Appendix D Scenario Outline Form ES-D-1 ILT42 December 17, 2012 Facility: Oconee Scenario No.: 1 rO Op-Test No.: 1 Examiners: Operators: Initial Conditions: . Reactor Power = 50% Unit 2: 100%, Unit 3: 100% Turnover: . Rx power at 50% Pressurize LDST with Hydrogen Event Malfunction Event No. No. Event Type* Description Oa MPI29O Block all Turbine Trips except Manual Ob Override Block Manual Turbine Trip pushbutton Oc Override SASS in Manual Od Override ES-5 Auto Actuation blocked 1 Override C: BOP, SRO Pressurize LDST with H2 (1 H-i will fail open requiring (TS) LDST vent to return to acceptable LDST pressure) 2 Override C: BOP, SRO Shutdown 1 B FDWP due to High Vibration MPIO5O,0 3 I: OATC, SRO lB Loop RCS Flow fails low MPIO8O,0 R: OATC, SRO 55 gpm Pri-Sec leak in lB SG requires Manual S/D. 4 MPSO2O,i .2 (TS) End 5.19 Control of Plant Equipment During Shutdown 5 N: BOP, SRO for SGTR (Transfer unit auxiliaries) 6 MP1290 C: OATC, SRO Main Turbine fails to trip requiring EHC Pump lockout 7 MPS400,0.25 M: All SBLOCA with ES Channel 5 failure to auto actuate (N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor

Transcript of Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Page 1: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-1ILT42 December 17, 2012

Facility: Oconee Scenario No.: 1 rO Op-Test No.: 1

Examiners: Operators:

Initial Conditions:. Reactor Power = 50% Unit 2: 100%, Unit 3: 100%

Turnover:. Rx power at 50%• Pressurize LDST with Hydrogen

Event Malfunction EventNo. No. Event Type*

Description

Oa MPI29O Block all Turbine Trips except Manual

Ob Override Block Manual Turbine Trip pushbutton

Oc Override SASS in Manual

Od Override ES-5 Auto Actuation blocked

1 Override C: BOP, SRO Pressurize LDST with H2 (1 H-i will fail open requiring(TS) LDST vent to return to acceptable LDST pressure)

2 Override C: BOP, SRO Shutdown 1 B FDWP due to High Vibration

MPIO5O,03 I: OATC, SRO lB Loop RCS Flow fails low

MPIO8O,0

R: OATC, SRO 55 gpm Pri-Sec leak in lB SG requires Manual S/D.4 MPSO2O,i .2 (TS)

End 5.19 Control of Plant Equipment During Shutdown5 N: BOP, SRO for SGTR (Transfer unit auxiliaries)

6 MP1290 C: OATC, SRO Main Turbine fails to trip requiring EHC Pump lockout

7 MPS400,0.25 M: All SBLOCA with ES Channel 5 failure to auto actuate

(N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor

Page 2: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: 1 - Page 1 of 3

Event Description: Pressurize LDST with Hydrogen

Time Position [ Applicant’s Actions or Behavior

Crew response:SRO • Direct the BOPto add H2to the LDST using OP/1/A/1106/017 (Hydrogen

System) Enclosure 4.5 (Unit 1 LDST H2 Addition).

SRO/BOP • Enclosure 4.5 (Unit 1 LDST H2 Addition) will:2.1 Notify Chemistry of hydrogen addition prior to adding hydrogen.

NOTE:• OPIO/A11108/O01 (Curves And General Information) and computer may be

referred to for LDST Pressure vs. Level curve.• LDST Maximum Pressure vs Indicated Level Curve should NOT be

exceeded when pressurizing LDST.

2.2 Immediately prior to pressurization determine lowest reading of diverseLDST level indications: inches.

2.3 For existing LDST level determine LDST Pressure allowable per LDSTPressure vs. Level curve:

_____

psig.

2.4 Notify Operator at H2 Cage to pressurize primary hydrogen.

NOTE: Operator should be in constant communication with CR to close 1 H-26if 1H-i fails open.

BOOTH CUE: When directed to open 1H-26, use Manual Valves andposition 1H-93 approximately 20% open

2.5 Direct Operator to open 1 H-26 (LDST Block).

2.6 Direct Operator in field to monitor explosive detector.

2.7 Cycle 1H-i (LDST SUPPLY) as required to pressurize LDST per LDSTPressure vs Level curve.

Examiner Booth Note: Once LDST pressure is being increased, 1H-1(LDST SUPPLY) will fail open.

2.8 WHEN Hydrogen addition complete, ensure closed 1 H-i (LDSTSUPPLY).

Applicable Tech Specs:SRO 3.5.2 Condition C (Action C.3) 72 hour completion time

3.5.2 Condition H (Action Hi) Enter 3.0.3 ImmediatelyLCO 3.0.3 requires Mode 3 within 12 hours.

This event is complete LDST pressure has been returned to the acceptable range and the SROhas made the Tech Spec determination OR as directed by lead examiner.

Page 2 of 40

Page 3: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: lLT42 Scenario No.: 1 Event No.: 1 Page 2 of 3

Event Description: Pressurize LDST with Hydrogen

Time Position [ ApplicanVs Actions or Behavior

Plant response:• LDST pressure will continue to increase.• 1 SA-02/D-2, HP Approaching LDST Operating Limits, actuates

R BCrew response:

S 0/ 0• BOP should determine that 1 H-i has failed open and direct the NLO to

close 1 H-26.

Examiner Note: 1HP-26 will not be closed until LDST pressure isoutside acceptable range.

• Refer to the ARG.

SRO • Verify LDST pressure/level are within the acceptable operating region ofthe LDST PRESSURE vs. LEVEL enclosure in OP/0/A/i 108/001 (Curvesand General Information).

IF necessary, vent LDST to GWD per OP/i/Ni 104/002 (HPI System).• LDST PRESSURE vs. LEVEL enclosure in OP/0/Ni 108/001 (Curves and

General Information) directs the following:

SRO/BOP • If LDST Pressure vs. Level is above and to the left of Curve 1, thendeclare BOTH trains of HPI INOPERABLE.

o Immediately depressurize LDST below Curve 1.o Refer to TS 3.0.3 for shutdown requirements.o Make notifications as required by OMP 1-14 (Notifications).

• Direct the ROs to vent LDST to GWD per OP/i/Ni 104/002 (HPI System),End. 4.16, (Lowering LDST Pressure)

• Review Limits and Precautions

3.1 Direct Operator to Close 1 GWD-20 (LDST Vent BIk).

3,2 Open 1 GWD-1 9 (LDST VENT).

3.3 Direct Operator to throttle open 1 GWD-20 (LDST Vent Blk) until LDSTpressure begins to slowly decrease GWD system can maintainvent header.

3.4 IF required, start Standy GWD Compressor per OP/i -2/Ni 104/018(GWD System). (See Next Page)

3.5 WHEN desired LDST pressure obtained, close 1 GWD-i 9 (LDSTVENT)

3.6 If started, stop Standy GWD Compressor3.7 Throttle 1/4 turn open 1GWD-20.

This event s complete LDST pressure has been returned to the acceptable range and the SROhas made the Tech Spec determination OR as directed by lead examiners

Page 3 of 40

Page 4: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: 1 Page 3 of 3

Event Description: Pressurize LDST with Hydrogen

Time Position [ Applicant’s Actions or Behavior

OP/i -2/Ni 104/018 (GWD System)

1. Initial Conditions

None

2. Procedure

2.1 IF desired to start ‘A’ GWD Compressor, perform the following:

2.1.1 Open DW-140 (‘A’ GWD COMP DW MAKEUP).

2.1.2 Start ‘A’ GWD COMPRESSOR.

2.1.3 Place DW-140 (‘A’ GWD COMP DW MAKEUP) in “AUTO”.

2.1.4 Verify GWD-8 (‘A’ SEPARATOR TANK DRAIN) closed.

2.2 IF desired to start ‘B’ GWD Compressor, perform the following:

2.2.1 Open DW-142 (‘B’ GWD COMP DW MAKEUP).

2.2.2 Start ‘B’ GWD COMPRESSOR.

2.2.3 Place DW-142 (‘B’ GWD COMP DW MAKEUP) in “AUTO”.

2.2.4 Verify GWD-9 (‘B’ SEPARATOR TANK DRAIN) closed.

2.3 IF desired to stop ‘A’ GWD Compressor, perform the following:

2.3.1 Ensure another compressor is carrying the header.

2.3.2 Stop ‘A’ GWD COMPRESSOR.

2.4 IF desired to stop ‘B’ GWD Compressor, perform the following:

2.4.1 Ensure another compressor is carrying the header.

2.4.2 Stop ‘B’ GWD COMPRESSOR.

This event is complete LDST pressure has been returned to the acceptable range and the SROhas made the Tech Spec determination OR as directed by lead examiner.

Page 4 of 40

Page 5: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: 2 Page 1 of 3

Event Description: Shutdown lB FDWP due to High Vibration

Time [ Position Applicant’s Actions or Behavior

Plant Response:

At 3.0 mils 1 B FDWP inboard bearing vibration the following alarms will bereceived:

• QAC alarm 01A0959 (FWPT lB Bearing Vib) HI alarm• 1 SA8/A8 (FDW “B” Bearing Vibration High)

Crew Response:SRO/BOP Crew will reference 1 SA8IA8:

3.1 Refer to Limits and Precautions of OP/1/N1106/002 B (FDWPTOperation).

3.2 Determine which bearing vibration is high by checking chart recorder inthe control room.

3.3 Monitor the Indikon Vibration Monitoring system located locally atSteam Generator Level Control Panel for an increase in FDWPTvibration.

Booth Cue: When NEO is dispatched, inform the team that using timecompression local indications show the alarm light is illuminated andthe 1 B FDWPT inboard bearing peak is approximately 3 mils.

3.4 Monitor FDWPT bearing oil drain temperatures and other pumpparameters to determine if the vibration indication is real.

3.5 IF vibration indication is NOT real, issue a WR for I&E to checkvibration probe for valid indication.

Booth Cue: If SPOC is contacted to investigate vibration indications,report that using time compression the indications appear to be realand the component engineer and OSM direct that we shutdown the lBFDWP so we can inspect the bearing.

3.6 IF it is necessary to remove the FDWPT from service, refer toOP/i/Ni 106/002 B (FDWPT Operation).

• IF> 60% power, reduce power to 55% prior to securing FDWPT(if possible).

• Refer to OP/i/Nil 02/004 (Operation at Power).

3.7 Notify Maintenance to check bearing for signs of damage beforeattempting to restart.

NOTE: steps to remove the lB FDWPT from service lAW OP/i/All 106/002B are on the next page.

This event is completed when the 18 FDWP has been secured, or when directed by the leadexaminer

Page 5 of 40

Page 6: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: ILT42 Scenario No.: 1 Event No.: 2 Page 2 of 3

Event Description: Shutdown 1 B FDWP due to High Vibration

Time Position Applicant’s Actions or Behavior

OP/1/N1106/002 B Enclosure 4.9 (Shutdown of lB FDWPT)

SRO/BOP 2.1 IF this is first FDWPT to be shutdown:

2.1.1 Verify 1 SA-5/E-1 (FWPT I RX TRIP ALERT) NOT in alarm.

2.1.2 Position the following: (already positioned during powerreduction)

A. Ensure 1FDW-53 (1A FDWP RECIRC CONTROL) in“MANUAL”

B. Ensure Closed 1 FDW-53 (1A FDWP RECIRC CONTROL)C. Ensure 1FDW-65 (18 FDWP RECIRC CONTROL) in

“MANUAL”D. Ensure Closed 1 FDW-65 (1 B FDWP RECIRC CONTROL)

2.2 IF in FDW Heatup, perform the following: (N/A)

2.2.1 Ensure 1 FDW-65 (1 B FDWP RECIRC CONTROL) in “MANUAL”.

• Ensure Closed 1 FDW-65 (1 B FDWP RECIRC CONTROL).

2.2.2 Ensure 1FDW-53 (1A FDWP RECIRC CONTROL) in “MANUAL”.

• Throttle 1 FDW-53 (1A FDWP RECIRC CONTROL) toestablish > 2300 gpm.

2.3 Ensure running 1 B FDWP AUXILIARY OIL PUMP. : (alreadypositioned during power reduction)

2.4 IF 1A FDWP is NOT isolated for maintenance, start 1A FDWPAUXILIARY OIL PUMP.(already positioned during powerreduction)

2.5 Place lB MAIN FDW PUMP (ICS) in “HAND”.

2.6 Slowly run 1 B MAIN FDW PUMP demand signal to minimum.

2.7 IF required, verify 1A FDWPT picks up load by observing FDWPTsuction flow instruments.

2.8 Immediately trip 1 B FDWPT from FW TURB 1 B TRIP/RESET switch.

• Verify closed 1 B FDWPT HP stop valve• Verify closed 1 B FDWPT LP stop valve

2.9 WHEN 1 B FDWPT reaches 0 speed:

• Ensure 1 B FDWP TURNING GEAR MOTOR starts.• Ensure 1 B FDWP TURNING GEAR engages.

This event is completed when the lB FDWP has been secured, or when directed by the leadexaminer

Page 6 of 40

Page 7: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: j_ Event No.: 2 Page 3 of 3

Event Description: Shutdown 1 B FDWP due to High Vibration

Time Position Applicant’s Actions or Behavior

OP!1/N1106/002 B Enclosure 4.9 (Shutdown of lB FDWPT)(Continued)

SRO/BOP 2.10 Openthefollowing:

• 1SD-125 (18 FDWPT LPSV BS Stm Trap Byp) (T-1-C25)• 1SD-126 (lB FDWPT HPSV BS Stm Trap Byp) (T-1-D25).

Booth Cue: If NEO contacted to open the above valves, acknowledge theinstructions however the valves are not modeled on simulator so nobooth actions are required.

2.11 Place 1 B FDWP Runback Bypass switch to “BYPASS”. (Ti - Locatedon SG FDW Panel 1 SGFP)

CAUTION: If either FDWPT still operating, isolating Aux Steam may causeoperating FDWPT to trip.

NOTE: If 1 A and 1 B FDWPT stop valves are closed then both FDWPT(s)are tripped.

2.12 IF both FDWPTs are tripped, close 1AS-97 (FDWPT Aux StmRegulator Inlet). (T-3-J20 W)

This event is completed when the 1 B FDWP has been secured, or when directed by the leadexaminer.

Page 7 of 40

Page 8: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-2LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: Page 1 of 4

Event Description: 1 B Loop RCS Flow Fails Low

Time Position Applicant’s Actions or Behavior

Plant Response:

• 1 SA-02/A-4, RC Loop B flow Low.• 1 SA-021A-5, RC Total Flow Low• 1SA-02/A-11, ICS Runback• 1 SA-02/A-1 2, ICS Tracking• 1SA-05/A-5, 1A RPS Trouble• 1 SA-04/C-1, Quadrant Power Tilt (after a couple of minutes)

Crew Response:

Crew should perform Plant Transient Response (PTR)SRO/OATC/

BOP • OATC reports to the SRO reactor power level and direction of movement.

• The BOP reports no valid runback and monitors RCS pressure andinventory.

• OATC takes ICS to MANUAL and both FDW controllers to HAND.

• The OATC will adjust FDW and/or control rods as necessary to restorereactor power to the desired control band.

SRO may direct the OATC to perform the actions of the ARG for 1 SA-02/A-4statalarm, but probably will move directly from PTR to AP/28.

ARG for 1SA-02/A-4

SRO/OATC 3.1. Ensure reactor power is reduced below the flux to flow minus imbalancetrip ratio.

3.2. Ensure feedwater demand reratios properly.

SRO directs performance of AP/1/N1700/028, ICS Instrument Failures. (seenext page)

This event is completed when at Step 6 (WHEN notified by SPOC..) of AP/28 Section 4E, or whendirected by the lead examiner.

Page 8 of 40

Page 9: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-2lLT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: Page 2 of 4

Event Description: lB Loop RCS Flow Fails Low

Time__[ Position Applicant1sActions or Behavior

API1 IA/i 700/028 Subsequent Actions

SRO/BOP/ 4.1. Provide control bands as required.OATC 4.2. Initiate notification of the following:

• OSM to reference the following:o OMP 1-14 (Notifications)o Emergency Plan

o STA

4.3. Verify a power transient 5% has occurred.

RNO: GO TO Step 4.5

EXAMINER NOTE: If power change was 5%, then step 4.4 will beperformed. It depends on the speed of crew response to the failure.

4.4. Notify Rx Engineering and discuss the need for a maneuvering plan.

4.5. Use the following, as necessary, to determine the applicable sectionfrom table in Step 4.6:

• OAC alarm video• OAC display points• Control Board indications• SPOC assistance, as needed

4.6. GO TO the applicable section per the following table:

Section Failure

4A RCS Temperature

4B Turbine Header Pressure

4C Controlling NI

4D Feedwater Loop Flow

4E RCS Flow

This event is completed when at Step 6 (WHEN notified by SPOC...) of API28 Section 4E, or whendirected by the lead examiner.

Page 9 of 40

Page 10: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: Event No.: Page 3 of 4

Event Description: 1 B Loop RCS Flow Fails Low

Time Position j ApplicanVs Actions or Behavior

AP111N17001028 SECTION 4E

NOTEThe following will occur when an ICS RCS flow loop signal fails:

ICS RUNBACKControlling Tave swaps to RCS loop with higher flowDelta Tc station re-ratios loop feedwater flows

SRO/OATC/ 1. Ensure the following in HAND:BOP

• 1AFDW MASTER• 1BFDW MASTER

2. Ensure DIAMOND in MANUAL.

3. Notify SPOC to perform the following:

• Select a valid RCS flow input to lOS per AM/i /A10326/020 (Controlof Unit 1 Star Module Signal Selection Function).

• Investigate and repair the failed RCS flow instrumentation.

4. PERFORM an instrumentation surveillance using applicable table inEnd 5.2 (ICS Instrument Surveillances) for the failed instrument.

. RO should refer to Table 3 and determine the surveillances are met.

5. Verify instrumentation surveillance in End 5.2 (ICS InstrumentSurveillances) was performed satisfactorily as written.

6. WHEN notified by SPOC that a valid RCS flow input has been restoredto ICS,THEN GO TO OP/i/Ni 102/004 A End (Placing ICS Stations To Auto).

EXAMINER/BOOTH NOTE: The crew may determine that manuallybypassing the failed RCS flow channel is desired. If so, see procedure onnext page (the keys are in the key cabinet near the booth door)

SRO directs the BOP to perform actions of ARG 1 SA-05/A-5 to bypass thefailed RPS channel A.

This event is completed when at Step 6 (WHEN notified by SPOC...) of AP128 Section 4E, or whendirected by the lead examiner.

Page 10 of 40

Page 11: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: Page 4 of 4

Event Description: 1 B Loop RCS Flow Fails Low

Time Position Applicant’s Actions or Behavior

ARG 1SA-05/A-5

SRO/BOP3.1. IF Reactor trips, Go To EP/1/A/1800/0O1 (Emergency Operating

Procedure).

3.2. Refer to OP/i/Ni 105/014 (Control Room Instrumentation Operationand Information).

3.3. Initiate Work Request for I&E to investigate cause.

OPI1/N11051014, Enclosure 4.7 (Removal and Restoration of RPS channels)

EXAMINER NOTE: This RCS flow channel is not required by TS 3.3.1since there are still 3 operable RCS flow channels.

3.1. IF affected RPS channel is NOT required per TS 3.3.1, perform one ofthe following:

3.1.1 IF Manual Bypass of affected RPS channel (A) is desired, performthe following:

A. Obtain Key #314.B. Declare affected RPS Channel (A) inoperable.C. Place affected RPS Channel MANUAL BYPASS keyswitch in

“BYP”. (Cab. 2, 4, 6, or 8)

3.1.2 IF Manual Trip of affected RPS channel is desired, perform thefollowing: (N/A since manual bypass is preferred in this case)

3.2. IF affected RPS channel is required per TS 3.3.1, perform the following:(N/A since this channel is not required by TS 3.3.1)

3.3. IF RPS Channel removed from service due to equipment failure,perform the following:

• Initiate Work Request.• IF required per OMP 1-14 (Notifications), perform appropriate

notifications.

