APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II...

38
APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation

Transcript of APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II...

Page 1: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

APWA Project of the Year: Paramount Theater

Restoration

Sandy Pumphrey, PE, CFMProject Engineer II – Flood Mitigation

Page 2: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Today’s Presentation

• History of the Theater• 2008 Flood• Limiting the Damage• Where to start• Setting the Vision• Funding

• The Project– Environmental

Remediation– Repair– Hazard Mitigation– Historical Restoration– Improvements– Other Elements

• Lessons Learned

Page 3: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Today’s Presentation

• History of the Theater• 2008 Flood• Limiting the Damage• Where to start• Setting the Vision• Funding

• The Project– Environmental

Remediation– Repair– Hazard Mitigation– Historical Restoration– Improvements– Other Elements

• Lessons Learned

Page 4: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

History

• Built in 1928 as the Capitol Theater

• Became Paramount in 1929

• Gifted to CR in 1975• Renovation in 1979• Renovation and

addition in 2003

Page 5: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Today’s Presentation

• History of the Theater• 2008 Flood• Limiting the Damage• Where to start• Setting the Vision• Funding

• The Project– Environmental

Remediation– Repair– Hazard Mitigation– Historical Restoration– Improvements– Other Elements

• Lessons Learned

Page 6: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

2008 Flood

11/13/12

Page 7: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

2008 Flood

Page 8: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

2008 Flood

11/13/12

Page 9: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

2008 Flood

Page 10: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

2008 Flood

11/13/12

Page 11: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

2008 Flood

• River at 31.12’ • Previous high 20’• Normal level 5’ – 10’

• Surpassed 500-year FIRM boundary in some areas.• 310 City Owned Buildings Damaged

• City Hall• 10 sq miles affected• 561 blocks affected• 7749 properties evacuated• $16m in damage to the Paramount Theater

11/13/12

Page 12: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Today’s Presentation

• History of the Theater• 2008 Flood• Limiting the Damage• Where to start• Setting the Vision• Funding

• The Project– Environmental

Remediation– Repair– Hazard Mitigation– Historical Restoration– Improvements– Other Elements

• Lessons Learned

Page 13: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Limiting the Damage

• Fighting mold and progressive water damage• Air stabilization

11/13/12

Page 14: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Today’s Presentation

• History of the Theater• 2008 Flood• Limiting the Damage• Where to start• Setting the Vision• Funding

• The Project– Environmental

Remediation– Repair– Hazard Mitigation– Historical Restoration– Improvements– Other Elements

• Lessons Learned

Page 15: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Where to start

• Community dialogue– For– Against

• Many Questions– Funding?– Flood Protection?– Historic Fabric?– Enhancements?

11/13/12

Page 16: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Today’s Presentation

• History of the Theater• 2008 Flood• Limiting the Damage• Where to start• Setting the Vision• Funding

• The Project– Environmental

Remediation– Repair– Hazard Mitigation– Historical Restoration– Improvements– Other Elements

• Lessons Learned

Page 17: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Setting the Vision

• Stakeholder Group• Design Team• Vision Setting Sessions

- Interviews- Historical Research

• Then the funding question

10/23/12

Page 18: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Setting the Vision

• Projects Objectives:• Improve patron experience• Improve seating comfort and accessibility• Improve sound quality• Enhance stage functions for all users• Increase orchestra pit capacity• Restore historic Wurlitzer Organ• Restore to SHPO standards• Relocate dressing rooms/HVAC to upper levels• Restore historic lighting, but with new technology

10/23/12

Page 19: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Today’s Presentation

• History of the Theater• 2008 Flood• Limiting the Damage• Where to start• Setting the Vision• Funding

• The Project– Environmental

Remediation– Repair– Hazard Mitigation– Historical Restoration– Improvements– Other Elements

• Lessons Learned

Page 20: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Funding

• FEMA Repair• FEMA Hazard Mitigation• FEMA Code Compliance• I-Jobs• State Historic Tax Credits• Federal Historic Tax Credits

10/23/12

Page 21: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Funding

10/23/12

Page 22: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Today’s Presentation

• History of the Theater• 2008 Flood• Limiting the Damage• Where to start• Setting the Vision• Funding

• The Project– Environmental

Remediation– Repair– Hazard Mitigation– Historical Restoration– Improvements– Other Elements

• Lessons Learned

Page 23: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Today’s Presentation

• History of the Theater• 2008 Flood• Limiting the Damage• Where to start• Setting the Vision• Funding

• The Project– Environmental

Remediation– Repair– Hazard Mitigation– Historical Restoration– Improvements– Other Elements

• Lessons Learned

Page 24: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Environmental Remediation

• Mold• Lead Paint• Asbestos

Page 25: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Today’s Presentation

• History of the Theater• 2008 Flood• Limiting the Damage• Where to start• Setting the Vision• Funding

• The Project– Environmental

Remediation– Repair– Hazard Mitigation– Historical Restoration– Improvements– Other Elements

• Lessons Learned

Page 26: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Repairs to Damaged Elements

11/13/12

Page 27: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Today’s Presentation

• History of the Theater• 2008 Flood• Limiting the Damage• Where to start• Setting the Vision• Funding

• The Project– Environmental

Remediation– Repair– Hazard Mitigation– Historical Restoration– Improvements– Other Elements

• Lessons Learned

Page 28: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Hazard Mitigation

11/13/12

Page 29: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Today’s Presentation

• History of the Theater• 2008 Flood• Limiting the Damage• Where to start• Setting the Vision• Funding

• The Project– Environmental

Remediation– Repair– Hazard Mitigation– Historical Restoration– Improvements– Other Elements

• Lessons Learned

Page 30: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Historical Restoration

Page 31: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Today’s Presentation

• History of the Theater• 2008 Flood• Limiting the Damage• Where to start• Setting the Vision• Funding

• The Project– Environmental

Remediation– Repair– Hazard Mitigation– Historical Restoration– Improvements– Other Elements

• Lessons Learned

Page 32: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Improvements• Stage Expansion• Backstage Access• Orchestra Pit Expansion• Seating – width and legroom• Audio Visual• Acoustic Enhancements• Electrical• HVAC• Concessions Area• Connection to Orchestra Iowa’s adjacent space• Backstage Amenities

Page 33: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Improvements

Page 34: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Today’s Presentation

• History of the Theater• 2008 Flood• Limiting the Damage• Where to start• Setting the Vision• Funding

• The Project– Environmental

Remediation– Repair– Hazard Mitigation– Historical Restoration– Improvements– Other Elements

• Lessons Learned

Page 35: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Other Elements

• Wurlitzer Organ• Marquee Sign• Tuckpointing

11/13/12

Page 36: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Today’s Presentation

• History of the Theater• 2008 Flood• Limiting the Damage• Where to start• Setting the Vision• Funding

• The Project– Environmental

Remediation– Repair– Hazard Mitigation– Historical Restoration– Improvements– Other Elements

• Lessons Learned

Page 37: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

Lessons Learned

• Stakeholder Group• Set scope first, then secure funding• Explore Historic Tax Credits• Be creative with other funding sources• Get Community Buy-In• Mitigate against future disasters• DREAM BIG!

10/23/12

Page 38: APWA Project of the Year: Paramount Theater Restoration Sandy Pumphrey, PE, CFM Project Engineer II – Flood Mitigation.

THANK YOU.

Sandy Pumphrey319 286 [email protected]