions Ltd,63 Cutlers Road, South Woodham Ferrers,Essex CM3 5WAT: 01245 205500W: www.careyplc.co.uk

Jackson Environmental LtdKeysoe Road, Thurleigh, Bedfordshire, MK44 2EA.T: 01234 771311W: www.cjacksonandsons.co.uk

Jeto LimitedSouthern Way, Rye Common, Hook Odiham,Hampshire, RG29 1HU.T: 01256 703929W: www.jeto.co.uk

John F Hunt Demolition LimitedEuropa Park, London Road, Grays, Essex RM20 4DBT: 01375 366700W: www.johnfhunt.co.uk

JW Doye (Insulation) LimitedRadius Works, 203 - 211 North Street, Romford,Essex, RM1 4QA.T: 01708 748295W: www.doyes.co.uk

Keltbray Ltd (t/a Keltbray Environmental Solutions)Keltbray House, Burnt Mills Road, Basildon,Essex, SS13 1DTT: 01268 591222W: www.keltbray.com

M H Goldsmith & Sons Ltd21A Station Road, Knebworth, Hertfordshire SG3 6APT: 01438 814565W: www.goldsmithasbestos.co.uk

M Shuttlewood LtdYard A Shannon Square, Thames Industrial Estate,Canvey Island, Essex SS8 0PD.T: 01268 692299W: www.mshuttlewood.co.uk

McGee Group Limited340 - 342 Athlon Road, Wembley, Middlesex, HA0 1BX.T: 0208 9914090W: www.mcgeeasbestos.co.uk

OCS Environmental Services Ltd,4 Tilgate Forest Business Park, Brighton Road, Crawley, West Sussex, RH11 9BP.T: 0844 846 7608W: www.ocsenvironmentalservices.co.uk

Qube Construction Management PlcCanterbury House, Waterside Court, Neptune Way,Rochester, Kent, ME2 4NZT: 0845 468 1267

RDM Environmental SolutionsConcorde House, Caxton Street North,Canning Town, London E16 1JLT: 0203 397 4715

R&F Insulations LtdUnit 5 Hall Road Industrial Estate, Hall Road,Southminster, Essex, CM0 7DA.T: 01621 774800W: www.randf-insulation.co.uk

Reactive Integrated Services LtdUnit 6, Willesborough Industrial Park, Kennington Road,Ashford, Kent TN24 0TD.T: 01233 663300W: www.reactive-services.com

Robyland Limited65 High Road, Wormley, Hertfordshire EN10 6JJ.T: 01992 451767

Romford Insulations LimitedRippleside House, Ripple Road, Barking, Essex IG11 ORJ.T: 0208 591 1207W: www.romfordgroup.com

SL Environmental LtdUnit 16 Blue Chalet Industrial Estate, London Road,West Kingsdown, Kent TN15 6BQ.T: 01474 854465W: www.slcontracts.com

Southern Asbestos Services LimitedRiverside Business Centre, River Lawn Road,Tonbridge, Kent, TN9 1EP.T: 01892 723171W: www.sasbestos.com

Squibb Group Limited62 River Road, Barking, Essex IG11 ODS.T: 0208 5947143W: www.squibbgroup.com

Syd Bishop & Sons (Demolition) LimitedWaldens Depot, Orpington, Kent BR5 4EUT: 01689 820315W: www.sydbishop.co.uk

Trinitas Contracts LtdSuite C, Rear of 17 High Street, Stevenage,Hertfordshire SG1 3BG.T: 01438 727377W: www.trinitascontracts.co.uk

WB Asbestos Consultancy Services Ltd (WBACS)WBACS Churchill House, 27 Little Marlow Road,Marlow, Buckinghamshire SL7 1HAT: 01628 610953W: www.wbasbestos.com

South West & Wales Members Abbey Contracting LtdUnit 9 Wirrall Park, Glastonbury, Somerset BA6 9XET: 01458 833800W: www.abbeycontracting.co.uk

AMS 2000AMS House, 1 Barbican Close, Barnstaple,Devon EX32 9HE.T: 01271 328663W: www.ams-2000.co.uk

Bond Demolition LimitedUnit 15E, Bedwas House Industrial Estate, Bedwas,Caerphilly, Mid Glamorgan CF83 8DW.T: 02920 888788W: www.bonddemolition.co.uk

CES (EU) LtdUnit 5, Park Industrial Estate,Park Road, Risca, Gwent NP11 6PUT: 01633 613882W: www.cityenvironmentalservices.com

Cuddy Environmental LtdTank Farm Road, Llandarcy, Neath, Glamorgan SA10 6EN.T: 01792 321110W: www.cuddy-group.com

Economic Insulations (Portsmouth) LtdWhittle Avenue, Segensworth West, Fareham,Portsmouth, Hampshire PO15 5SHT: 01489 582588W: www.economic-insulation.co.uk

GET YOUR LOGO PLACED WITH YOUR MEMBERSHIP LISTING - CALL LAURA ON 01283 566467

Page 37: Arca news iss86 autumn14 final

ARCA & ATAC NEWS 37

arca member list

Hereford Asbestos Services Ltd,Sigeric Business Park, Holme Lacy Road, Rotherwas, Hereford, HR2 6BQ.T: 01432 270113W: www.herefordasbestos.co.uk

Lawson Environmental LtdStation Yard, Station Road, Shrivenham, Swindon SN6 8JL T: 01793 782000W: www.lawsongroupltd.co.uk

Merryhill Envirotec LimitedMerryhill House, Budds Lane, Romsey,Hampshire SO51 OHAT: 01794 515848W: www.merryhillenvirotec.com