EXAMINER NOTE: The failed RCS Flow channel will not be returned toservice during this scenario

3.4. WHEN notified by I&E, restore RPS channels as follows: (N/A)

This event is completed when at Step 6 (WHEN notified by SPOC....) of AP/28 Section 4E, or whendirected by the lead examiner.

Page 11 of 40

Page 12: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: Page 1 of 2

Event Description: 55 gpm Pri-Sec Leak in 1 B SG Requires Manual SID (TS)

Time Position Applicant’s Actions or Behavior

Plant response:

• 1 SA8/A9 (RM AREA MONITOR RADIATION HIGH)• 1 SA8/Ei 0 (N-i 6 RM PRIMARY TO SECONDARY TUBE LEAK)• 1SA8/D10 (RM CSAE EXHAUST RADIATION HIGH)• 1SA8IB9 (RM PROCESS MONITOR RADIATION HIGH)• 1 RIA-40 in alarm

• 1 RIA 59 in alarm and indicating 55 gpm.• 1 RIA 60 in alarm

Crew response:

EXAMINER NOTE: Direct entry into the SGTR Tab is SGTL 25 gpm. EDLs

S RO are in effect

EOP SGTR TAB

SRO/BOP/1. Verify Rx tripped.

OATC RNO: 1. Maintain Pzr level 220” - 260” by initiating End 5.5 (Pzr and LDSTLevel Control).

2. GOTOStep9.

9 IAAT Pzr level decreasing with all available HPI,AND Rx power is> 18%,THEN perform the following:

A. Trip the Rx.B. GO TO IMAtab.

10. Verify all:

• Rx power> 40%• 1 RIA-59 operable• 1 RIA-60 operable

EXAMINER NOTE: Crew determines that SGTL rate is 55 gpm.

11. Determine leak rate using:

• 1RIA-59• 1RIA-60

12. Notify OSM of SGTR leak rate.

SRO/OATC 13. Verify ICS capable of power reduction in AUTO.RNO: 1. Initiate manual power reduction to < 15%.

2. GOTOStepl5.

This event is completed when > 10% power reduction has occurred, or when directed by the leadexaminers

Page 12 of 40

Page 13: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: 4 Page 2 of 2

Event Description: 55 gpm Pri-Sec Leak in 1 B SG Requires Manual SID (TS).

Time__[ Position Applicant*s Actions or Behavior

EOP SGTR TAB (continued)

NOTEEnd 5.19 (Control of Plant Equipment During Shutdown for SGTR) will swapauxiliaries.

SRO/BOP 15 Initiate End 5.19 (Control of Plant Equipment During Shutdown forSGTR). (see next page for Event 6)

16. WHEN both exist:

• Reactor power is 15% FP• Unit auxiliaries have been transferred

THEN continue.

EXAMINER NOTE: The Tech Spec for this SGTR is TS 3.4.13 for leakage>150 gpd. Condition B applies (Mode 3 within 12 hours and Mode 5 within36 hours)

BOOTH CUE: Ensure the OATC has reduced Reactor Power>10% ANDthe BOP has transferred auxiliaries prior to initiating the next event (Timer8)

This event is completed when > 10% power reduction has occurred, or when directed by the leadexaminer.

Page 13 of 40

Page 14: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: 5 Page 1 of 4

Event Description: Control of Plant Equipment During Shutdown for SGTR (End 5.19).

Time Position ApplicanVs Actions or Behavior

SRO/BOP EOP Enclosure 5.19

1. — Perform the following:A. Monitor RIAs to identify Jj. SGs with a tube rupture:

• 1RIA-16

• 1RIA-17

• 1 RIA-59 when Rx power > 40%• 1 RIA-60 when Rx power> 40%

B. — Inform CR SRO of results.2. — Place 1TA AUTO/MAN transfer switch in MAN.3. — Place 1TB AUTO/MAN transfer switch in MAN.4. — Close 1TA SU 6.9 KV FDR.5. Close 1TB SU 6.9 KV FDR.6. — Place MFB1 AUTO/MAN transfer switch in MAN.7. — Place MFB2 AUTO/MAN transfer switch in MAN.8. — Close El1 MFB1 STARTUP FDR.9. — Close E21 MFB2 STARTUP FDR.10. — Notify CR SRO that unit auxiliaries have been transferred.11. Start:

— TURBINE TURNING GEAR OIL PUMP— 1 A through 1 E TURBINE BRNG OIL LIFT PUMPs— TURBINE MOTOR SUCTION PUMP

12. Start:— A OUTSIDE AIR BOOSTER FAN— B OUTSIDE AIR BOOSTER FAN

13. Notify Unit 3 to start:— 3A OUTSIDE AIR BOOSTER FAN

3B OUTSIDE AIR BOOSTER FAN14. Stop:

— 1AMSRH DRN PUMP— 1BMSRH DRN PUMP

15. Place in manual and close:1FDW-531FDW-65

This event is completed when Unit Auxiliaries have been swapped, or when directed by the leadexaminer.

Page 14 of 40

Page 15: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-2LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: 5 Page 2 of 4

Event Description: Control of Plant Equipment During Shutdown for SGTR (End 5.19).

Time Position Applicant’s Actions or Behavior

SRO/BOP EOP Enclosure 5.19 (continued)

16. Place in DUMP:1HD-37

1HD-52

17. Perform the following:

Place 1A FDWP SEAL INJECTION PUMP switch to START.— Place 1 B FDWP SEAL INJECTION PUMP switch to START.— Start 1A FDWP AUXILIARY OIL PUMP.— Start lB FDWP AUXILIARY OIL PUMP.

18. — WHEN Rx power is 80%,THEN stop:

— 1E1 HTRDRN PUMP

— 1E2HTRDRNPUMP

19. — Verify Main FDW pumps running.

NOTE1 B Main FDW Pump is the preferred pump to be shutdown first.To lower 1 B Main FDW Pump suction flow, bias is adjusted counter-clockwise.To lower 1A Main FDW Pump suction flow, bias is adjusted clockwise.

RNO: GO TO Step 22

22. — IAAT both Main FDW pumps running,AND both of the following exist:— 1 B Main FDW Pump is first pump to be shut down— jy of the following alarms occur:

• FWP B FLOW MINIMUM(1 SA-1 6/A-3)

• FWPBFLOWBELOWMIN(1 SA-1 6/A-4)

THEN trip lB Main FDW Pump.

This event is completed when Unit Auxiliaries have been swapped, or when directed by the leadexaminer.

Page 15 of 40

Page 16: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: 5 Page 3 of 4

Event Description: Control of Plant Equipment During Shutdown for SGTR (End 5.19).

Time Position Applicant’s Actions or Behavior

SRO/BOP EOP Enclosure 5.19 (continued)

23. — IAAT Main FDW pumps running,AND both of the following exist:

1A Main FDW Pump is first pump to be shut down—

jy of the following alarms occur:• FWP A FLOW MINIMUM

(1 SA-1 6/A-i)

• FWPAFLOWBELOWMIN(1 SA-1 6/A-2)

THEN trip 1A Main FDW Pump.24. — Notify RP to survey MS lines for radiation.

25. — WHEN load is 450 MWe,THEN continue.

26. Verify 1C COND BOOSTER PUMP operating. {12}

27. Stop:— 1A COND BOOSTER PUMP

lB COND BOOSTER PUMP28. — Place the control switch for one shutdown CBP to AUTO.29. — Ensure CBP LOAD SHED DEFEAT switch positioned to a running

CBP.

30. — WHEN load is 400 MWe,THEN stop:

iDi HTRDRN PUMP1D2 HTR DRN PUMP

31. — WHEN load is 325 MWe,THEN ensure only two HWPs in operation.

32. Place the control switch for one shutdown HWP to AUTO.

33. — Ensure HWP LOAD SHED DEFEAT switch positioned to a runningHWP.

34. — IAAT suction flow on the jy operating Main FDW Pump is<1.5 x 106 Ibm/hr,THEN throttle operating Main FDW pump recirc control valve toestablish2300 - 6000 gpm:

This event is completed when Unit Auxiliaries have been swapped, or when directed by the leadexaminer.

Page 16 of 40

Page 17: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: 5 Page 4 of 4

Event Description: Control of Plant Equipment During Shutdown for SGTR (End 5.19).

Time Position [ Applicant’s Actions or Behavior

SRO/BOP EOP Enclosure 5.19 (continued)

35. — WHEN load is 225 MWe,THEN ensure only one HWP in operation.

36. — Ensure HWP LOAD SHED DEFEAT switch positioned to a runningHWP.

37. — Notify WOO SRO to make notifications per End 5.2 (WOO SRO SupportDuring Rapid Shutdown) of AP129 (Rapid Unit Shutdown).

38. — WHEN directed by OR SRO,THEN EXIT this enclosure.

This event is completed when Unit Auxiliaries have been swapped, or when directed by the leadexaminer.

Page 17 of 40

Page 18: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-2ILT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: 6 Page 1 of 1

Event Description: Turbine Fails to Automatically Trip During IMA’s

Time Position 1 Applicant’s Actions or Behavior

Plant Response:

• RCS pressure will begin to decrease. 1 SA-2/D-3 (RC PRESSHI/LOW)

• An automatic RX trip will occur on low RCS pressure.

Crew Response:

SRO/OATC If the OATC notices that RCS pressure and PZR level are decreasing at arate that is obviously in excess of make-up capability, he may choose tomanually trip the reactor prior to the automatic trip. (OMP 1-18)

The SRO will direct the OATC to perform EOP Immediate Manual Actions

The SRO will direct the BOP to perform a Symptoms Check

EOP Immediate Manual Actions:

3.1 Depress REACTOR TRIP pushbutton.

3.2 Verify reactor power < 5% FP and decreasing.

3.3 Depress turbine TRIP pushbutton.

EXAMINER NOTE: The OATC should diagnose that the turbine did nottrip and then perform the RNO step which will stop and lock out bothEHC pumps. This will cause the turbine to trip. (CT-18)

3.4 Verify all turbine stop valves closed.*

RNO: Place both EHC pumps in PULL TO LOCK.

3.5 Verify RCP seal injection available.

BOP will perform a Symptoms Check (per OMP 1-18 Attachment C)

• Reactivity Controlo Power Range NIs <5% and decreasing

• ICC/Loss of Subcooling Margin (SCM)o If any SCM 0°F, perform Rule 2

• Loss of Heat Transfer (LOHT)o Loss of Main and Emergency FDW (including unsuccessful manual

initiation of EFDW)• Excessive Heat Transfer (EHT)

o Uncontrolled Main Steam Line(s) pressure decrease• Steam Generator Tube Rupture

o CSAE off-gas alarms, process RlAs (RIA-40, 59, 60), area RIAs(RIA-1 6/1 7)

This event is completed when IMAs and symptom checks are completed and EHC pumps arein PTL, or when directed by the lead examiner.

Page 18 of 40

Page 19: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: 7 Page 1 of 12

Event Description: SBLOCA with ES Channel 5 failure to auto actuate

_Time Position J Applicant’s Actions or Behavior

Plant Response:

• 1 SA-08/A-9 RM Area Monitor Radiation High

• 1 SA-08/B-9 Process Monitor Radiation High

• 1 SA-08/E-9 Reactor Building Normal Sump Isolate

• ES Channels 1 and 2 will actuate on low RCS pressure (< 1600 psig)

• ES Channels 3— 6 will actuate on High RB pressure (>3 psig) in 6mm

Crew Response:

• Once the RCS saturates, one of the RO’s will perform Rule 2 which

SRO begins on next page. Rule 2 will direct performing Rule 3 (page 24)which will direct performing Enclosure 5.9 (page 25).

• The SRO will direct the RO not performing Rule 2 to begin performingEnclosure 5.1 due to ES actuation. Enclosure 5.1 begins on page 26

• The SRO will transfer to the LOSCM tab of the EOP from SubsequentActions Parallel Actions page.

BOOTH CUE: If requested by the crew, Unit 2 will performAP11/A/i 700/018 (Abnormal Release of Radioactivity) actions.

This event is completed when step 92 of LOSCM Tab is reached or when directed by the leadexaminer

Page 19 of 40

Page 20: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: 7 Page 2 of 12

Event Description: SBLOCA with ES Channel 5 failure to auto actuate

Time Position [ Applicant’s Actions or Behavior

Crew Response:

SRO/BOP/ Initiate Rule 2 when y SCM indicates 0°FOATC

EOP Rule 2, Loss of SCM1. IAAT all exist:

• flySCM0°F• Rxpower1%• 2 minutes elapsed since loss of SCMTHEN perform Steps 2 and 3

2. Stop all RCPs (CT-I) (Within 2 minutes of LOSCM)3. Notify CR SRO of RCP status4. Verify Blackout exists

RNO: GO TO Step 6

6. Open 1 HP-24 and 1 HP-257. Start ll available HP! pumps8. GOTOStepl3

13. Open 1HP-26 and 1HP-27

14. Verify at least two HP! pumps are operating using two diverseindications

15. IAAT 2 HP! pumps operating,

AND HPI flow in y header is in the Unacceptable Region ofFigure 1

THEN perform Steps 16—21.RNO: GOTOStepl7

This event is completed when step 92 of LOSCM Tab is reached or when directed by the leadexaminer.

Page 20 of 40

Page 21: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: 7 Page 3 of 12

Event Description: SBLOCA with ES Channel 5 failure to auto actuate

Q__Time Position J ApplicanVs Actions or Behavior

SRO/BOP/ Rule 2 (continued)OATC

17. IAAT flow limits are exceeded

Pump Operation Limit

1 HPI pump/hdr 475 gpm (md. sealinjection for A hdr)

1A&1BHPI Totalflowof 950pumps operating gpm (md. sealwith 1 HP-409 injection)open

THEN perform Steps 18 - 20RNO: GO TO Step 21

21. Notify CR SRO of HPI status.22. Verify RCS pressure > 550 psig.23. IAAT either exists:

• LPI FLOW TRAIN A pjLPI FLOW TRAIN B 3400 gpm• Only one LPI header in operation with header flow 2900 gpmTHEN GO TO Step 24

RNO: GOTOStep3535. IAAT TBV’s are unavailable,

THENA Dispatch two operators to perform End 5.24 (Operation of ADVs)B Notify CR SRO the ADVs are being aligned for use.

36. Verify 1SA-21C-8 (AFIS HEADER A INITIATED) lit.

RNO: Select OFF for jj digital channels on AFIS HEADER A.

37. Verify 1SA-21D-8 (AFIS HEADER B INITIATED) lit.

RNO: Select OFF for digital channels on AFIS HEADER B.

38. Verify any EFDW pump operating.

39. Start MD EFDW pumps on all intact SGs:

• 1AMDEFDWP

This event is completed when step 92 of LOSCM Tab is reached or when directed by the leadexaminer.

Page 21 of 40

Page 22: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-2LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: 7 Page 4 of 12

Event Description: SBLOCA with ES Channel 5 failure to auto actuate

fl__Time Position Applicant’s Actions or Behavior

SRO/BOP/ Rule 2 (continued)OATC

40. Verify any EFDW pump operating.

41. Verify both SGs intact.

42. Establish 300 gpm EFDW flow to each SG

43. Verify both MD EFDWPs operating.

44. Place TD EFDW PUMP in PULL TO LOCK.

45. Trip both Main FDW pumps.

46. Place FDW block valve switches in CLOSE:

• 1FDW-33• 1FDW-31• 1FDW-42• 1 FDW-40

NOTESG levels must continue to increase until SG Lvi Control Point is reached.If Main FDW is feeding jy SG, Rule 7 provides a different SG LevelControl Point.TS cooldown rates are 50°F1½ hr when TCOId > 280°F and 25°F1½ hrwhen TCOId 280°F.

47. Begin feeding all intact SGs to the appropriate SG Level Control Pointin Rule 7 (SG Feed Control) using available feed sources;

48. IAAT SG Level Control Point is reached,Then maintain SG Level Control Point by feeding and steaming asnecessary.

49. Notify CR SRO of SG feed status.

This event is completed when step 92 of LOSCM Tab is reached or when directed by the leadexaminer.

Page 22 of 40

Page 23: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: 7 Page 5 of 12

Event Description: SBLOCA with ES Channel 5 failure to auto actuate

Time Position Applicant’s Actions or Behavior

SRO/BOP/ Rule 2 (continued)OATC

CAUTIONIf 1 TD EFDW PUMP is being used for SG feed and Unit 1 is supplying theAuxiliary Steam header, reducing SG pressure below 250 psig can resultin reduced pumping capability.

50. IAAT SG pressure is> RCS pressure,THEN reduce SG pressure < RCS pressure using either:

• TBVs

Dispatch two operators to perform End 5.24 (operation of the ADVs)

51. Verify any Main FDW pump operating.

RNO: GO TO Step 58.

58. Ensure Rule 3 (Loss of Main or Emergency FDW) is in progress orcomplete.

59. WHEN directed by CR SRO,THEN EXIT this rule.

This event is completed when step 92 of LOSCM Tab is reached or when directed by the leadexaminer.

___________

Page 23 of 40

Page 24: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-2lLT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: 7 Page 6 of 12

Event Description: SBLOCA with ES Channel 5 failure to auto actuate

Q_Time Position Applicant’s Actions or Behavior

SRO/BOP/ Rule 3OATC

1. Verify loss of Main FDW/EFDW is due to Turbine Building Flooding.

RNO: GO TO Step 3

3. IAAT NO SGs can be fed with FDW (Main/CBP/Emergency),AND any of the following exist:

• RCS pressure reaches 2300 psig OR NDT limit• Pzr level reaches 375” [340” acc]

THEN PERFORM Rule 4 (Initiation of HPI Forced Cooling).

4. Start operable EFDW pumps, as required, to feed all intact SGs.

5. Verify any EFDW pump operating.

6. GO TO Step 37.

37. IAAT an EFDW valve CANNOT control in AUTO,OR manual operation of EFDW valve is desired to control flow/level,THEN perform Steps 38 - 42.

RNO: GO TO Step 43

43. Verify any SCM 0°F.

44. IAAT Unit 1 EFDW is in operation,THEN initiate End 5.9 (Extended EFDW Operation). (See page 25)

45. WHEN directed by CR SRO,THEN EXIT this rule.

This event is completed when step 92 of LOSCM Tab is reached or when directed by the leadexaminer.

Page 24 of 40

Page 25: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: lLT42 Scenario No.: 1 Event No.: 7 Page 7 of 12

Event Description: SBLOCA with ES Channel 5 failure to auto actuate

II_Time Position ApplicanVs Actions or Behavior

SRO/BOP/ End 5.9 (Extended EFOW Operation)OATC 1. Monitor EFDW parameters on EFW graphic display.

2. IAAT UST level is < 4’,THEN GO TO Step 120

3. IAAT feeding both SGs with one MD EFDWP is desired,THEN perform Steps 4—7.

RNO: GO TO Step 8

8. Perform as required to maintain UST level > 7.5’:

• Makeup with demin water.• Place CST pumps in AUTO.

9. IAAT all exist:• Rapid cooldown NOT in progress• MD EFDWP operating for each available SG• EFDW flow in each header < 600 gpm

THEN place 1 TD EFDW PUMP switch in PULL TO LOCK.

10. Verify 1 TD EFDW PUMP operating.

RNO: GO TO Step 12

NOTE

• Loss of the condensate system for 25 minutes results in cooling downto LPI using the ADV5. If NO HWPs are operating, continuing thisenclosure to restore the condensate system is a priority unless the CRSRO deems EOP activities higher priority. The 25 minute criterion issatisfied when a HWP is started and 1 C-i 0 is 10% open.

• If the condensate system is operating, the remaining guidance establishesFDW recirc, monitors and maintains UST, and transfers EFDW suction tothe hotwell if required.

12. Notify CR SRO to set priority based on the NOTE above EOPactivities.

This event is completed when step 92 of LOSCM Tab is reached or when directed by the leadexaminer.

