Arabell Steam Turbine Nuclear Power Plants Performance Boost
-
Upload
elzimar-freitas -
Category
Documents
-
view
221 -
download
0
Transcript of Arabell Steam Turbine Nuclear Power Plants Performance Boost
-
7/30/2019 Arabell Steam Turbine Nuclear Power Plants Performance Boost
1/12
NUCLEAR PRODUCT SOLUTIONS
ARABELLETM
sTEAM TURBiNEFOR NUCLeaR POweR PLaNT
POWERPOWER
-
7/30/2019 Arabell Steam Turbine Nuclear Power Plants Performance Boost
2/12
The LaRgeSTPORTFOLIO FOR
NUCLeaR POweRSOLUTIONS
geNeRaTORS
ARABELLETMsTEAM TuRBinEs
emeRgeNCy DIeSeLgeNeRaTORS
aUTOmaTIONaND CONTROL
PUmPS
heaT exChaNgeRS
SeRvICeS
25prcnt o t orlds
por productioncpcit dpnds on
alsto tcnolo
52,000plos round torld in 70 countris
100rs o industrldin prtis
Wth ur recne experte all er the
pwer eneratn market, we are able t n
lutn t the challene ta.
CLEAN POWER TODAY!
We recoge the eed to mprove the evro-metal balace o legacy plat whle crea-g adopto o ew clea eergy olto.
PLANT INTEGRATOROr olto maxme perormace byoptmg the complex teracto betweeb-ytem rom deg to operato.
LIFECYCLE MANAGEMENTAt all tage o the lecycle we pport owerto maxme ther retr o vetmet whlemmg egatve evrometal eect.
Altom a global leader power geerato wth a portolo o prodct
coverg all el type. From ol ad boma to clear ad reewable,
cloe to 25% o the world power prodcto capacty deped o
Altom Power techology ad ervce. Whether deg, maactre,
procremet or ervcg, Altom Power ettg the bechmark or
ovatve techologe that provde clea, ecet, fexble ad tegrated
power olto. Altom ca pply aythg rom gle compoet to
complete trkey power plat. Or Plat itegrator approach ad power
atomato ad cotrol olto ere the optmato o all elemet to
derve the maxmm letme vale rom all or ctomer vetmet.
Altom Power ha more tha 100 year o experece egeerg,
procremet ad cotrcto (EPC) o ew power plat. Bt or egeer
are alo expert retrottg, moderg ad ervcg extg plat.
Wth operato 70 cotre, Altom Power cloe to ctomer all over
the world, erg rapd repoe ad ervce excellece at all tme.
wlco toAltm Pwer
-
7/30/2019 Arabell Steam Turbine Nuclear Power Plants Performance Boost
3/12
Altm the N1 uppler nuclear team turbne.
Tod, 30% o ll oprtin nuclr por plnts
in t orld n alsto st turbin nrtor
insid, nd 40% o t us alsto-d quipnt.
Alstom, market leader or nuclear power plantAltom the market leader or clear team trbe ad other key clear power covero eqpmet. Altom ha demotrated t
kll ad leaderhp a a clear power plat eqpmet maactrer ad tegrator throgh a terrpted et o project, both or
ew ad retrotted clear plat.
An advanced technologyAltom clear power covero olto are baed o t ARABELLE team trbe techology platorm. Wth t peror
perormace ad exceptoal relablty ARABELLE team trbe ca accommodate power otpt ragg rom 900 MW to 1,900
MW. The larget trbe operato worldwde or the pat 10 year are ARABELLE team trbe wth a 1,550 MW power otpt
provded wth extremely hgh relablty (99.96%).
An integrated approach or more efciencyAltom ha developed the other key eqpmet o a clear power plat covero ytem co-ordato wth the ARABELLE amly,
yo, a plat ower, ca beet rom a tegrated power covero package. Altom deg, maactre, tall ad mata all
the crtcal power covero eqpmet o a clear trbe lad: team trbe ad trbogeerator, motre eparator-reheater,
codeer ad pmp, low ad hgh prere eedwater heater, ad more.
ARABELLE steam trbePov ad cttg dg tcology
3
-
7/30/2019 Arabell Steam Turbine Nuclear Power Plants Performance Boost
4/124
ARABELLE nt jut a pruct. it a aml cuttn-ee
pruct. Altm nteratn capablte are bult n the l
unatn a ull n-hue pruct rane cern the ke
cmpnent nuclear plant turbne lan. The cu
n the perrmance mprement that can be btane
rm the ARABELLE team turbne thruh ptmal
cmpatblt wth the turbeneratr, the mture eparatn
reheater an the cnener t et mre than jut the um
the ke cmpnent an ultmatel ptme the pwer
cnern rm the nuclear reactr team.
