Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment...

19
Agenda Apprenticeship Advisory Committee June 29, 2016 9:30-12:00 PM WSDOT HQ Nisqually Conference Room (1D2) Attendees: Committee Members: Bob Adams, Chris, Christopher (chair), David Myers, Pamp Maiers, Don McLeod, Dean Smith, Josh Swanson, Terry Tilton, Tom Zamzow WSDOT Staff: Craig McDaniel, Mark Gaines, Mike Grigware, Dacia Dunbar Absent: Agenda Items: Topic Time Welcome Introductions Review agenda, Safety Purpose of the Committee o To give advice and feedback to WSDOT o Monitor effectiveness of the program o Networking among the attendees 9:30 AM Chris Craig Program Update Overall WSDOT Apprenticeship/Journeymen Participation Summary for Completed Projects 2014-Current Quarter Apprenticeship Occupation by Trade WSDOT Apprenticeship/Journeymen Participation Summary – Active Projects WSDOT Apprenticeship/Journeymen Participation Summary – Completed Projects Advanced Schedule of Projects 9:40 AM Dacia Guidelines for Non-Compliance 10:00 AM Mike 2016 Legislative Session Recap Looking ahead to 2017 Legislative Session 11:00 AM Chris All Next Meeting Scheduling and Topics 11:50 AM Dacia Adjourn NOON

Transcript of Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment...

Page 1: Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment Spokane Apollo, Inc. 10/03/2013 $15,368,730 $15,614,249 100% 8303 67040 37% 10%

Agenda

Apprenticeship Advisory Committee June 29, 2016

9:30-12:00 PM

WSDOT HQ Nisqually Conference Room (1D2)

Attendees: Committee Members: Bob Adams, Chris, Christopher (chair), David Myers, Pamp Maiers, Don

McLeod, Dean Smith, Josh Swanson, Terry Tilton, Tom Zamzow

WSDOT Staff: Craig McDaniel, Mark Gaines, Mike Grigware, Dacia Dunbar

Absent:

Agenda Items:

Topic Time

Welcome

• Introductions

• Review agenda, Safety

• Purpose of the Committee

o To give advice and feedback to WSDOT

o Monitor effectiveness of the program

o Networking among the attendees

9:30 AM Chris

Craig

Program Update

• Overall WSDOT Apprenticeship/Journeymen Participation Summary for

Completed Projects 2014-Current Quarter

• Apprenticeship Occupation by Trade

• WSDOT Apprenticeship/Journeymen Participation Summary – Active

Projects

• WSDOT Apprenticeship/Journeymen Participation Summary –

Completed Projects

• Advanced Schedule of Projects

9:40 AM Dacia

Guidelines for Non-Compliance 10:00 AM Mike

2016 Legislative Session Recap

• Looking ahead to 2017 Legislative Session

11:00 AM Chris

All

Next Meeting Scheduling and Topics 11:50 AM Dacia

Adjourn NOON

Page 2: Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment Spokane Apollo, Inc. 10/03/2013 $15,368,730 $15,614,249 100% 8303 67040 37% 10%

112

67

27

18

1,099,037

6,348,350

7,447,387

14.8%

Total Journeyman Hours 85.2%

Total Apprenticeship Attainment 2014 - Current

Total Contracted Hours

Total Apprenticeship Hours 14.8%

Number of Contracts that did not meet the requirement 16.1%

Number of Contracts that met the utilization requirement through GFE 24.1%

Number of Contracts that met the requirement through Apprentice Labor Hours 59.8%

Overall WSDOT Apprentice/Journeymen Participation Summary for

Completed Projects 2014 - Current

Total Number of Completed Contracts

0

10

20

30

40

50

60

1

Page 3: Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment Spokane Apollo, Inc. 10/03/2013 $15,368,730 $15,614,249 100% 8303 67040 37% 10%

Apprentice Occupation Total Hours Worked Percent of Total

Laborer 1,018,733 28%Carpenter 819,094 23%Operator 692,050 19%Electrician 361,483 10%Ironworker 316,869 9%Cement Mason 103,816 3%Boilermaker 66,841 2%Painter 61,551 2%Truck Driver 45,119 1%Plumber & Pipefitter 30,126 1%All Other Trades 83,508 2%

Total 3,599,190 100%

Occupation hours are retreived from active and completed contracts, since the program inception,

as captured in the monthly reports submitted by Prime Contractors. Data in this report is current through

April 13, 2016.

For more information, please call the WSDOT Construction Office at (360) 705-7820 or visit

http://www.wsdot.wa.gov/business/construction

28%

23%19%

10%

9%

3%

2%2% 1% 1% 2%

Apprenticeship Occupation By Trade

Laborer

Carpenter

Operator

Electrician

Ironworker

Cement Mason

Boilermaker

Painter

Truck Driver

Plumber & Pipefitter

All Other Trades

2

Page 4: Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment Spokane Apollo, Inc. 10/03/2013 $15,368,730 $15,614,249 100% 8303 67040 37% 10%

Contract

Number

Contract Title City Contractor Name Notice To

Proceed

Bid Amount Amount Paid Complete App Hrs Journey Hrs App %

Female

App %

Minority

Req App % Current

App %

7948 Sr 529, Ebey Slough Br - Replace Bridge Marysville Granite Construction Company 07/02/2010 $21,541,000 $20,523,369 95% 10346 47568 4% 13% 15% 18%

7963 Sr 520, Eastside Transit And Hov Project A Design Bellevue Eastside Corridor Constructors 11/29/2010 $306,278,000 $364,131,001 100% 144411 926197 17% 26% 15% 13%

7998 I-5, Grand Mound To Maytown Stage Two - Replace In Maytown Tri-State Construction, Inc. 12/14/2010 $15,517,832 $16,917,830 100% 9663 50675 28% 19% 15% 16%

7999 Sr 99, Bored Tunnel Alternative - Design Build Pro Seattle Seattle Tunnel Partners 01/06/2011 $1,089,700,002 $1,122,826,087 100% 300526 2725157 17% 36% 15% 10%

8022 I-90 Sullivan Rd To Barker Rd Additional Lanes Add Spokane Acme Concrete Paving, Inc. 12/22/2010 $14,949,578 $16,097,625 100% 7697 63942 30% 6% 15% 11%

8053 I-405, Ne 116th Street Interchange And Street Impr Kirkland Gary Merlino Construction Co., Inc. 03/25/2011 $10,693,961 $13,560,569 100% 8674 64316 1% 42% 15% 12%

8066 Sr 520 / I-5 To Medina - Evergreen Point Floating Seattle Kiewit General Manson Joint Venture 08/31/2011 $586,561,000 $717,760,040 100% 429681 1588016 17% 34% 15% 21%

8127 I-90, Snowshed To Keechelus Dam Phase 1c - Replace Easton Guy F. Atkinson Construction, Llc 08/19/2011 $177,144,343 $143,115,305 81% 45992 305165 16% 21% 15% 13%

8128 Sr 522, Snohomish River Bridge To Us 2 Vic Widenin Monroe Scarsella Bros., Inc. 06/16/2011 $73,138,890 $74,959,715 100% 70546 320298 6% 13% 15% 18%

8140 Sr 9, 212th St Se To 176th St Se Stage 3 Widening Bothell Northwest Construction, Inc. 07/12/2011 $24,297,000 $20,882,201 86% 20844 103880 20% 7% 15% 17%

8153 I-5 / I-205, Ne 134th St Interchange (I-5 / I-205) Vancouver Rotschy, Inc. 07/01/2011 $19,949,910 $20,553,334 100% 7884 45360 13% 28% 15% 15%

8166 Sr 28, E. End Of The George Sellar Br. Construct B Wenatchee Klb Construction Inc. 07/19/2011 $16,363,378 $16,729,188 100% 10573 57827 3% 31% 15% 15%

8204 I-405, Ne 6th St To I-5 Widening And Express Toll Multiple Flatiron Constructors Inc 02/01/2012 $155,500,001 $156,693,588 100% 58533 418189 13% 24% 15% 12%

8229 Us 2, Stevens Pass West Slope Stabilization Skykomish Midwest Rockfall, Inc. 01/20/2012 $5,291,071 $6,244,765 100% 989 25213 0% 50% 15% 4%

8268 Sr 9, 176th St Se Vic To Sr 96 Paving Clearview Cemex Construction Materials Pacific 05/14/2012 $2,508,376 $2,320,156 92% 1885 13279 31% 5% 15% 12%

8286 Us 2, Bickford Ave I/C Safety And Culvert Replacem Snohomish Granite Construction Company 06/11/2012 $14,311,311 $16,390,397 100% 13663 56536 16% 39% 15% 19%

8288 Sr 520, Evans Creek Eastside Wetland Mitigation Redmond Goodfellow Bros Inc 06/11/2012 $3,856,069 $3,043,820 79% 996 3146 41% 72% 15% 24%

8290 Sr 99, Awv S Holgate St To S King St Stage 3 - Atl Seattle Guy F. Atkinson Construction, Llc 06/20/2012 $29,371,123 $29,774,646 100% 26890 103478 38% 41% 15% 21%

8303 Sr 529, Sb Snohomish River Bridge Special Bridge R Everett Pcl Civil Constructors Inc 06/19/2012 $1,711,104 $1,561,150 91% 3094 11932 23% 59% 15% 21%

8310 Sr 285, W End Of George Sellar Bridge Intersection Wenatchee Selland Construction, Inc. 07/09/2012 $9,787,325 $9,841,337 100% 3854 31886 18% 33% 15% 11%

8311 I-5 / I-205, Ne 134th St. Interchange(I-5/I-205) S Vancouver Max J. Kuney Company 07/19/2012 $43,416,929 $42,654,773 98% 31657 128175 10% 14% 15% 20%

8352 I-5, Spokane Street Interchange Vic Special Bridge Seattle Mowat Construction Company 09/04/2012 $2,400,400 $1,947,963 81% 976 6224 15% 87% 15% 14%

8376 Us 101, Shore Rd To Kitchen-Dick Rd Widening Port Angeles Scarsella Bros., Inc. 12/11/2012 $27,069,690 $27,964,688 100% 19006 82599 19% 23% 15% 19%

8378 Cheney-Spokane Road New I/C - New Interchange Spokane Selland Construction, Inc. 12/07/2012 $6,408,375 $6,767,778 100% 3553 19888 15% 1% 15% 15%

8400 Sr 92 / I-90, Intersection Improvements & Regionwi Multiple Graham-Marshbank Jv 04/16/2013 $7,131,691 $7,151,072 100% 4696 31761 20% 22% 15% 13%

8414 I-5, Seattle Area Bridges Phase 1 Deck Rehab And E Seattle Mowat Construction Company 04/15/2013 $3,950,269 $3,904,622 99% 839 3927 3% 77% 15% 18%

8439 Sr 104 To 52nd/220th Sw Paving I-5/220th St Sw I/C Mountlake Granite Construction Company 04/22/2013 $3,624,239 $3,172,608 88% 1811 9304 6% 9% 15% 16%

8473 I-5, Mellen Street To Blakeslee Junction - Stage 2 Chehalis Scarsella Bros., Inc. 07/16/2013 $48,221,444 $41,271,965 86% 25757 131254 22% 34% 15% 16%

8496 Us 395, Nsc - Bnsf Railway Structures/Realignment Spokane Apollo, Inc. 10/03/2013 $15,368,730 $15,614,249 100% 8303 67040 37% 10% 15% 11%

8501 I-5, Sr 510 To Sr 512 Congestion Management Lakewood Granite Construction Company 08/05/2013 $9,823,888 $10,932,373 100% 8559 44295 49% 46% 15% 16%

8513 Sr 167, Puyallup River Bridge - Bridge Replacement Tacoma Guy F. Atkinson Construction, Llc 10/18/2013 $23,220,888 $24,602,478 100% 8425 45918 32% 28% 15% 16%

8514 Northwest Region Traffic Management Center Project Shoreline Pcl Construction Services, Inc. 11/22/2013 $8,934,000 $10,428,052 100% 6099 30778 8% 28% 15% 17%

8549 Sr 99, Alaskan Way Viaduct - Replacement North Acc Seattle Guy F. Atkinson Construction, Llc 01/24/2014 $41,640,623 $43,792,269 100% 25231 114461 8% 57% 15% 18%

8550 Sr 305, Bainbridge Ferry Terminal - Main Terminal Bainbridge Phc Asani Inc Dba Phc Construction 12/18/2013 $1,940,274 $2,084,447 100% 3115 11125 0% 34% 15% 22%

8559 I-5, S 272nd St Vic To S Rose St Seismic Retrofit Tukwila Quigg Bros. Inc. 01/23/2014 $8,504,188 $7,322,996 86% 7737 41653 0% 23% 15% 16%