Page 25 of 40

Page 26: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Actuation Setpoint (psig) Associated ES Channel

1600 (RCS) 1&2

550 (RCS) 3&4

3 (RB) 1,2, 3, 4, 5,&6

10 (RB) 7&8

2. Verify aN ES channels associated with actuation setpoints haveactuated

3. IAAT additional ES actuation setpoints are exceeded,THEN perform Steps 1 —2

4. Place Diverse HPI in BYPASS5. Perform both:

• Place ES CH 1 in MANUAL• Place ES CH 2 in MANUALVerify Rule 2 in progress or completeVerify y RCP operating

GO TO Step 9IAAT aN exist:

• Voter associated with ES channel is in OVERRIDE• An ES channel is manually actuated• Components on that channel require manipulation

THEN depress RESET on the required channel

10. IAAT jy RCP is operating,AND ES Channels 5 and 6 actuate,THEN perform Steps 11-14GO TO Step 15IAAT ES Channels 3 & 4 are actuated,THEN GO TO Step 16

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: 7 Page 8 of 12

Event Description: SBLOCA with ES Channel 5 failure to auto actuate

Time Position ApplicanVs Actions or Behavior

EXAMINER NOTE: ES Channel 1 and 2 actuate when RCS 1600psig. When RB pressure is> 3 psig, ES Channel 3, 4, & 6 will autoactuate. ES Channel 5 will require manual actuation. If the ROreaches Step 15 prior to ES 3&4 actuation, he will GO TO Step 53.When subsequent ES Channels actuate, the RO should review IAATSteps 3, 9, 10, and 15 and perform any required actions.

EOP Enclosure 5.1, ES Actuation

1. Determine all ES channel that should have actuated based on RCSpressure and RB pressure:SRO/BOP/

OATC

6.7.

RNO:9.

RNO:15.

This event is completed when step 92 of LOSCM Tab is reached or when directed by the leadexaminer.

Page 26 of 40

Page 27: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: Page 9 of 12

Event Description: SBLOCA with ES Channel 5 failure to auto actuate

_Time Position ApplicanVs Actions or Behavior

SRO/BOP/ EOP Enclosure 5.1, ES Actuation (continued)OATC RNO: GO TO Step 53 (Step 53 is on page 29 if that direction is taken)

16. Place Diverse LPI in BYPASS17. Perform both:

• Place ES CH 3 in MANUAL• Place ES OH 4 in MANUAL

CAUTIONLPI pump damage may occur if operated in excess of 30 minutes against ashutoff head.

18. IAAT gy LPI pump is operating against a shutoff head,THEN at the CR SROs discretion, stop affected LPI pumps

19. IAAT RCS pressure is < LPI pump shutoff head,THEN perform Steps 20 - 21

RNO: GOTOStep2222. IAAT 1 A and 1 B LPI PUMPs are off / tripped,

AND all exist:• RCS pressure < LPI pump shutoff head• 1 LP-1 9 closed• 1 LP-20 closed

THEN perform Steps 23 - 24RNO: GOTOStep25

25. IAAT 1A LPI PUMP fails while operating,AND lB LPI PUMP is operating,THEN close 1 LP-1 7

26. IAAT lB LPI PUMP fails while operating,AND 1A LPI PUMP is operating,THEN close 1 LP-i 8

27. Start A and B OUTSIDE AIR BOOSTER FANs (CT-27) (Must bestarted within 30 minutes of LOCA)

28. Notify Unit 3 to start 3A and 3B OUTSIDE AIR BOOSTER FANs29. Verify 1 CF-i and 1 CF-2 are open30. Verify 1HP-410 closed31. Secure makeup to the LDST32. Verify afl ES channel 1 — 4 components are in the ES position33. Verify Unit 2 turbine tripped

RNO: GO TO Step 36

This event is completed when step 92 of LOSCM Tab is reached or when directed by the leadexaminer.

Page 27 of 40

Page 28: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: 7 Page 10 of 12

Event Description: SBLOCA with ES Channel 5 failure to auto actuate

Time__[ Position Applicants Actions or Behavior

SRO/BOP/ EOP Enclosure 5.1, ES Actuation (continued)OATC 36. Close 1LPSW-139

37. Place in FAIL OPEN:— 1LPSW-251 FAIL SWITCH

1 LPSW-252 FAIL SWITCH38. Start all available LPSW pumps39. Verify either:

— Three LPSW pumps operating— Two LPSW pumps operating when Tech Specs only requires

two operable40. Open 1 LPSW-4 and 1 LPSW-541. IAAT BWST level 19’,

THEN initiate End 5.12 (ECCS Suction Swap to RBES)42. Dispatch an operator to perform End 5.2 (Placing RB Hydrogen

Analyzers In Service) (PS)43. Select DECAY HEAT LOW FLOW ALARM SELECT switch to ON44. IAAT ES channels 5 & 6 have actuated

THEN perform Step 45

Note: RBCU transfer to low speed will NOT occur until 3 minute timedelay is satisfied.

EXAMINER NOTE: ES-5 did not actuate, IAAT step 3 applies (page 26).Crew performs step 2 RNO (below) to actuate ES-5 then returns tostep 45RNO: Step 2: Depress TRIP on affected ES logic channels that have NOT

previously been actuated.45. Verify all ES channel 5 & 6 components are in the ES position46. IAAT ES channels 7 & 8 have actuated,

THEN perform Step 47-48RNO: GOTOStep49

49. Notify U2 CR SRO that SSF is inoperable due to OTS1-1 open50 Ensure any turnover sheet compensatory measures for ES

actuation are complete as necessary.51. IAAT conditions causing ES actuation have cleared,

THEN initiate End 5.41 (ES Recovery)52. WHEN CR SRO approves,

THEN EXIT this enclosure.

This event is completed when step 92 of LOSCM Tab is reached or when directed by the leadexaminer.

Page 28 of 40

Page 29: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: lLT42 Scenario No.: 1 Event No.: 7 Page 11 of 12

Event Description: SBLOCA with ES Channel 5 failure to auto actuate

Time Position ApplicanVs Actions or Behavior

SRO/BOP/ EOP Enclosure 5.1, ES Actuation (continued)OATC EXAMINER NOTE: Steps 53—72 may be required if the RO reaches

Step 15 prior to ES 3&4 actuation. When ES Channel 3&4 actuate, theRO should return to IAAT Steps 3, 9, 10, and 15 and perform anyrequired actions (see page 26).

53. Start A and B OUTSIDE AIR BOOSTER FANS54. Notify Unit 3 to start 3A and 3B OUTSIDE AIR BOOSTER FANS55. Verify 1 CF-i and 1 CF-2 are open56. Verify 1 HP-410 closed57. Secure makeup to the LDST58. Verify all ES channel 1 &2 components are in the ES position59. Verify Unit 2 turbine tripped

RNO: GOTOStep6262. Close 1 LPSW-1 3963. Place in FAIL OPEN:

1 LPSW-251 FAIL SWITCH— 1 LPSW-252 FAIL SWITCH

64. Start all available LPSW pumps.65. Verify either:

— Three LPSW pumps operating— Two LPSW pumps operating when Tech Specs only requires two

operable66. Open:

1 LPSW-41LPSW-5

67. IAAT BWST level 19’,THEN initiate End 5.12 (ECCS Suction Swap to RBES).

68. Dispatch an operator to perform End 5.2 (Placing RB HydrogenAnalyzers In Service). (PS)

69. Notify U2 CR SRO that SSF is inoperable due to OTS1-i open.70 Ensure any turnover sheet compensatory measures for ES

actuation are complete as necessary.71. IAAT conditions causing ES actuation have cleared,

THEN initiate End 5.41 (ES Recovery).72. WHEN CR SRO approves,

THEN EXIT this enclosure.

This event is completed when step 92 of LOSCM Tab is reached or when directed by the leadexaminer.

Page 29 of 40

Page 30: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

LOSCM tab1. Ensure Rule 2 (Loss of SCM) is in progress or complete.

2. Verify Station ASW feeding any SG.

RNO: GO TO Step 4

4. Verify LOSCM caused by excessive heat transfer.

RNO: GO TO Step 6

6. IAAT either of the following exists:• LPI FLOW TRAIN A plus LPI FLOW TRAIN B 3400 gpm• Only one LPI header in operation with header flow 2900 gpmTHEN GO TO LOCA CD tab.

7. Verify SSF activated per AP/25 with both of the following systemsrequired:

• SSF RC Makeup• SSF Aux Service Water

RNO: GO TO Step 9

9. Verify all of the following exist:

• NO RCPs operating• HPI flow in both HPI headers• Adequate total HPI flow per LOSCM Tab Figure 1 (Total Required

HPI Flow)

10. GOTOStep89.

89. Open 1AS-40 while closing 1MS-47.

90. Verify HPI forced cooling in progress.

RNO: Close 1 RC-4

91. Close 1GWD-17, 1HP-1, 1HP-2, and 1RC-3

92. Verify either of the following:

• Core superheated• Rx vessel head level at 0”

RNO: GO TO Step 94

94. IAAT BWST level is 19,THEN initiate End 5.12 (ECCS Suction Swap to RBES).

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 1 Event No.: 7 Page 12 of 12

Event Description: SBLOCA with ES Channel 5 failure to auto actuate

II_Time Position Applicant’s Actions or Behavior

SRO/BOP/OATC

This event is completed when step 92 of LOSCM Tab is reached or when directed by the leadexaminer.

Page 30 of 40

Page 31: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Page 1 of 8NOTE

At any time during this scenario the operator may choose to use Enclosure 5.5 to maintain RCSinventory controL See below.

ENCLOSURE 5.5

ACTION/EXPECTED RESPONSE [ RESPONSE NOT OBTAINED

NOTE

Maintaining Pzr level >100” [180” acc] will ensure Pzr heater bundles remain covered.

1. — Utilize the following as necessary to — IF 1 HP-26 will NOT open,maintain desired Pzr level: THEN throttle 1 HP-41 0 to maintain

• 1A HPI Pump desired Pzr level.

. 1BHPI Pump

. 1HP-26

. 1HP-7

. 1 HP-i 20 setpoint or valve demand

. 1HP-5

2. IAAT makeup to the LDST isdesired,

THEN makeup from 1A BHUT.

3. — IAAT it is desired to secure makeup toLDST,THEN secure makeup from iA BHUT.

4. — IAAT it is desired to bleed letdown flowto 1A BHUT,THEN perform the following:

A. Open:

iCS-261CS-41

B. — Position 1HP-l4to BLEED.

C. — Notify SRO.

5. — IAAT letdown bleed is NO longerdesired,THEN position 1 HP-i 4 to NORMAL.

Page 31 of 40

Page 32: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-2lLT42 December 17, 2012

ENCLOSURE 5.5 (cont.)Page 2 of 8

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED I

6. — IAAT 1C HPI PUMP is required, — GO TO Step 10.THEN perform Steps 7- 9.

7. — Open: 1 . — IF jgj BWST suction valves

• 1 HP-24 (1 HP-24 and 1 HP-25) are closed,

• 1 HP-25THEN perform the following:

A. — Start 1A LPI PUMP.B. — Start lB LPI PUMP.

C. Open:

1LP-15

1LP-16

1LP-9

1LP-i0

1LP-6

1LP-7D. IF two LPI Pumps are running fly

to provide HPI pump suction,THEN secure one LPI pump.

E. — Dispatch an operator to open1 HP-363 (Letdown Line To LPIPump Suction Block) (A-i -119,Ui LPI Hatch Rm, N end).

F. — GOTO Step 8.2._ IF only one BWST suction valve

(1 HP-24 or 1 HP-25) is open,THEN perform the following:

A. — IF three HPI pumps are operating,THEN secure 1 B HPI PUMP.

B. — IF < 2 HPI pumps are operating,THEN start HPI pumps to obtaintwo HPI pump operation,preferably in opposite headers.

C._ GOTO Step 9.

Page 32 of 40

Page 33: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

ENCLOSURE 5.5 (cont)Page 3 of 8

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

8. StartlCHPl PUMP.

9. Throttle the following as required to maintaindesired Pzr level:

1HP-261HP-27

— IF at least two HPI pumps are operating,THEN throttle 1 HP-409 to maintaindesired Pzr level.

1._ IF at least two HPI pumps are operating,AND 1 HP-26 will NOT open,THEN throttle 1 HP-41 0 to maintaindesired Pzr level.

2._ IF1AHPI PUMPand 1BHPI PUMPareoperating,AND 1 HP-27 will NOT open,THEN throttle 1 HP-409 to maintaindesired Pzr level.

Page 33 of 40

Page 34: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Page 4 of 8ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED I

10. — IAAT LDST vel CANNOT bemaintained,THEN perform Step 11.

11. — Perform the following:

.Open 1HP-24.

• Open 1 HP-25.

•Close 1HP-16.

GOTO Step 12.

IF both BWST suction valves(1 HP-24 and 1 HP-25) are closed,THEN perform the following:

A. — Start 1A LPI PUMP.B. — Start lB LPI PUMP.C. Open:

1LP-15

1LP-16

1LP-91LP-10

1LP-6

1LP-7D. — IF two LPI Pumps are running jjjy

to provide HPI pump suction,THEN secure one LPI pump.

E. — Dispatch an operator to open1 HP-363 (Letdown Line To LPIPump Suction Block) (A-i -119,Ui LPI Hatch Rm, N end).

F. — GOTO Step 12.2._ IF only one BWST suction valve

(1 HP-24 or 1 HP-25) is open,AND three HPI pumps are operating,THEN secure lB HPI PUMP.

Page 34 of 40

Page 35: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

ENCLOSURE 5.5 (cont.)Page 5 of 8

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

12. — IAAT additional makeup flow to LDST isdesired,AND 1A BLEED TRANSFER PUMP isoperating,THEN dispatch an operator to close1CS-48 (1A BHUT Recirc) (A-1-107,Unit 1 AC Bleed Transfer Pump Rm.).

13. — IAAT two Letdown Filters are desired,THEN perform the following:

Open 1HP-17.Open 1HP-18

.. .——..-- ........

14 — IAAT aH of the following exist: — GO TO Step 34.Letdown isolatedLPSW availableLetdown restoration desired

TH EN pe.orm Stes 1. 3.3 (4

15 Open: 1 . — Notify CR SRO that letdown CANNOT be1 CC-7 restored due to inability to restart the CC1CC-8 system.

2._ GOTO Step 34.

16. — Ensure only one CC pump running.

17. — Place the non-running CC pump inAUTO.

18. Verify both are open: 1._ IF 1HP-1 is closed due to 1HP-3 failing to1HP-1 close,1HP-2 THEN GOTO Step 20.

2._ IF 1 HP-2 is closed due to 1 HP-4 failing toclose,THEN GO TO Step 20.

19. — GO TO Step 22.

NOTEVerification of leakage requires visual observation of East Penetration Room.

20. — Verify letdown line leak in East — GO TO Step 22.Penetration Room has occurred.

21. — GO TO Step 34.

Page 35 of 40

Page 36: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

ENCLOSURE 5.5 (cont.)Page 6 of 8

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

22. — Monitor for unexpected conditions whilerestoring letdown.

23. — Verify both letdown coolers to be placedin service.

24. Open:

1HP-11 HP-21HP-31 HP-4

25. — Verify at least one letdown cooler isaligned.

26. — Close 1 HP-6.

27. — Close 1 HP-7.

28. — Verify letdown temperature < 125°F.

1. — IF 1A letdown cooler is to be placed inservice,THEN open:

1HP-11HP-3

2._ IF 1 B letdown cooler is to be placed inservice,THEN open:

1 HP-21 HP-4

3._ GO TO Step 25.

Perform the following:

A. _Notify CR SRO of problem.B. _GOTOStep34.

1._ Open 1HP-13.

2. Close:

1HP-81HP-9&11

3._ IF y deborating IX is in service,THEN perform the following:

A. _Select 1HP-l4to NORMAL.B. _Close 1HP-16.

4._ Select LETDOWN HI TEMP INTLK BYPswitch to BYPASS.

Page 36 of 40

Page 37: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-2ILT42 December 17, 2012

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

29. — Open 1 HP-5.

30. — Adjust 1 HP-7 for 20 gpm letdown.

31. — WHEN letdown temperature is<125°F,THEN place LETDOWN HI TEMPINTLK BYP switch to NORMAL.

32. — Open 1HP-6.

33. — Adjust 1 HP-7 to control desired letdownflow.

NOTEAP/32 (Loss of Letdown) provides direction to cool down the RCS to offset increasing pressurizerlevel.

34. — IAAT it is determined that letdown isunavailable due to equipment failures orletdown system leakage,THEN notify CR SRO to initiateAP/32 (Loss of Letdown).

35. — IAAT> 1 HPI pump is operating,AND additional HPI pumps are NOlonger needed,THEN perform the following:

A. — Obtain SRO concurrence to reducerunning HPI pumps.

B. — Secure the desired HPI pumps.

C. — Place secured HPI pump switch inAUTO, if desired.

36. — IAAT ll the following conditions exist:Makeup from BWST NOT requiredLDST level > 55”All control rods insertedCooldown Plateau NOT being used

THEN close:1 HP-241HP-25

ENCLOSURE 5.5 (cont.)Page 7 of 8

Page 37 of 40

Page 38: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

ENCLOSURE 5.5 (cont.)Page 8 of 8

ACTION/EXPECTED RESPONSE RESPONSE NOTOBTAINED

37. — Verify 1CS-48 (1A BHUT Recirc) has — GO TO Step 39.been closed to provide additionalmakeup flow to LDST.

38. WHEN 1CS-48 (1A BHUT Recirc) is NOlonger needed to provide additionalmakeup flow to LDST,THEN perform the following:

A. — Stop 1A BLEED TRANSFER PUMP.B. — Locally position 1 CS-48 (1 A BHUT

Recirc) turn open (A-i -107, Unit1 RC Bleed Transfer Pump Rm.).

C. — Close 1 CS-46.

D. — Start 1A BLEED TRANSFER PUMP.

E. — Locally throttle 1CS-48 (1 A BHUTRecirc) to obtain 90 - 110 psigdischarge pressure.

F. — Stop 1A BLEED TRANSFER PUMP.

39. — Verify two Letdown Filters in service, — GO TO Step 41.AND only one Letdown filter is desired.

40. Perform g of the following:

Place 1 HP-i 7 switch to CLOSE.Place 1 HP-i 8 switch to CLOSE.

41. — WHEN directed by CR SRO,THEN EXIT this enclosure.

•..END.

Page 38 of 40

Page 39: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

CRITICAL TASKS

1. CT-i 8, Trip the turbine as part of IMAs to prevent unnecessary cooldown (Page18).

2. CT-i, Trip ALL RCPs within 2 minutes of LOSCM (Page 20).

3. CT-27, Start A and B OUTSIDE AIR BOOSTER FANs within 30 minutes ofLOCA. (Page 27).

Page 39 of 40

Page 40: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

ppenaix u1LT42 December 17, 2012

scenario uutiine i-orm -u-i

SAFETY: Take a Minute

UNIT 0 (OSM)

SSF Operable: Yes II KHU’s Qperable: Ui - QF- U2 - UG ILLCTs Operable: ? II Fuel Handling: NoUNIT STATUS (CR SRO)

Unit 1 Simulator Other Units

Mode: 1 Unit 2 Unit 3

Reactor Power: 50% Mode: 1 Mode: 1

Gross MWE: 449 100% Power 100% Power

RCS Leakage: 0.024 gpm EFDW Backup: Yes EFDW Backup: Yes

RBNS Rate: 0.01 gpm

Technical Specifications/SLC Items (CR SRO)Component/Train OOS Restoration Required TSISLC #

Date/Time Date/Time

Shift Turnover Items (CR SRO)

Primary

. Reactor power holding at approximately 50% following power reduction to repair a heaterdrain system issue. Heater Drain work is complete. Reactor Engineering developingmaneuvering plan to support return to power planned for next shift.

. LDST H2 pressure is low (approximately 30 psig). Pressurize LDST with Hydrogen.

.

Secondary

• 1SSH-1, 1SSH-3, 1SD-2, 1SD-5, 1SD-140, 1SD-303, 1SD-355, 1SD-356 and 1SD-358 areclosed with power supply breakers open per the Startup Procedure for SSF OvercoolingEvent.

.

