NCHRP 18-14, Final Report Draft, Appendix E E-1 APPENDIX E ASTM SPECIFICATIONS Table of Contents E.1 ASTM D6489-99 ............................................................................................................. E-1 E.2 ASTM G109–99a ............................................................................................................. E-5

Transcript of APPENDIX E ASTM SPECIFICATIONS Table of Contents E.1 ASTM ...

Page 1: APPENDIX E ASTM SPECIFICATIONS Table of Contents E.1 ASTM ...

NCHRP 18-14, Final Report Draft, Appendix E E-1

APPENDIX E

ASTM SPECIFICATIONS

Table of Contents

E.1 ASTM D6489-99 ............................................................................................................. E-1

E.2 ASTM G109–99a ............................................................................................................. E-5

Page 2: APPENDIX E ASTM SPECIFICATIONS Table of Contents E.1 ASTM ...

NCHRP 18-14, Final Report Draft, Appendix E E-2

E.1 ASTM D6489-99

Page 3: APPENDIX E ASTM SPECIFICATIONS Table of Contents E.1 ASTM ...

NCHRP 18-14, Final Report Draft, Appendix E E-3

Page 4: APPENDIX E ASTM SPECIFICATIONS Table of Contents E.1 ASTM ...

NCHRP 18-14, Final Report Draft, Appendix E E-4

Page 5: APPENDIX E ASTM SPECIFICATIONS Table of Contents E.1 ASTM ...

NCHRP 18-14, Final Report Draft, Appendix E E-5

E.2 ASTM G109–99a

ASTM G109–99a is used to test the effect of chemical admixtures added to the concrete

mix on the corrosion of embedded steel reinforcement. Three concrete prisms (6 x 4.5 x 11 in.),

are made for every concrete mix that contains chemical admixtures. Also, three specimens that

are made from a concrete mix with no chemical admixture are used as control specimens. Each

specimen is provided with three steel bars made of the same size. The bar size can range from #3

to #5. The tips of the bars are covered with electroplater tape. One bar is installed close to the

top surface of the specimen and is used as the anode of the circuit. Two bars are installed close to

the bottom surface and are used as the cathode of the circuit. The top surface of the specimen is

exposed to the salt solution for two weeks and then removed for the next two weeks. The voltage

across a 100-ohm resistor is measured at the beginning of the second week of every ponding

period, and the corresponding current is calculated.

This ponding-dry periods are repeated until the average integrated macrocell current of

the control specimens is 150 Coulombs or greater, and at least half of the specimens show

integrated macrocell current equal to 150 Coulombs or greater. ASTM G 109 – 99a states that

this limit will be reached in about six months. The total integrated corrosion at various time

periods (1, 2, ….and 6 months) is calculated and compared to that of control specimens.

Page 6: APPENDIX E ASTM SPECIFICATIONS Table of Contents E.1 ASTM ...

NCHRP 18-14, Final Report Draft, Appendix E E-6

Page 7: APPENDIX E ASTM SPECIFICATIONS Table of Contents E.1 ASTM ...

NCHRP 18-14, Final Report Draft, Appendix E E-7

Page 8: APPENDIX E ASTM SPECIFICATIONS Table of Contents E.1 ASTM ...

NCHRP 18-14, Final Report Draft, Appendix E E-8

Page 9: APPENDIX E ASTM SPECIFICATIONS Table of Contents E.1 ASTM ...

NCHRP 18-14, Final Report Draft, Appendix E E-9

Page 10: APPENDIX E ASTM SPECIFICATIONS Table of Contents E.1 ASTM ...

NCHRP 18-14, Final Report Draft, Appendix E E-10

Page 11: APPENDIX E ASTM SPECIFICATIONS Table of Contents E.1 ASTM ...

NCHRP 18-14, Final Report Draft, Appendix E E-11