8560 Sr 9, 32nd St Se & 84th St Ne - Safety Improvement Lake Stevens Rodarte Construction, Inc. 03/18/2014 $5,699,005 $5,632,233 99% 3895 20780 0% 46% 15% 16%

8565 I-5, Sr 18 I/C To S 288th St Seismic Retrofit Federal Way Ceccanti Inc 01/15/2014 $4,644,837 $3,988,792 86% 3086 8797 16% 29% 15% 26%

8569 I-90, Two-Way Transit & Hov Operations Stage 3a - Seattle Mid-Mountain Contractors, Inc. 04/01/2014 $7,399,235 $7,259,619 98% 3848 22486 33% 49% 15% 15%

8572 Sr 6, Rock Creek Bridges - Replace Bridges 6/102 & Pe Ell Scarsella Bros., Inc. 02/25/2014 $11,612,612 $11,140,525 96% 9110 36994 1% 32% 15% 20%

8573 Sr 502, I-5 To Battle Ground Add Lanes Stage 2 Vancouver Rotschy, Inc. 04/09/2014 $27,544,360 $23,178,831 84% 10487 53200 4% 11% 15% 16%

8583 Sr 164 & Sr 410, High Point St To Sr 410 Watson St Enumclaw Icon Materials,A Division Of Cpm Corp. 04/09/2014 $2,139,175 $1,979,145 93% 1483 8788 0% 68% 15% 14%

8594 I-5, Nooksack River Bridges Painting Bellingham Dunkin & Bush Inc 04/30/2014 $3,389,833 $3,306,652 98% 3626 25369 0% 62% 15% 13%

8597 Sr 520, 108th Ave Ne To W Lk Sammamish Pkwy Paving Bellevue Granite Construction Company 05/05/2014 $2,975,187 $2,661,977 89% 1455 6528 16% 62% 15% 18%

8601 I-405, Sb Se 8th St To Northup Way Vic - Paving Bellevue C.A. Carey Corporation 05/19/2014 $3,787,598 $3,898,007 100% 0% 0% 15% 0%

8602 Sr 16, Tacoma Narrows Bridge Replace Maintenance T Tacoma Pcl Civil Constructors Inc 07/21/2014 $7,365,713 $7,817,380 100% 9169 17146 32% 22% 15% 35%

8605 Us 2, Stevens Pass East Paving Chelan Central Washington Asphalt, Inc. 05/27/2014 $4,045,000 $4,275,906 100% 1166 6017 48% 2% 15% 16%

8607 I-5, M St To Portland Ave - Hov Tacoma Max J. Kuney Company 07/01/2014 $98,175,444 $58,804,008 60% 16757 85956 10% 11% 15% 16%

8617 Sr 530, Slide - Roadway Clearing Darrington Imco General Construction, Inc. 05/02/2014 $4,959,924 $2,681,196 54% 633 0% 0% 15% 0%

8623 Sr 532, Davis Slough Bridge Replacement Widening F Stanwood Scarsella Bros., Inc. 07/07/2014 $11,718,295 $9,672,093 83% 8545 27349 5% 30% 15% 24%

8625 Sr 520, Montlake To Evergreen Pt. Bridge West Appr Seattle Flatiron West Inc 08/20/2014 $199,537,371 $101,220,946 51% 35652 167761 29% 28% 15% 18%

WSDOT Apprentice/Journeymen Participation Summary - Active Projects

3

Page 5: Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment Spokane Apollo, Inc. 10/03/2013 $15,368,730 $15,614,249 100% 8303 67040 37% 10%

8630 Sr 530, Skaglund Hill Vic To C-Post Road Vic - Eme Oso Guy F. Atkinson Construction, Llc 06/03/2014 $20,570,001 $21,893,712 100% 3895 35012 22% 2% 15% 10%

8633 I-5, Ne 117th St To Sr 104 Pavement Repair And Its Shoreline Granite Construction Company 07/17/2014 $9,287,455 $10,266,858 100% 9716 43477 25% 50% 15% 18%

8657 I-90, Lake Washington Floating Bridges Anchor Cabl Seattle Orion Marine Con (Nw Marine Cns To 09/26/2014 $2,380,744 $2,707,840 100% 2003 6575 19% 50% 15% 23%

8662 Two-Way Transit & Hov Operations Stage 3 Seattle Imco General Construction, Inc. 12/03/2014 $120,105,661 $59,862,035 50% 29289 89191 14% 13% 15% 25%

8664 I-205, Mill Plain Interchange To Ne 18th St Build Vancouver Cascade Bridge, Llc 10/22/2014 $24,309,057 $18,357,752 76% 10418 46664 10% 22% 15% 18%

8665 Sr 167 / 8th St E Vic To S 277th St Vic - Southbou Federal Way Guy F. Atkinson Construction, Llc 12/30/2014 $53,999,888 $33,928,319 63% 12798 70178 27% 33% 15% 15%

8670 I-5, Portland Avenue To Port Of Tacoma Road - Nort Tacoma Hamilton Construction Co 12/22/2014 $134,709,930 $64,714,138 48% 20998 136098 6% 71% 15% 13%

8676 Sr 203, Coe-Clemons Creek Ced Duvall Pcl Civil Constructors Inc 02/10/2015 $1,772,452 $1,584,283 89% 1438 6001 29% 34% 15% 19%

8677 Sr 104, Hood Canal Bridge - Anchor Cable Replaceme Paulsbo Manson Construction/Engineering Co. 12/17/2014 $7,324,203 $8,021,411 100% 6231 28769 0% 29% 15% 18%

8685 Sr 162, Puyallup River Bridge - Bridge Replacement Puyallup Selby Bridge Company, Inc. 01/05/2015 $5,482,395 $5,347,453 98% 3051 9403 0% 2% 15% 24%

8689 I-5, Sb Mount Vernon To Joe Leary Slough - Paving Burlington Cemex Construction Materials Pacific 01/28/2015 $2,381,922 $2,233,605 94% 1331 6563 32% 25% 15% 17%

8703 I-90, Columbia River Vantage Bridge - Painting Ellensburg Abhe & Svoboda, Inc. 03/23/2015 $6,711,770 $3,979,310 59% 648 6397 0% 0% 15% 9%

8706 M V Chelan Dockside Preservation Ferries Lake Union Drydock Company 03/19/2015 $4,021,872 $4,249,854 100% 856 26863 0% 0% 15% 3%

8709 S Of Wm E Sutton Rd To Silverdale Way Silverdale Lakeside Industries 03/06/2015 $2,193,177 $2,332,537 100% 1455 6377 6% 28% 15% 19%

8711 Sr 17, 26, 28, 207 & 281 Ncr Seal 2015 Multiple Central Washington Asphalt, Inc. 03/16/2015 $3,573,056 $3,578,959 100% 2220 9873 11% 22% 15% 18%

8715 I-90, Keechelus Dam To Stampede Pass Phase 2a- Add Kyak Guy F. Atkinson Construction, Llc 05/07/2015 $72,777,532 $19,023,888 26% 5496 31025 26% 22% 15% 15%

8723 Us 101, Hoquiam River -Simpson Ave Bridge-Bridge Hoquiam Hercules Painting Company, Inc. 04/28/2015 $4,410,156 $4,577,191 100% 4529 19229 0% 67% 15% 19%

8727 Sr 99, George Washington Memorial Bridge - Paintin Seattle Hercules Painting Company, Inc. 06/08/2015 $15,869,269 $4,684,814 30% 897 4412 0% 64% 15% 17%

8728 Us 2, Et Al, 2015 Eastern Region Chip Seal Multiple Central Washington Asphalt, Inc. 04/24/2015 $6,984,888 $6,638,260 95% 3206 13105 7% 33% 15% 20%

8736 Sr 20 Spur, Anacortes Ferry Terminal Tie-Ups Slips Anacortes Orion Marine Con (Nw Marine Cns To 05/11/2015 $3,436,409 $3,356,060 98% 2231 3409 43% 45% 15% 40%

8737 Us 101, S Of Mansfield Rd To W Of Shore Rd - Pavin Forks Lakeside Industries 05/12/2015 $3,084,409 $3,081,301 100% 1171 6363 9% 21% 15% 16%

8738 Sr 290, Sullivan Rd To Idaho State Line - Paving Spokane Poe Asphalt Paving, Inc. 05/12/2015 $3,700,981 $3,729,935 100% 3198 11472 14% 22% 15% 22%

8739 Sr 164, Hemlock St To Se 408th St Paving And Ada C Auburn Icon Materials,A Division Of Cpm Corp. 05/22/2015 $2,789,761 $2,415,938 87% 1571 8817 0% 43% 15% 15%

8740 I-90, Oaks Ave I/C To Peoh Rd Bridge Vic Wb - Rep Cle Elum Mid-Mountain Contractors, Inc. 05/22/2015 $10,632,684 $4,502,924 42% 1968 12371 32% 11% 15% 14%

8742 Sr 507, Old Hwy 99 To E Of Water St - Paving Yelm Granite Construction Company 05/15/2015 $2,512,023 $2,413,564 96% 1563 7386 18% 29% 15% 17%

8753 Sr 542, Anderson Creek Culvert Bellingham Granite Construction Company 06/04/2015 $4,728,673 $4,736,004 100% 1393 5315 0% 46% 15% 21%

8756 Us 101, N Of Salmon Creek Bridge - Stabilize Slope Cosmopolis Rognlins, Inc. 06/02/2015 $3,699,355 $3,769,296 100% 1639 7787 0% 83% 15% 17%

8757 Us 195, Excelsior Rd To Jct I-90 Sb Lanes - Pccp R Spokane Wm. Winkler Company 06/10/2015 $4,798,212 $4,605,745 96% 2102 13136 0% 5% 15% 14%

8760 Sr 3, Belfair Area - Widening & Safety Widening & Belfair Ceccanti Inc 06/16/2015 $10,255,073 $2,532,018 25% 1625 5638 48% 0% 15% 22%

8766 Sr 14, 6th St To Bingen - Chip Seal Multiple Granite Construction Company 06/16/2015 $3,988,988 $4,143,971 100% 1200 13297 0% 80% 15% 8%

8768 I-90 Easton Hill Vic To Kachess River Bridge Eastb Yakima Granite Construction Company 07/21/2015 $4,187,187 $2,631,603 63% 759 1866 41% 82% 15% 29%

8773 I-5, Union, Steamboat, & Ebey Slough Bridge Specia Marysville Pcl Civil Constructors Inc 07/02/2015 $3,656,924 $1,278,795 35% 83 1940 0% 66% 15% 4%

8775 Sr 503/Sr 500, Orchards To Battle Ground - Grind & Battleground Granite Construction Company 06/23/2015 $4,404,404 $4,432,785 100% 2408 13593 28% 33% 15% 15%

8795 Sr532, Davis Slough Bridge Replacement Dugualla Ba Camano Is. Trimaxx Construction 08/19/2015 $4,209,170 $79,200 2% 0 101 0% 0% 15% 0%

8808 Sr 9 Et Al Mt Baker Area Bst 2016 Multiple Doolittle Construction Llc 11/17/2015 $3,486,784 $0 0% N/A N/A 0% 0% 15% 0%

8812 Sr224 & Sr225, Benton City- Construct Intersection Tri-Cities Rotschy, Inc. 12/02/2015 $2,517,478 $653,578 26% 0% 0% 15% 0%

8816 I-5, Sb S 320th St To Duwamish River Br- Concrete Tukwila Mid-Mountain Contractors, Inc. 01/11/2016 $20,471,129 $0 0% 0 0% 0% 15% 0%

8822 Sr 900 Tukwila Ncl To Sr 167 Concrete Pavement Reh Tukwila Mid-Mountain Contractors, Inc. 01/11/2016 $2,367,709 $0 0% N/A N/A 0% 0% 15% 0%

8841 Us 12 Et Al, 2016 Scr Region Wide Chip Seal Chip S Multiple Central Washington Asphalt, Inc. 03/10/2016 $5,093,000 $0 0% N/A N/A 0% 0% 15% 0%

1,584,803 8,925,336

Number of Active Contracts: 89

Apprentice Hours: 1,584,803

Journeyman Hours: 8,925,336

Total Contract Hours: 10,510,139

Percent of Hours performed by Apprentices on all active projects: 15.1%

For more information, please call the WSDOT Construction Office at (360) 705-7820 or visit

http://www.wsdot.wa.gov/business/construction

4

Page 6: Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment Spokane Apollo, Inc. 10/03/2013 $15,368,730 $15,614,249 100% 8303 67040 37% 10%

Contract

Number

Contract Title Contractor Name Complete

Date

Bid Amount Apprentice

Hours

Journeyman

Hours

Total Hours

Performed on

the Contract

Required

Apprentice %

Apprentice %

Attained

GFE

Submitted

GFE

Approved

8333 Pt Townsend Transfer Span Replace Transfer Span Re American Construction Co., Inc. Jan-14 $3,068,815 844 6465 7309 15% 12% YES NO