Reactivity Management CR SRO)

RCS Boron: 51 ppmB Gp 7 Rod Position: 55%

Human Performance Emphasis (OSM)

Procedure Use and Adherence

Page 41: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-11LT42 December 17, 2012

Facility: Oconee Scenario No.: 2 rO Op-Test No.: 1

Examiners:

_________________________

Operators:

________________________SRO___________________ ___________________OATC__________________ __________________BOP

Initial Conditions:• Reactor Power = 75% Unit 2:100%, Unit 3:100%

Turnover:• 1 B FDWP on Handjack• SASS in manual for l&E• Voltage Regulator is in MANUAL for l&E• Reduce VAR5 to 150 ± 10 MVAR5 lAW OP/1/A11106/001, Enclosure 4.8 (Changing Generator

MVAR)

Event Malfunction 1 EventNo. No. [ Event Type*

Description

Oa Override SASS in Manual

Ob Override AFIS Disabled

Oc

1 Place Voltage Regulator Mode in AUTO and decreaseN: BOP, SRO VARs.

2 Override C: BOP, SRO HPSW Jockey Pump trips

3 MSS47O C: BOP, SRO Re-occurring Hi Vibration on 1C RBCU degrades to(TS) Cooler Rupture

Pzr level #1 fails low (concurrent with BOP swapping4 MPI121 C: OATC, SRO RBCUs)

5 MCRO21 C: OATC, SRO Dropped control rod with failure of auto runback circuit(TS) (requires 1 B FDWP adjustment)

6 MCRO22 C: OATC, SRO 2nd dropped rod requiring manual Rx trip.

1 B MSLB outside the reactor building (EHT tab) withMSS39O, 14%

MSS26OM: ALL Auto AFIS actuation blocked

1A MDEFWP fails

8 Override M: ALL LOHT to good SG requiring transfer to LOHT

(N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor

Page 42: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 1 Page 1 of 1

Event Description: Place Voltage Regulator Mode in AUTO and Decrease VARs

Time_] Position Applicant’s Actions or Behavior

Crew Response:

SRO The SRO will direct the BOP to reduce Generator MVARs to 150 ± 10 MVAR5in accordance with OP/1/A11106/001, enclosure 4.8.

OPI1IN11O6IOO1 Enclosure 4.8

CAUTIONDo NOT exceed limits as shown on Enclosure 4.5 (Capability Curve).

NOTEMinimum of 18.05 Generator kV must be maintained.Operation with leading PF is acceptable.

2.1. Notify other online units of VAR change.BOP

2.2. Select VARS on WATTNAR TRANSFER Switch.

2.3. Ensure MVARS are indicated on MWATT/MVAR meter.

2.4. IF VOLTAGE REGULATOR MODE will be swapped between AUTO &MANUAL, notify System Operating Center (SOC) that VOLTAGEREGULATOR MODE will be swapped.

2.5. IF AUTO adjustment is required, perform the following:

NOTE:VOLTAGE REGULATOR MODE Ready Light (Amber light) should be ON.CRD AC Power Fault ‘A’ and/or ‘B’ alarms along with CRD Global System Faultmay be received during generator voltage changes.

2.5.1. Ensure VOLTAGE REGULATOR MODE in AUTO.

2.5.2. Use VOLTAGE ADJUST to slowly modify Generator voltage toincrease/decrease MVARS.

2.6. IF MANUAL adjustment is required, perform the following: N/A

This event is completed when MVARs have been adjusted to 150±10 MVARs, or when directed bythe lead examiner.

Page 2 of 45

Page 43: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-2ILT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 2 Page 1 of 1

Event Description: HPSW Jockey Pump trips

Time Position Applicant’s Actions or Behavior

Plant Response:

• 1 SA-9/A-8 HPSW Header NB PRESS LOW• 1 SA-9/D-8 HPSW JOCKEY PUMP OFF• 1 HPSW-25 (Altitude Valve) will open to maintain system pressure.• HPSW header pressure decreases due to Jockey Pump trip.

NOTE:HPSW pump selected in BASE will start when Elevated Storage Tank leveldecreases to 60,000 gals. Pump will stop when level increases to 80,000 gals.

HPSW pump selected in STANDBY will start if Elevated Storage Tank leveldecreases to 50,000 gals. Pump will stop when level increases to 80,000 gals.

BOPCrew Response:Refer to ARG 1 SA-9/D-8

3.1 Verify automatic actions until jockey pump is restartedBOOTH CUE: If NEO dispatched, report (using time compression) there isno evidence of any breaker or pump motor problems

3.2 IF there is 9 evidence of breaker and/or pump motor problem,attempt to restart jockey pump one time. If restart is unsuccessful,notify Maintenance Department. (restart successful)

3.3 When desired return HPSW Pumps as follows:3.3.1 Ensure ‘B’ HPSW Pump in “BASE”.3.3.2 Ensure ‘A’ HPSW Pump in “STANDBY”.

This event is complete when the Jockey Pump has been restarted, or as directed by the LeadExaminer.

Page 3 of 45

Page 44: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-2lLT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 3 Page 1 of 4

Event Description: Re-occurring Hi Vibration on 1C RBCU Degrades to Cooler Rupture (TS)

Time Position Applicant’s Actions or Behavior

Plant response:

• DAC alarm 01 Dl 363, RBCU Fan 1 C Vib

Crew response:

BOP • BOP will pull up the OAC alarm response guide

EXAMINER NOTE: The first time this OAC alarm comes in, it will resetand clear when the alarm reset pushbutton is depressed. 3 minutes afterthe initial alarm, there will be another High Vibration alarm. The secondtime it will not clear when reset.BOOTH CUE: The first time the high vibration timer is fired, Timer 15 willautomatically fire 5 seconds later to allow the Hi Vib alarm to be reset bythe operator. Three minutes after the initial Hi Vib alarm, a second Hi Vibalarm will occur that cannot be reset.

OAC Alarm Response for 01D1363 (RBCU FAN 1C VIB)

1 Depress the RBCU OAC Vibration Alarm Reset Pushbutton.

2 If the alarm does not clear, STOP the RBCU

3 Notify Engineering for an evaluation.

BOOTH CUE: Using time compression, Engineering requests the crew tostart the lB RBCU in HIGH speed in accordance with OP/i/A/i 1 04/015,Reactor Building Cooling System, Enclosure 4.3 Section 4 (StartingRBCUs)

OP/1/N1104/015, Enclosure 4.3, Section 4

NOTE: When starting RBCUs or changing LPSW flows, RB pressure willchange as RB temperature changes. (8)

4.1 Verify RB pressure within limits of PT/1/A10600/001 (PeriodicInstrument Surveillance).

4.2 Begin monitoring RB absolute pressure. (OAC Turn On Code: 1 RBPA)

4.3 IF personnel inside containment, announce over plant page that startingRBCU lB.

NOTE: Starting RBCUs can affect the following: RBCU bearing temperatures,RBCU vibration, RBNS level, 1 RIA-47 level, RB pressure/temperature.

This event is complete when the 1 C RBCU rupture is isolated, or as directed by the leadexaminer.

Page 4 of 45

Page 45: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 3 Page 2 of 4

Event Description: Re-occurring Hi Vibration on 1C RBCU Degrades to Cooler Rupture (TS)

Time Position j Applicant’s Actions or Behavior

OP/1/N1104/015, Enclosure 4.3, Section 4 (continued)

BOP 4.4. Place desired switch to “HIGH” or “LOW”:

• 1ARBCU• 1BRBCU• 1CRBCU

NOTE:When changing LPSW flows, RB pressure will change as RB temperaturechanges.Each RBCU must have 550 gpm In let Flow or 750 gpm Outlet Flow to meetflow requirements of SLC 16.9.12.

4.5 Position valves as required for RB cooling:

• 1LPSW-18 (1A RBCU OUTLET)• 1 LPSW-21 (1 B RBCU OUTLET)• 1 LPSW-24 (1 C RBCU OUTLET)

Examiner/Booth Note: When the 1C RBCU is stopped, Timer 15 willautomatically fire and insert a 1C RBCU cooler rupture. See next page foractions related to the 1C RBCU cooler rupture)

This event is complete when the 1 C RBCU rupture is isolated, or as directed by the leadexaminer.

Page 5 of 45

Page 46: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: ..j_ Event No.: 3 Page 3 of 4

Event Description: Re-occurring Hi Vibration on 1C RBCU Degrades to Cooler Rupture (TS)

Time__[ Position Applicant’s Actions or Behavior

Plant Response:

• 1 SA-9/D-9, LPSW RBCU C Cooler Rupture

• 1SA-9/A-6, RB Normal Sump Level High/Low

• RB normal sump level will increase

• 1 C RBCU LPSW flow indicator indicates low on VB2

Crew Response:BOP ARG for 1SA-9/D-9 (Manual Actions’)

3.1 Verify alarm is valid by checking RBCU 10 Inlet Flow and RBCU 1Cdelta flow.

3.2 Verify 1 LPSW-24 (RBCU 1 C Outlet) open

3.3 Verify adequate LPSW flow is available; check LPSW pump operation

3.3.1 Verify 1LPSW-22 (1C RBCU INLET) is open.

3.3.2 IF 1LPSW-22 (1C RBCU INLET) is NOT open, refer to TechnicalSpecifications and Selected Licensee Commitments

3.4 Monitor RBNS Level for any unexplained increase

3.5 IF RBNS Level is increasing AND ES has actuated, notify Chemistry tosample RBNS for boron to determine if a cooler rupture has occurred

3.6 IF RBCU 1C Cooler rupture or line break is indicated, then:

NOTE: This sequence prevents having to call LPSW and Containmentinoperable per SLC 16.9.12.

BOOTH CUE: As BOP performs step 36. 1, fire timer #4 to initiate PZRLevel #1 failure.

SRO/BOP 3.6.1 Isolate the 10 RBCU Cooler as follows:

A. Close 1LPSW-22 (10 RBCU INLET).B. Close 1 LPSW-24 (RBCU 1C OUTLET). (may already be

closed)C. Perform TS 3.6.3 Condition C (C.1 =4 hrs & C.2 = 31 days) for

closed containment system (as required).D. Enter TS 3.6.5 Condition B (7 days and 14 days from discovery

of failure to meet LCO) for RBCU inoperable.E. Continue to monitor RBNS level for increase.F. IF RBNS level is still increasing, notify TSC to evaluate further

isolation of 10 RBCU.

This event is complete when the 1C RBCU rupture is isolated, or as directed by the leadexaminer.

Page 6 of 45

Page 47: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: Event No.: 3 Page 4 of 4

Event Description: Re-occurring Hi Vibration on 1C RBCU Degrades to Cooler Rupture (TS)

Time Position AppUcanVs Actions or Behavior

Crew Response (contj:

EXAMINER NOTE: The crew may decide to pump the RB Normal Sump. Ifso, see the steps below from OP/i/All 104/007 L WD System, Enclosure 4.1Pumping RBNS to 6”

SRO3.6.2 Refer to Technical Specifications

3.6.3 Refer to SLC 16.9.12

OP/i/All 104/007 Enclosure 4.1BOP

3.1 Verify MWHUT level adequate to receive waste volume.

3.2 Position the following:

• Ensure open 1 LWD-1 (RB NORMAL SUMP ISOLATION)

• Ensure open 1LWD-2 (RB NORMAL SUMP ISOLATION)

3.3 Start one or both of the following:

• 1A RB NORM SUMP PUMP

• lB RB NORM SUMP PUMP

NOTE:.Changes in LAWT levels may occur during pumping.

RIA Alarms may be indicative of gas leakage.

If RBNS level was above 14” when pumps were started, a level increasefollowing securing the RBNS pumps may occur. {7}

3.4 WHEN RBNS is at desired level OR at 6” (low level alarm), ensure thefollowing:

• 1A RB NORMAL SUMP PUMP “OFF”

• lB RB NORMAL SUMP PUMP “OFF”.

3.5 IF required to close the valves, position the following:

• Close 1 LWD-i (RB NORMAL SUMP ISOLATION)

• Close 1 LWD-2 (RB NORMAL SUMP ISOLATION)

EXAMINER NOTE: The SRO should identify that the inoperability of the1C RBCU results in entry into TS 3.6.5 Condition B (7 days and 14 daysfrom discovery of failure to meet LCO). Also, as requireD, the crew mayneed to Perform the required actions for TS 3.6.3 Condition C (C. 1=4 hrs& C.2 =31 days). SRO refers to SLC 16.9.12, but it is not entered becauseof the sequence by which step 3.6.1 above was performed.

This event is complete when the IC RBCU rupture is isolated, or as directed by the leadexaminer.

Page 7 of 45

Page 48: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: j_ Event No.: 4 Page 1 of 2

Event Description: Pzr level #1 fails low

Time Position Applicant’s Actions or Behavior

Plant response:

Statalarms

• 1 SA-021C-3, RC Pressurizer Level High/Low

• 1 SA-02/C-4, RC Pressurizer Level Emerg. High/Low

Front board (1 UB1) indications:

• PZR Level 1 indicates 0”• 1HP-120 (RC Volume Control) throttles open• Makeup flow Increases.• PZR heaters trip OFF.

OATC Crew response:1SA-021C-3 ARG:

3.1 Check alternate PZR level indications. (confirms that it is aninstrument failure)

3.2 Check for proper Makeup/Letdown flows and adjust to restore properlevel.

3.3 Refer to the following procedures as required:

• AP/1/AJ1700/002 (Excessive RCS Leakage)• AP/1/A/1700/014 (Loss of Normal HPI Makeup and/or RCP Seal

Injection)• AP/1/N1700/032 (Loss of Letdown).

SRO 3.4 Refer to Technical Specification 3.4.9. (Does not apply)

3.5 Refer to Technical Specification 3.3.8. (Does riot apply)

3.6 Refer to OP/i/All 105/014 (Control Room Instrumentation OperationAnd Information). (see next page)

This event is complete when an alternate PZR level channel has been selected or when directedby the lead evaluator.

Page 8 of 45

Page 49: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: Event No.: •_4_ Page 2 of 2

Event Description: Pzr level #1 fails low

Time Position Applicant’s Actions or Behavior

OP/1/N1105/014, Enclosure 4.11 (SASS Information)

SRO/OATC 3.2 SASS (Smart Automatic Signal Selector) Manual Operation

3.2.1 IF “MISMATCH” light is on and “TRIP ‘A” or “TRIP ‘B” light ison, a SASS trip has occurred.

A. Controlling signal will be signal selected from CR keyswitch(for parameters in lOS Cabinet #8).

B. Select valid signal as controlling signal by positioning CRkeyswitch or pushbutton for Pzr level to valid signal (forparameters in lOS Cabinet #8).

3.2.2 IF “MISMATCH” light is on, a mismatch has occurred.: N/A

A. Controlling signal will be signal selected from CR keyswitch(for parameters in ICS Cabinet #8). N/A

B. Select valid signal as controlling signal by positioning CRkeyswitch or pushbutton for Pzr level to valid signal (forparameters in ICS Cabinet #8). N/A

3.2.3 Initiate a Work Request to repair faulty signal.

This event is complete when an alternate PZR level channel has been selected or when directedby the Lead Examiner.

Page 9 of 45

Page 50: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-2LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 5 Page 1 of 5

Event Description: Dropped Control Rod, Auto Runback Circuit Fails (TS)

Time Position Applicant’s Actions or Behavior

Plant Response:

• Group 2 Rod 6 drops into the core• Statalarm 1 SA-2/A-1 0 (CRD GLOBAL TROUBLE)• Statalarm 1SA-2/B-i0 (CRD ASYMMETRIC ROD POSITION ERROR)• Statalarm 1SA-2/D-9 (CRD OUT INHIBIT)• Statalarm 1SA-4/C-i (QUADRANT POWER TILT) (at in 2 minutes)• Statalarm 1 SA-5/A-5 (1 A RPS TROUBLE)• Statalarm 1 SA-5/B-5 (1 B RPS TROUBLE)• Statalarm 1 SA-5/D-5 (1 D RPS TROUBLE)

Crew Response:

OATC/BOP Crew should perform Plant Transient Response (PTR)

• OATC reports to the SRO reactor power level and direction of movement.• The BOP reports expected AUTO Runback did not occur, and monitors

RCS pressure and inventory and inserts Control Rods as needed.• The OATC will adjust FDW and/or control rods as necessary to restore

reactor power to the desired control band.

SRO/OATC SRO should enter AP/i/A11700/00i (Unit Runback)

AP/1 /N1 700/00 1

4.1 GO TO the most limiting section per the following table:

Si Section Runback4H Asymmetric Control Rod

(1%/mm to 55%power)

Section 4H

1 IAAT a more limiting runback occurs,THEN GO TO Subsequent Actions Step 4.1.

2 IAAT more than one control rod is dropped or misaligned 6.5% (9”)from the group average,THEN trip the Rx.

NOTENIs should NOT be calibrated per guidelines contained in OP/i/A/li 02/004(Operation at Power) due to actual power re-distribution within the core as aresult of a dropped/misaligned rod.

3 Verify Rx is critical.

4. Verify power > 55% when the rod was dropped or misaligned.

This event is complete when Rx Power has decreased at least 10% and FWP suction has beenadjusted, or as directed by the lead examiner.

Page 10 of 45

Page 51: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 5 Page 2 of 5

Event Description: Dropped Control Rod, Auto Runback Circuit Fails (TS)

Time Position [ Applicant’s Actions or Behavior

AP/1/A11700/O01 Section 4H (continued)

EXAMINER NOTE: Malfunction set to fail Auto runback. Candidate willproceed to RNO

SRO/OATC 5 Verify Rx runback to 55% core thermal power in progress.

• CTPDsetat55%• ASYMETRIC RODS Runback Light lit• CTP Demand decreasing• Reactor power will decrease when the runback catches up with

the initial power decrease from the dropped rod.

RNO: 1. Initiate power reduction to 55% core thermal power at 1 %/min.

2. IF control rods will not insert manually,

THEN perform the following:

A. Trip reactor.

B. GO TO Unit 1 EOP.

6 Initiate End 5.1 (Control of Plant Equipment During Shutdown). (seepage 13)

NOTEThe following actions should be performed as quickly as possible due to thecomplexity of resetting RPS trip setpoints and Tech Spec time limits.

7 Notify SPOC to perform the following:

• Investigate cause of dropped or misaligned control rod.• Prepare to reduce the following trip setpoints:

o RPS Flux/Flow-Imbalanceo RPS High Flux

SRO 8 Notify the OSM to ensure the requirements of the following Tech Specsare met:• TS 3.1.4 (Control Rod Group Alignment Limits)• TS 3.1.5 (Safety Rod Position Limits)• TS 3.2.3 (Quadrant Power Tilt)

Booth Cue: When OSM is contacted, inform the team that the OSM isoccupied on Unit 3 and cannot verify TS requirements at this time.

This event is complete when Rx Power has decreased at least 10% and FWP suction has beenadjusted, or as directed by the lead examiner.

Page 11 of 45

Page 52: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

AP/1/N1700/001 Section 4H (continued)

9 Notify OSM to make notifications as required per OMP 1-14(Notifications).

10 Verify> 1 % SDM with allowance for the inoperable control rod perPT/i/All 103/015 (Reactivity Balance Calculation) within one hour.

11 Reduce core thermal rower the following limits, based on the numberof RCPs operating, within two hours:

RCPs Allowable Thermal Power (% FP)3 45

4 60

NOTE:The following ensures adequate margin in preparation for resetting RPS tripsetpoints.

12 IAAT the power decrease is complete,AND any NI is > the following:

RCPs Maximum NI Power (% FP)3 40

4 55

THEN reduce power until all Nis are the Maximum NI Power limit forthe operating RCP combination per End 5.4 (Power Reduction).

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 5 Page 3 of 5

Event Description: Dropped Control Rod, Auto Runback Circuit Fails (TS)

Time Position [ ApplicanVs Actions or Behavior

SRO/OATCIBOP

This event is complete when Rx Power has decreased at least 10% and FWP suction has beenadjusted, or as directed by the lead examiner.

Page 12 of 45

Page 53: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-2lLT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 5 Page 4 of 5

Event Description: Dropped Control Rod, Auto Runback Circuit Fails (TS)

Time Position Applicant’s Actions or Behavior

AP/1/N1700/OO1 Enclosure 5.1

BOP1 IAAT SRO determines all appropriate actions have been taken,

AND the runback is complete,THEN EXIT this Enclosure.

2 Notify the WCC SRO to initiate Enclosure 5.2 (WCC SRO SupportDuring Unit Runback;

3 Start the following pumps:

• 1A FDWP SEAL INJECTION PUMP• 1A FDWP AUXILIARY OIL PUMP• 18 FDWP AUXILIARY OIL PUMP• lB FDWP SEAL INJECTION PUMP.

EXAMINER NOTE: This scenario was snapped at 75% so steps 3 &4 havealready been accomplished.

4 WHEN CTP is 80%,THEN stop the following pumps

• 1E1HTRDRNPUMP• 1E2HTRDRN PUMP

5 WHEN CTP 65%,THEN continue this Enclosure.

6 Place the following in MANUAL and close:

• 1FDW-53• 1 FDW-65

NOTE:1 B FDWP is the preferred pump to shut down first.