MSS Environmental LtdEdward House, Dowlais Road, Cardiff CF24 5TWT: 02920 432841W: www.themssgroup.co.uk

Phoenix Asbestos Recovery LtdUnits 6/7, Gorseinon Business Park, Gorseinon Road,Gorseinon, Swansea SA4 4DQT: 01792 310460W: www.phoenixasbestos.co.uk

RH Insulation Services LimitedD7, Segensworth Business Centre,Segensworth Road, Fareham, Hants, PO15 5RQT: 01329 840360W: www.rhinsulation.co.uk

Severn Insulation Co Ltd (Newport)Somerton House, South Point, Clos Marion,Cardiff, South Glamorgan, CF10 4LQT: 02920 471040W: www.severninsulation.co.uk

Shield Environmental Services LtdShield House, Caxton Business Park,Crown Way, Warmley, Bristol, Avon BS30 8XJT: 0117 960 6366W: www.shieldenvironmental.co.uk

Solent Environmental Services (Asbestos) LtdUnit 4 Hardley Industrial Estate, Hardley, Southampton, Hampshire SO45 3NQT: 02380 815080W: www.solentenvironmental.co.uk

S Roberts & Son (Bridgewater) LtdCastlefields, The Drove, Bridgwater, Somerset TA6 4AGT: 01278 422521W: www.srobertsandson.co.uk

Swindon Borough CouncilWaterside Park, Darby Close,Cheney Manor Industrial Estate, Swindon SN2 2PNT: 01793 464729W: www.swindoncommercialservices.co.uk

Wring GroupVale Lane, Bedminster, Bristol, Avon BS3 5RUT: 01179 231320W: www.wringgroup.co.uk

Midlands Members AIB Solutions LtdUnit 804, Centre 500, Lowfield Drive,Newcastle-under-Lyme, Staffordshire ST5 0UUT: 01782 613773W: www.aibsolutions.co.uk

All Clear Services LtdStation Street, Wednesbury, West Midlands WS10 8BWT: 0121 5264839W: www.allclearenv.com

Amicus Environmental LtdUnit C1 New Yatt Business Centre,New Yatt, Witney, Oxfordshire OX29 6TJT: 01993 869320W: www.amicus-environmental.co.uk

Amity Insulation Services LtdWindrush House, Lynch Hill, Stanton Harcourt,Oxfordshire OX29 5BBT: 01865 733733W: www.amitygroup.co.uk

Armac Environmental LtdArden Brickworks, Coventry Road, Bickenhill,Solihull, West Midlands, B92 0DYT: 01675 443788W: www.armacgroup.co.uk

Asbestos Abatement ServicesUnit 1 North Street, Walsall, West Midlands, WS2 8AUT: 01922 644712W: www.asbestosonline.co.uk

Asbestrip (Kaefer C & D Division)63 Portland Street, Mansfield Woodhouse,Nottingham, NR19 8BET: 01623 781200W: www.kaefercd.co.uk

Axiom Building Solutions Ltd Unit 6 Four Ashes Enterprise Centre, Latherford Close, Four Ashes, Wolverhampton WV10 7BYT: 01902 703510W www.axiom-asbestos.co.uk

Bloxwich Environmental Services LtdUnit C Field Street, Willenhall, West Midlands, WV13 2NXT: 01902 630099W: www.bloxwichenvironmental.co.uk

Burton Environmental Services LtdUnit 1, Wetmore Lane, Burton upon Trent, Staffordshire, DE14 1RHT: 01283 517374W: www.bes-online.com

Central Environmental Services LtdSuite A1 Imex Business Centre, Flaxley Road, Stechford, Birmingham, West Midlands, B33 9AL.T: 0121 783 4050W: www.centralasbestos.com

City Insulation Contractors LimitedCity House, Pony Road, Horspath Industrial Estate,Oxford, Oxfordshire, OX4 2RDT: 01865 715173W: www.cityins.co.uk

CMEC Demolition LtdGibbons Street, Dunkirk, Nottinghamshire, NG7 2SBT: 0115 942 0600W: www.cmecdemo.com

Colspar Environmental Services LtdUnit 3 Rayleigh Court, Ayr Street,Nottingham, Nottinghamshire, NG7 4GAT: 0115 910 0179W: www.colspar.com

Crystal Environmental Services4 Stanton Court, Merlin Way, Ilkeston, Derbyshire, DE7 4RAT: 0115 9303 147W: www.crystalenvironmental.co.uk

D J Hinton & Co LimitedRoad 2, Hoobrook Industrial Estate, Worcester Road,Kidderminster, DY10 1HYT: 01299 402455W: www.dj-hinton.co.uk

DSM Demolition LtdArden House, Arden Road, Heartlands,West Midlands, B8 1DET: 0121 322 2225W: www.dsmgroup.info

Enviro Call LtdUnit 22, Coleshill Industrial Estate, Station Road, Coleshill, Birmingham, B46 1JPT: 0808 1683 369W: www.envirocall.co.uk

Enviro-Safe Ltd58A Stratford Street North, Birmingham,West Midlands, B11 1BPT: 01217 727774W: www.enviro-safe.co.uk

G.M. Environmental Services LtdUnit 1, Phoenix Court, Finch Close,Lenton Lane Industrial Estate, Nottingham, NG7 2PUT: 0115 974 7028W: www.gmes.co.uk