7610 Us 395, Nsc - Us 2 Lowering Graham Construction & Jan-14 $42,849,074 30180 217553 247733 12% 12% NO N/A

8232 Us 97a, 0.5 Mile So. Of Rocky Reach Dam Slope Stab Janod, Inc. Jan-14 $3,110,681 780 13848 14628 15% 5% YES YES

7857 Us 2, Stevens Pass Summit- Pedestrian Safety Tri-State Construction, Inc. Jan-14 $1,785,325 3460 13803 17263 15% 20% NO N/A

8289 Babbit Road To Colfax Paving Central Washington Asphalt, Inc. Feb-14 $1,961,182 514 5408 5922 15% 9% YES YES

8060 Sr 530, Skaglund Hill Slide - Permanent Repair Vetch Construction Inc. Feb-14 $3,297,816 2172 14491 16663 15% 13% YES NO

8240 Sr 410, Nile Valley Landslide - Re-Construct Route Apollo, Inc. Mar-14 $4,083,066 1570 6568 8138 15% 19% NO N/A

8362 Us 2 Et Al, Statewide Durable Striping Re-Advertis Specialized Pavement Marking Mar-14 $1,874,251 116 5084 5200 15% 2% YES NO

8427 Us 97, W Wapato Rd To Lateral A - Paving & Replace Columbia Asphalt & Gravel, Inc. Mar-14 $3,019,525 672 5098 5770 15% 12% YES YES

7431 Sr522, U/W Bothell Cascadia South Access Mowat Construction Company Mar-14 $36,650,726 19064 159917 178981 10% 11% NO N/A

7874 I-5, Blaine Exit Interchange Improvements Interwest Construction Inc Mar-14 $2,765,789 2357 20974 23331 15% 10% YES YES

7859 Sr 11, I-5 Interchange - Josh Wilson Rd Rebuild In Interwest Construction Inc Apr-14 $4,794,882 3467 19350 22817 15% 15% NO N/A

7866 Sr 410/ 214th Ave E To 234th Ave E- Widening J. R. Hayes & Sons, Inc. Apr-14 $6,783,945 6353 42778 49131 15% 13% YES YES

8483 Us 2 Et Al, 2013 Statewide Durable Striping Apply-A-Line, Inc. Apr-14 $2,427,630 1614 7072 8686 15% 19% NO N/A

8239 I-5, Samish Way And Northwest Ave To Birch Bay Lyn Valley Electric Co. Of Mt Vernon Apr-14 $5,343,783 4217 22771 26988 15% 16% NO N/A

7916 Us 2 Safety Improvements Vetch Construction Inc. Apr-14 $2,932,708 2662 11612 14274 15% 19% NO N/A

8399 Us12 To Valley Mall Vic Paving Columbia Asphalt & Gravel, Inc. Apr-14 $2,671,717 788 6055 6843 15% 12% YES YES

8455 Sr512 Jct I-5 To Ne Of 104th Paving Tucci & Sons, Inc. May-14 $2,779,290 3642 9403 13045 15% 28% NO N/A

8449 Us 12 Et Al, 2013 Scr Region-Wide Chip Seal Granite Construction Company May-14 $5,644,683 2195 13726 15921 15% 14% YES YES

8491 I-5, M St To Portland Ave Vault Removal Mid-Mountain Contractors, Inc. May-14 $1,693,757 479 1808 2287 15% 21% NO N/A

7971 I-90, Lake Easton Vic To Big Creek Br Vic Eb - Rep Icon Materials,A Division Of Cpm May-14 $14,807,103 3417 76080 79497 15% 4% YES NO

8462 I-205 / I-5, Sr 14 To I-5 Merge Concrete Rehabilit Penhall Company Jun-14 $2,240,474 1436 8117 9553 15% 15% NO N/A

7726 I-405, Ne 8th St To Sr 520 Braided Ramps- Intercha Guy F. Atkinson Construction, Llc Jun-14 $107,500,000 45777 248974 294751 15% 16% NO N/A

7903 I-5, Blakeslee Junction Rr Xing To Grand Mound I/C Tri-State Construction, Inc. Jun-14 $19,730,515 18502 99525 118027 15% 16% NO N/A

8393 Concrete Pavement Rehabilitation Guy F. Atkinson Construction, Llc Jul-14 $7,277,888 905 19242 20147 15% 4% YES YES

8314 I-5, Military Rd To Ne 117th St Pavement Repair Interstate Improvement, Inc. Jul-14 $5,004,744 2733 14966 17699 15% 15% NO N/A

8446 Sr27 32nd Ave To Jct Sr 290 Pave R Morse Bros., Inc. Jul-14 $1,880,925 1452 8286 9738 15% 15% NO N/A

7637 Sr 520/ W Lake Sammamish Pkwy To Sr 202 Hov And Sr Pcl Construction Services, Inc. Aug-14 $37,736,270 28222 206354 234576 12% 12% NO N/A

7962 I-5 Downtown Bellingham On/Off Ramps - Ramp Recons Vetch Construction Inc. Aug-14 $4,439,672 4495 20121 24616 15% 18% NO N/A

8292 Us 101, Bone River Bridge Replace Bridge Cascade Bridge, Llc Aug-14 $5,715,393 1829 21118 22947 15% 8% YES YES

8222 Sr 9/Sr 531, 172nd St Ne & Eaglefield Dr Intersect Interwest Construction Inc Sep-14 $4,995,958 2230 14540 16770 15% 13% YES YES

8244 Us 97, Satus Creek Vicinity - Replace Br. 97/106 A William Charles Construction, Llc Sep-14 $8,830,732 6238 27078 33316 15% 19% NO N/A

8592 Mv Kitsap Preservation Dockside (13-15) Vigor Marine Llc Sep-14 $4,806,284 4850 70127 74977 15% 6% YES YES PASS

8463 Sr3, Us101 To End Front St - Paving Northwest Asphalt Inc Oct-14 $2,037,908 1076 16358 17434 15% 6% YES NO

8184 Sr 9, 212th St Se To 176th St Se Stage 3 Wetland M Tri-State Construction, Inc. Oct-14 $1,252,400 498 3552 4050 15% 12% YES YES

7946 I-5, Portland Ave To Port Of Tacoma Rd - Nb Hov St Scarsella Bros., Inc. Oct-14 $16,392,704 16169 94636 110805 15% 15% NO N/A

7779 I-5, Port Of Tacoma Road To King County Line - Hov Tri-State Construction, Inc. Oct-14 $31,015,383 22319 139304 161623 12% 14% NO N/A

8553 Us 12 Et Al, 2014 Scr Region Wide Chip Seal Poe Asphalt Paving, Inc. Oct-14 $5,785,947 1959 14180 16139 15% 12% YES NO

8421 Sr 291, Division St To Stevens Co Line Paving Shamrock Paving, Inc. Oct-14 $3,791,715 2527 10591 13118 15% 19% NO N/A

8102 I-5, Express Lane Automation Elcon Corporation Nov-14 $3,419,556 6071 27648 33719 15% 18% NO N/A

8435 I-5, Nisqually River Bridges Bridge Painting Intech Contracting Llc Nov-14 $4,993,369 1663 17757 19420 15% 9% YES YES

8518 I-5, Skagit River Bridge Bridge Elements Repair Pcl Civil Constructors Inc Nov-14 $2,739,075 1679 11314 12993 15% 13% YES NO

7852 I-90, Hyak To Snowshed Vicinity Phase 1b- Add Lane Max J. Kuney Company Dec-14 $76,699,233 48970 247640 296610 15% 17% NO N/A

8600 Sr 410, Enumclaw Golf Course Vicinity To National Granite Construction Company Dec-14 $2,539,002 578 6498 7076 15% 8% YES YES

8299 Sr 502 / I-5 To Battle Ground Add Lanes Stage 1 Tapani Underground, Inc. Dec-14 $5,194,043 1117 18432 19549 15% 6% YES NO

313,858 2,046,222 2,360,080

Met

Requirement

Through App

Hours

Pass/Fail

NO FAIL

WSDOT Apprentice/Journeymen Participation Summary - Completed Projects 2014

YES PASS

NO PASS

YES PASS

NO PASS

NO FAIL

YES PASS

NO FAIL

NO PASS

YES PASS

NO PASS

YES PASS

NO PASS

YES PASS

YES PASS

YES PASS

NO PASS

YES PASS

NO PASS

YES PASS

NO FAIL

YES PASS

YES PASS

YES PASS

NO PASS

YES PASS

YES PASS

YES PASS

YES PASS

NO PASS

NO PASS

YES PASS

NO FAIL

NO PASS

NO

YES PASS

YES PASS

NO FAIL

YES PASS

YES PASS

NO PASS

NO FAIL

YES PASS

NO PASS

NO FAIL

5

Page 7: Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment Spokane Apollo, Inc. 10/03/2013 $15,368,730 $15,614,249 100% 8303 67040 37% 10%

WSDOT Apprentice/Journeymen Participation Summary - Completed Projects 2014

45 313,858

23 51.1% 2,046,222

14 31.1% 2,360,080

8 17.8% 13.3%

For more information on Apprenticeship Utilization requirements for participation, please see RCW 39.04.320.

Contracts with a completion date prior to January 2014 have been omitted from this list to save on space and printing.

To request a full copy of this report, please email [email protected].

Met the Requirement with Apprentice Labor Hours and GFE Total Contract Hours

Did Not Meet Requirement is the 2014 Percent of Apprentice Labor Hours Attained

Total Number of Contracts Total Apprentice Hours

2014 Summary

Met the Requirement through Apprentice Labor Hours Total Journeyman Hours

82.2% of all contracts in 2014 met the Apprenticeship requirement.

17.8% of contracts did not meet the requirement.

13.3% Is the 2014 Percent of Apprentice Labor Hours Attained.

The Apprenticeship Requirement does not apply to contracts advertised for bid before July 1, 2007, for any public works by the department of transportation.

For contracts advertised for bid on or after July 1, 2007, and before July 1, 2008, for all public works by the department of transportation estimated to cost five million dollars or more, all specifications shall require that no less than ten percent of

the labor hours be performed by apprentices.

For contracts advertised for bid on or after July 1, 2008, and before July 1, 2009, for all public works by the department of transportation estimated to cost three million dollars or more, all specifications shall require that no less than twelve percent

of the labor hours be performed by apprentices.

For contracts advertised for bid on or after July 1, 2015, and before July 1, 2020, for all public works by the department of transportation estimated to cost three million dollars or more, all specifications shall require that no less than fifteen percent

of the labor hours be performed by apprentices.

For contracts advertised for bid on or after July 1, 2020, for all public works by the department of transportation estimated to cost two million dollars or more, all specifications shall require that no less than fifteen percent of the labor hours be

performed by apprentices.

23

14

8

0

5

10

15

20

25

30

35

40

45

50

Nu

mb

er

of

Co

ntr

act

s

Contracts by Attainment Category

Did Not Meet Requirement

Met the Requirement with

Apprentice Labor Hours

and GFE

Met the Requirement

through Apprentice Labor

Hours

6

Page 8: Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment Spokane Apollo, Inc. 10/03/2013 $15,368,730 $15,614,249 100% 8303 67040 37% 10%

Contract

Number

Contract Title Contractor Name Notice To

Proceed

Complete

Date

Bid Amount Amount Paid App Hours Journeyman

Hours

Required

App %

App %

Attained

App %

Female

App%

Minority

Met

Requirement

Through App

Hours

GFE

Submitted

GFE

Approved

Pass/Fail

7967 Us 395, Nsc - Freya St To Farwell Rd Sb Additional Graham Construction & Aug-10 Jan-15 $21,455,921 $22,117,151 13583 104967 15% 11% 19% 18% NO YES YES PASS

8419 I-90, Easton To Ellensburg Vic Wb And Eb Bridges - Penhall Company Apr-13 Jan-15 $3,526,489 $3,639,454 1059 11073 15% 9% 0% 0% NO YES NO FAIL

8614 Sr 14 Et Al, Klickitat Co. Chip Seals Granite Construction Company Jun-14 Jan-15 $5,140,335 $4,808,068 1122 11953 15% 9% 9% 15% NO YES YES PASS

8306 Sr Us 2/97, Sr 97a, West Of Wenatchee Paving And I Central Washington Asphalt, Inc. Jun-12 Jan-15 $2,891,203 $3,015,542 1729 7828 15% 18% 37% 47% YES NO N/A PASS

7847 Sr 99, Alaskan Way Viaduct - Replacement S Holgate Skanska Usa Civil West California May-10 Feb-15 $114,569,194 $122,309,703 38942 322595 15% 11% 27% 36% NO YES YES PASS