ARABELLE
Key benefts
MoRE MW
A cmpact, pwerful, efciet ad reliable turbie
60% f the pwer cmes frm hihly efciet sile
fow expao
A uique cmbied HP/IP mdule Stadard iterface / ftprit fr 50 Hz & 60 Hz
Based mature 1,550 MW uits
AdAPTEd To ALL REACToR TyPEs
Fully adaptable steam path
Frm 900 MW t 1,900 MW, 50 Hz r 60 Hz
Fr ay backpressure cditis
C-eerati applicatis
LP sizE oPTiMisEd oR ANy siTE CoNdiTioNs
Varius last-stae blade sizes fr each frequecy
(50 Hz ad 60 Hz)
A blade desi that has demstrated its reliability
Tw, three r fur LP mdules fr ptimum vacuum t
WELdEd RoToRs oR RELiABiLiTy ANd sECURE dELivERy
Hih resistace t stress crrsi cracki (SCC)
Excellet reliability, fewer ispectis required
Smaller fris easier t supply ad ispect
dEsigNEd oR EAsE o MAiNTENANCE
Easy access fr maiteace
Easy adjustmet f LPs with idepedet structure
Cmpact arraemet with fewer bladed rws
t or
wit or tn 300,000 oprtin ours ccuultd nd n outstndin
rlibilit rt, ARABELLE the mt aance team turbne technlr ur nuclear pwer plant.
-
7/30/2019 Arabell Steam Turbine Nuclear Power Plants Performance Boost
5/125
turbne-eneratr packae:
Process equipment
alsto s tnsi kno-o in t cn cross ll tps o porplnts, includin nuclr pplictions. alsto nuclr t cnrs rdptbl to n rctor output ll, dlirin iu prornc ndrlibilit, cilittin intnnc.
alsto tilor-d pups or n outstndin rlibilit, fcincnd cost-ctinss. Our tndd pups portolio o products or nuclrpor plnts includs on otrs: circultin tr pups, condnsttrction pups, d-tr pups.
GiGATOP 4-pole trbogeerator
Wth over 30 year developmet ad more tha 1.5 mllo hor
o operato, Altom ha accmlated vat experece wth very
hgh ratg 4-pole trbogeerator or clear power plat.
The Altom GiGATOP 4-pole trbogeerator complemet the
ARABELLE team trbe wth prodct ragg rom 900
to 1,900 MW, eablg hgh otpt wth almot 99% ececy.
Ther deg eatre have bee jdcoly combed to optme
relablty ad acltate mateace.
n just t su o t k coponnts
-
7/30/2019 Arabell Steam Turbine Nuclear Power Plants Performance Boost
6/12
A ovatve actctPreu-eneratn nuclear turbne eature ne uble-fw
hh-preure (HP) clner llwe b ur r x
lw-preure (LP) fw (wth tw r three LP, repectel)r nal expann t the cnener.
The ARABELLE trbe oer a ew archtectre where the
steam rst expads i a sile-w HP path; after misture
eparato ad reheat, t the expad a gle-fow terme-
date-prere (iP) ecto beore gog throgh the or or x
low prere (LP) fow.
This unique ARABELLE architecture makesmaintenance work much easier
it eed oly or team readmo valve et tead o x.Th acltate mateace. i addto, the btterfy valve
are istalled at the level f the HP/IP cylider, accessible frm
a platorm above the MsR, tead o hagg above the
operatg foor rot o each LP cylder.
The LP team admo ppe are etrely below the trbe operatg
foor. Th arragemet help redce mateace drato ad cot,
becae mateace o the LP doe ot reqre daembly o ther
let ppe. Large lay-dow area are th avalable alogde the LP
cylder, rther acltatg mateace.
MSR
HP IP LP 1 LP 2 LP 3
MSR
LP 1 LP 2 LP 3
MSR
MSR
HP 2F
Former cograto
ArabelleTM uqe cograto
ARABELLE pron
6
-
7/30/2019 Arabell Steam Turbine Nuclear Power Plants Performance Boost
7/12
LP-xat
wth depedet trctre
i prevo-geerato trbe, the LP er cag pportedby the LP oter cag, whch tr pported by the trbe
table. Dtorto o the oter cag or load varato o the
table dced by vacm or codeer weght varato drg
operato wll aect the relatve cetrg o the rotatg ad
xed part. Th e become more crtcal wth the very large
exhat trctre that charactere moder clear plat.