GET YOUR LOGO PLACED WITH YOUR MEMBERSHIP LISTING - CALL LAURA ON 01283 566467

Page 38: Arca news iss86 autumn14 final

ARCA & ATAC NEWS38

arca member list

H B Insulations (Notts) LtdUnit 3, Falcon Court, Manners Industrial Park,Ilkeston, Derbyshire, DE7 8EFT: 0115 944 0244W: www.hbinsulations.com

ICL Environmental Services LtdFirs Industrial Estate, Kidderminster,Worcestershire, DY11 7QNT: 01562 744655W: www.iclenvironmental.co.uk

Insulation Contracting Services Ltd2 Butchers Court, 1692-1694 High Street, Knowle,Solihull, B93 0LYT: 01564 779204W: www.ics-asbestos.co.uk

Interserve Environmental Services 3rd Floor, Litchurch Plaza, Litchurch Lane,Derbyshire, DE24 8AAT: 01332 663001W: www.interserve.com

J Cullen Thermals Ltd202 Deykin Avenue, Witton, Birmingham,West Midlands, B6 7BHT: 0121 327 5260W: www.jcullenthermals.com

M & D Carpentry & Building Contracts LtdUnit 21 Enfield Industrial Estate, Redditch,Worcester, B97 6BYT: 01527 597783W: www.mdcarpentry.co.uk

M & G Services LtdUnit 2 Pintail Close, Victoria Business Park,Netherfield, Nottinghamshire, NG4 2SG.T: 0115 9613222W: www.mgservicesltd.com

Maylarch Environmental LimitedOakwood, Oakfields Industrial Estate,Oxfordshire, OX29 4THT: 01865 883829W: www.maylarch.co.uk

Midlands Asbestos Solutions LtdUnit 8, Crompton Road, Ilkeston, Derbyshire DE7 4BGT: 0115 9326521W: www.midlandsasbestossolutions.co.uk

MJW Asbestos Removal & Re-Insulation Services LtdUnit 4 Barton Road, Long Eaton,Nottinghamshire, NG10 2FNT: 0115 972 0145W: www.mjw-asbestos.co.uk

O’Reilly Asbestos RemovalSuite 1, 1st Floor, Birch Lane Business Park,Stonnall, Aldridge, WS9 0NFT: 01922 457021W: www.oreillyasbestos.co.uk

Phoenix (Leicester) LtdUnit 16, Marlow Road Ind Estate, Marlow Road,Leicester, LE3 2BQT: 0116 281 6850W: www.phoenix-leicester.co.uk

SWS Environmental Services LtdUnit 9 & 10 Hazel Court, Burma Road,Blidworth, Nottinghamshire, NG21 0RYT: 01623 491764W: www.swsenvironmental.co.uk

TES Environmental Services LtdUnit 6 Griffin Business Park, Walmer Way,Chemsley Wood, Birmingham, B37 7UXT: 0121 2440427W: www.tesenvironmental.co.uk

Wellington Insulation Co LtdUnit B2 Halesfield 21, Telford, Shropshire, TF7 4NXT: 01952 587087W: www.wellingtoninsulation.co.uk

East Anglian Members

Alliance Asbestos Services LtdUnit 1, Downing Park, Station Road,Swaffham Bulbeck, Cambridgeshire, CB25 0NWT: 01223 812987W: www.alliance-asbestos-services.co.uk

Anglian Demolition & Asbestos LtdAnglian Business Centre, West Carr Road,Attleborough, NR17 1ANT: 01953 608050W: www.angliandemo.co.uk

Antec Contracting Services (Anglia) Ltd Unit 24, Ashwellthorpe Ind Est, Ashwellthorpe,Norwich, East Anglia, NR16 1ER.T: 01508 481630W: www.antecasbestos.co.uk

Kershaw Contracting Services LtdEdward Leonard House, Pembroke Avenue,Denny End Road, Waterbeach,Cambridgeshire, CB25 9QRT: 01223 715800W: www.kershaw-grp.co.uk

Northern Members

A Buckler Haulage Ltd24 - 28 Marsh Road, Middlesbrough, TS1 5LB.T: 01642 243399W: www.bucklerdemolition.co.uk

Addison Green LtdUnit 4, Brookfields Business Park, Clay Lane,Shiptonthorpe, York YO43 3PUT: 01430 803045W: www.addisongreen.co.uk

Advanced Asbestos Removal Contractors Ltd7A Paddock Road, Pimbo Industrial Estate,Skelmersdale, Lancashire, WN8 9PLT: 01695 728998W: www.aarcltd.co.uk

Asbestos Business Contractors LtdAlexandra House, Unit D, Parkside Business Park,Golborne, Warrington, WA3 3PYT: 0844 4142121W: www.abc-asbestos.com

Asbestos Clearance & Disposal Services LtdUnit A7, The Dresser Centre, Whitworth Street,Openshaw, Greater Manchester, M11 2NE.T: 0161 2232640W: www.winsulate.co.uk

Asbestos Control & Treatment LtdUnit 14 Lingard Court, Skypark Trading Estate,Liverpool, Merseyside, L24 1YLT: 0845 017 0505W: www.act.uk.net

Bagnall (UK) LtdLexia House, West Yard, Lyncastle Way, Appleton,Warrington WA4 4STT: 01925 214110W: www.bagnalluk.com

Bardon Environmental LtdPresident Park, President Way, Sheffield S4 7URT: 0845 500 8050W: www.bardon-environmental.co.uk

Bilfinger Industrial Services UK LtdAxis House, Tudor Road, Manor Park, Runcorn,Cheshire, WA7 1BDT: 01928 530000W: www.bis-uk.bilfinger.com

BLS Asbestos LimitedUnit 12, A One Business Park, 370 Bradford Road,Bridghouse, West Yorkshire, HD6 4DJT: 01484 400558W: www.bls-group.co.uk