8615 Sr 530, Slide-Access Road Maintenance And Traffic Granite Construction Company Apr-14 Feb-15 $3,383,659 $1,688,875 2323 6057 15% 28% 0% 30% YES NO N/A PASS

8546 Sr 163, Point Defiance Ferry Terminal Floating Dol Orion Marine Con (Nw Marine Cns Dec-13 Feb-15 $1,655,998 $1,664,266 2495 4150 15% 38% 2% 1% YES NO N/A PASS

8500 I-5, Skagit River Bridge Permanent Bridge Replacem Max J. Kuney Company Jun-13 Feb-15 $6,875,800 $7,139,139 3522 16959 15% 17% 42% 13% YES NO N/A PASS

8622 Sr 508, I-5 To Sr 7 Chip Seal Doolittle Construction Llc Jun-14 Feb-15 $2,068,740 $2,137,966 1079 6018 15% 15% 8% 30% YES NO N/A PASS

8536 Sr 203, Tolt River Bridge To Mcdougall St - Paving Watson Asphalt Paving Co. Dec-13 Feb-15 $4,285,224 $4,194,195 1050 5613 15% 16% 47% 10% YES NO N/A PASS

8418 Sr 546, Depot Rd And Bender Rd Intersection Improv Colacurcio Brothers Inc Apr-13 Mar-15 $2,149,052 $2,322,085 1357 14051 15% 9% 0% 5% NO YES YES PASS

7777 Nsc Us 2 To Wandemere Vicinity Graham Construction & Aug-09 Mar-15 $37,540,556 $39,783,603 22896 123198 12% 16% 1% 15% YES NO N/A PASS

8150 I-5, E Fork Lewis River Bridge To Todd Road Vicini Granite Construction Company Jul-11 Mar-15 $4,250,250 $4,590,455 1571 15957 15% 9% 14% 0% NO YES YES PASS

8538 I-90, Grant Co Line To Sr 21 - Paving Central Washington Asphalt, Inc. Dec-13 Mar-15 $4,815,096 $5,068,289 1439 5609 15% 20% 0% 20% YES NO N/A PASS

8065 Sr 530, Sauk River Bank Erosion Realign Roadway Trimaxx Construction Feb-11 Mar-15 $2,480,568 $2,503,921 942 10166 15% 8% 0% 96% NO YES NO FAIL

8405 Sign Replace/Lane Electrical & Express Lane Electr Valley Electric Co. Of Mt Vernon Feb-13 Mar-15 $4,878,672 $5,203,955 1642 30568 15% 5% 5% 72% NO YES NO FAIL

7920 Sr 9, Lundeen Parkway To Sr 92 Intersection Improv Granite Construction Company Jun-10 Mar-15 $10,921,000 $12,038,839 7316 36808 15% 17% 1% 43% YES NO N/A PASS

8432 Sr 520 West Connection Bridge Mowat-American Jv 20210 142nd May-13 Mar-15 $22,129,243 $24,328,008 19867 86009 15% 19% 13% 52% YES NO N/A PASS

8499 I-5, N Fork Lewis River Bridge Nb And Sb Painting Geronimo Painting Company Aug-13 Mar-15 $11,981,648 $10,763,250 7323 38639 15% 16% 10% 31% YES NO N/A PASS

8568 I-90, W Of George - Paving Central Washington Asphalt, Inc. Feb-14 Apr-15 $2,872,537 $2,924,368 710 4016 15% 15% 51% 27% YES NO N/A PASS

8198 Seattle Terminal Elect Distrib Sstm Upgrade System Mcclure And Sons Inc. Sep-11 Apr-15 $2,969,688 $3,161,447 1668 11428 15% 13% 1% 25% NO YES YES PASS

8344 Us 101, Middle Nemah Riv Br. Replace Bridge Sb Structures, Llc Aug-12 Apr-15 $3,253,051 $3,162,093 1812 10047 15% 15% 0% 80% YES NO N/A PASS

7835 I-5, Sr 432, Talley Way Interchange Northwest Construction, Inc. Jan-10 Apr-15 $20,528,756 $21,289,358 12124 67960 15% 15% 12% 29% YES NO N/A PASS

7862 I-90 Spokane Poe Weigh Station Relocation Selland Construction, Inc. Mar-10 May-15 $6,704,333 $6,893,872 2617 37718 15% 6% 11% 6% NO YES NO FAIL

8460 I-5 M St & I-705 Overcrossings Seismic Retrofit Quigg Bros. Inc. May-13 May-15 $3,237,136 $2,694,420 2458 11841 15% 17% 0% 55% YES NO N/A PASS

7553 Sr 900, Se 78th St Vic To Newport Way Vic And I-90 Icon Materials,A Division Of Cpm Jul-08 May-15 $19,354,287 $19,172,445 7289 81781 10% 8% 14% 45% NO YES NO FAIL

8548 Sr 539 / Sr 9, Advanced Traveler Information Syste Valley Electric Co. Of Mt Vernon Dec-13 May-15 $1,875,189 $1,877,475 843 5470 15% 13% 0% 0% NO YES YES PASS

7895 Sr 433, Lewis And Clark Bridge Superstructure Pain Odyssey/Geronimo Joint Venture Jun-10 May-15 $33,774,714 $35,089,866 15663 177321 15% 8% 15% 10% NO YES NO FAIL

8508 I-5, Seattle Area Bridges - Phase 2 Expansion Join Pcl Civil Constructors Inc Sep-13 Jun-15 $2,160,424 $2,053,575 2071 8627 15% 19% 24% 54% YES NO N/A PASS

8582 I-5, Stillaguamish River Bridge Major Bridge Rehab Mowat Construction Company May-14 Jun-15 $5,877,202 $5,753,974 3346 17511 15% 16% 0% 2% YES NO N/A PASS

8634 I-5, Ne 39th St Vic To Ne 99th St - Paving Granite Construction Company Jul-14 Jun-15 $1,964,964 $1,816,870 759 4251 15% 15% 28% 52% YES NO N/A PASS

8587 Us 2 Et Al, 2014 Eastern Region Chip Seal Central Washington Asphalt, Inc. Apr-14 Jun-15 $8,876,791 $8,629,390 3683 12821 15% 22% 0% 32% YES NO N/A PASS

8547 I-90, Price Creek Vicinity To Mp 65.54 - Paving Columbia Asphalt & Gravel, Inc. Dec-13 Jun-15 $5,944,899 $6,099,915 1807 4842 15% 27% 47% 0% YES NO N/A PASS

7936 I-5, Sr 161/Sr 18 Interchange Improvements Mowat Construction Company Jul-10 Jul-15 $50,778,923 $52,127,723 37431 210531 15% 15% 30% 29% YES NO N/A PASS

7938 Sr 522, Us 2 Interchange Flyover Ramp Scarsella Bros., Inc. Jun-10 Jul-15 $15,514,435 $15,973,978 15055 78406 15% 16% 9% 23% YES NO N/A PASS

8293 Us 97, North Of Goldendale, Wildlife Habitat Conne Rotschy, Inc. Jun-12 Jul-15 $2,113,355 $2,283,974 1640 8441 15% 16% 0% 16% YES NO N/A PASS

8540 I-90, Lincoln Co Line To Salnave Rd - Paving Inland Asphalt Company Jul-15 $3,687,413 850 7190 15% 11% NO YES NO FAIL

8379 Sr 99, Spokane Street Overcrossing Timber Replacem Mid-Mountain Contractors, Inc. Dec-12 Aug-15 $9,213,158 $9,110,430 4389 21452 15% 17% 3% 58% YES NO N/A PASS

8443 I-90, Mp 65.54 To Easton Hill Eb & Wb - Paving Granite Construction Company May-13 Aug-15 $5,359,359 $4,977,466 1414 4987 15% 22% 31% 59% YES NO N/A PASS

8688 Sr 14, Sr 221 To 2 Miles E Of Christy Rd - Paving Central Washington Asphalt, Inc. Feb-15 Sep-15 $2,943,215 $2,862,793 691 2386 15% 22% 42% 18% YES NO N/A PASS

8700 Us 395, Foster Wells Road Vic To E Elm Road Sb - P Central Washington Asphalt, Inc. Feb-15 Sep-15 $1,627,907 $1,551,263 662 2494 15% 21% 0% 25% YES NO N/A PASS

8472 Sr 510, Reservation Road Vicinity Intersection Imp Klb Construction Inc. Jun-13 Sep-15 $2,630,699 $2,889,030 1715 15914 15% 10% 8% 8% NO YES YES PASS

8611 I-90, Barker Rd To Idaho State Line - Paving Icon Materials,A Division Of Cpm Jun-14 Sep-15 $2,365,237 $2,514,268 479 3664 15% 12% 0% 0% NO YES NO FAIL

8482 I-5, Nb & Sb, Ne 179th St To North Fork Lewis Rive Kerr Contractors Oregon Inc Jun-13 Sep-15 $4,468,700 $4,337,780 1037 6991 15% 13% 0% 1% NO YES YES PASS

8624 Sr 3 & Sr 16, Vic Burley Olalla To Sr 303 Paving Granite Construction Company Jun-14 Oct-15 $2,517,039 $2,788,053 1379 8145 15% 14% 6% 68% NO YES YES PASS

8566 Ncr Seal 2014 Central Washington Asphalt, Inc. Feb-14 Oct-15 $15,496,658 $14,291,781 5820 19333 15% 23% 9% 39% YES NO N/A PASS

8618 I-5, Vicinity Tumwater Blvd To Gravelly Lake Dr - Tucci & Sons, Inc. Jun-14 Oct-15 $3,806,280 $4,029,881 3260 12940 15% 20% 20% 5% YES NO N/A PASS

8189 I-5 / Sr16, Eastbound Nalley Valley I/C - Hov Mowat Construction Company Oct-11 Nov-15 $74,687,777 $75,721,501 65767 255001 15% 21% 25% 47% YES NO N/A PASS

WSDOT Apprentice/Journeymen Participation Summary - Completed Projects 2015

7

Page 9: Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment Spokane Apollo, Inc. 10/03/2013 $15,368,730 $15,614,249 100% 8303 67040 37% 10%

WSDOT Apprentice/Journeymen Participation Summary - Completed Projects 2015

8758 Us 395, Sr 17 To Muse Rd Sb - Paving Central Washington Asphalt, Inc. Jun-15 Nov-15 $3,965,746 $4,149,142 905 3941 15% 19% 12% 34% YES NO N/A PASS

7945 I-5, 196th St (Sr 524) I/C Sb Braided Ramp Northwest Construction, Inc. Jul-10 Nov-15 $18,727,000 $20,158,205 15869 82398 15% 16% 19% 8% YES NO N/A PASS

8544 I-5, Sr 510 To Sr 512 Its And Ramp Revisions Tucci & Sons, Inc. Dec-13 Nov-15 $2,322,690 $2,374,793 1598 8369 15% 16% 3% 10% YES NO N/A PASS

7465 I-5 Grand Mound-Maytown Stg 1-Add Lanes Scarsella Bros., Inc. Apr-08 Dec-15 $61,494,606 $65,904,394 39898 339269 10% 11% 26% 15% YES NO N/A PASS

8609 Us 101, Hoh River Erosion Site #2 Bank Stabilizati Strider Construction Co, Inc. Jun-14 Dec-15 $2,212,436 $2,033,126 871 3799 15% 19% 0% 48% YES NO N/A PASS

8296 Us 395, Nsc Francis Avenue Improvements Graham Construction & Aug-12 Dec-15 $14,045,943 $14,466,673 8786 44368 15% 17% 15% 26% YES NO N/A PASS

397,623 2,453,871

54 397,623

36 66.7% 2,453,871

10 18.5% 2,851,494

8 14.8% 13.9%

The Apprenticeship Requirement does not apply to contracts advertised for bid before July 1, 2007, for any public works by the department of transportation.

For more information on Apprenticeship Utilization requirements for participation, please see RCW 39.04.320.

Met the Requirement with Apprentice Labor Hours and GFE Total Contract Hours

Did Not Meet Requirement is the 2015 Percent of Apprentice Labor Hours Attained

Met the Requirement through Apprentice Labor Hours Total Journeyman

Total Number of Contracts Total Apprentice Hours

2015 Summary

85.2% of all contracts in 2015 met the Apprenticeship requirement.

14.8% of contracts did not meet the requirement.

13.9% Is the 2015 Percent of Apprentice Labor Hours Attained.

For contracts advertised for bid on or after July 1, 2007, and before July 1, 2008, for all public works by the department of transportation estimated to cost five million dollars or more, all specifications shall require that no less than ten percent of the labor hours be

performed by apprentices.

For contracts advertised for bid on or after July 1, 2008, and before July 1, 2009, for all public works by the department of transportation estimated to cost three million dollars or more, all specifications shall require that no less than twelve percent of the labor

hours be performed by apprentices.