7 Verify both Main FDWPs operating.

8 Verify 1 B FDWP to be shut down first.

9 Adjust the FWP bias counter-clockwise to lower 1 B FWP suction flow1 x 10 lb/hr < 1A FWP suction flow.

10 GOTOStepl2.

This event is complete when Rx Power has decreased at least 10% and FWP suction has beenadjusted, or as directed by the lead examiner.

Page 13 of 45

Page 54: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: ILT42 Scenario No.: 2 Event No.: 5 Page 5 of 5

Event Description: Dropped Control Rod, Auto Runback Circuit Fails (TS)

Time Position Applicant’s Actions or Behavior

API1IN1700IOO1 Enclosure 5.1 (continued)

BOP 12 IAAT both Main FDW pumps running,AND both of the following exist:

• 1 B Main FDW pump is first pump to be shut down• Any of the following alarms occur:

o iSA-i 61A-3 (FWP B FLOW MINIMUM)o 1SA-16/A-4 (FWP B FLOW BELOW MIN),

THEN trip 1 B Main FDW Pump.

13 IAAT both Main FDW pumps running,AND both of the following exist:

• 1A Main FDW pump is first pump to be shut down• Any of the following alarms occur:

o 1SA-16/A-i (FWPA FLOW MINIMUM)o iSA-i 6/A-2 (FWP A FLOW BELOW MIN),

THEN trip 1A Main FDW Pump.

14 IAAT the operating FDWP suction flow < 1 .5 x 106 lb/hr,THEN slowly throttle the associated recirc control valve to establish2300 - 6000 gpm total Condensate flow:

• 1FDW-53• 1FDW-65

15 Maintain Pzr level between 22Q”- 250”.

EXAMINER NOTE: The SRO should refer to Tech Specs and make thefollowing determinations:

• TS 3.1.4 (Control Rod Group Alignment Limits), Condition A applies.• TS 3.1.5 (Safety Rod Position Limits), Condition A applies (Safety rods

are in Groups 1—4)• TS 3.2.3 (Quadrant Power Tilt), Condition A applies (due to misaligned

control rod) (If the highest Incore OPT exceeds +7.11 then Condition Bwould apply)

This event is complete when Rx Power has decreased at least 10% and FWP suction has beenadjusted, or as directed by the lead examiner.

Page 14 of 45

Page 55: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 6 Page 1 of 1

Event Description: 2nd Dropped Rod Requiring Manual Rx Trip.

Time Position AppIicants Actions or Behavior

Plant response:

• Group 3 Rod 6 drops into the core

Crew response:

EXAMINER NOTE: When the second rod drops, the OATC will trip thereactor based on “Licensed Operator Memory Item” from OMP 1-18(Implementation Standards During Abnormal and Emergency Events)

SRO/OATCOATC tnps the reactor.

SRO directs OATC to perform Immediate Manual Actions (IMAs):

• Depress REACTOR TRIP pushbutton

• Verify Reactor Power < 5% FP and decreasing

• Depress turbine TRIP pushbutton

• Verify aH turbine stop valves closed

• Verify RCP seal injection available

EXAMINER/BOOTH NOTE: The reactor trip triggers a steam line break(Timer 7) on the lB SG which will be diagnosed by the BOP operatorduring his symptom checks. See Event #7 on next page

This event is complete when the reactor is manually tripped or as directed by the leadexaminer

Page 15 of 45

Page 56: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-2LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 7 Page 1 of 15

Event Description: 1 B MSLB outside the reactor building,

fl_Time Position Applicant’s Actions or Behavior

Plant response:

• iSA-i/A-i, B-i, C-i, D-i, RP Channel Trip• 1 SA-2/D-3, RC Press High/Low• 1 SA-02/A-9 (MS PRESS HIGH/LOW)• ES Channels 1 & 2 will actuate

Crew response:

BOP will perform a Symptoms Check (per OMP 1-18 Attachment C)SROBOP • Reactivity Control

o Power Range NIs <5% and decreasing

• ICC/Loss of Subcooling Margin (SCM)o If any SCM 0°F, perform Rule 2

• Loss of Heat Transfer (LOHT)o Loss of Main and Emergency FDW (including unsuccessful manual

initiation of EFDW)

• Excessive Heat Transfer (EHT)o Uncontrolled Main Steam Line(s) pressure decrease

• Steam Generator Tube Ruptureo CSAE off-gas alarms, process RIAs (RIA-40, 59, 60), area RIA5 (RIA

16/17)OATC/BOP Perform Rule #5 (Main Steam Line Break) after receiving concurrence from the

SRO (details on page 20)

If SCM reaches 0°F, Rule #2 will be performed (details on page 17)

SRO will direct performance of EOP Enclosure 5.1 (ES Actuation) (detailsbegin on page 25)

SRO refers to “Parallel Actions” page of the Subsequent Actions Tab and

• if SCM > 0°F transfers to the Excessive Heat Transfer Tab (page 29)

• if SCM = 0°F transfers to LOSCM tab (page 28)

The SRO will direct an RO to make a PA announcement and notify the OSMto reference the Emergency Plan and NSD-202

This event is complete when step 32 complete in EHT Tab or as directed by the lead examiner

Page 16 of 45

Page 57: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-2ILT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 7 Page 2 of 15

Event Description: lB MSLB outside the reactor building,

II_Time Position Applicant’s Actions or Behavior

EOP Rule 2OATC/BOP 1. IAAT aM exist:

• ySCM0°F• Rxpower1%• 2 minutes elapsed since loss of SCMTHEN perform Steps 2 and 3

2. Stop all RCPs (CT-i) (Within 2 minutes of LOSCM)3. Notify CR SRO of RCP status4. Verify Blackout exists

RNO: GO TO Step 6

6. Open 1 HP-24 and 1 HP-257. Start available HPI pumps

8. GOTOStep1313. Open 1HP-26 and 1HP-2714. Verify at least two HPI pumps are operating using two diverse

indications15. IAAT 2 HPI pumps operating,

AND HPI flow in y header is in the Unacceptable Region ofFigure 1

THEN perform Steps 16—21.RNO: GOTOStepl7

17. IAAT flow limits are exceeded

Pump Operation Limit

1 HPI pump/hdr 475 gpm (md. sealinjection for A hdr)

1A&1BHPI Totalflowof 950pumps operating gpm (md. sealwith 1 HP-409 injection)open

THEN perform Steps 18 - 20RNO: GO TO Step 21

This event is complete when step 32 complete in EHT Tab or as directed by the lead examiner

Page 17 of 45

Page 58: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 7 Page 3 of 15

Event Description: 1 B MSLB outside the reactor building,

Time Position Applicant’s Actions or Behavior

Rule 2 (cont.)

OATC/BOP 21. Notify CR SRO of HPI status.22. Verify RCS pressure > 550 psig.23. IAAT either exists:

• LPI FLOW TRAIN A QjLPI FLOW TRAIN B 3400 gpm• Only one LPI header in operation with header flow 2900 gpmTHEN GO TO Step 24

RNO: GO TO Step 35

35. IAAT TBV’s are unavailable,THENA Dispatch two operators to perform End 5.24 (Operation of ADVs)B Notify CR SRO the ADVs are being aligned for use.

36. Verify 1 SA-2/C-8 (AFIS HEADER A INITIATED) lit.

RNO: Select OFF for digital channels on AFIS HEADER A.

37. Verify 1SA-2/D-8 (AFIS HEADER B INITIATED) lit.

RNO: Select OFF for fl digital channels on AFIS HEADER B.

38. Verify any EFDW pump operating.

39. Start MD EFDW pumps on all intact SGs:

• 1AMDEFDWP

40. Verify any EFDW pump operating.

41. Verify both SGs intactRNO: Establish 450 gpm EFDW flow to the intact SG

GO TO step 43

43. Verify both MD EFDWPs operating.

RNO: If 1 TDEFWP is operating, OR NO Main FDW Pumps areoperating THEN GO TO step 45.

45. Trip both Main FDW pumps.

This event is complete when step 32 complete in EHT Tab or as directed by the lead examiner

Page 18 of 45

Page 59: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 7 Page 4 of 15

Event Description: 1 B MSLB outside the reactor building,

Time Position [ Applicant’s Actions or Behavior

Rule 2 (cont.)

OATC/BOP 46. Place FDW block valve switches in CLOSE:

• 1FDW-33• 1FDW-31• 1FDW-42• 1FDW-40

NOTESG levels must continue to increase until SG Lvl Control Point is reached.If Main FDW is feeding y SO, Rule 7 provides a different SG LevelControl Point.TS cooldown rates are 50°F/1/2 hr when TOId > 280°F and 25°F1½ hrwhen TCOjd 280° F.

47. Begin feeding all intact SGs to the appropriate SG Level Control Pointin Rule 7 (SG Feed Control) using available feed sources;

48. IAAT SG Level Control Point is reached,Then maintain SG Level Control Point by feeding and steaming asnecessary.

49. Notify CR SRO of SG feed status.

CAUTIONIf 1 TD EFDW PUMP is being used for SG feed and Unit 1 is supplying theAuxiliary Steam header, reducing SO pressure below 250 psig can resultin reduced pumping capability.

50. IAAT SG pressure is> RCS pressure,THEN reduce SG pressure < RCS pressure using either:

• TBVs• Dispatch two operators to perform End 5.24 (operation of the ADV5)

51. Verify any Main FDW pump operating.

RNO: GO TO Step 58.

58. Ensure Rule 3 (Loss of Main or Emergency FDW) is in progress orcomplete.

59. WHEN directed by CR SRO,

THEN EXIT this rule.

This event is complete when step 32 complete in EHT Tab or as directed by the lead examiner

Page 19 of 45

Page 60: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 7 Page 5 of 15

Event Description: 1 B MSLB outside the reactor building,

Tim Position Applicant’s Actions or Behaviore

EOP Rule 5OATC/BOP

1. Perform the following on affected headers:

EXAMINER NOTE: AFIS did not auto actuate because a malfunction ispreventing it, but the manual initiation below does work.

• Initiate AFIS 1 B SG Digital Channels 1 and 2 (CT-17)• Select OFF for 1 B MDEFDW Pump

EXAMINER NOTE: Overcooling must be stopped prior to violating NDTlimits. The critical task is to stop feeding the affected SG.

• Trip both Main FDW pumps• Close 1 FDW-31 6, 1 FDW-42, and 1 FDW-40

EXAMINER NOTE: TD EFDW Pump tripped by AFIS and 1A MD EFDWPdid not start and will not manually start.

2. Verify 1 TD EFDW PUMP operating.

RNO: 1. IF MD EFDWP for the intact SG is operating,THEN GO TO Step 5

2. Start 1 TD EFDW Pump

3. Verify 1 TD EFDW Pump is feeding affected SG.

RNO: GO TO Step 5

5. Verify 1 B SG is an affected SG.

6. Open 1 AS-40 while closing 1 MS-47.

7. WHEN overcooling is stopped,THEN adjust steaming of unaffected SG to maintain CETCs constantusing either:

• TBV5• Send two operators to perform End 5.24 (Operation of ADV’s)

rThis event is complete when step 32 complete in EHT Tab or as directed by the lead examiner

Page 20 of 45

Page 61: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 7 Page 6 of 15

Event Description: 1 B MSLB outside the reactor building,

Tim Position Applicant’s Actions or Behaviore

EOP Rule 5 (continued)OATC/BO P

CAUTIONThermal shock conditions may develop if HPI is NOT throttled and RCSpressure NOT controlled.

8. WHEN afl of the following exist:

• Core SCM >00 F• RxPwri%• Pzr Level increasing,

THEN continue

9. Verify ES HPI actuated

10. Place Diverse HPI in BYPASS

ii. Place ES CH 1 and ES CH 2 in MANUAL

12. Perform the following to stabilize RCS PIT:

• Throttle HPI• Reduce 1 HP-i 20 setpoint to> 100” (180” AGO)• Adjust steaming of unaffected SG (1 B SG) to maintain CETCs

constant

13. WHEN CETCs have stabilized,THEN resume use of T for RCS temperature control

14. Ensure Rule 3 (Loss of Main or Emergency FDW) is in progress orcomplete (see next page)

15. Ensure Rule 8 (Pressurized Thermal Shock (PTS)) is in progress orcomplete (see page 24)

16. WHEN directed by CR SRO,THEN EXIT this rule

This event is complete when step 32 complete in EHT Tab or as directed by the lead examiner

Page 21 of 45

Page 62: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 7 Page 7 of 15

Event Description: 1 B MSLB outside the reactor building,

fl_Time__[ Position Applicant’s Actions or Behavior

EOP Rule 3 (as directed by Rule 5)

OATC/BOP 1. Verify loss of Main FDW/EFDW is due to Turbine Building Flooding.

RNO: GO TO Step 3

3. IAAT NO SGs can be fed with FDW (Main/CBP/Emergency),AND any of the following exist:

• RCS pressure reaches 2300 psig OR NDT limit• Pzr level reaches 375” [340” accj

THEN PERFORM Rule 4 (Initiation of HPI Forced Cooling).

4. Start operable EFDW pumps as required to feed all intact SGs

5. Verify any EFDW pump operating.

6. GO TO Step 37.

37. IAAT an EFDW valve CANNOT control in AUTO,OR manual operation of EFDW valve is desired to control flow/level,THEN perform Steps 38-42.

RNO: GO TO Step 43

43. Verify any SCM 0°F.

RNO: IF overcooling,OR exceeding limits in Rule 7 (SG Feed Control),THEN throttle EFDW, as necessary.

44. IAAT Unit 1 EFDW is in operation,THEN initiate End 5.9 (Extended EFDW Operation). (see next page)

45. WHEN directed by CR SRO,THEN EXIT this rule.

This event is complete when step 32 complete in EHT Tab or as directed by the lead examiner

Page 22 of 45

Page 63: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: ILT42 Scenario No.: 2 Event No.: 7 Page 8 of 15

Event Description: 1 B MSLB outside the reactor building,

II_Time Position Applicant’s Actions or Behavior

OATC/BOP End 5.9 (Extended EFDW Operation) as directed by Rule 3

1. Monitor EFDW parameters on EFW graphic display.

2. IAAT UST level is <4’,THEN GO TO Step 120

3. IAAT feeding th SGs with one MD EFDWP is desired,THEN perform Steps 4-7

RNO: GO TO Step 8

8. Perform the following as required to maintain UST level > 7.5’:

• Makeup with demin water.• Place CST pumps in AUTO.

9. IAAT the following exist:• Rapid cooldown NOT in progress• MD EFDWP operating for each available SG• EFDW flow in each header < 600 gpm

THEN place 1 TD EFDW PUMP switch in PULL TO LOCK.

10. Verify 1 TD EFDW PUMP operating.

11. Start TD EFDWP BEARING OIL COOLING PUMP.

NOTE

• Loss of the condensate system for 25 minutes results in cooling downto LPI using the ADVs. If NO HWP5 are operating, continuing thisenclosure to restore the condensate system is a priority unless the CRSRO deems EOP activities higher priority. The 25 minute criterion issatisfied when a HWP is started and iC-b is 10% open.

• If the condensate system is operating, the remaining guidance establishesFDW recirc, monitors and maintains UST, and transfers EFDW suction tothe hotwell if required.

12. Notify CR SRO to set priority based on the NOTE above EOPactivities.

This event is complete when step 32 complete in EHT Tab or as directed by the lead examiner

Page 23 of 45

Page 64: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 7 Page 9 of 15

Event Description: 1 B MSLB outside the reactor building,

Time Position Applicant*s Actions or Behavior

OATC/BOP Rule 8 (as directed by Rule 5)

EXAMINER NOTE: Neither of the criteria in the note below are met sono actions are required in RuleS. If the crew pulls Rule 8 as directedby Rule 5, they should immediately EXIT back out based on the note atthe beginning.

NOTEThis rule is invoked under either of the following conditions:• A cooldown below 400°F T at> 100 °F/hr has occurred.• HPI has injected through an open or throttled open 1 HP-26, 27, 409,

410 with a RCPs OFF.

• SCM must be minimized. The following methods may be used at thediscretion of the CR SRO:

• Throttling HPI per Rule 6 (HPI)

• De-energizing Pzr heaters

• Using Pzr normal spray

• Using Pzr aux spray

• Using PORV

• Throttling LPI {22}

• Once RCS temperature is stable, a 1-hour hold of RCS temperaturemust be performed unless a LOCA or SGTR is in progress. Use T0 inloop with an operating RCP use CETCs if NO RCPs are operating.

• Once invoked, SCM shall remain minimized until Engineering hasperformed an evaluation and determined that PTS restrictions NOlonger apply. Starting RCPs and/or restoring cool down rates to normalvalues do NOT negate the need for this evaluation.

This event is complete when step 32 complete in EHT Tab or as directed by the lead examiner

Page 24 of 45

Page 65: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-2lLT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 7 Page 10 of 15

Event Description: 1 B MSLB outside the reactor building,

Time_j Position Applicant’s Actions or Behavior

EOP Enclosure 5.1 (ES Actuation)OATC/BOP 1. Determine all ES channels that should have actuated based on RCS

pressure and RB pressure.

• RCS 1600 psig: Channels 1, 2

2. Verify aH ES digital channels associated with actuation setpoints haveactuated.

3. IAAT additional ES actuation setpoints are exceeded,THEN perform Steps 1-2.

4. Place Diverse HPI in BYPASS

5. Place ES OH 1 and ES OH 2 in MANUAL

6. Verify Rule 2 in progress g complete.

RNO: GOTOStep73

73. Open 1 HP-24 and 1 HP-25

74. Ensure at least two HPI pumps are operating

75. Verify 1 HP-26 and 1 HP-27 are open

NOTE TO EXAMINER: Conditions not met to require opening 1HP-410or 1HP-409. No operator action required at this time by step 76.

76. IAAT at least two HPI pumps are operating,AND HPI flow in y header that has NOT been intentionally throttled

is in the Unacceptable Region of Figure 1,THEN open the following in the affected header:

q 1 A Header q 1 B Header

1HP-410 1HP-409

77. Verify jjy RCP operating

78. Open 1 HP-20 and 1 HP-21

79. lAATallexist:

• Voter associated with ES channel is in OVERRIDE• An ES channel is manually actuated• Components on that channel required manipulation

THEN depress RESET on the required channel

This event is complete when step 32 complete in EHT Tab or as directed by the lead examiner

Page 25 of 45

Page 66: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 7 Page 11 of 15

Event Description: 1 B MSLB outside the reactor building,

Time Position Applicant’s Actions or Behavior

EOP Enclosure 5.1 (ES Actuation) (continued)OATC/BOP 80. lAATy RCP is operating,

AND ES Channels 5 and 6 actuate,THEN perform Steps 81 - 84

RNO: GO TO Step 85

85. IAAT ES Channels 3 & 4 are actuated,THEN GO TO Step 86

RNO: GO TO Step 123.

123. Start A & B Outside Air Booster Fans.

124. Notify Unit 3 to Start 3A & 3B Outside Air Booster Fans.

125. Verify open 1CF-1 and 1CF-2.

126. Verify 1 HP-41 0 closed.

127. Secure makeup to the LDST.

128. Verify all ES channel 1 & 2 components are in the ES position.

129. Verify Unit turbine tripped.

RNO: GOTO Step 132

132. Close 1 LPSW-1 39.

133. Place in FAIL OPEN:

• 1LPSW-251 FAIL SWITCH• 1 LPSW-252 FAIL SWITCH

134. Start all available LPSW pumps.

135. Verify either:

• Three LPSW pumps operating• Two LPSW pumps operating when Tech Specs only requires two

operable

136. Open 1 LPSW-4 and 1 LPSW-5

137. IAAT BWST level 19’,THEN initiate End 5.12 (ECCS Suction Swap to RBES).

138. Dispatch an operator to perform End 5.2 (Placing RB HydrogenAnalyzers In Service).

This event is complete when step 32 complete in EHT Tab or as directed by the lead examiner

Page 26 of 45

Page 67: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 7 Page 12 of 15

Event Description: 1 B MSLB outside the reactor building,

Time Position Applicants Actions or Behavior

EOP Enclosure 5.1 (ES Actuation) (continued)OATC/BOP 139. Notify U2 CR SRO that SSF is inoperable due to OTS1-1 open.