Bradley Demolition LtdKent Street, Preston, PR1 1PET: 01772 280256W: www.bradley-demolition-asbestos.co.uk

GET YOUR LOGO PLACED WITH YOUR MEMBERSHIP LISTING - CALL LAURA ON 01283 566467

Page 39: Arca news iss86 autumn14 final

ARCA & ATAC NEWS 39

arca member list

Chirmarn LtdNewburn Bridge Road, Blaydon, Tyne & Wear NE21 4NT.T: 01914 148000W: www.chirmarn.co.uk

City Scaffolding LtdCity House, 124 Chesterfield Road, Barlborough,Chesterfield S43 4TTT: 01246 813030W: www.cityscaffolding.co.uk

Clarkes Environmental LtdUnit 2, Moxon Court, Thurston Road,Northallerton, DL6 2NGT: 01609 781016W: www.clarkesenvironmental.co.uk

Colt Industrial Services LtdColt Business Park, Witty Street, Hull,Humberside, HU3 4TTT: 01482 214244W: www.colt-cut.co.uk

Connell Bros LtdOrchard House, Orchard Street, Salford,Manchester, Greater Manchester, M6 6FLT: 0161 925 0606W: www.connellbrothers.co.uk

Cordtape Environmental Services LtdFinchwell Close, Handsworth, Sheffield, S13 9DFT: 0114 243 1239W: www.cordtape.co.uk

Countrywide Environmental Services Ltd18 Sinclair Way, Prescot Business ParkPrescot, Merseyside L34 1PBT: 0151 426 2110W: www.countrywide-environmental.co.uk

Crest Environmental LtdAlma Street, St Helens, Merseyside WA9 3ART: 01744 750100W: www.crest-env-asbestos.co.uk

Demolition ServicesDSL House, Wortley Moor Road, Wortley, Leeds,West Yorkshire LS12 4JET: 01132 794286W: www.demolish.co.uk

D Hughes Demolition & Excavation LtdCoteman Heights Farm, Ship Lane, Delph,Oldham OL3 5RWT: 0161 624 3460W: www.dhughesdemolition.co.uk

E4 Environmental LtdUnit 8 Fieldhouse Way, Sheffield, S4 7SFT: 0114 244 7227W: www.e4ltd.co.uk

G O’Brien & Sons LtdCleadon House, Cleadon Lane, East Boldon,Tyne & Wear NE36 0AJT: 0191 537 4332W: www.g-obrien.co.uk

Gentoo Group LtdEmperor House, 2 Emperor Way,Doxton International Business Park, Sunderland SR3 3XRT: 0191 525 5000

Grade 3 LimitedBendel House, Temple Street, Hull,East Yorkshire HU5 1AD.T: 01482 330525W: www.grade3ltd.com

Green Contract Services LtdOld Hall, Brickhouse 2, Congleton Road,Sandbach, Cheshire CW11 4SR.T: 01270 760379W: www.greencs.co.uk

Henderson Site Services LtdUnit 5 Banks Court, Dunne Road, Blaydon,Tyne & Wear, NE21 5NH.T: 0191 414 4242W: www.hendersonsiteservices.co.uk

Hutchinson Asbestos Removal LtdNetherfield Works, Calder Road, Ravensthorpe,Dewsbury, West Yorkshire WF13 3JST: 01924 466443

Insul-Eight Environmental LtdCanal Yard, Cavendish Street, Ashton-under-Lyne OL6 7QLT: 0161 330 3131W: www.insul-eight.co.uk

John Beech LtdDock Road North, Bromborough, Wirrall,Cheshire CH62 4TQT: 0151 645 7571W: www.beech-group.co.uk

J Bryan (Victoria) LtdPickering Road, Halebank Industrial Estate,Widness, Cheshire WA8 8XWT: 0151 4243 229W: www.jbryan.co.uk

J C Asbestos Solutions LtdUnit B1, Newlands House, 60 Chain House Lane,Whitestake, New Longton, Preston PR4 4LGT: 01772 610730W: www.jcasbestos.com

KDC Contractors LtdSharston Green Business Park, 1 Robeson Way,Manchester M22 4SWT: 0161 947 2150W: www.kdc.co.uk

Kirklees Building ServicesFlint Street, Fartown, Huddersfield,West Yorkshire HD1 6LFT: 01484 225400W: www.buildingservices.kirklees.gov.uk

LAR LtdUnit 5 Crossley Park Industrial Estate,Crossley Road, Stockport Cheshire, SK4 5BFT: 01619 479628W: www.larltd.com

McHale Contracts and Plant Environmental LLPSparton Road, South Bradford Trading Estate,Low Moor, Bradford, West Yorkshire BD12 0RYT: 01274 601021W: www.mcp-environmental.com

MGL Demolition LtdDavison House, Rennys Lane,Dragonville Ind Est, County Durham DH1 2RST: 0191 383 9900W: www.mglgroup.co.uk

Northern Insulation Contractors LLPCaroline House, High Street,Stalybridge, Stockport, Cheshire SK15 1SET: 01613 031899W: www.northerninsulation.com

P McGuinness & Co LtdRondin House, Rondin Road, Ardwick,Greater Manchester M12 6BFT: 0161 273 5272W: www.pmcguinness.com

Pyeroy Ltd Kirkstone House, St Omers Road,Gateshead, Tyne & Wear NE11 9EZT: 01914 932600W: www.pyeroy.co.uk

Reddish Vale Insulations LtdVale House, Franklin Street, Oldham OL1 2DPT: 0161 688 6444W: www.reddishvale.co.uk