For contracts advertised for bid on or after July 1, 2015, and before July 1, 2020, for all public works by the department of transportation estimated to cost three million dollars or more, all specifications shall require that no less than fifteen percent of the labor

hours be performed by apprentices.

For contracts advertised for bid on or after July 1, 2020, for all public works by the department of transportation estimated to cost two million dollars or more, all specifications shall require that no less than fifteen percent of the labor hours be performed by

apprentices.

36

10

8

0

10

20

30

40

50

60

Nu

mb

er

of

Co

ntr

act

s

Contracts by Attainment Category

Did Not Meet Requirement

Met the Requirement with

Apprentice Labor Hours

and GFE

Met the Requirement

through Apprentice Labor

Hours

8

Page 10: Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment Spokane Apollo, Inc. 10/03/2013 $15,368,730 $15,614,249 100% 8303 67040 37% 10%

Contract

Number

Contract Title Contractor Name Notice To

Proceed

Complete

Date

Bid Amount Amount Paid Apprentice

Hours

Journeyman

Hours

Req App % App %

Attained

App %

Female

App %

Minority

Met

Requirement

Through App

Hours

GFE

Submitted

GFE

Approved

8199 Sr 161, 24th St East To Milton Way Widening Tri-State Construction, Inc. 09/07/2011 Jan-16 $11,927,624 $17,086,574 15971 87856 15% 15% 3% 25% YES NO N/A

8710 Sr20, Frostad Rd Vic To Sharpes Corner Vic - Pavin Lakeside Industries 04/06/2015 Jan-16 $2,502,024 $2,084,972 726 3551 15% 17% 17% 48% YES NO N/A

8216 Sr 9 / Sr 92 Intersection Improvements Design Buil Guy F. Atkinson Construction, Llc 02/15/2012 Jan-16 $3,346,888 $3,505,476 534 7269 15% 7% 23% 72% NO YES YES

8558 I-90, Snoq. Pass Vic - Pccp Rehab Eb/Stormwater Re Acme Concrete Paving, Inc. 02/10/2014 Jan-16 $6,425,000 $6,803,660 4922 23548 15% 17% 17% 22% YES NO N/A

8721 Us 12 Et Al South Central Chip Seal Poe Asphalt Paving, Inc. 04/08/2015 Jan-16 $2,874,735 $3,127,849 1599 10337 15% 13% 27% 35% NO YES NO

7826 Sr 520 Pontoon Construction Design-Build Project Kiewit-General, A Joint Venture 02/12/2010 Jan-16 $367,330,000 $448,931,203 331212 1538008 15% 18% 23% 21% YES NO N/A

8423 Sr 20, Skagit River - Ced Permanent Restoration Trimaxx Construction 05/01/2013 Jan-16 $5,164,771 $5,263,086 870 4888 15% 15% 0% 0% YES NO N/A

8608 Sr 539, Lynden Aldergrove Port Of Entry Improvemen Granite Construction Company 05/27/2014 Feb-16 $3,262,709 $3,558,197 1023 6192 15% 14% 2% 7% NO YES YES

8636 Us 97, Biggs Rapids Bridge Painting Intech Contracting Llc 07/29/2014 Feb-16 $8,791,665 $8,053,246 3965 34852 15% 10% 4% 0% NO YES YES

8755 Us 12, 0.8 Miles West Of Chapman Rd. Erosion Prote Conway Construction Company 06/02/2015 Feb-16 $1,587,478 $1,460,894 471 2042 15% 19% 0% 0% YES NO N/A

8535 Us 2, Espanola Rd To Jct I-90 - Paving Inland Asphalt Company Feb-16 $5,108,783 1524 16381 15% 9% NO YES No

8732 Sr 195, Colfax To Dry Creek-Paving Poe Asphalt Paving, Inc. 05/04/2015 Mar-16 $2,028,766 $2,094,463 1739 7265 15% 19% 0% 14% YES NO N/A

8105 Sr 14, Camas / Washougal - Add Lanes And Build Int Tapani Underground, Inc. 05/11/2011 Mar-16 $28,618,804 $29,021,615 23000 106068 15% 18% 4% 26% YES NO N/A

387,556 1,848,257

13 387,556

8 61.5% 1,848,257

3 23.1% 2,235,813

2 15.4% 17.3%

The Apprenticeship Requirement does not apply to contracts advertised for bid before July 1, 2007, for any public works by the department of transportation.

For more information on Apprenticeship Utilization requirements for participation, please see RCW 39.04.320.

84.6% of all contracts in 2016 met the Apprenticeship requirement.

15.4% of contracts did not meet the requirement.

17.3% Is the 2016 Percent of Apprentice Labor Hours Attained.

WSDOT Apprentice/Journeymen Participation Summary - Completed Projects through March 2016

Total Contract Hours

Did Not Meet Requirement is the 2016 Percent of Apprentice Labor Hours Attained

Total Number of Contracts: Total Apprentice Hours

Met the Requirement through Apprentice Labor Hours Total Journeyman

Pass/Fail

PASS

PASS

PASS

PASS

FAIL

PASS

PASS

PASS

PASS

PASS

PASS

FAIL

PASS

2016 Summary

For contracts advertised for bid on or after July 1, 2007, and before July 1, 2008, for all public works by the department of transportation estimated to cost five million dollars or more, all specifications shall require that no less than ten percent of the labor

hours be performed by apprentices.

For contracts advertised for bid on or after July 1, 2008, and before July 1, 2009, for all public works by the department of transportation estimated to cost three million dollars or more, all specifications shall require that no less than twelve percent of the

labor hours be performed by apprentices.

For contracts advertised for bid on or after July 1, 2015, and before July 1, 2020, for all public works by the department of transportation estimated to cost three million dollars or more, all specifications shall require that no less than fifteen percent of the

labor hours be performed by apprentices.

For contracts advertised for bid on or after July 1, 2020, for all public works by the department of transportation estimated to cost two million dollars or more, all specifications shall require that no less than fifteen percent of the labor hours be performed

by apprentices.

Met the Requirement with Apprentice Labor Hours and GFE

8

3

2

0

2

4

6

8

10

12

14

Nu

mb

er

of

Co

ntr

act

s

Contracts by Attainment Category

Did Not Meet Requirement

Met the Requirement with

Apprentice Labor Hours

and GFE

Met the Requirement

through Apprentice Labor

Hours

9

Page 11: Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment Spokane Apollo, Inc. 10/03/2013 $15,368,730 $15,614,249 100% 8303 67040 37% 10%

Advanced Schedule of ProjectsMay 2, 2016 through April 30, 2017

Region Type Cost Range SR * Section 502

Applies

State Funds Only

Title and Work Description County Ad Date WI Number

Eastern Bridge Under 1M 090 2016 Eastern Region Bridge - Deck Repair - Bridge 90/314 S deck repair

Adams 5/2/16 F09021A

North Central Bridge 1 - 2M 153 SR 153/Methow River Bridges - Deck Rehabilitation - Repair Methow River bridge decks - Br# 153/10,13,14,15

Okanogan 5/2/16 B15300I

AWV Bridge 3 - 4M 099 SR 99/AWV South Access NB Off Bridge - South Access Construction Bridge

King 5/9/16 U09904C

North Central Bridge Under 1M 002 US 2/W of Alice Rd Br Deck Rehab - Deck Rehab on Bridge 2/226N Chelan 6/6/16 B00207OFerries Bridge Under 1M 020 FT

LOPEZ SR 20 Spur/Lopez Island Trm - Olympic Class Dolphin Modifications - Landing aid modifications to configure for Olympic Class vessel service

San Juan 9/12/16 M04316A

AWV Bridge 25 - 30M 099 X SR 99/Tunnel Alternative, South Access Connection - South Access Construction

King 9/19/16 U09904A

Olympic Bridge Under 1M 5 X I-5/93rd Ave SW Bridge - Special Repair - Replace damaged girder on bridge 121/15

Thurston 10/17/16 C00504H

Olympic Bridge 3 - 4M 104 SR 104/Hood Canal Bridge - Gear Box - Design new lower gear boxes for span drive system on 104/005.1

Kitsap, Jefferson 10/17/16 C10439D

Olympic Bridge 1 - 2M 005 I-5/Koontz Road Overpass - Repair Bridge - Repair third party damaged bridge 5/212

Lewis 10/17/16 D00516R

Southwest Bridge 5 - 10M 508 SR 508/S Fork Newaukum River Bridge Replacement - Replace structurally deficient bridge 508/12

Lewis 12/19/16 D50816R

South Central Bridge 10 - 15M 082 I-82/Columbia River Bridge EB - Truss Deck Replacement - Replace truss deck and barrier on Bridge 82/280S

Benton 2/6/17 E08208S

Northwest Bridge 5 - 10M 529 X SR 529/Northbound Steamboat Slough Bridge - Painting - Paint existing structure - Bridge 529/20E

Snohomish 2/13/17 A52907D

Olympic Bridge 4 - 5M 104 SR 104/Hood Canal-WA Bugge Br - Girder Repair - Prestress girder rehabilitation 104/005.1

Kitsap, Jefferson 2/21/17 C10448A

North Central Bridge 3 - 4M 153 SR 153/Methow River Bridges - Structural Rehabilitation - Structural Rehabilitation Bridge 153/15

Okanogan 3/6/17 B15300L

South Central Bridge 1 - 2M 082 I-82/Yakima Valley Highway Bridge WB - Deck Rehabilitation - Scarify and overlay bridge deck on Bridge 82/135N

Yakima 3/13/17 E08208P

South Central Bridge 1 - 2M 082 I-82/SR 821/Thrall Road Bridge EB - Deck Rehabilitation - Scarify and overlay bridge deck on Bridge 82/10S

Kittitas 3/13/17 E08208R

South Central Bridge Under 1M 090 I-90 & I-82 Ellensburg Vicinity EB & WB - Deck Rehabilitation - Scarify and overlay bridge deck on 90/152N,82/10S,90/174S,90/150N

Kittitas 3/13/17 E09008X

South Central Bridge Under 1M 090 I-90/Renslow Bridge EB - Deck Rehabilitation - Scarify and overlay bridge deck on Bridge 90/174S

Kittitas 3/13/17 E09013R

South Central Bridge Under 1M 090 I-90/Taneum Creek Bridge WB - Deck Rehabilitation - Scarify and overlay bridge deck on Bridge 90/150N

Kittitas 3/13/17 E09014H

South Central Bridge Under 1M 097 US 97/Satus Creek 3rd Crossing Bridge - Deck Rehabilitation - Scarify and overlay bridge deck on Bridge 97/103

Yakima 3/13/17 E09705P

South Central Bridge Under 1M 090 I-90/Big Creek Bridge WB - Deck Rehabilitation - Scarify and overlay bridge deck on Bridge 90/126N

Kittitas 3/20/17 E09014I

Southwest Bridge 5 - 10M 409 X SR 409/Columbia River Br at Puget Island - Painting - Paint Steel Bridge

Wahkiakum 3/20/17 D40912P

Southwest Bridge 3 - 4M 409 SR 409/Columbia River Bridge at Puget Island - Deck Replacement - Replace timber deck on Bridge 409/010

Wahkiakum 3/20/17 D40920D

Eastern Bridge Under 1M 026 SR 26/N Fork Palouse River Bridge - Special Repair - Bridge 26/26P remove and replace sidewalk on northwest side

Whitman 3/27/17 F02613F

Eastern Bridge Under 1M 195 US 195/N Fork Palouse River Bridge - Replace Rail - Bridge 195/27 replace rail

Whitman 3/27/17 F19503L

Eastern Bridge 1 - 2M 195 2016 Eastern Region Bridge - Special Repairs - Bridge 195/27 girder repairs

Whitman 3/27/17 F19503M

South Central Bridge 2 - 3M 090 X I-90/Franklin Falls Bridge WB - Deck Rehabilitation - Scarify and overlay bridge deck on Bridge 90/97.8N

King 3/27/17 E09013M

South Central Bridge 10 - 15M 090 X I-90/Denny Creek Viaduct & Franklin Falls Bridge WB-Deck Rehabilitation - Scarify and overlay bridge deck on Bridge 90/97.2N & 90/97.8N

King 3/27/17 E09013T

South Central Bridge Under 1M 090 I-90/Denny Creek Rd Bridge WB - Deck Rehabilitation - Scarify and overlay bridge deck on Bridge 90/96.5N

King 3/27/17 E09015I

South Central Bridge Under 1M 090 I-90/S Fork Snoqualmie Bridge E of North Bend EB - Deck Rehabilitation - Scarify and overlay bridge deck on Bridge 90/91S

King 3/27/17 E09016L

These contracts are planned for advertisement by the Washington State Department of Transportation for May 2, 2016 through April 30, 2017. Please note the advertisement dates are tentative and some information may change after this report is issued. Projects are dependent on funding availability. For current information, please visit the Contract Ad and Award website at http://www.wsdot.wa.gov/biz/contaa/

Only one state route is displayed per project. Some types of projects, e.g., chip seals, bridge painters, seismic retrofits, electrical updates, and guardrail updates, may involve regionwide work.