The ARABELLE LP cylder are deged wth depedet
trctre. The LP er cag coected at each ed to a
ed-wall, whch tegrate the rotor bearg hog. The LP
oter cag, whch o loger act a a pport, mply become
a evelope rgdly welded to the codeer, whch pportedo the baemet foor. Th mple deg mprovemet provde
may advatage:
The trbe load o the odato greatly redced.
The load o the trbe table ot aected by the vacm
varato or by the orce tramtted by the codeer
(throgh chagg water level).
Th depedet trctre alo make the relatve cetrg o
the movg ad tatoary part eaer, more prece ad more
stable. Very predictable vibrati behaviur is the result.
Welded rotor technologyWelded rotor techology a key Altom team trbe ad ga
trbe ovato, whch ha bee cotoly mproved over
the pat 80 year to erve larger ad larger t.
Compared to a hrk-o dk deg, welded rotor
ecoter redced tre level ad provde better retace
to tre corroo crackg (sCC).
Compared to moobloc rotor, welded rotor eatre maller
orged cylder (whch are the welded together), meag
that orcg ad delvery are eaer ad more ecre.
Dcov wat mak
o ARABELLE q
nd rlibl dsin
7
-
7/30/2019 Arabell Steam Turbine Nuclear Power Plants Performance Boost
8/12
Stage
E
c
ency
Blade Aspect Ratio
1 2 3 4
Blade Aspect Ratio
= Height/Width
Low Tip Leakage losses
Low Endwall losses
l
High Tip Leakage losses
High Endwall losses
Height
Width
Efficiency vs Blade Aspect Ratio
Altm ha leerae er 35 ear experence n nuclear
pwer plant, an mre than 100 ear n team turbne
technl, t eelp an cntnuul mpre t
ecent an relable turbne blae aml.
Hih-efciecygle-fow expao
The mot trkg eatre o the ARABELLE archtectre
t gle-fow team expao eatrg blade wth hgher
apect rato. Th ere hgher ececy de to the redcto
o ecodary loe at the root ad the tp o the team path. The
relt greater trbe perormace, wth a overall ececy
ai f at least 1%. T reduce verall turbie leth, the HP ad
IP expasi sectis have bee ruped it a cmbied HP/iP cylder, mlar to thoe ed ol red applcato. The
cmpact HP/IP mdule ale, with the same ftprit fr bth
1,500 ad 1,800 rpm applcato, ca prodce p to 60% o the
total power delvered by the trbe.
Ecet, relable bladg
All ARABELLE trbe blade eatre three-dmeoal
prole to optme ther aerodyamc perormace.
statoary tage eatre a welded platorm deg or hgh
reliability, especially fr the HP staes, but that als yields better
aerodyamc optmato o the ed-wall codto, redcg
the ecodary loe. Th robt deg perectly adapted to
the large volme fow od today clear power plat.
All rotatg blade, other tha the Lat stage Blade (LsB),
are deged wth tegral hrod to mme loe. They
are maactred a gle pece, .e. o looe part, ad
aembled throgh a orked ad ped root ateg deg:
a extremely robt olto. The ealg rb are machedater aembly or optmm perormace, ad a coto
blade hrod coecto ere cotetly good reqecy
cotrol ad relablty.
The LsB optmed throgh detaled 3D modellg, valdated
mero laboratory tet ad maactred throgh
hgh-preco orgg. A tegral treamled bber or blade
tercoecto ad coto lahg greatly creae tage
tablty. it help avod vbrato, whch ch log blade wth
hgh-apect rato cold otherwe dergo ervce. A crved
etry, r-tree root ateg provde excellet tramo o eort
to the dk, bt alo acltate traportato ad pecto.
Maxmnour por plnt it
8
uniqu dsin
-
7/30/2019 Arabell Steam Turbine Nuclear Power Plants Performance Boost
9/12
A worldwde ootprt
The Altom Power clear be headqartered Levallo ear Par, (Frace). Egeerg cetre pecaled clear
equipmet are t be fud i Levallis (Frace), Bade (Switzerlad), Wuha (Chia), Sait Petersbur, Jit-Veture AAEM (Russia), ad
Chattaooga (usA). Maactrg locato dedcated to clear power techology are Portgal, Polad, Ra, Cha, usA ad Mexco,a well, a Frace. Together wth the pport o local ervce cetre 70 cotre, Altom Power ca delver rapd clear ervce
acro the globe.