Rhodar LimitedUnit C Astra Park, Parkside Lane, Leeds,West Yorkshire LS11 5SZT: 0113 2700775W: www.rhodar.co.uk

Rhodes Asbestos Services LtdUnit 23, Ecclesfield 35 Industrial Estate, Station Road,Ecclesfield, Sheffield S35 9YRT: 01142 349240W: www.rhodesasbestos.co.uk

Rilmac Insulation LtdCrofton Drive, Allenby Road Industrial Estate,Lincoln, Lincolnshire LN3 4NJT: 01522 531711W: www.rilmac.co.uk

GET YOUR LOGO PLACED WITH YOUR MEMBERSHIP LISTING - CALL LAURA ON 01283 566467

Page 40: Arca news iss86 autumn14 final

ARCA & ATAC NEWS40

arca member list

Ron Hull Demolition LtdMangham Works, Mangham Road, Parkgate,Rotherham, South Yorkshire S62 6EFT: 01709 524115W: www.ronhulldemolition.co.uk

S Evans & Sons Ltd Ditton Road, Widnes, Cheshire WA8 0PJT: 0151 424 3944W: www.sevansdemolition.co.uk

Thompsons of Prudhoe LtdPrincess Way, Low Prudhoe, Northumberland NE42 6PLT: 01661 832422W: www.thompsonsofprudhoe.com

Thomsons LtdMonk Fryston Park, Betteras Hill, Hillam, Leeds LS25 5PFT: 01977 686100W: www.thomson-group.co.uk

Tradeslink Asbestos Services LimitedPO Box 17, Disley, Stockport, Cheshire SK12 2FJ T: 01663 761901W: www.tradeslinkasbestos.co.uk

UK Environmental & Asbestos Solutions Ltd1 Stanley Street, Liverpool L1 6AAT: 0151 520 2772W: www.uk-eas.co.uk

Weldlag (Preston) Ltd16a Boxer Place, Moss Side, Leyland, Preston PR26 7QLT: 01772 458550W: www.weldlag.co.uk

Scottish Members

ARDS Limited70 Johnstone, Hillington, Glasgow G52 4NZT: 0141 8831151W: www.ardsltd.co.uk

Asbestos Specialists (UK) Ltd36 Moycroft Road, Moycroft Industrial Estate, Elgin,Moray, IV30 1XE.T: 01343 548277W: www.asbe.co.uk

Central Demolition LtdCentral House, Chattan Industrial Estate,Bonnyside Road, Bonnybridge, FK4 2AGT: 01324 815700W: www.centraldemolition.co.uk

Chamic Industrial Services Ltd396 Gorgie Road, Edinburgh, Lothian, EH11 2RNT: 01314 777201W: www.chamicgroup.co.uk

City Building (Glasgow) LLP 350 Darnick Street, Glasgow G21 4BAT: 0141 287 2339W www.citybuildingglasgow.co.uk

Damada Asbestos Removals Ltd5 Wilson Place, Nerston Industrial Estate,East Kilbride, Lanarkshire, G74 4QDT: 01355 271999W: www.damada.co.uk

Dem-Master Demolition LtdPottishaw Place, Whitehill Industrial Estate,Bathgate EH48 2EN.T: 01506 654845W: www.dem-master.co.uk

Enviraz (Scotland) LtdCurran House, 23 Kelvin Avenue, Hillington Park,Glasgow G52 4LTT: 0141 882 8440W: www.enviraz.co.uk

George Hunter (Demolishers) LtdBalmuildy Road, Bishopbriggs, Glasgow, G23 5HET: 0141 762 0800W: www.hunterdemolition.com

GK Contracts (Scotland) Ltd47 Scotts Road, Paisley, Renfrewshire, PA2 7ANT: 0141 530 9484

Masterton LimitedBo’ness Road, Grangemouth, FK3 9XFT: 01324 635553W: www.masterton.uk.com Northern Asbestos Services Ltd4 The Wards, Elgin, Moray, IV30 6AAT: 01343 552650W: www.northernasbestos.co.uk

Reigart Contracts Ltd16 Hornock Road, Coatbridge, Scotland, ML5 2QJT: 01236 431290W: www.reigart.com

Specialist Building & Asbestos Services Ltd2 Canyon Road, Netherton Industrial Estate,Wishaw, Lanarkshire, ML2 0EG.T: 01698 359966W: www.safeasbestosremoval.co.uk

Stork Technical ServicesNorfolk House, Pitmedden Road, Dyce,Aberdeenshire, AB21 0DP.T: 01224 722888W: www.storktechnicalservices.com

Sureclean LtdCromba House, Teaninich Industrial Estate, Alness,Ross-shire, IV17 OPG.T: 01349 884480W: www.sureclean.com

Ireland Members Asbestaway LtdUnit 21, City Link Park, Forge Hill, Co. CorkRepublic of IrelandT: 00353 21 4310100W: www.asbestaway.ie

Harrington Asbestos RemovalUnit 73, Grange Close, Baldoyle Industrial Estate,Baldoyle, Dublin 13, Dublin, Ireland.T: 00353 01 8326292W: www.har.ie

Insulation & Environmental Services LtdUnit 56, Block 503, Greenogue Business Park,Rathcoole, Co. Dublin. Republic of IrelandT: 00353 1401 6118W: www.ieservices.ie

John Tinnelly & Sons LtdCloughoge House, 46 Forkhill Road, Newry,County Down, BT35 8LZ.T: 02830 265331W: www.tinnelly.co.uk