* “This Connecting Washington project is subject to Section 502 reporting requirements.”

ASOP | Page 1 http://www.wsdot.wa.gov/biz/contaa/ 10

Page 12: Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment Spokane Apollo, Inc. 10/03/2013 $15,368,730 $15,614,249 100% 8303 67040 37% 10%

Advanced Schedule of ProjectsMay 2, 2016 through April 30, 2017

Region Type Cost Range SR * Section 502

Applies

State Funds Only

Title and Work Description County Ad Date WI Number

Eastern Major Construction

1 - 2M 395 US 395/NSC Wellesley Ave/Freya St - Intersection Improvements Spokane 5/16/16 F00014A

Eastern Major Construction

4 - 5M 395 X US 395/NSC - Spokane River to Francis Ave - Grading - Site preparation, grading, drainage and intersection improvements

Spokane 7/11/16 F00013A

Northwest Major Construction

Under 1M 524 SR 524/WB 21st Ave W to 196th Pl SW - Pedestrian Improvements - Construct Westbound Pedestrian Improvements

Snohomish 7/11/16 A52410D

Olympic Major Construction

Under 1M 165 SR 165/Wilkeson Creek Bridge to N of Pearl St Ct - Stormwater Retrofit - Stormwater drainage improvements

Pierce 11/7/16 C16514A

Olympic Major Construction

45 - 50M 005 X X I-5/SR 510 Interchange - Reconstruct Interchange - Construct single point urban interchange with southbound slip-ramp

Thurston 12/11/16 C00502C

Ferries Major Construction

60 - 70M 525 FT MUKILT

SR 525/Mukilteo Trm (Phase 2) - New Ferry Terminal Construction - Construction of new ferry term. facilities, berthing structures, and OHL

Snohomish 1/9/17 M04433D

Northwest Major Construction

5 - 10M 518 X X SR 518/Des Moines Memorial Drive - Interchange Improvements - New Eastbound Off-Ramp to Des Moines Memorial Drive

King 1/23/17 A51801K

Olympic Major Construction

Under 1M Regionwide Pierce/Thurston County - Stormwater Retrofit - Stormwater retrofit Pierce, Thurston 3/6/17 C00090J

Olympic Major Construction

Under 1M 005 I-5/W of Carpenter Rd NB - Stormwater Retrofit - Stormwater retrofit Thurston 3/6/17 C00501R

Olympic Major Construction

Over 80M 005 X I-5/Mounts Rd to Thorne Ln - Corridor Improvements Pierce 3/13/17 C00501T

Southwest Major Construction

Under 1M 101 X US 101/Heath St to Duryea St - Replace Enclosed Drainage System - Replace enclosed drainage system

Pacific 3/20/17 D10112R

Eastern Major Construction

5 - 10M 195 X US 195/Colfax to Spangle - Add Passing Lanes - Add passing lanes Spokane, Whitman

4/3/17 F19504B

Olympic Major Construction

2 - 3M 003 X SR 3/SR 304 - Interchange Modifications - Restripe two southbound lanes of SR 3

Kitsap 4/24/17 C00303C

ASOP | Page 2 http://www.wsdot.wa.gov/biz/contaa/ 11

Page 13: Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment Spokane Apollo, Inc. 10/03/2013 $15,368,730 $15,614,249 100% 8303 67040 37% 10%

Advanced Schedule of ProjectsMay 2, 2016 through April 30, 2017

Region Type Cost Range SR * Section 502

Applies

State Funds Only

Title and Work Description County Ad Date WI Number

Olympic Resurface Under 1M 104 SR 104/E of Balmoral Pl NE to Kingston Ferry - Paving - HMA inlay and ADA improvements

Kitsap 6/20/16 C10440A

Northwest Resurface 25 - 30M 005 I-5/NB Martin Luther King Jr Wy to NE Ravenna Br - Pavemnt Repair & More - Pavement Repair, Expansion Joint Replacement, ADA, & Barrier Extension

King 9/7/16 A00516G

North Central Resurface 3 - 4M 002 US 2/Eagle Falls Vic to Tye Creek - BST - Bituminous Surface Treatment

Snohomish 10/10/16 A00256A

Northwest Resurface 20 - 25M 005 X I-5/NB S 260th St to Duwamish River Br - Concrete Pavement Rehab & ADA - Concrete Pavement Rehabilitation and ADA Compliance

King 10/17/16 A00506G

Northwest Resurface 3 - 4M 020 X SR 20/Sedro-Woolley to Concrete Vicinity - BST - Bituminous Surface Treatment

Skagit 10/17/16 A02054B

Northwest Resurface 3 - 4M Multiple Routes

SR 509/S 168th St to S 112th St Vic - Paving, ADA, & Barrier Replacement - HMA Paving, ADA, and Barrier Replacement

King, Snohomish 10/17/16 A50922D

Northwest Resurface 5 - 10M 005 I-5/Ebey Slough Bridge to SR 531 Vicinity - Paving & ADA Compliance - HMA Paving & ADA Compliance

Snohomish 10/24/16 A00551B

Northwest Resurface 1 - 2M 164 SR 164/SE 408th St to 196th Ave SE Vicinity - Pavement Repair & ADA - Pavement Repair and ADA Compliance

King 10/24/16 A16406E

South Central Resurface 1 - 2M 090 I-90/Easton Hill Vic to Kachess River Br WB -Replace/Rehab Concrete - Replace deteriorated concrete panels and grind, restore delineation

Kittitas 10/24/16 E09006F

South Central Resurface 1 - 2M 397 SR 397/S Yew Street to S 10th Ave - Paving and Roadside Improvements - Grind and repave HMA; shoulder widening and install safety edge

Franklin, Benton 11/7/16 E39701O

North Central Resurface 3 - 4M 150 SR 150/W of Chelan - Paving Chelan 11/28/16 B15000DNorth Central Resurface 10 - 15M Regionwide NCR Seal 2017 - NCR region wide chip seal construction year 2017 Okanogan,

Douglas12/5/16 B00008C

South Central Resurface 2 - 3M 240 SR 240/0.2 Miles E of Jadwin Ave to I-182 - Paving and ADA Compliance - Grind and repave HMA; upgrade existing curb ramps to ADA compliance

Benton 12/12/16 E24001I

Northwest Resurface 4 - 5M 020 SP ANACRT

SR 20 Spur/Sharpe's Corner to Anacortes Ferry Terminal - Paving & ADA - HMA Paving & ADA Compliance

Skagit 1/9/17 A02029D

Northwest Resurface 2 - 3M 169 SR 169/140th Ave SE to Cedar River Park Vic - Paving & ADA Compliance - HMA Paving and ADA Compliance

King 1/9/17 A16927C

South Central Resurface 2 - 3M 012 US 12/McNary Pool to Dodd Rd & Nine Mile Cr to Old Highway 12 - Paving - HMA overlay and restore delineation

Walla Walla 1/9/17 E01213I

South Central Resurface 1 - 2M 012 US 12/McNary Pool to Dodd Road - Paving - Grind and repave HMA Walla Walla 1/9/17 E01215ENorthwest Resurface 5 - 10M 096 SR 96/I-5 Interchange Vic to SR 9 Vic - Paving & ADA Compliance -

HMA Paving and ADA ComplianceSnohomish 1/17/17 A09601B

Northwest Resurface 1 - 2M 164 SR 164/SR 18 to 17th St SE - Paving & ADA Compliance - HMA Paving & ADA Compliance

King 1/17/17 A16401B

Northwest Resurface 1 - 2M 528 SR 528/55th Dr NE Vic to 83rd Ave NE Vic - Paving & ADA Compliance - HMA Paving and ADA Compliance

Snohomish 1/17/17 A52801B

South Central Resurface 1 - 2M 010 X SR 10/SR 970 to US 97 - Chip Seal Kittitas 1/17/17 E01001MSouth Central Resurface Under 1M 012 X US 12/Wallula Vic to N Shore Rd Vic - Chip Seal Walla Walla 1/17/17 E01216LSouth Central Resurface Under 1M 024 SR 24/2 Miles E of Badger Ln to 7.4 Miles W of SR 241 - Chip Seal Yakima 1/17/17 E02402GSouth Central Resurface Under 1M 024 SR 24/SR 241 to Cold Creek Rd Vic - Chip Seal Benton, Yakima 1/17/17 E02402HSouth Central Resurface Under 1M 082 X I-82/Military Road Interchange - Chip Seal Kittitas 1/17/17 E08209CSouth Central Resurface Under 1M 125 X SR 125/Carrie Ave to SR 124 - Chip Seal Walla Walla 1/17/17 E12501TSouth Central Resurface 1 - 2M 260 X SR 260/SR 17 to Kahlotus - Chip Seal Franklin 1/17/17 E26001ISouth Central Resurface Under 1M 410 X SR 410/Yakima Co Line to East Winter Gate - Chip Seal - BST with

crack seal and restore delineationYakima 1/17/17 E41001Q

South Central Resurface Under 1M 410 X SR 410/Sawmill Flat Campground Vic to Nile Rd - Chip Seal - BST with crack seal and restore delineation

Yakima 1/17/17 E41001V

South Central Resurface Under 1M 410 X SR 410/Nile Road to US 12 - Chip Seal Yakima 1/17/17 E41002WSouth Central Resurface Under 1M 903 SR 903/Cle Elum to Roslyn - Chip Seal Kittitas 1/17/17 E90301FSouth Central Resurface Under 1M 903 SR 903/Roslyn to National Forest Boundary - Chip Seal Kittitas 1/17/17 E90301G

Northwest Resurface 3 - 4M 002 US 2/Fern Bluff Rd Vic to 10th St Vic - Paving & ADA Compliance - HMA Paving and ADA Compliance

Snohomish 1/23/17 A00228B

Northwest Resurface 2 - 3M 526 SR 526/5th Ave W Vicinity to I-5 - Paving - HMA Paving Snohomish 1/23/17 A52605A

ASOP | Page 3 http://www.wsdot.wa.gov/biz/contaa/ 12

Page 14: Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment Spokane Apollo, Inc. 10/03/2013 $15,368,730 $15,614,249 100% 8303 67040 37% 10%

Advanced Schedule of ProjectsMay 2, 2016 through April 30, 2017

Region Type Cost Range SR * Section 502

Applies

State Funds Only

Title and Work Description County Ad Date WI Number

Olympic Resurface 3 - 4M 005 I-5/N of Maytown Rd to Martin Way - Paving - HMA inlay Thurston 1/23/17 C00502DOlympic Resurface Under 1M 105 X SR 105/W of Constantine Way to Edward P Smith Dr - Chip Seal Grays Harbor 1/23/17 C10501D

South Central Resurface 3 - 4M 097 US 97/SR 22 Vicinity to W Wapato Rd Vicinity - Paving - Grind and repave HMA

Yakima 1/30/17 E09703V

Northwest Resurface 1 - 2M 020 SR 20/Collins Rd to SR 9 - Paving & ADA Compliance - HMA Paving & ADA Compliance

Skagit 2/6/17 A02047A

Olympic Resurface Under 1M 162 X SR 162/SR 410 to S of 96th St E - Paving - HMA inlay Pierce 2/6/17 C16201DEastern Resurface 1 - 2M 021 X SR 21/Canniwai Creek to US 2 - 2017 Chip Seal Lincoln 2/13/17 F02107EEastern Resurface 1 - 2M 021 X SR 21/US 2 to Keller Ferry - 2017 Chip Seal Lincoln 2/13/17 F02109MEastern Resurface Under 1M 028 X SR 28/Lamona to Harrington - 2017 Chip Seal Lincoln 2/13/17 F02810XEastern Resurface 5 - 10M Multiple

Routes2017 Eastern Region Chip Seal - 2017 Chip Seal Whitman,

Adams, Lincoln, Pend Oreille,

Stevens

2/13/17 F11117A

Eastern Resurface 1 - 2M 174 X SR 174/Grant Co Line to SR 21 - 2017 Chip Seal Lincoln 2/13/17 F17402XEastern Resurface 1 - 2M 002 US 2/Francis Ave to Division Wye - Paving - Hot Mix Asphalt paving

with basic safety restorationSpokane 3/13/17 F00229U

Eastern Resurface 1 - 2M 270 SR 270/Jct US 195 to Bishop Blvd - Paving - Hot Mix Asphalt paving with basic safety restoration

Whitman 3/13/17 F27000U

Eastern Resurface 3 - 4M 290 SR 290/Mission Ave to Sullivan Rd - Paving - HMA paving with basic safety restoration