Lare team turbne
Cttnoo,USa
elbl,Polnd
wrocl,Polnd
Bbc,grn
Stubl,Portul
Dli,Indi
St. Ptrsbour,Joint-vntur aaemRussi
Podolsk,Russi
Bijin,Cin
wun,Cin
morli,mico
Lllois,Frnc
Blort,Frnc
Bdn,Sitzrlnd
Birr,Sitzrlnd
Nnts,Frnc
9
in ction in nuclr por plnts
-
7/30/2019 Arabell Steam Turbine Nuclear Power Plants Performance Boost
10/12
Altom worldwde experece
Altom ha bee at the orerot o degg ad tallg clear trbe lad or the pat 30 year, wth all kd
o clear reactor. Or logtadg experte rvalled.
LIng Ao PHASE II, ChinA
2 x 1,080 MW turbne eneratr packae
Lin ao 3+4 turbin nrtor pcks or 2,160 mw turbinislnds r ordrd in 2005.Fturin aRaBeLLe tcnolo, t units strtd succssullin 2010 or t unit 3 nd 2011 or t unit 4, d o tscdul nd tirs surd por outpots r irtn t urntd ll.For tis projct, sinifcnt trnsr o tcnolo ndnucturin srin it our lon tr prtnr DeCL sbn iplntd. Lrin on tis solution, srl siilrprojcts r undr construction in cin, suc s honn,Nind, or Fnjisn, on otrs.
FLAMAnVILLE 3, FrAnCe
1,750 MW nuclear turbne lanFlnill 1+2 strtd corcil oprtion in 1985 it to1,350 mw units. T rctors r o t our-loop ar P4tp. Undr nubr o sprt contrcts, alsto dsind,dlird nd rctd t turbonrtors, plus t bulk o tturbin islnd cnicl nd lctricl uiliris, includincondnsrs, dtr rtrs, nd condnst trction ndcircultin tr pups.a por plnt tnsion is no undr construction. It ill includon aRaBeLLe st turbin (unit 3), dlirin 1,750 mwro t n ePR (eolutionr Prssurizd Rctor) roar. wn coissiond tis ill b t ist poroutput in t orld ro sinl turbinnrtor st. alstos dsind, dlird nd rctd t coplt turbin islnd,
includin t condnst trction pups, circultin trpups nd rnc disl nrtor sts.
BALTiC, russiA
2 x 1,200 MW nuclear turbne lan
T alsto-atonros (aaem) Joint-vntur s slctdb Rosto, t Russin drl nuclr nc, to dlir tturbin islnds o t Bltic nuclr por plnt to b con-structd in Klininrd, Russi.Tis is t frst jor contrct on b t Joint-vntur crtdin 2007 b alsto it atonros to suppl t turbinislnds to Russin nuclr por plnts.T plnt ill b bsd on t Russin vveR 1200 prssurisdtr rctor dsin.aaems scop includs t suppl o bot units turbin ll,includin t alsto aRaBeLLe st turbins, nrtorsnd tir ssocitd uiliris, t oistur sprtor rtrs
(mSR), t condnsr nd d-tr tin plnt quipnt.
10
Reerence
-
7/30/2019 Arabell Steam Turbine Nuclear Power Plants Performance Boost
11/12
-
7/30/2019 Arabell Steam Turbine Nuclear Power Plants Performance Boost
12/12
TPW/BPRoB/RBLSTn1
2/eg/THP/05.12/FR/7612ALSToM2012.Allrightsreserved.Ifrmatictaiedithisdcumetisidicatively.nrepresetatirwarratyisgivershuldbereliedthatitiscmpletercrrectrwillapplytayparticularprject.This
wlldependonthetech
ncalandcommercalcrcumtance.
itprovdedwthoutlabltya
ndubjecttochangewthoutnotce.
Reproducton,ueordclo
uretothrdparte,wthoutexprewrttenauthorty,
trctlyprohbted.Phtcredits:2007BryPaulMcCartey|
www.a
teler-mccartney
.com,
Altoma
ndother.
Layoutandrealaton:Ledtonstrat
gque
Altom cotrbte to the protecto o the evromet.Th brochre prted o evrometally-redly paper.
Altom ( Frace )3 avee Adr Malrax92309 Levallo Perret CedexTel: +33 1 41 49 20 00
www.alstom.com