MCE Contract Services LtdUnit 11, Termon Business Park, Milestone Centre,Carrickmore, Co Tyrone, N Ireland, BT79 9ALT: 0288 076 1900W: www.mceservices.co.uk

Safeway EnvironmentalBrandon, Tralee, Co. Kerry, Republic of IrelandT: 00353 66 7138880W: www.safewayenvironmental.ie

Offshore Members

CAC Environmental Services LimitedNew Unit 9, Spring Side, Trinity, Jersey, JE3 5DG.T: 01534 730000W: www.asbestos.je

GET YOUR LOGO PLACED WITH YOUR MEMBERSHIP LISTING - CALL LAURA ON 01283 566467

Page 41: Arca news iss86 autumn14 final

ARCA & ATAC NEWS 41

arca/atac member list

Members ListSouth East Members

ABP Associates LtdUnit 8, Chancery Gate Business Centre,Manor House Avenue, Southampton, SO15 0AET: 02380 528571W: www.abp.uk.com

AC & MS LimitedSuite 1 Enterprise House, Kings Road, Canvey Island, Essex SS8 0QYT: 01268 680136W: www.acandms.co.uk

Adams Environmental LtdUnit 6 Kimpton Link Business Park,40 Kimpton Road, Sutton, Surrey SM3 9QPT: 0208 6416000W: www.adamsenvironmental.co.uk

Airtech Analysis LtdUnit 6 Blenheim Court, Hurricane Way, Wickford,Essex, SS11 8YTT: 01268 562645W: www.airtechanalysis.com

Armstrong York Asbestos Environmental Ltd 64 River Road, Barking, Essex IG11 0DST: 0870 3500375W: www.armstrong-york.com

Asbestos Consultants Europe Ltd,Magnet Road, Grays, Essex, RM20 4DPT: 01375 366777W: www.acepsi.com

ASI Environmental Ltd 6 Testwood Lane, Totton, Southampton,Hampshire, SO40 3AQT: 02380 427750W www.asi-surveys.co.uk

Aspect Contracts Limited (Surveying Division) Aspect House, Honywood Road, Basildon,Essex SS14 3DST: 01268 271385W: www.aspectcontracts.co.uk

Ayerst Environmental Ltd72 Bromley Road, Beckenham, Bromley, Kent BR3 5NPT: 0208 6588050W: www.ayerstenv.com

Bauer Compliance LtdUnit 44 Bowlerscroft, Basildon, Essex SS14 3EDT: 0800 167 0200W: www.bauerc.co.uk

Bureau Veritas (Ilford) Brandon House, 180 Borough High Street,London, SE1 1LBT: 0845 600 1828W: www.bureauveritas.co.uk

Cavendish Laboratories LimitedBush House, 294 Ongar Road, Writtle, Chelmsford,Essex CM1 3NZT: 01245 422800W: www.cavendishlaboratories.com

Clearwater Environmental LtdMercury House, 2nd Floor, 1 Broadwater Road,Welwyn Garden City, Hertfordshire, AL7 3BQT: 01707 294949W: www.clearwater-environmental.com

Core Surveys LtdKnight Court, Bevernbridge, South Chailey,East Sussex BN8 4QFT: 08450 758316W: www.coresurveys.co.uk

ENV Surveys LtdFormula House, 12 Upper Hollingdean Road, Brighton, East Sussex, BN1 7GAT: 01273 506098W: www.envsurveys.com

Envirochem Analytical Laboratories Ltd 12 The Gardens, Broadcut, Fareham,Hampshire PO16 8SST: 01329 287777W: www.envirochem.co.uk

Forest Environmental LtdUnit 10-13 Theydon Road, London E5 9BQT: 0208 880 5050W: www.forestenvironmental.co.uk

Gully Howard Technical LtdUnit 5, St Georges Square, Portsmouth,Hampshire PO1 3EYT: 02392 728040W: www.ghtechnical.com

Life Environmental Services Ltd4 Duckers Wharf, South Street, Bishops Stortford, Hertfordshire CM23 3ART: 01279 503117W: www.lifeenvironmental.co.uk

ManesteamUnit 5 New Ford Road Business Centre, New Ford Road,Waltham Cross, Hertfordshire EN8 7PGT: 01992 788417W: www.manestream.co.uk

Merryhill Asbestos Testing & ConsultingMerryhill House, Budds Lane, Romsey,Hampshire SO51 0HAT: 01794 515848W: www.merryhillenvirotec.com

Redhill Analysts LimitedUnit 1 Dean House Farm, Church Lane, Newdigate,Dorking, Surrey RH5 5DLT: 01306 631820W: www.redhills.co.uk

Riverside Environmental LtdUnit 12 Whiffens Farm, Clement Street, Hextable,Kent BR8 7PQT: 0870 9500161W: www.riversideenvironmental.co.uk

RPS Health Safety & Environment14 Cornhill, London, EC3V 3NDT: 0207 2803200W: www.rpsgroup.com

Spectra Analysis Services LimitedUnit 2 Olympic Business Centre, Paycocke Road, Basildon, Essex SS14 3EXT: 01268 534380W: www.spectra-analysis.co.uk

GET YOUR LOGO PLACED WITH YOUR MEMBERSHIP LISTING - CALL LAURA ON 01283 566467

Non-Contracting Associate Members

Acumen Waste Services LtdAcumen House, Headlands Lane, Knottingley,West Yorkshire WF11 0LAT: 01977 529586W: www.acumenwaste.co.uk

Anglian WindowsUnit 2, 45 Hurricane Way, Norwich, Norfolk, NR6 6JBT: 01603 420537W: www.anglian-windows.com