140. Ensure y turnover sheet compensatory measures for ES actuationare complete as necessary.

141. IAAT conditions causing ES actuation have cleared,THEN initiate End 5.41 (ES Recovery).

142. WHEN CR SRO approves,THEN EXIT.

This event is complete when step 32 complete in EHT Tab or as directed by the lead examiner

Page 27 of 45

Page 68: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 7 Page 13 of 15

Event Description: 1 B MSLB outside the reactor building,

Time Position Applicant’s Actions or Behavior

EOP LOSCM tabSRO The SRO will direct an RO to make a PA announcement and notify the

OSM to reference the Emergency Plan and NSD-202

1. Ensure Rule 2 in progress or complete

2. Verify Station ASW feeding SG (it is not).

RNO: GO TO step 4

4. Verify LOSCM caused by Excessive Heat Transfer

5. Verify EHT tab has been performed (it has not been).

RNO: GO TO EHT tab (details begin on next page)

This event is complete when step 32 complete in EHT Tab or as directed by the lead examiner

Page 28 of 45

Page 69: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 7 Page 14 of 15

Event Description: 1 B MSLB outside the reactor building,

Time Position__j Applicant’s Actions or Behavior

EOP Excessive Heat Transfer Tab (EHT)

SRO The SRO will direct an RO to make a PA announcement and notify the OSMto reference the Emergency Plan and NSD-202

1. Verify jy SG pressure < 550 psig

2. Ensure Rule 5 (Main Steam Line Break) in progress or complete

3. Place the following in HAND and decrease demand to zero on jjaffected SGs:

• 1 FDW-41 and 1 FDW-44(for 1 B SG)

4. Close the following on ll affected SGs:

• 1 FDW-382, 1 MS-26, 1 MS-76, 1 MS-36, 1 MS-84, 1 FDW-369

5. Verify level in SGs < 96% O.R.

6. IAAT core SCM is > 0°F,THEN perform Steps 7 and 8

7. Throttle HPI per Rule 6 (H P1) (CT-5)

Note: HPI flow must be throttled and RCS temperature controlled toprevent a solid Pzr and subsequent operation of the PORV.

8. Verify letdown in service.

RNO: IF desired to restore letdown,THEN initiate End 5.5 (Pzr and LDST Level Control) (see page 36)

9. Verify jy SG has an intact secondary boundary (intact SG)

NOTEIf only one SG is intact and has been isolated for SGTR, the following stepswill unisolate and use it for heat removal.

10. Open the following on gj intact SGs

• 1 FDW-372, 1 FDW-368, and 1 MS-i 7

ii. Start MDEFDWP associated with afl intact SGs

• 1AMDEFDWP

RNO: Start TDEFDWP

12. Feed and steam gil intact SGs to stabilize RCS PIT using either of thefollowing:

• TBVs• Dispatch two operators to perform End 5.24 (Operation of the

ADV5)

This event is complete when step 32 complete in EHT Tab or as directed by the lead examiner

Page 29 of 45

Page 70: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-2lLT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 7 Page 15 of 15

Event Description: 1 B MSLB outside the reactor building,

Time Position Applicant’s Actions or Behavior

EHT Tab (continued)

SRO 13. GO TO Step 32

32. Verify of the following:

• HPI has operated in the injection mode while NO RCPs wereoperating

• A cooldown below 400°F at> 100°F/hr has occurred

RNO: GOTOStep34

BOOTH CUE: Fire Timer 8 after step 32 to trip pumps required toinitiate LOHT

34. Verify 1 MS-24 and 1 MS-33 are closed

35. Open 1AS-8

36. Close 1 SSH-9

37. Perform the following notifications:

• Notify Chemistry to determine RCS boron concentration and tosample RBES for boron.

• Notify Secondary Chemistry to check for indications of SGTR• Notify RP to check for indications of a SGTR

This event is complete when step 32 complete in EHT Tab or as directed by the lead examiner

Page 30 of 45

Page 71: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 8 Page 1 of 5

Event Description: LOHT

fl__Time Position Applicant’s Actions or Behavior

SRO SRO will direct to re-perform symptoms check and notes a loss of Mainand Emergency Feedwater. SRO enters LOHT Tab.

LOHT Tab (Loss Of Heat Transfer)

Examiner Note: If RCS pressure reaches 2300 psig and not SG can befed, the SRO should ensure Rule 4 is initiated. Details of Rule 4 are onpage #34

1. Ensure Rule 3 in progress or complete. (SRO will direct Rule 3 tobe re-run. See next page for Rule 3 steps).

NOTE: Transfer to LOSCM tab is NOT required if RCS heats to the pointwhere core SCM = 0°F

2. IAAT the RCS heats to the point where core SCM = 0°F,THEN GO TO Step 4.

3. IAAT NO SG5 can be fed with FDW (Main/CBP/Emergency),AND y of the following exist:

. RCS pressure reaches 2300 psig OR NDT limit

. Pzr level reaches 375” [340” acc]

THEN PERFORM Rule 4 (Initiation of HPI Forced Cooling) seepage #34.

NOTE: 1 Al RCP provides the best Pzr spray.

RNO: 1. Reduce operating RCPs to one pump/loop.

2. WHEN jjy of the following exists:

• EFDW flow has been re-established by existingRules/Enclosures

• EFDW aligned from another unit• Operator performing Rule 3 (Loss of Main or

Emergency FDW) or End 5.27 (Alternate Methods forControlling EFDW Flow) reports EFDW available

THEN GO TO Step 48

EXAMINER NOTE: The SRO will hold here at this WHEN statementuntil one of the above EFDW flowpaths is successfully established.

This event is complete when either the SRO is waiting at the WHEN statement at step 3 RNO inthe LOHT Tab, Rule 4 is complete, or as directed by the lead examiner

Page 31 of 45

Page 72: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-2ILT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 8 Page 2 of 5

Event Description: LOHT

Time Position AppNcant’s Actions or Behavior

Rule 3

OATC/BOP 1. Verify loss of Main FDW/EFDW is due to Turbine Building Flooding.

RNO: GO TO Step 3.

3. IAAT NO SGs can be fed with FDW (Main/CBP/Emergency), ANDany of the following exist:

• RCS pressure reaches 2300 psig OR NDT limit• Pzr level reaches 375” [340” acc]

THEN PERFORM Rule 4 (Initiation of HPI Forced Cooling).

4. Start operable EFDW pumps, as required, to feed all intact SGs.

5. Verify any EFDW pump operating.

RNO: GO TO Step 7.

7. Place the following in MANUAL and close:

• 1FDW-315• 1FDW-316

8. Verify both of the following:

• Any CBP operating• TBVs available on an intact SG

RNO: GO TO Step 16

16. Verify 1 TD EFDW PUMP is operable and available for manual start.

RNO: GO TO Step 18

18. Verify cross-tie with Unit 2 is desired.

19. Dispatch an operator to open 2FDW-31 3 and 2FDW-31 4

20. Dispatch an operator to 1 FDW-31 3 and have them notify the CRwhen in position.

21. Notify Unit 2 to:

• Manually Close 2FDW-315 & 316.• Start their U2 TDEFWP

This event is complete when either the SRO is waiting at the WHEN statement at step 3 RNO inthe LOHT Tab, Rule 4 is complete, or as directed by the lead examiner

Page 32 of 45

Page 73: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 8 Page 3 of 5

Event Description: LOHT

II_Time__[ Position Applicant1sActions or Behavior

Rule 3 (continued)

OATC/BOP 22. WHEN, either exists:

• 1 FDW-31 3 Operator in position• Unit 1 TDEFWP has been manually started;

THEN continue.

23. IAAT an operator is in position at 1 FDW-31 3,AND Unit 1 TD EFDW PUMP is NOT operating,THEN notify the operator to open:

• 1FDW-313 (1A EFDW Line Disch To 1A SIG X-Conn)o 1 FDW-31 4 (1 B EFDW Line Disch To 18 SIG X-Conn)

24. Verify either exists:

• HPI Forced Cooling is maintaining core cooling• CBP feed providing SG feed

NOTEBegin opening EFDW control valve when this step is reached. Flow to theSG will begin as soon as alternate unit valve is off closed seat. 100 gpmcould cause overcooling if adequate decay heat levels do NOT exist

RNO: 1. Establish a maximum of 100 gpm to each available intact SGusing:

• 1FDW-315• 1FDW-316

This event is complete when either the SRO is waiting at the WHEN statement at step 3 RNO inthe LOHT Tab, Rule 4 is complete, or as directed by the lead examiner

Page 33 of 45

Page 74: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Op-Test No.: 1LT42 Scenario No.: 2 Event No.: 8 Page 4 of 5

Event Description: LOHT

Time Position [ Applicants Actions or Behavior

Verify any HPI pump can be operated.Open:

• 1HP-24• 1HP-25

Start all available HPI pumps.Open:

• 1HP-26• 1HP-27

5. Open 1 RC-4.6. Verify flow exists in any HPI header.7. Perform the following:

A. Place 1 RC-66 SET POINT SELECTOR to OPEN.B. Depress 1 RC-66 OPEN PERMIT pushbutton.

8. Verify at least two HPI pumps operating.9. Verify flow in both HPI headers is in the acceptable region of Figure

1 (Required HPI Flow Per Header).

Figure 1

Required HP! flow Per Header

OATC/BOP

Rule 4

1.

2.

3.4.

2600

2400

2200

2000

ieon

1600

I 4110

1200

1000

Roe

trn

100

200

13

0 100 200 300 400 Ro0 100

Required HF! Flow Per Header (gpxn)

This event is complete when either the SRO is waiting at the WHEN statement at step 3 RNO inthe LOHT Tab, Rule 4 is complete, or as directed by the lead examiner

Page 34 of 45

Page 75: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Rule 4 (continued)

10. Verify flow exists in any HPI header.

11. Perform the following:A. Place 1 RC-66 SET POINT SELECTOR to OPEN.B. Depress 1 RC-66 OPEN PERMIT pushbutton.

12. Verify> one RCP operating.

RNO: GO TO Step 14.

14. IAAT the following limits are exceeded,

THEN throttle HPI to maximize flow flow limit.

De-energize all Pzr heaters.

Close 1 HP-5.

Close:

• TBV5• 1FDW-35• 1FDW-44

Appendix D Required Operator Actions Form ES-D-2ILT42 December 17, 2012

Op-Test No.: ILT42 Scenario No.: 2 Event No.: 8 Page 5 of 5

Event Description: LOHT

fl_Time Position Applicant’s Actions or Behavior

OATC/BO P

Pump Operation Limit1 HPI pump/hdr 475 gpm (md. seal

injection for A hdr)1A & lB HPI pumps Total flow of 950 gpmoperating with 1 HP-409 (md. seal injection)open

15.

16.

17.

18. IAAT all HPI is lost,THEN:

A. Stop all RCP5.B. Position 1 RC-66 SETPOINT SELECTOR to HIGH.

19. WHEN directed by CR SRO,THEN EXIT.

This event is complete when either the SRO is waiting at the WHEN statement at step 3 RNO inthe LOHT Tab, Rule 4 is complete, or as directed by the lead examiner

Page 35 of 45

Page 76: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-2ILT42 December 17, 2012

EXAMINER NOTEAt any time during this scenario the operator may choose to use Enclosure 5.5 to maintainRCS inventory control. See excerpt below.

ENCLOSURE 5.5

ACTION/EXPECTED RESPONSE RESPONSE NOTOBTAINED

NOTE

Maintaining Pzr level >100” [180” accj will ensure Pzr heater bundles remain covered.

1. Utilize the following as necessary to maintain — IF 1 HP-26 will NOT open,desired Pzr level: THEN throttle 1 HP-41 0 to maintain

. 1A HPI Pump desired Pzr level.

. lB HPI Pump

• 1HP-26

• 1HP-7

. 1 HP-i 20 setpoint or valve demand

. 1HP-5

2. IAAT makeuj to the LDST is desired,THEN makeup from 1A BHUT.

3. IAAT it is desired to secure makeur toLDST,THEN secure makeup from 1A BHUT.

4. IAAT it is desired to bleed letdown flow to1A BHUT,THEN perform the following:

A. Open:

1CS-26

1CS-4i

B. Position 1HP-l4to BLEED.

C. Notify SRO.

5. IAAT letdown bleed is NO longer desired,THEN position 1 HP-14 to NORMAL.

Page 36 of 45

Page 77: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

ENCLOSURE 5.5 (cont.)Page 2 of 8

I ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED I

6. IAAT 1C HPI PUMP is required, — GO TO Step 10.THEN perform Steps 7- 9.

7. Open: 1 . — IF BWST suction valves

• 1 HP-24 (1 HP-24 and 1 HP-25) are closed,

• 1 HP-25THEN perform the following:

A. — Start 1A LPI PUMP.

B. — Start lB LPI PUMP.

C. Open:

1LP-15

1LP-16

1LP-9

1LP-i0

1LP-6

1LP-7

D. — IF two LPI Pumps are running Qjjjyto provide HPI pump suction,THEN secure one LPI pump.

E. Dispatch an operator to open1HP-363 (Letdown Line To LPIPump Suction Block) (A-i -119,Ui LPI Hatch Rm, N end).

F. — GOTO Step 8.2._ IF only one BWST suction valve

(1 HP-24 or 1 HP-25) is open,THEN perform the following:

A. — IF three HPI pumps are operating,THEN secure lB HPI PUMP.

B. — IF < 2 HPI pumps are operating,THEN start HPI pumps to obtaintwo HPI pump operation,preferably in opposite headers.

C. GO TO Step 9.

Page 37 of 45

Page 78: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

ENCLOSURE 5.5 (cont.)Page3 of 8

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

8. Start 10 HPI PUMP. IF at least two HPI pumps are operating,THEN throttle 1 HP-409 to maintaindesired Pzr level.

9. Throttle the following as required to 1 . — IF at least two HPI pumps are operating,maintain desired Pzr level: AND 1 HP26 will NOT open,

-

THEN throttle 1 HP-410 to maintain. ‘I”

desired Pzr level.. 1HP-27

2._ IF1AHPI PUMP and 1BHPI PUMP areoperating,AND 1HP-27 will NOT open,THEN throttle 1 HP-409 to maintaindesired Pzr level.

Page 38 of 45

Page 79: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Page 4 of 8ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOTOBTAINED

10. IAAT LDST vel CANNOT be — GO TO Step 12.maintained,THEN perform Step 11.

11. Perform the following: 1 . — IF BWST suction valves

• Open 1 HP-24. (1 HP-24 and 1 HP-25) are closed,

. Open 1 HP-25.THEN perform the following:A. Start 1A LPI PUMP.

.Close 1HP-16B. — Start 18 LPI PUMP.

C. Open:

1LP-15

1LP-16

1LP-9

1LP-10

1LP-6

1LP-7

D. — IF two LPI Pumps are running jjjyto provide HPI pump suction,THEN secure one LPI pump.

E. — Dispatch an operator to open1 HP-363 (Letdown Line To LPIPump Suction Block) (A-1-119,Ui LPI Hatch Rm, N end).

F. — GO TO Step 12.2._ IF only one BWST suction valve

(1 HP-24 or 1 HP-25) is open,AND three HPI pumps are operating,THEN secure 18 HPI PUMP.

Page 39 of 45

Page 80: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

20. Verify letdown line leak in EastPenetration Room has occurred.

21. GO TO Step 34.

ENCLOSURE 5.5 (cont.)Page 5 of 8

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

12. IAAT additional makeup flow to LDST isdesired,AND 1A BLEED TRANSFER PUMP isoperating,THEN dispatch an operator to close1CS-48 (1A BHUT Recirc) (A-1-107,Unit 1 RC Bleed Transfer Pump Rm.).

13. IAAT two Letdown Filters are desired,THEN perform the following:

• Open 1HP-17.• Open 1HP-18

14. IAAT of the following exist: — GO TO Step 34.

. Letdown isolated

. LPSW available

. Letdown restoration desiredTHEN perform Steps 15-33.141

15. Open: 1 . — Notify CR SRO that letdown CANNOT be. 100-7 restored due to inability to restart the CC

. 1CC-8 system.

2._ GO TO Step 34.

16. Ensure only one CC pump running.

17. Place the non-running CC pump inAUTO.

18. Verify both are open: 1. IF 1 HP-i is closed due to 1 HP-3 failing to

• 1HP-1 close,

. 1HP-2 THEN GOTO Step2O.2._ IF 1 HP-2 is closed due to 1 HP-4 failing to

close,THEN GO TO Step 20.

19. GO TO Step 22.

NOTEVerification of leakage requires visual observation of East Penetration Room.

— GO TO Step 22.

Page 40 of 45

Page 81: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

ENCLOSURE 5.5 (cont.)Page 6 of 8

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

22. Monitor for unexpected conditions whilerestoring letdown.

23. Verify both letdown coolers to be placed 1 . — IF 1 A letdown cooler is to be placed inin service, service,

THEN open:1 HP-i1HP-3

2._ IF 1 B letdown cooler is to be placed inservice,THEN open:

1 HP-21 HP-4

3._ GO TO Step 25.

24. Open:

. 1HP-1

. IHP-2

. 1HP-3

. 1HP-4

25. Verify at least one letdown cooler is Perform the following:aligned. A. — Notify CR SRO of problem.

B. GO TO Step 34.

26. Close 1 HP-6.

27. Close 1 HP-7.

28. Verify letdown temperature < 125°F. 1 . — Open 1 HP-i 3.2. Close:

1HP-81HP-9&ii

3._ IF y deborating IX is in service,THEN perform the following:A. 1HP-l4to NORMAL.B. 1HP-16.

4._ Select LETDOWN HI TEMP INTLK BYPswitch to BYPASS.

Page 41 of 45

Page 82: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

Page 7 of 8ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

29. Open 1 HP-5.

30. Adjust 1 HP-7 for 20 gpm letdown.

31. WHEN letdown temperature is <125°F,THEN place LETDOWN HI TEMPINTLK BYP switch to NORMAL.

32. Open 1 HP-6.

33. Adjust 1 HP-7 to control desired letdownflow.

NOTEAP/32 (Loss of Letdown) provides direction to cool down the RCS to offset increasing pressurizerlevel.

34. IAAT it is determined that letdown isunavailable due to equipment failures gletdown system leakage,THEN notify CR SRO to initiateAP/32 (Loss of Letdown).

35. IAAT> 1 HPI pump is operating,AND additional HPI pumps are NOlonger needed,THEN perform the following:

A. Obtain SRO concurrence to reducerunning HPI pumps.

B. Secure the desired HPI pumps.C. Place secured HPI pump switch in

AUTO, if desired.

36. IAAT jj the following conditions exist:

• Makeup from BWST NOT required• LDST level > 55”• All control rods inserted• Cooldown Plateau NOT being used

THEN close:

• 1HP-.24• 1HP-25

Page 42 of 45

Page 83: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

ENCLOSURE 55 (cont.)Page 8 of 8

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

37. Verify 1CS-48 (1A BHUT Recirc) has — GO TO Step 39.been closed to provide additionalmakeup flow to LDST.

38. WHEN 1CS-48 (1A BHUT Recirc) is NOlonger needed to provide additionalmakeup flow to LDST,THEN perform the following:

A. Stop 1A BLEED TRANSFERPUMP.

B. Locally position 1CS-48 (1ABHUT Recirc) one turn open (A1-107, Unit 1 RC Bleed TransferPump Rm.).

C. Close 1 CS-46.D. Start 1A BLEED TRANSFER

PUMP.E. Locally throttle 1 CS-48 (1 A

BHUT Recirc) to obtain 90 - 1 10psig discharge pressure.

F. Stop 1A BLEED TRANSFERPUMP.

39. Verify two Letdown Filters in service, — GO TO Step 41.AND only one Letdown filter is desired.

40. Perform of the following:

. Place 1HP-17 switch to CLOSE.• Place 1 HP-i 8 switch to CLOSE.

41. WHEN directed by CR SRO,THEN EXIT this enclosure.

•..END.