Spokane 3/20/17 F29000X

Eastern Resurface 1 - 2M 904 SR 904/Mullenix Rd to Betz Rd - Paving - HMA paving with basic safety restoration

Spokane 3/20/17 F90400J

Olympic Resurface 2 - 3M 303 SR 303/SR 304 to WM E Sutton Rd NE - Paving - HMA inlay Kitsap 3/20/17 C30326AOlympic Resurface Under 1M 119 X SR 119/US 101 to Lake Cushman Rec Area - Chip Seal Mason 3/27/17 C11907A

South Central Resurface 1 - 2M 012 US 12/Indian Creek Vic to Wildcat Creek Bridge Vic - Paving - Grind and repave HMA

Yakima 3/27/17 E01214T

South Central Resurface 15 - 20M 090 I-90/468th Ave SE to W Summit Rd EB - Rehab Concrete - Selective panel replacement, diamond grind, restore delineation

King 3/27/17 E09012S

South Central Resurface Under 1M 012 US 12/SR 128 Vicinity to Snake River Bridge - Paving - Grind and repave HMA

Asotin 4/3/17 E01214J

Southwest Resurface 1 - 2M 097 US 97/4 Miles S of Satus Cr Br to Yakima Co Line w/exception - Paving - Rehabilitates pavement with Hot Mix Asphalt overlay

Klickitat 4/3/17 D09717P

Eastern Resurface 3 - 4M 002 US 2/Jct I-90 to Euclid Ave - Paving - Hot Mix Asphalt paving with basic safety restoration

Spokane 4/10/17 F00228R

Eastern Resurface 1 - 2M 002 US 2/Deer Rd to Colbert Rd - Paving - Hot Mix Asphalt paving with basic safety restoration

Spokane 4/10/17 F00229R

Eastern Resurface 2 - 3M 395 US 395/Arden to Colville - Paving - Hot Mix Asphalt paving with basic safety restoration

Stevens 4/10/17 F39522T

Southwest Resurface 2 - 3M 006 X SR 6/Raymond to Chehalis River Bridge - Chip Seal - Rehabilitate pavement with a chip seal overlay

Lewis, Pacific 4/10/17 D00615P

Southwest Resurface 1 - 2M 014 SR 14/Wood Creek to Alderdale Rd Vic - Chip Seal - Rehabilitate Pavement with a chip seal

Klickitat 4/10/17 D01414P

Southwest Resurface 1 - 2M 103 X SR 103/US 101 to Stackpole Rd with Exceptions - Chip Seal - Rehabilitate pavement with a chip seal overlay

Pacific 4/10/17 D10315B

Southwest Resurface 2 - 3M 105 X SR 105/Raymond to Grays Harbor County Line - Chip Seal - Rehabilitate Pavement with a chip seal

Pacific 4/24/17 D10514P

ASOP | Page 4 http://www.wsdot.wa.gov/biz/contaa/ 13

Page 15: Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment Spokane Apollo, Inc. 10/03/2013 $15,368,730 $15,614,249 100% 8303 67040 37% 10%

Advanced Schedule of ProjectsMay 2, 2016 through April 30, 2017

Region Type Cost Range SR * Section 502

Applies

State Funds Only

Title and Work Description County Ad Date WI Number

Northwest Safety Under 1M Multiple Routes

Northwest Region Guardrail & Glare Screen - Install Guardrail & Glare Screen

King 5/2/16 A00015B

Southwest Safety Under 1M Regionwide SWR Regionwide Curb Ramps - ADA Compliance - Address curb ramps to meet ADA Compliance

Regionwide 5/2/16 D00016A

Eastern Safety Under 1M Regionwide Eastern Region Regionwide Curve Warning Chevron Signing - Curve signing improvements

Spokane, Stevens, Whitman

5/9/16 F00025G

North Central Safety Under 1M 002 US 2/97 Lower Sunnyslope Road - Access Control - Paving and access control

Chelan 5/23/16 B00291X

Olympic Safety Under 1M 012 US 12/Oakville City Limits to Huntington St SW - Safety Improvements - Remove or protect fixed objects, I/S and speed management strategies

Thurston, Grays Harbor

5/23/16 C01287A

Southwest Safety Under 1M 503 SR 503/Padden Parkway - Intersection Improvements - Modify right-turn radii and add right-turn signal displays

Clark 5/23/16 D50316S

Southwest Safety Under 1M Regionwide SWR - Intersection Safety Implementation Program - Signing & pavement marking enhancements for stop controlled intersection

Regionwide 5/31/16 D00016I

Olympic Safety 1 - 2M 008 SR 8/Winslow Dr SW to Vic US 101 - Safety Improvements - Remove or protect fixed objects

Thurston 6/6/16 C00826A

Olympic Safety Under 1M 012 X X US 12/Schouweiler Rd - Intersection Improvements Grays Harbor 6/6/16 C01288CSouthwest Safety Under 1M Regionwide SWR Regionwide Basic Safety - Guardrail 2015-17 - Upgrade

guardrail as needed to meet current standardsRegionwide 6/13/16 D00015G

Olympic Safety Under 1M Regionwide 15-17 OR Region Wide Basic Safety - Signing - Replace signing Regionwide 8/8/16 C00015SOlympic Safety Under 1M Regionwide Olympic Region - Intersection Safety Implementation Program 15-17 -

Low cost safety improvementsClallam, Grays

Harbor, Jefferson, Kitsap,

Mason

8/8/16 C00098H

Headquarters Safety 2 - 3M Regionwide X Wireless Communication-PE and Vendor Supplied Equipment - Wireless Communication

Regionwide 9/6/16 H99908E

Eastern Safety 1 - 2M Regionwide Eastern Region Regionwide ADA Project - Pedestrian Access Upgrades - Design & construct ADA compliant access as required

Ferry, Lincoln, Spokane, Stevens, Whitman

9/12/16 F00025H

Olympic Safety Under 1M Regionwide X OR - Regionwide Curve Warning Signing - Chevron Alignment 3 - Signing Improvements

Clallam, Grays Harbor,

Jefferson, Kitsap, Mason

9/12/16 C00098E

Olympic Safety Under 1M Regionwide 15-17 Olympic Region Centerline Rumble Strips Regionwide 9/19/16 C00090DOlympic Safety Under 1M Regionwide 15-17 Olympic Region Shoulder Rumble Strips Regionwide 9/19/16 C00091D

South Central Safety Under 1M 129 SR 129/SR 129 Spur Intersection - Replace Signal and Lighting System - Replace signal bridge, detection loops, and displays

Asotin 10/24/16 E12901O

Northwest Safety Under 1M 524 SR 524/Yew Way - Railroad Crossing Improvement - Signalization Snohomish 10/31/16 A52413BSouth Central Safety Under 1M 397 SR 397/S Yew St Vicinity - Roadside Improvements - Shoulder

widening and install safety edgeBenton 11/7/16 E39702D

Eastern Safety 3 - 4M 090 I-90/US 2 Garden Springs to Broadway Ave - Variable Speed System -Install ITS variable speed system

Spokane 11/14/16 F09047H

South Central Safety 2 - 3M 097 X US 97/Dolarway Intersection - Intersection Improvements - Construct roundabout and widen off-ramps

Kittitas 11/14/16 E09705X

North Central Safety Under 1M Regionwide NCR 15-17 Regionwide Intersection Safety Implementation Regionwide 11/21/16 B00007ANorth Central Safety Under 1M 026 SR 26/Intersection Improvements Grant 11/21/16 B02600N

Northwest Safety Under 1M 548 SR 548/Kickerville Rd - Intersection Improvements Whatcom 11/21/16 A54813BNorth Central Safety Under 1M 028 SR 28/17th to 19th St. E. Wenatchee - Two Way Left Turn Lane -

Construct Two Way Left Turn LaneDouglas 12/5/16 B02842B

South Central Safety Under 1M Regionwide 15-17 SCR Region Wide Basic Safety - Signing - Replace existing deteriorating signs

12/5/16 E00007S

South Central Safety Under 1M Regionwide 15-17 SCR - Intersection Safety Implementation Program - Improve signing and pavement markings

Regionwide 12/5/16 E00008T

Olympic Safety Under 1M 016 SR 16/Union Ave To Jackson Ave - ADA Ramps - Upgrade curb ramps

Pierce 12/12/16 C01698L

South Central Safety 1 - 2M 012 US 12/Rimrock Lake Vicinity - Stabilize Slope - Scaling, rock bolts and dowels; Slope #183

Yakima 12/12/16 D01206E

South Central Safety Under 1M 240 SR 240/SR 224/Van Giesen Street - Intersection Improvements - Add acceleration lane

Benton 12/12/16 E24003G

South Central Safety Under 1M 240 SR 240/0.2 Miles E of Jadwin Ave to I-182 - ADA Compliance - Upgrade existing curb ramps to meet ADA compliance

Benton 12/12/16 E24003M

Olympic Safety Under 1M Regionwide 15-17 OR Region Wide Basic Safety - Guardrail Regionwide 12/19/16 C00015T

ASOP | Page 5 http://www.wsdot.wa.gov/biz/contaa/ 14

Page 16: Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment Spokane Apollo, Inc. 10/03/2013 $15,368,730 $15,614,249 100% 8303 67040 37% 10%

Advanced Schedule of ProjectsMay 2, 2016 through April 30, 2017

Region Type Cost Range SR * Section 502

Applies

State Funds Only

Title and Work Description County Ad Date WI Number

Olympic Safety Under 1M Regionwide Olympic Region - Guardrail Installations - Install guardrail Clallam, Grays Harbor,

Jefferson, Kitsap, Mason

12/19/16 C00098J

Olympic Safety Under 1M 101 US 101/Evergreen Parkway to Vic Crosby Blvd - Install Cable Barrier - Install 4-strand cable median crossover barrier

Thurston 12/19/16 C10142E

Eastern Safety Under 1M Regionwide Eastern Region HMA Route Rumble Strips - Install Rumble Strip - Design and construct rumble strips based on engineering analysis

Regionwide 1/9/17 F00045B

North Central Safety Under 1M 028 SR 28/North of East Wenatchee - Safety Improvements - Radar detection camera and flashing sign.

Douglas 1/9/17 B02842C

Northwest Safety Under 1M 525 SR 525/SB Alderwood Mall Pkwy - Intersection Improvements - Signalize the existing intersection

Snohomish 1/9/17 A52500S

North Central Safety 3 - 4M 150 X SR 150/No-See-Um Road - IS Improvements and realignment - Realign SR 150 and construct roundabout

Chelan 1/17/17 B15000M

Eastern Safety Under 1M Regionwide 15-17 ER Regionwide Basic Safety - Signing - Regionwide sign replacement

Spokane, Stevens, Pend

Oreille, Whitman, Lincoln

1/23/17 F00025F

North Central Safety Under 1M 028 CO SR 28/5th Street Intersection Improvements Douglas 1/23/17 B02803QSouth Central Safety Under 1M 097 US 97/Branch Road - Intersection Improvements - Add beacons to

existing signsYakima 1/30/17 E09705A

South Central Safety Under 1M 097 US 97/Progressive - Intersection Improvements - Add beacons to existing signs

Yakima 1/30/17 E09705C

South Central Safety Under 1M 097 US 97/2nd Ave Vicinity - Roadside Improvements - Install shoulder rumble strips and concrete barrier

Yakima 1/30/17 E09705W

North Central Safety Under 1M 002 US 2/W of Coles Corner Roadside Safety - Roadside regrading, paving, delineation, and signing.