Derisk (H&S) LLPSilver House, 31 – 35 Beak Street, London W1F 9DPT: 0207 734 6655W: www.deriskuk.com Tradeslink Asbestos Services LimitedPO Box 17, Disley, Stockport, Cheshire, SK12 2FJT: 01663 761901W: www.tradeslinkasbestos.co.uk

Page 42: Arca news iss86 autumn14 final

ARCA & ATAC NEWS42

atac member list

Tersus Consultancy Ltd First Floor Rainham House, Manor Way, Rainham,Essex RM13 8RHT: 01708 555705W: www.tersusgroup.co.uk

WSP Environmental LtdWSP House, 70 Chancery Lane, London WC2A 1AF T: 0207 3145000W: www.wspenvironmental.com

South West & Wales Members ASM Compliance LimitedHorton House, Tank Farm Road, Llandarcy,Swansea, SA10 6ENT: 0844 8560668W: www.asmcompliance.com

First Order Red LtdSantia House, Parc Nantgarw, Cardiff, CF15 7QXT: 0845 8800350W: www.firstorderred.co.uk

REC Asbestos (South) LtdUnit 13, Barn Close, Langage Business Park, Plymouth,Devon PL7 5HQT: 01752 347789W: www.recltd.co.uk

Midlands Members 4 See AsbestosHenge Barn, Pury Hill Business Park, Alderton Road,Towcester, Northamptonshire NN5 6HET: 01327 810628W: www.4seeasbestos.com

ALS EnvironmentalTorrington Avenue, Coventry,Warwickshire, CV4 9GUT: 02476 421213W: www.alsenvironmental.co.uk

BDA Surveying Ltd16 Chapel Street, Oadby, Leicester LE2 5ADT: 0116 271 9179W: www.bdasurveying.co.uk

Birmingham City LaboratoriesPhoenix House, Valepits Road, Garretts Green, Birmingham, West Midlands B33 0TDT: 0121 3039300W: www.bcl-testing.co.uk

Bradley Environmental Consultants Limited 20 Stourbridge Road, Halesowen,West Midlands B63 3UST: 0121 5500224W: www.bradley-enviro.co.uk

Broadland Group LtdDunston Innovation Centre, Dunston Road, Chesterfield, Derbyshire S41 8NGT: 01246 267954W: www.broadland-group.co.uk

Consultants & Specialist Surveyors Ltd Suite 3, Keynes House, Chester Park, Alfreton Road, Derby DE21 4AST: 01332 204074W: www.css-surveys.com

DMW Environmental Safety LtdUnit 4 Calibre Industrial Park, Laches Close, Four Ashes, Wolverhampton, West Midlands WV10 7DZT: 01902 791565W: www.dmwsafety.co.uk

Ensafe ConsultantsThe Forge, Blisworth Hill Farm, Stoke Road,Blisworth, Northampton NN7 3DBT: 01604 878190W: www.ensafe.co.uk

Environmental Essentials LtdUnit 3 Arlington Court, Silverdale Enterprise Park,Cannel Row, Newcastle-under-Lyme, Staffordshire ST5 6SST: 0845 4569953W: www.environmentalessentials.co.uk

Environmental Scientifics Group LtdPO Box 100, Bretby Business Park, Ashby Road,Burton Upon Trent, Staffordshire DE15 0YZT: 01283 554499W: www.esg.co.uk

Monitor Environmental LtdMonitor House, Crompton Road, Ilkeston,Derbyshire DE7 4BGT: 0115 932 7782W: www.monitorenv.com

Oracle Solutions (UK) Ltd16 Trinity Centre, Park Farm Industrial Estate, Wellingborough, Northants NN8 6ZBT: 0844 800 0801W: www.oracleasbestos.com

PKL Consultants LtdUnit 14, Lymedale Business Centre,Lymedale Business Park, Newcastle Under Lyme, Staffordshire, ST5 9QF T: 01782 566252W: www.pklconsultants.co.uk

PTL Occupational Hygiene Consultants Ltd1 Church Walk, Stapleford, Nottingham,Nottinghamshire NG9 8DET: 0115 9397581W: www.ptlhygiene.co.uk

Santia Asbestos Management LtdSantia House, Parc Nantgarw, Cardiff, CF15 7QXT: 02920 852852W: www.santia.co.uk

Shields On-Site ServicesUnit 5 Loomer Road, Chesterton,Newcastle Under Lyme, Staffordshire ST5 7LBT: 01782 576590W: www.shieldon-siteservices.com

East Anglian Members

Thames Laboratories LtdHollow Farm, Hilton Road, Fenstanton,Cambridgeshire PE28 9LJT: 01480 891800W: www.thameslabs.co.uk

Northern Members

Acorn Analytical Services LtdColbeck House, Colbeck Row Business Park, Birstall,West Yorkshire, WF17 9NR.T: 01924 443552.W: www.acorn-as.com

Admas LimitedThe Old Fellowship Hall, 77 Storr Hill, Wyke,Bradford BD12 8PQT: 01274 677111W: www.admas.ltd.uk

Airborne Environmental Consultants Ltd 23 Wheelforge Way, Trafford Park, Manchester,Greater Manchester M17 1EHT: 0161 8727111W: www.aec.uk.net

All Clear Solutions LtdSpen Valley House, Bradford Road,Cleckheaton BD19 5LT T: 01274 861759W: www.allclearsolutions.co.uk

AMS Asbestos Management Services LtdUnit 10, Atley Business Park, Atley Way, Cramlington, Northumberland, NE23 1WPT: 01670 787355W: www.askams.co.uk