Page 43 of 45

Page 84: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

CRITICAL TASKS

1. CT-i, Stop all RCPs (Within 2 minutes of LOSCM). page 17 (contingent on LOSCM due toovercooling)

2. CT-17, Initiate AFIS to stop overcooling on MSLB. page 20

3. CT-5, Throttle •HPI per Rule 6. page 29

Page 44 of 45

Page 85: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Required Operator Actions Form ES-D-21LT42 December 17, 2012

SAFETY: Take a Minute

UNIT 0 (OSM)

SSF Operable: Yes 1 KHU’s Operable: Ui - OH, U2 - UG II LCTs Operable: 2 1 Fuel Handling: NoUNIT STATUS (CR SRO)

Unit 1 Simulator Other Units

Mode: 1 Unit 2 Unit 3

Reactor Power: 75% Mode: 1 Mode: 1

Gross MWE: 685 100% Power 100% Power

RCS Leakage: .024 gpm EFDW Backup: Yes EFDW Backup: Yes

RBNS Rate: .01 gpm

Technical Specifications/SLC Items (CR SRO)

Component/Train OOS Restoration TSISLC #Date/Time Required

Date/Time

Shift Turnover Items (CR SRO)

Primary

. SASS in Manual for l&E

.

.

Secondary

• 1SSH-1, 1SSH-3, 1SD-2, 1SD-5, 1SD-140, 1SD-303, 1SD-355, 1SD-356 and 1SD-358 areclosed with power supply breakers open per the Startup Procedure for SSF OvercoolingEvent.

• Holding power at 75% to facilitate work on 1 B FDWP.

• 1 B FWPT on Handjack

. Voltage Regulator in Manual for maintenance. l&E ready to return it to Auto and reduce VARsto approximately 150 (± 10) using OP/i /AJ1 106/001, End 4.8 (Changing Generator MVAR) toverify proper operation. SOC is already notified the Voltage Regulator will be swapped toAUTO

Reactivity Management CR SRO)R2 Reactivity management controls

RCS Boron: 6 ppmB Gp 7 Rod Position: 70% established in the Control Room perSOMP 01-02

Human Performance Emphasis (OSM)Procedure Use and Adherence

Page 86: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-11LT42 December 17, 2012

Facility: Oconee Scenario No.: 3 r0 Op-Test No.: 1

Examiners: Operators:

Initial Conditions:. Reactor Power = 3% Unit 2: 100%, Unit 3: 100%

Turnover:

. Holding power at 3% at step 3.42 of OP/i/Ni 102/001 (Unit Startup from 532°F/2155 psig toMode 1)while.PT/i/A10630/001 (Mode Change Verification) Enclosure 13.10 “Prior To Entry IntoMODE 1 is being performed.

. Swap CBPs to the 1 A CBP running and 1 B HWP running using OP/i /Ni 106/002 C Enclosure4.3

Event Malfunction * EventNo. No. Event Type Description

Oa Override Auto start of HPIP on low seal injection flow is blocked

Ob

Oc

1 N: BOP, SRO Swap running CBP’s and HWP’s

2 Override C: OATC, SRO (TS) Inadvertent DLPIS

3 MP5270,1 C: BOP, SRO High Oil Level on iA2 RCP

4 Override C: BOP, SRO (TS) 1AHPI pump trips and standby HPI pump fails to auto

5 Override C: OATC, SRO, PZR Spray Valve (1 RC-i) Fails OPEN

6 MCRO6i C: OATC, SRO, Continuous Control Rod Withdrawal

MELi7O M: ALL Blackout Requiring Manual Alignment From CT-5

7 MEL1 80 CT-i LockoUtKHU-i Emergency Lockout

MELO2OKHU-2 Emergency Lockout

8 MS5550,100 M: ALL Turbine Building Flood

(N)ormal, (R)eactivity, (I )nstrument, (C)omponent, (M)ajor

Page 87: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.: 3 Event No.: 1 Page 1 of 2

Event Description: Swap running CBPs and HWP’s

Time Position J Applicant’s Actions or Behavior

OPI1/N1106/002 C, Enclosure 4.3 (Swapping CBPs)

SRO/BOP 2.1 Position any of the following: (N/A)

• IF desired ensure closed 1 XGC-F1 B (1 A CBP Aux Oil Pump Bkr)• IF desired ensure closed 1 XGC-F1 C (1 B CBP Aux Oil Pump Bkr)• IF desired ensure closed 1 XGC-F1 D (10 CBP Aux Oil Pump Bkr)

2.2 Position any of the following: (N/A)

• IF desired ensure Racked-In 1TC-7 (1A CBP Mtr)• IF desired ensure Racked-In 1TD-5 (1 B CBP Mtr)• IF desired ensure Racked-In 1TE-5 (10 CBP Mtr)

2.3 IF desired bypass Powdex per OP/i /N1 106/002 (Condensate And FDWSystem). N/A

• NOTE• Number of operating HWP(s) is normally number of operating CBP(s).• During FDW system startup an additional HW pump is required prior to

starting CBP until Condensate and FDW systems have been filled by highflow flushes.

BOOTH CUE: If directed to dispatch NEO to HWP & CBP to clear the area,inform the CR that using time compression the lB HWP and the 1A CBPbreaker and pump areas are cleared.

2.4 IF desired, start standby lB HWP.

2.5 Start desired 1A CBP.

2.6 Stop desired 1C CBP.

2.7 IF desired, stop standby 1A HWP.

2.8 Ensure CBP LOAD SHED DEFEAT switch is positioned to running CBP.

2.9 Ensure HWP LOAD SHED DEFEAT switch is positioned to running HWP.

NOTE: If one or two HWP(s) are operating, standby HWP CR switch should bein “AUTO”. Required pump maintenance may prevent having a standby pumpavailable.

2.10 IF desired, place standby 1A HWP switch in “AUTO”

NOTE: If one or two CBP(s) are operating, standby CBP CR switch should bein “AUTO”. Required pump maintenance may prevent having a standby pumpavailable.

2.11 IF desired, place standby lB CBP switch in “AUTO”.

This event is complete when the 1 A HWP and the 1 B CBP are in AUTO or as directed by the LeadExaminer.

Page 2 of 41

Page 88: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.: 3 Event No.: 1 Page 2 of 2

Event Description: Swap CBPs

Time Position Applicant’s Actions or Behavior

SRO/BOP 0P111A111061002 C, Enclosure 4.3 (Swapping CBP5) (continued)

2.12 IF desired, place Powdex in service per 0P111A111061002 (CondensateAnd FDW System). N/A

2.13 IF Unit 1 is in Mode 1, perform the following: (T-5-Heater Panel) N/A

• Ensure closed 1 HD-298 (Htr 1 Fl Drain Lvl Control Byp)• Ensure closed 1 HD-303 (Htr 1 F2 Drain Lvl Control Byp)• Ensure closed 1 HD-308 (Htr 1 F3 Drain Lvi Control Byp).

This event is complete when the 1 A HWP and the 1 B CBP are in AUTO or as directed by the LeadExaminer.

Page 3 of 41

Page 89: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.: 3 Event No.: 2 Page 1 of 4

Event Description: Inadvertent DLPIS (TS)

Time__[ Position ApplicanVs Actions or Behavior

Plant Response:

• 1 SA-O1/E-1 1, Diverse LPI Trip• 1 SA-07/D-3, ES ODD VOTERS TROUBLE• 1 SA-071E-3, ES EVEN VOTERS TROUBLE• DLPIS red pushbutton Illuminated• LPI Pumps start• LPI injection aligned• LPSW Pumps start

Crew Response:OATC/BOP ARG: 1SA-O1/E-1 1, Diverse LPI Trip

3.1 Determine if DLPIAS condition exists (RCS pressure 462 psig).

3.2 IF RCS pressure is 462 psig, Go To EP/1/A11800/001 (EmergencyOperating Procedure).

3.3 IF ES condition does NOT exist, Initiate AP/1 IA/i 700/042 (InadvertentES Actuation).

3.4 Refer to OP/i/All 105/014 (Control Room Instrumentation OperationAnd Information).

AP111N17001042 (Inadvertent ES Actuation)

4.1 Verify any of the following have inadvertently actuated:

• Diverse HPI• ES Channel 1• ESChannel2

RNO: GO TO Step 4.4

4.4 Verify any of the following have inadvertently actuated:

• ES Channel 5• ESChannel6

RNO: 1. IF ES Channel 1, ES Channel 2, or Diverse HPI have inadvertentlyactuated,AND it is desired to restore letdown,THEN initiate AP/42 End 5.2 (Letdown Restoration).

2. GO TO Step 4.10.

This event is complete when ILP-17 & 1LP-18 are closed and TSISLC has been addressed, or asdirected by the Lead Examiner.

Page 4 of 41

Page 90: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.: 3 Event No.: 2 Page 2 of 4

Event Description: Inadvertent DLPIS (TS)

Time Position Applicant’s Actions or Behavior

AP111N17001042 (Inadvertent ES Actuation) (continued)

4.10 Close the following:

• 1HP-24• 1HP-25

NOTEIf personnel are available, progression should continue while End 5.1(Required Operator Actions) is in progress.

SRO/BOP 4.11 Ensure AP/42 End 5.1 (Required Operator Actions) is in progress. (seepage 7)

SRO/OATC 4.12 Verify any of the following have inadvertently actuated:

• Diverse LPI• ES Channel 3• ES Channel 4

4.13 Verify Diverse LPI has inadvertently actuated.

EXAMINER NOTE: Placing Diverse LPI in BYPASS will give you 1SA-Ol E10 statalarm. This is an expected alarm.

4.14 Ensure DIVERSE LPI BYPASS is in BYPASS

4.15 Perform the following on all inadvertently actuated system(s):

• Ensure ES CH-3 is in MANUAL• Ensure ES CH-4 is in MANUAL

4.16 Verify LPI was aligned in decay heat removal mode prior to ESactuation.

RNO: 1. Stop the following:

• 1ALPIPUMP• 1BLPIPUMP

2. Simultaneously close the following:

• 1LP-17• 1LP-18

4.17 Verify the Rx is critical.

This event is complete when 1 LP-1 7 & 1 LP-1 8 are closed and TS/SLC’S have been addressed, or asdirected by the Lead Examiner.

Page 5 of 41

Page 91: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.: 3 Event No.: 2 Page 3 of 4

Event Description: Inadvertent DLPIS (TS)

Time__[ Position ApplicanVs Actions or Behavior

AP111A117001042 (Inadvertent ES Actuation) (continued)

CAUTIONDo NOT add demin water to counter the boration until RCS boronconcentration stabilizes to prevent a positive reactivity event.

NOTE105 in Auto means lOS is in control of Tave and Rx power.

SRO/OATC 4.18 Verify ICS in Auto

4.19 Verify control rods are outside the desired control band.

RNO: GO TO Step 4.21

4.21 Verify any of the following have inadvertently actuated:

• ES Channel 1• Diverse HPI

RNO: GO TO Step 4.24

4.24 Notify SPOC to investigate and repair the cause of the inadvertent ESactuation, as necessary.

SRO 4.25 Initiate logging TS/SLC Entry/Exit, as applicable, in accordance withEnd 5.4 (TS/SLC Requirements).

EXAMINERS NOTE: If OAC alarm is received for LPSW leakageaccumulator level, TS 3.7.7 CONDITION B (7 days) will apply due toLPSW leakage accumulator alarm.

SLC 16.7.6 (Diverse Actuation Systems) will apply due to the automaticactuation logic being blocked if any Diverse Actuation system inOVERRIDE or BYPASS. CONDITION A (7 days)

This event is complete when I LP-1 7 & 1 LP-l 8 are closed and TS/SLC’S have been addressed, or asdirected by the Lead Examiner.

Page 6 of 41

Page 92: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Event No.: 2 Page 4 of 4Op-Test No.: 1LT42 Scenario No.: 3

____

Event Description: Inadvertent DLPIS (TS)

Time_j Position Applicant’s Actions or Behavior

SRO/BOP AP/1/N1700/042 Enclosure 5.1 (Required Operator Actions)

1 Initiate announcement of AP Entry using the PA system.

2 Verify any of the following have inadvertently actuated:

• Diverse HPI• ES Channel 1• ES Channel 2

RNO: GO TO Step 5

5 Verify any of the following have inadvertently actuated:

• ES Channel 7• ES Channel 8

RNO: GO TO Step 9

9 Perform the following:

A. Open the following to restore RB RIAs:

• 1PR-7• 1PR-8• 1PR-9• 1PR-10

B. From the ENABLE CONTROLS screen on the RIA View Node,perform the following:

1) Select OFF for RB RIA sample pump.2) Start the RB RIA sample pump.

10 Verify any of the following have inadvertently actuated:

• Diverse HPI• ES Channel 1

RNO: GOTO Step 12

12 EXIT this enclosure.

EXAMINER NOTE: If time permits, the BOP may refer to the ARGs for1SA-07/D-3 and 1SA-07/E-3. Both ARGs will lead him to go to the ESCabinets to see if there are any flashing lights or abnormal indications onthe Even or Odd Voters.

EXAMINER CUE: There are no flashing lights or abnormal indications oneither the Even or Odd Voters. (Both of those alarms have cleared by thispoint in the event)

This event is complete when 1 LP-1 7 & 1 LP-1 8 are closed and TSISLC’S have been addressed, or asdirected by the Lead Examiner.

Page 7 of 41

Page 93: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.: 3 Event No.: 3 Page 1 of 4

Event Description: High Oil Level on 1A2 RCP

Time_I Position Applicant’s Actions or Behavior

Plant Response:

• OAC alarm 01 Dl 036 (RCP 1A2 MTR LOWER OIL POT LEVEL HI)

Crew Response:

SRO/BOP Refer to Alarm Response Guide for O1D1036 (RCP 1A2 MTR LOWER OIL POTLEVEL HI)

1) Display RCP parameters and closely monitor oil levels and bearingtemperatures.

2) Refer to AP/1/A11700/01 6 (Abnormal Reactor Coolant Pump Operation)

3) Notify OSM and RCP Component Engineer of the alarm.

API1IN1 700/01 6, Abnormal RCP Operation

4.1 IAAT any RCP meets immediate trip criteria of End 5.1 (RCPImmediate Trip Criteria),THEN perform Steps 4.2 - 4.11.

RNO: GOTOStep4.12

EXAMINER NOTE: In step 4.12, the crew may conservatively decide tosecure the RCP because the oil pot level is threatening to go offscalehigh. If so, they will proceed to step 4.13 and will not end up in Section4C. This path is on page 11. This path or the path below are acceptable

4.12 IAAT either of the following apply:

• Any RCP approaching immediate trip criteria of End 5.1 (RCPImmediate Trip Criteria)

• It is desired to secure a RCP

THEN perform Steps 4.13 - 4.15.

RNO: GO TO Step 4.16

4.16 Announce AP entry using the PA system.

4.17 Notify OSM to request evaluation by RCP Component Engineer.

4.18 IAAT the failure is identified,THEN GO TO the applicable section per the following table:

Section Failure4A Seal Failure4B Abnormal Vibration4C High or Low Oil Pot Level4D Loss of Seal Return4E Abnormal RCP Temperatures

This event is complete when actions to secure the 1 A2 RCP are completed, or as directed by theLead Examiner.

Page 8 of 41

Page 94: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.: 3 Event No.: 3 Page 2 of 4

Event Description: High Oil Level on 1A2 RCP

Time Position Applicant’s Actions or Behavior

API1IN1700IO16, Section 4C

SRO/BOP 1 IAAT any RCP meets immediate trip criteria of End 5.1 (RCPImmediate Trip Criteria),THEN perform Steps 2 - 11.

RNO: GOTO Step 12

12 Start trending RCP oil pot levels. (Turn-on Code “unitpump”RCPT3,example 1A2RCPT3)

NOTE• RCP oil pot level indication range is +1.5 to -1.5 inches.• RCP motor oil pot temperatures and RCP motor guide bearing temperatures

may be used to validate low oil pot level. {4}

13 IAAT oil pot level threatens to go off scale high or low for an operatingRCP,THEN perform Steps 14- 24.

14 Verify MODE 1 or 2.

15 Verify three RCPs will remain operating after affected RCP is tripped.

16 Verify Rx power is 70% as indicated on all NIs.

17 Verify any SG on Low Level Limits.

EXAMINER NOTE: STATALARM 1SA-07/D-8, 1A2 RCPMP Trip, will alarmwhen the 1A2 RCP is stopped.

18 Stop the affected RCP.

19 GOTOStep23.

23 Initiate End 4.3 (Special Instructions for < 4 RCP Operation) ofOP/i/Ni 102/004 (Operation at Power)..

24 Make the following notifications:

• Notify OSM to make required notifications of OMP 1-14 (Notifications).• Notify Rx Engineering and request a power maneuver plan, if needed.• Notify SOC if load reduction was required.• Notify Chemistry to take RCS boron samples on a 1 hour frequency.

This event is complete when actions to secure the 1 A2 RCP are completed, or as directed by theLead Examiner.

Page 9 of 41

Page 95: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.: 3 Event No.: 3 Page 3 of 4

Event Description: High Oil Level on 1A2 RCP

Time Position Applicant’s Actions or Behavior

SRO/BOP AP/1 /A/i 700/016, Section 4C (continued)

25 IAAT an RB fire exists,THEN perform Steps 26 - 29.

RNO: GO TO Step 30

30 IAAT either of the following conditions is met:

• a RCP with low oil level has been shut down for 3 hours, {9}• a RCP with high oil level has been shut down

THEN close the associated RCP motor cooler inlet/outlet valve:

• 1 LPSW-7&8 (1 Al RCP)• 1 LPSW-9&l 0 (1 Bl RCP)• 1LPSW-13&14 (1A2 RCP)• 1LPSW-ll&12(1B2RCP)

31 IAAT a RCP has been tripped due to exceeding Immediate Trip Criteriaon a RCP motor,THEN contact RCP engineer prior to restart. {8}

32 WHEN conditions permit,THEN EXIT this procedure.

This event is complete when actions to secure the 1A2 RCP are completed, or as directed by theLead Examiner.

Page 10 of 41

Page 96: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.: 3 Event No.: 3 Page 4 of 4

Event Description: High Oil Level on 1A2 RCP

Time Position ApplicanVs Actions or Behavior

AP/1/N1700/O1 6, (continued)

SRO/BOP 4.13 Verify Rx Power> 70%.

RNO: GO TO Step 4.15

4.15 WHEN Rx Power is 70%,

THEN GO TO Step 4.2.

4.2 Verify MODE 1 or 2.

4.3 Verify Rx power is 70% as indicated on all NIs.

4.4 Verify three RCPs will remain operating after affected RCP is tripped.

4.5 Verify any SG on Low Level Limits.

4.6 Stop the affected RCP.

4.7 GO TO Step 4.26.

4.26 Initiate End 4.3 (Special Instructions for < 4 RCP Operation) ofOP/i/Ni 102/004 (Operation at Power).

4.27 IAAT an RCP has been shut down for 3 hours, {9}THEN close the associated RCP motor cooler inlet/outlet valves:

• 1LPSW-7&8 (1A1 RCP)• 1 LPSW-9&i 0 (1 Bi RCP)• 1LPSW-13&14 (1A2 RCP)• 1LPSW-1i&12(1B2RCP)

This event is complete when actions to secure the 1P2 RCP are completed, or as directed by theLead Examiner.

Page 11 of 41

Page 97: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.: 3 Event No.: 4 Page 1 of 3

Event Description: 1A HPI pump trips and standby HPI pump fails to auto start (TS)

Time Position [ Applicant’s Actions or Behavior

Plant response:

Statalarms:

• 1 SA-2/B-2 (HP RCP Seal Injection Flow High/Low)

• 1 SA-21C-2 (HP Injection Pump Disch. Header Pressure High/Low)

Board indications:

• RC Makeup Flow = -.0 gpm

• RCPSIfIow=-Ogpm

• 1A HPI Pump amps low = -15 amps

PZR level will begin to decrease and LDST level will begin to increase.

Crew response:

Refer to ARGs: Refer to AP/1 4

AP/1/A/1 700/01 4, Loss of Normal HPI Makeup and/or RCP Seal InjectionSRO/OATC

3.1 IAAT RCP seal injection flow is lost,AND Component Cooling is lost,THEN perform the following:

A. Trip the Rx.B. Stop all RCPs.C. Initiate AP/25 (SSF EOP).

3.2 IAAT loss of suction to operating HPI pumps is indicated:

• Motor amps low or cycling• Discharge pressure low or cycling• Abnormal LDST level trend

THEN GO TO Step 3.3.