Chelan 2/6/17 B00207R

North Central Safety Under 1M 002 US 2/SR 207 Coles Corner - Two Way Left Turn Lane - Construct Two Left Turn Lane

Chelan 2/6/17 B00291Y

South Central Safety Under 1M 012 US 12/White Pass Vicinity - Major Drainage Phase 1 - Restore drainage systems and repair erosion

Yakima, Lewis 2/6/17 E01208V

South Central Safety Under 1M 090 X I-90/2 miles W of W Summit I/C EB - Culvert Rehabilitation - Install culvert lining, repair inlets and repair erosion

King 2/6/17 E09015J

North Central Safety Under 1M Multiple Routes

SR 17 & 171/Moses Lake Intersection Improvements - Construct Left Turn Lane

Grant 2/13/17 B01702X

Eastern Safety Under 1M Regionwide Eastern Region BST Rumble Strips A - Install Rumble Strip - Install rumble strips for BST routes based on engineering analysis

Regionwide 2/27/17 F00045D

North Central Safety 2 - 3M Multiple Routes

NCR ADA Compliance 2017 - Reconstruct curb ramps for ADA compliance

Grant 2/27/17 B00006R

Eastern Safety 2 - 3M 002 US 2/Deer Rd to Day Mt Spokane Rd - Corridor Improvements - Corridor safety improvements

Spokane 3/27/17 F00206B

South Central Safety Under 1M 012 US 12/SR 128 Vicinity to Snake River Bridge - Upgrade existing curb ramps to meet ADA Compliance

Asotin 4/3/17 E01216E

ASOP | Page 6 http://www.wsdot.wa.gov/biz/contaa/ 15

Page 17: Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment Spokane Apollo, Inc. 10/03/2013 $15,368,730 $15,614,249 100% 8303 67040 37% 10%

Advanced Schedule of ProjectsMay 2, 2016 through April 30, 2017

Region Type Cost Range SR * Section 502

Applies

State Funds Only

Title and Work Description County Ad Date WI Number

North Central Unique Under 1M Regionwide NCR Strategic Pavement Preservation 15-17 Area 2 - Low Cost Pavement preservation

Regionwide 4/21/16 B00008D

Olympic Unique Under 1M 112 X SR 112/W of West Twin River Bridge - Culvert Replacement - Replace existing culvert

Clallam 5/9/16 C11249A

Capital Facilities Unique Under 1M Regionwide X Vancouver Main Street Office Building 02 - Roof Replacement - SWR -Replace the roofing system

Clark 5/16/16 S88814B

Eastern Unique Under 1M 025 SR 25/Spokane River Bridge - Navigation Light System Replacement - Replace obsolete 70-year old navigation light system on two bridges

Stevens, Lincoln 5/16/16 F02505B

Ferries Unique Under 1M 020 FT ORCAS

SR 20 Spur/Orcas Island Trm - Facility ADA Compliance Improvements - Terminal facility ADA compliance improvements

San Juan 5/16/16 M04531A

Southwest Unique Under 1M 097 X US 97/Centerville Rd to Yakima Co - Variable Message Signs - Replace two obsolete and install one new VMS sign

Yakima, Klickitat 5/16/16 D09716Q

Olympic Unique Under 1M Regionwide X Region Wide HAR Improvements and Fiber Expansion - Install fiber optic cable and upgrade HAR transmitters

Pierce, Thurston 5/23/16 C00044Q

Southwest Unique Under 1M 503 SR 503 ATIS Infill-I/S Bypass; 4th Plain to Main St. and Signal Study Clark 5/31/16 D50317Q

Southwest Unique Under 1M 097 X US 97/Centerville Rd to Yakima Co - Variable Message Signs Klickitat, Yakima 5/31/16 D09716QCapital Facilities Unique Under 1M Regionwide X Eastern Region Signals Shop Building Roof Replacement - ER - Install

new roofSpokane 6/6/16 S88816D

Ferries Unique Under 1M 305 FT WINSLO

SR 305/Bainbridge Island Trm - Illumination System Rebuild - Replace existing light fixtures and deficient luminaire poles as needed

Kitsap 7/11/16 M03425A

North Central Unique 1 - 2M Regionwide NCR Strategic Pavement Preservation 15-17 Area 1 - Low Cost Pavement preservation

Regionwide 7/11/16 B00008E

North Central Unique 1 - 2M Regionwide SR 153/ NCR Strategic Pavement Preservation 15-17 Regionwide 7/18/16 B00008FCapital Facilities Unique Under 1M Regionwide X Everett Signals/Bridge Shop Structural Wall Repair - NWR - Repair

stuctural wallSnohomish 8/8/16 S88811N

Capital Facilities Unique Under 1M 082 I-82/Selah Creek EB SRA - Water System Improvements Phase 2 - SCR - Extend the depth of the existing well

Yakima 8/15/16 H08200E

Capital Facilities Unique Under 1M Regionwide X Region Headquarters Building Chiller Replacement - SWR - Replace chiller and controls

Clark 9/6/16 S88814Q

Ferries Unique Under 1M 104 FT EDMOND

SR 104/Edmonds / Kingston - Illumination System Rebuild - Replace existing light fixtures and deficient luminaire poles as needed

Snohomish 9/12/16 M00501A

North Central Unique Under 1M Regionwide X NCR 15-17 Electrical Service Upgrade - Electrical Service Upgrade Regionwide 9/12/16 B00005KCapital Facilities Unique Under 1M 005 X I-5/Gee Creek NB RV Dump Station Rehabilitation - Rehabilitate

existing RV dump stationClark 10/3/16 H00506D

Olympic Unique 5 - 10M 008 X SR 8/EF Wildcat Creek - Remove Fish Barrier - Remove fish passage barrier (990133)

Grays Harbor 10/10/16 C00817A

Olympic Unique 5 - 10M 008 X SR 8/Middle Fork Wildcat Creek - Remove Fish Barrier - Remove fish passage barrier (220.0507 0.10)

Grays Harbor 10/10/16 C00817B

Olympic Unique Under 1M 020 X SR 20/N of Eaglemount Half Bridge - Culvert Replacement - Replace existing culvert

Jefferson 10/10/16 C02011B

Northwest Unique 4 - 5M 532 SR 532/Church Creek - Fish Passage - Remove fish barrier Snohomish 10/17/16 A53206CNorth Central Unique Under 1M 002 X US 2/W of Wenatchee - VMS - Install VMS Chelan 10/24/16 B00208Q

Northwest Unique Under 1M 542 SR 542/Cornell Creek Rd Vic to Nooksack River - Guardrail Replacement - Guardrail Replacement

Whatcom 10/31/16 A54232A

Olympic Unique Under 1M 005 X I-5/SB 84th St - Replace Signal - Replace outdated signal system Pierce 10/31/16 C00551BFerries Unique Under 1M 020 FT

ANACORSR 20 Spur/Anacortes / San Juan Islands - Illumination System Rebuild - Replace existing light fixtures and deficient luminaire poles as needed

Skagit 11/7/16 M00801A

ASOP | Page 7 http://www.wsdot.wa.gov/biz/contaa/ 16

Page 18: Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment Spokane Apollo, Inc. 10/03/2013 $15,368,730 $15,614,249 100% 8303 67040 37% 10%

Advanced Schedule of ProjectsMay 2, 2016 through April 30, 2017

Region Type Cost Range SR * Section 502

Applies

State Funds Only

Title and Work Description County Ad Date WI Number

Southwest Unique 3 - 4M 005 I-5/Ridgefield Port of Entry - Scalehouse Reconstruction - Replace existing scalehouse building and add scale pit.

Clark 11/7/16 D00516S

North Central Unique 2 - 3M 002 US 2/West of Leavenworth - Slope Stabilization - Slope Stabilization --Slope# 033

Chelan 11/14/16 B00207N

Olympic Unique Under 1M Regionwide X Olympic Region Major Electrical Rehab - RWIS Upgrades - Upgrade variable message signs and road weather information systems

Clallam, Jefferson, Kitsap, Pierce, Thurston

11/28/16 C00072L

Capital Facilities Unique Under 1M 005 X I-5/Silver Lake SB RV Dump Station Rehabilitation - Rehabilitate existing RV dump station

Snohomish 12/5/16 H00531B

Capital Facilities Unique Under 1M 090 X I-90/Schrag EB SRA - Water System Rehabilitation - ER - Replace waterline

Adams 12/12/16 H09019R

North Central Unique 1 - 2M 101 US 101/Matriotti Creek - Remove Fish Barrier - Remove fish passage barrier (18.0021 5.40)

Clallam 12/12/16 C10196C

South Central Unique Under 1M 397 SR 397/E Bruneau Ave - Railroad Crossing Improvements - Install cantilever-mounted beacons - Xing #808925X

Benton 12/12/16 E39701V

Olympic Unique 2 - 3M Regionwide X US 12/US 101/Aberdeen Signals - Rebuild Signals - Rebuild existing signal systems on US 12 and US 101

Grays Harbor 12/19/16 C00070F

Olympic Unique 1 - 2M Regionwide X US 101/SR 105/SR 109/Aberdeen-Hoquiam Signals - Rebuild Signals -Rebuild signal systems on US 101, SR 105 and SR 109

Grays Harbor 12/19/16 C00070G

Ferries Unique Under 1M 020 FT COUPVL

SR 20/Port Townsend/Coupeville - Illumination System Rebuild - Replace existing light fixtures and deficient luminaire poles as needed

Jefferson 1/9/17 M00701A

Ferries Unique Under 1M 163 FT PTDEFI

SR 163/Point Defiance Trm - Emergency Generator Improvement - Installation of a 150 kW emergency generator

Pierce 1/9/17 M04606A

North Central Unique Under 1M Regionwide NCR Sign Update 15-17 - Sign Update Adams, Chelan, Douglas, Grant,

Okanogan

1/9/17 B00006B

North Central Unique Under 1M Regionwide NCR Guardrail Update 15-17 - Guardrail Update Adams, Chelan, Douglas, Grant,

Okanogan

1/9/17 B00006D

North Central Unique 1 - 2M 504 SR 504/Wooster Creek - Culvert Replacement Chronic Environ. Deficiency - Replace culvert

Cowlitz 1/9/17 D50416C

Northwest Unique 3 - 4M 090 I-90/N Fork Issaquah Creek - Fish Passage - Fish Barrier Removal King 1/9/17 A09058BNorthwest Unique 3 - 4M 542 SR 542/Hedrick Creek - Fish Barrier Removal Whatcom 1/9/17 A54231JNorthwest Unique 1 - 2M 900 SR 900/Green Creek - Fish Passage - Remove fish barrier King 1/17/17 A90021C

South Central Unique Under 1M 090 I-90/North Bend to Easton - ITS System Preservation - System Preservation

Kittitas, King 2/6/17 E09016P

Northwest Unique 1 - 2M 531 SR 531/Edgecomb Creek - Remove fish barrier Snohomish 2/13/17 A53175ANorthwest Unique Under 1M 524 X SR 524/Great Dane Creek - Remove Fish Barrier (ID# 102 L020) Snohomish 2/27/17 A52412D

Ferries Unique Under 1M 163 FT PTDEFI

SR 163/Point Defiance/Tahlequah - Illumination System Rebuild - Replace existing light fixtures and deficient luminaire poles as needed

Pierce 3/6/17 M00403A

Ferries Unique Under 1M 020 FT ANACOR

SR 20 Spur/Anacortes Trm Bldg Vic - Underground Storage Tank Remediation - Remediation of former underground storage tank site soil contamination

Skagit 3/6/17 M03387A

North Central Unique Under 1M 020 SR20/Wauconda Summit - RWIS and Camera - Install Road and Weather Information System and Camera

Okanogan 3/6/17 B02000W

North Central Unique Under 1M 097 US 97/1.7 Mi. N of Blewett Pass - Culvert Replacement - Major Drainage

Chelan 3/6/17 B09704J

North Central Unique Under 1M 020 SR 20/7 Mi. W of Rainy Pass - Flood Deflection Berm - Major Drainage

Skagit 3/13/17 B02000M

Olympic Unique Under 1M 101 X US 101/N of Lower Salmon Cr - Culvert Replacement - Replace existing culvert #114117

Grays Harbor 3/20/17 C10102D

Capital Facilities Unique Under 1M 090 X I-90/Schrag WB SRA - RV Dump Station Rehabilitation - Rehabilitate existing RV dump station

Adams 4/3/17 H09001B

Ferries Unique 2 - 3M 160 FT SOUTHW

SR 160/Southworth Trm (Stage 1) - Main Terminal Building Replacement - Replace existing ferry terminal building on trestle and relocate upland

Kitsap 4/17/17 M05003B

ASOP | Page 8 http://www.wsdot.wa.gov/biz/contaa/ 17

Page 19: Apprenticeship Meeting Minutes June 2016 · 8496 Us 395, Nsc - Bnsf Railway Structures/Realignment Spokane Apollo, Inc. 10/03/2013 $15,368,730 $15,614,249 100% 8303 67040 37% 10%

WSDOT disciplinary measures for non‐compliance on Apprenticeship Utilization Requirements: 

First and Second Offences:  

Certified letter informing the Contractor they failed to meet apprenticeship requirements.  Requires a plan detailing how apprenticeship utilization requirements will be attained on all current active 

WSDOT contracts with apprenticeship utilization requirements.  Offense remains in effect until 

o Contractor meets apprenticeship utilization requirements on three consecutive contracts, or o Two calendar years have passed 

 

Third Offence:  Certified letter informing the Contractor they failed to meet apprenticeship requirements.  Requires a plan detailing how apprenticeship utilization requirements will be attained on all current active 

WSDOT contracts with apprenticeship utilization requirements.  Notification that a suspension of qualifications will be imposed for a period of six months. 

o If additional non‐compliance occurs during the suspension period, the State Construction Office will determine if further action is warranted. 

o After the suspension period, the next offence will be a first offence. o If a third offence occurs within two years of a previous suspension the Contractor’s 

prequalification may be revoked.