Coal Consultants LtdFirst Floor, 3 Phoenix Court, Wakefield Road,Brighouse HD6 1PFT: 0113 3971040W: www.coal-consultants.co.uk

Lucion Environmental LtdUnit 7, Halifax Court, Dunston, Gateshead NE11 9JTT: 0191 4618999W: www.lucion.co.uk

GET YOUR LOGO PLACED WITH YOUR MEMBERSHIP LISTING - CALL LAURA ON 01283 566467

Page 43: Arca news iss86 autumn14 final

ARCA & ATAC NEWS 43

atac member list

McHale Contracts & Plant Environmental LLPSpartan Road, Low Moor, Bradford BD12 0RYT: 01274 601021W: www.mcp-environmental.com

Micron Analytical LtdConcorde House, Bessemer Way, Scunthorpe,North Lincolnshire DN15 8XET: 01724 859984W: www.micronanalytical.co.uk

OHEC (UK) LtdOakhill Court, 171 Bury New Road, Prestwich,Manchester, M25 9NDT: 0161 7733701W: www.ohec.co.uk

OHS Limited1st Floor, Kidd House, Whitehall Road, Leeds,West Yorkshire, LS12 1APT: 01274 735848W: www.ohs.co.uk

Omega Asbestos Consulting LtdUnit 3, Omega Business Village, Thurston Road, Northallerton, North Yorkshire DL6 2NJT: 01609 777987W: www.omega-asbestos.co.uk

PCS Asbestos ConsultantsFirst Floor, 2 Moor Lane, Highburton,Huddersfield HD8 0QST: 01484 604920W: www.pcs-asbestos.co.uk

Pennington Choices LimitedCharter House, Victoria Road, Runcorn, WA7 5SST: 01928 568842W: www.pennington.org.uk

Qualsurv Environmental Solutions LtdMortec Office Park, Suite 5B, York Road, Leeds, LS15 4TA T: 0113 273 4916W: www.qualsurv.co.uk

Richard L Thomas Associates Ltd1st Floor, 120 Ashton Road, Denton,Greater Manchester M34 3JET: 01613 206789W: www.rtasbestos.co.uk

SGS MIS EnvironmentalEden House, Watling Street Industrial EstateLeadgate, Consett, County Durham DH8 6TAT: 01207 500463W: www.mis-environmental.co.uk

WYG Environment Planning Transport LtdArndale Court, Otlet Road, Headingley,West Yorkshire LS6 2UJT: 01132 787111W: www.wyg.com

Scottish Members

ACS Physical Risk Control LtdUnit 14, Claremont Centre, Durham Street, Glasgow, Strathclyde G41 1BST: 01414 275171W: www.acs-env.com

Ethos Environmental LtdUnits 16, Dumbryden Industrial Estate,32 Dumbryden Road, Edinburgh, Midlothian EH14 2ABT: 0131 4535111W: www.ethosenvironmental.co.uk

Ireland Members Occupational Hygiene & Safety ServicesUnit 2, Beat Centre, Stephenstown Estate,Bulbriggan, Co. Dublin ROIT: 00353 1 6905907W: www.ohss.ie

GET YOUR LOGO PLACED WITH YOUR MEMBERSHIP LISTING - CALL LAURA ON 01283 566467

Stand Out from the crowd!Arca News offers Arca and Atac members the facility to include

their company logo to enhance their regular member contact listings. In addition to the logo inclusion, the company name will be highlighted in bold.

Costs for this service will be £25.00 (+vat) for a single issue, or £85.00 (+vat) for four consecutive issues.

All we require is a high resolution (300dpi) company logo in jpeg, tiff or eps format which will fit into a space with proportions of 10mm deep x 20mm wide.

For more information please contact Laura Rankin-Smith on 01283 505775 ext 200 or email [email protected]

Page 44: Arca news iss86 autumn14 final

Showcase your company’s products or services or advertise your situations vacant in the leading

publication for the asbestos management industry. Placing an advert in ARCA News will ensure that your message is targeted at the very audience you are aiming to reach, professionals within the asbestos management industry, or clients looking to source professional products and services.

Only ARCA Members have access to ARCA News advertising opportunities, providing unparalleled exposure for your products, services, or situations vacant.

ARCA News advertising rates are significantly lower than those in many other sector specific publications. In addition to the ARCA News magazines which are posted to our members, subscribers, and all those companies who have attended arca training courses in the last 12 months, the latest issue of ARCA news is available to view online. A link to the current issue of ARCA News is placed prominently on the home page of our new website, giving the publication and your advertisement even greater reach.

A 15% discount is available to those booking advertising space in the next 4 editions of ARCA News. This will be invoiced on a quarterly basis which means that you only pay as and when your advert is published. ARCA News is published quarterly, at the end of March, June, October and December

To book Advertising space please contact Laura Rankin-Smith on 01283 505775 ext 200 or email [email protected]

Still searching for your target audience?(You’re looking at it!)

Inside Front Cover254mm x 180mm (Portrait) £1,100 + VAT

Back Cover254mm x 180mm (Portrait) £1,100 + VAT

Full Page254mm x 180mm (Portrait) £935 + VAT

Half Page124mm x 180mm (Landscape) £550 + VAT

Quarter Page124mm x 87mm (Portrait) £330 + VAT

Situations VacantFull Page254mm x 180mm (Portrait) £660 + VAT

Half Page124mm x 180mm (Landscape) £330 + VAT

Quarter Page124mm x 87mm (Portrait) £165 +VAT

A D V E R T I S I N G R AT E S