RNO: GO TO Step 4.7

4.7 Announce AP entry using PA System.

4.8 Verify any HP! pump operating.

RNO 1. Close 1 HP-5

2. Place 1HP-120 in HAND and closed

3. Place 1HP-31 in HAND and closed

4. Attempt to start the Standby HPIP (1 B HPIP starts)

5. IF standby HP! pump started,THEN GO TO Step 4.111.

This event is complete when 1 HP-31 is placed in AUTO, or as directed by the Lead Examiner.

Page 12 of 41

Page 98: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: lLT42 Scenario No.: 3 Event No.: Page 2 of 3

Event Description: 1A HPI pump trips and standby HPI pump fails to auto start (TS)

Time Position Applicant’s Actions or Behavior

AP/14, Loss of Normal HPI Makeup and/or RCP Seal Injection (continued)

OATC/BOP 4.111 Place 1 HP-31 in HAND

4.112 Slowly open 1HP-31 until 8 gpm/RCP is achieved.

4.113 Re-establish normal makeup through 1HP12O.

4.114 Ensure proper operation of the Component Cooling System.

4.115 Reduce 1 HP-7 demand to 0%.

4.116 Close 1HP-6

4.117 Open the following:> 1HP-1> 1HP-2

1HP-31HP-4

BOOTH NOTE: Crew may direct NEO to open & rack out the 1A HPIPbreaker. (Use Quick Strike to remove fuses)

4.118 Open 1HP-5

4.119 Throttle open 1 HP-7 for 20 gpm letdown flow.

4.120 Open 1HP-6

4.121 Adjust 1HP-7 for desired letdown flow.

4.122 Open the following:1HP-228, 1HP-226,1HP-232, 1HP-230

4.123 Open 1HP-21.

4.124 IAAT SEAL INLET HDR FLOW 32 gpm,THEN place 1 HP-31 in AUTO

4.125 Monitor RCP seal parameters.

4.126 Maintain RCP seal injection flows as required.

4.127 Log thermal cycle of 1A HPI header.

4.128 WHEN conditions permit,THEN EXIT this procedure.

Note: Crew may enter AP/16 (Abnormal RCP Operation) as a result of highseal return temperatures. Steps are on the next page.

This event is complete when 1 HP-31 is placed in AUTO, or as directed by the Lead Examiner.

Page 13 of 41

Page 99: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.: 3 Event No.: Page 3 of 3

Event Description: 1A HPI pump trips and standby HPI pump fails to auto start (TS)Time Position ApplicanVs Actions or Behavior

AP/16 (Abnormal RCP Operation)

OATC/BOP 4.1 IAAT any RCP meets immediate trip criteria... (does not)

RNO: GO TO Step 4.12

4.12 IAAT all of the following apply:

• Any RCP approaching immediate trip criteria of End 5.1.• It is desired to secure a RCP

THEN perform Steps 4.13— 4.15:

RNO: GOTOStep4.16

4.16 Announce AP entry using the PA system.

4.17 Notify OSM to request evaluation by RCP Component Engineer.

4.18 IAAT the failure is identified,THEN GO TO the applicable section per the following table:

4D Loss of Seal Return

AP/16 (Abnormal RCP Operation) Section 4D

1. IAAT any RCP meets immediate trip criteria... (does not)

RNO: GOTO Step 12

12. Monitor RCP parameters for abnormalities (Turn on Code “RCP”).

13. Open 1HP-20 and 1HP-21

14. OpenlHP-228, 1HP-226, 1HP-232, and 1HP-230

15. Verify either of the following... (not met)

RNO GO TO Step 17.

17. Verify RCP seal return low flow alarms off.

RNO: Request that RCP Component Engineer provide the following:• Immediate evaluation• Additional monitoring requirements

EXAMINER CUE: If candidate attempts to monitor the Loose part Monitor,indicate that the noise is normal.

EXAMINER NOTE: Due to sequence of events, SRO may not reWew the TSduring the scenario. Follow-up questions may be required to ensureknowledge of this competency. Tech Spec 3.5.2 High Pressure Injection

• Condition “A”• Required Action: Restore HPI pump to OPERABLE status• Completion Time: 72 hours

This event is complete when 1 HP-31 is placed in AUTO, or as directed by the Lead Examiner.

Page 14 of 41

Page 100: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: lLT42 Scenario No.: 3 Event No.: 5 Page 1 of 3

Event Description: PZR Spray Valve (1RC-1) Fails OPEN

Time__[ Position Applicant’s Actions or Behavior

Booth Cue: Call control room as Secondary Chemist and request positionof 1AS-35 (Stm to E Heaters) and steam flow to E heaters. While BOP is atvertical boards, fire Timer 5 to initiate event.

Plant Response:

• RCS pressure will decrease

• 1SA-2/D-3 (RC PRESS HIGH/LOW)

Crew Response:

EXAMINER NOTE: The crew may perform Plant Transient Response (PTR)

Refer to Alarm Response Guide 1 SA-2/D-3 (RC PRESS HIGH/LOW)3.2 Low Alarm

3.2.1 Refer to AP/1/A/1 700/044 (Abnormal Pressurizer Pressure Control)

AP/1 IN1 700/044 (Abnormal Pressurizer Pressure Control)

SRO/OATC 3. Immediate Manual Actions3.1 IAAT aB of the following conditions exist:

PORV open— RC pressure <2300 psig (HIGH) or 480 psig (LOW)— PZR level 375”THEN close 1 RC-4

EXAMINER NOTE: The crew may perform Immediate Manual Action Step32 from memory prior to the SRO entering AP/44.

3.2 IAAT aB the following conditions exist:RC pressure < 2155 psig

— RC pressure decreasing without a corresponding decrease inPZR level

— PZR heaters unable to maintain RCS pressureTHEN close the following:

1RC-11 RC-3

EXAMINER NOTE: If the block valve (1RC-3) is not closed, the Reactorwill trip on variable low pressure and ES actuation will occur

This event is complete when 1 RC-3 is re-opened and 1 RC-1 is in Auto, or as directed by the LeadExaminer.

Page 15 of 41

Page 101: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.: 3 Event No.: 5 Page 2 of 3

Event Description: PZR Spray Valve (1RC-1) Fails OPEN

Time_J Position [ Applicant’s Actions or Behavior

AP/1 IA/i 700/044 (Abnormal Pressurizer Pressure Control) (continued)

SRO/OATC 4.1 Announce AP entry using the PA system

4.2 GO TO the applicable per the following table:

‘ Failure Caused StepRCS Pressure

Decrease 4.3

Increase 4.19

4.3 Verify the following:

• 1 RC-4 failed to close• PORV open

RNO: GO TO Step 4.5

4.5 Verify 1 RC-1 failed OPEN

4.6 Position the following to maintain RC pressure within desired band, asrequired:

• 1RC-1• 1RC-3

4.7 Verify RC pressure decreasing uncontrollably

RNO: GO TO Step 4.14

4.14 Verify PZR heaters maintaining RCS pressure within desired band

4.15 Notify SPOC to repair malfunctioning component

SRO 4.16 Ensure requirements of following are met: (no TS should apply)

• TS 3.4.1 (RCS Pressure, Temperature, and Flow DNB Limits)• TS 3.4.9 (Pressurizer)• TS 3.4.12 (LTOP System)• SLC 16.5.1 (RCS Vents)

This event is complete when I RC-3 is opened and 1 RC-1 is in Auto, or as directed by the LeadExaminer.

Page 16 of 41

Page 102: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.: 3 Event No.: 5 Page 3 of 3

Event Description: PZR Spray Valve (1RC-1) Fails OPEN

Time_j Position ApplicanttsActions or Behavior

SRO/OATC AP/1 IA/i 700/044 (Abnormal Pressurizer Pressure Control) (continued)

BOOTH CUE: Fire Timer 14 to repair 1RC-1 then call control room asSPOC and inform the crew that (using Time Compression) 1RC-1 hasbeen repaired and can be returned to normal operation

4.17 WHEN repairs complete,THEN place the following components in desired position for currentplant conditions as determined by CR SRO.

• 1RC-1• 1RC-3• 1RC-4• PZR heaterbank#1• PZR heater bank #2• PZR heater bank #3• PZR heater bank #4

4.18 When directed by the CR SRO, THEN EXIT this procedure.

This event is complete when 1 RC-3 is opened and 1 RC-1 is in Auto, or as directed by the LeadExaminer.

Page 17 of 41

Page 103: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.: 3 Event No.: 6 Page 1 of 1

Event Description: Continuous Control Rod Withdrawal

Time Position Applicant’s Actions or Behavior

Plant response:

• Control Rods withdrawing without operator action

• Nl-5 thru Nl-9 indicate increasing reactor power

• SURs on Wide Range Nis increasing

Crew response:

• The candidates should utilize the “Plant Transient Response” process to stabilizethe plant and recognize that control rods are withdrawing without a valid signal.

• Verbalize to the SRO reactor power level and direction of movement.

• Place the Diamond and both FDW Masters in MANUAL to stabilize the plant.SRO/OATC

> The crew should insert control rods and monitor reactor power and widerange startup rate to stabilize the plant

• Report no valid (ICS) Runback and monitor RCS pressure and inventory

Contact SPOC to investigate the continuous rod withdrawal.

Note: The OATC may elect to trip the Rx during this transient per SOMP 01-02 and OMP 1-18 Attachment J (Plant Transient Response).

6.3.3 During abnormal operating conditions a manual reactor trip shall beinitiated it any of the following conditions occur:

• Reactor power level approaches any operating limit

• Reactor power level exceeds the pre-transient power level by greaterthan 5% AND the cause of the power change is NOT understood, OR isNOT controllable

• Any time plant conditions are considered uncontrollable or unsafe

EXAMINER/BOOTH NOTE: When the Rx is tripped Timer 7 will auto initiateBlackout (event 7- next page)

This event is complete when the plant is stabilized using PTR, the reactor is tripped, or as directedby the Lead Examiner..

Page 18 of 41

Page 104: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No: 1LT42 Scenario No.:3 Event No.: Page 1 of 10

Event Description: Blackout Requiring Manual Alignment From CT-5

Time Position Applicant’s Actions or Behavior

Plant Response

• Reactor will trip (if not already tripped)

• MFBs will de-energize

• CT-i Lockout

• KHU-1 Emergency Lockout

• KHU-2 Emergency Lockout

Crew Response:

SRO directs OATC to perform Immediate Manual Actions (lMAs):

SRO/OATC • Depress REACTOR TRIP pushbutton

• Verify Reactor Power < 5% FP and decreasing

• Depress turbine TRIP pushbutton

• Verify a turbine stop valves closed

• Verify RCP seal injection available

EXAMINER NOTE: The OATC should determine that RCP Seal Injectionand CC are not available and inform the SRO to initiate AP/25. The SROwill then direct an RO to initiate AP/25. When the RO attempts to leavethe Control Room, inform himlher that a Unit 2 RO will perform AP/25actions at the SSF.

SRO directs BOP to perform Symptoms Check:S RO/BOP

• Power Range NIs < 5% and/or decreasing

• Any SCM 0°F

• Loss of Main and Emergency FDW (including unsuccessful manualinitiation of EFDW)

• Uncontrolled Main Steam Line(s) pressure decrease

• Steam Generator Tube Rupture

o CSAE Offgas alarms

o Process Monitor alarms (RIA-40)

o Area monitor alarms (RIA-1 6/1 7)

This event is complete once the SRO transitions back to Subsequent Actions, or as directedby the Lead Examiner.

Page 19 of 41

Page 105: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.: Event No.:...L Page 2 of 10

Event Description: Blackout Requiring Manual Alignment From CT-5

Time Position Applicant’s Actions or Behavior

Crew Response:

SRO will transfer to Subsequent Actions Tab of the EOP after documentingIMA5 and will refer to the Parallel Actions Page which will require a transfer tothe Blackout Tab due to ALL 41 60V switchgear being de-energized.

Blackout Tab

SROIOATC/ 1. Ensure Rule 3 (Loss of Main or Emergency FDW) is in progress orBOP complete. (page 22)

2. Verify two ROs available to perform Control Room actions

NOTE:

During performance of End 5.38 (Restoration of Power), progression throughthe Blackout Tab should continue.

SROIBOP 3. Notify one RO to perform End 5.38 (Restoration of Power)(see page 24)

4. Verify any SG is being fedSRO/OATC 5. Verify y MD EFDWP operating using diverse indication.

RNO: Position to OFF:• 1AMDEFDWP• 1BMDEFDWP

6. Verify either:

• Blackout occurred during Mode 3• Blackout occurred while in mode 4 with SGs removing decay heat.

RNO: 1. Feed and steam available SGs as necessary to stabilize RCS PIT inbands prescribed by Rule 7 (SG Feed Control)

2. GO TO step 8.

NOTE:Feeding SGs with EFDW is desired over HPI Forced cooling. Step 8 shouldbe performed prior to re-performing Rule 3.100 gpm could cause overcooling if decay heat levels do NOT exist.

8. IAAT NO SGs are being fed,AND jjy source of EFDW (Unit 1 or another unit) becomes available,THEN perform steps 9— 11.

RNO: GOTO step 12

This event is complete once the Sf0 transitions back to Subsequent Actions, or as directedby the Lead Examiner.

Page 20 of 41

Page 106: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.: Event No. :_ Page 3 of 10

Event Description: Blackout Requiring Manual Alignment From CT-5

Time Position Applicant’s Actions or Behavior

Blackout Tab (continued)

SRO/OATC 12. IAAT EFDW from any source is insufficient to maintain stable RCS P/I,THEN notify SSF operator that feeding SGs with SSF ASW is required.

13. IAAT power is restored to y of the following:

1TClTD1 TE

THEN GO TO Step 14

RNO: GOTOStepl9

19. Verify End 5.38 (Restoration of Power) in progress or complete

EXAMINER NOTE: When power is restored using End 5.38, return toBlackout Tab here.

13. IAAT power is restored to gjy of the following:

• 1TC• lTD• 1TE

THEN GO TO Step 14

14. Ensure Step 8 dispositioned appropriately.

15. Verify SSF activated.

NOTEAP/1 1 (Recovery From Loss of Power) will transition seal injection from SSFto HPI.

16. Communicate status of SG feed and seal injection to SSF operator usingx-2766, radio, or plant page.

17. Initiate AP/1 1 (Recovery from Loss of Power) (see page 26)

18. GO TO Subsequence Actions Tab.

This event is complete once the SRO transitions back to Subsequent Actions, or as directedby the Lead Examiner.

Page 21 of 41

Page 107: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.:_ Event No.:_L Page 4 of 10

Event Description: Blackout Requiring Manual Alignment From CT-5

Time Position Applicant’s Actions or Behavior

SRO/BOP/ EOP Rule 3OATC 1. Verify loss of Main FDW/EFDW is due to Turbine Building Flooding

RNO: GO TO Step 3

3. IAAT NO SGs can be fed with FDW (Main/CBP/Emergency)AND jy of the following exist:

• RCS pressure reaches 2300 psig OR NDT limit• Pzr level reaches 375” [340” acc]

THEN PERFORM Rule 4 (Initiation of HPI Forced Cooling)

4. Start operable EFDW pumps, as required, to feed all intact SGs

5. Verify EFDW pump operating

6. GO TO Step 37

37. IAAT an EFDW valve CANNOT control in AUTO,OR manual operation of EFDW valve is desired to control flow/level,THEN perform Steps 38-42

RNO: GO TO Step 43

43. Verify ay SCM 0°F

RNO: IF overcooling,OR exceeding limits in Rule 7 (SG Geed Control),THEN throttle EFDW, as necessary

44. IAAT Unit 1 EFDW is in operation,THEN initiate End 5.9 (Extended EFDW Operation) (see next page)

45. WHEN directed by CR SRO,THEN EXIT this rule

This event is complete once the SRO transitions back to Subsequent Actions, or as directedby the Lead Examiner.

Page 22 of 41

Page 108: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.:....i.. Event No.:....L Page 5 of 10Event Description: Blackout Requiring Manual Alignment From CT-5

Time__[ Position Applicant’s Actions or Behavior

SRO/BOP/ End 5.9 (Extended EFDW Operation) as directed by Rule 3OATC 1. Monitor EFDW parameters on EFW graphic display.

2. IAAT UST level is <4’,THEN GO TO Step 120

3. IAAT feedingj SGs with one MD EFDWP is desired,THEN perform Steps 4-7

RNO: GO TO Step 8

8. Perform the following as required to maintain UST level > 7.5’:

• Makeup with demin water.• Place CST pumps in AUTO.

9. IAAT the following exist:• Rapid cooldown NOT in progress• MD EFDWP operating for each available SG• EFDW flow in each header < 600 gpm

THEN place 1 TD EFDW PUMP switch in PULL TO LOCK.

10. Verify 1 TD EFDW PUMP operating.

11. Start TD EFDWP BEARING OIL COOLING PUMP.

NOTE

• Loss of the condensate system for 25 minutes results in cooling downto LPI using the ADVs. If NO HWPs are operating, continuing thisenclosure to restore the condensate system is a priority unless the CRSRO deems EOP activities higher priority. The 25 minute criterion issatisfied when a HWP is started and 1C-10 is 10% open.

• If the condensate system is operating, the remaining guidance establishesFDW recirc, monitors and maintains UST, and transfers EFDW suction tothe hotwell if required.

12. Notify CR SRO to set priority based on the NOTE above EOPactivities.

This event is complete once the SRO transitions back to Subsequent Actions, or as directedby the Lead Examiner.

Page 23 of 41

Page 109: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.:3 Event No.:7 Page 6 of 10

Event Description: Blackout Requiring Manual Alignment From CT-5

Time Position [ Applicant’s Actions or Behavior

SRO/BOP/ EOP Enclosure 5.38 (Restoration of Power)OATC

• Verify power has been restored

RNO: GO TO Step 3

3. Place 1 HP-31 in HAND and reduce demand to 0

4. Close 1 HP-21

5. Verify any of the following energized:

MFB1MFB2

RNO: GO TO Step 8

8. Verify CT-i indicates 4160 volts

RNO: GO TO Step 18

18. Verify both Standby Bus #1 and Standby Bus #2 are de-energized

19. Verify both Keowee units operating

RNO: 1. Emergency Start Keowee units:

— KEOWEE EMER START CHANNEL A— KEOWEE EMER START CHANNEL B

(not modeled on simulator)2. IF NO Keowee units are operating,

THEN GO TO Step 36

36. IAAT CT-5 indicates 4160 volts,THEN GO TO Step 51

Si. Place the following switches in MAN:

— MFB1 AUTO/MAN (already in manual)— MFB2 AUTO/MAN (already in manual)— STANDBY 1 AUTO MAN— STANDBY 2 AUTO MAN

52. Open the following breakers:

— Ni1 MFB1 NORMAL FDR (already open)— N21 MFB2 NORMAL FDR (already open)

El1 MFB1 STARTUP FDR (already open)—

E21 MFB2 STARTUP FDR (already open)

This event is complete once the SRO transitions back to Subsequent Actions, or as directedby the Lead Examiner

Page 24 of 41

Page 110: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.:3 Event No.:j_ Page 7 of 10

Event Description: Blackout Requiring Manual Alignment From CT-5

_Time Position Applicant’s Actions or Behavior

SRO/BOP/ EOP Enclosure 5.38 (continued)OATC

53. Place the following switches in MAN:

_CT4BUS1 AUTO/MAN— CT4 BUS 2 AUTO/MAN— CT5 BUS 1 AUTO/MAN (already in manual)— CT5 BUS 2 AUTO/MAN (already in manual)

54. Open the following breakers:

— SKi CT4 STBY BUS 1 FEEDER (already open)— SK2 CT4 STBY BUS 2 FEEDER (already open)

55. Close the following breakers: (CT-8) (*Critical Steps to regain power.Only one set of breakers is required to regain power)

— SL1 CT5 STBY BUS 1 FEEDER*— SL2 CT5 STBY BUS 2 FEEDER*

56. Place the following switches in AUTO:

— CT5 BUS 1 AUTO/MAN— CT5 BUS 2 AUTO/MAN

57. Verify Standby Bus #1 energized

58. Notify CR SRO in each unit where a blackout exists that Standby Bus #1is energized

Note: The Blackout exists on Unit 1 only.

59. Close the following breakers:

S1 STBYBUS1 TOMFB1*— S21 STBY BUS 2 TO MFB2*

60. Verify y of the following energized:

_1TC,1TD,_1TE

61. Notify Unit 1 CR SRO of status of 41 60V SWGR

EXAMINER NOTE: When power is restored to 1 TC, 1 TO, or 1 TE, IAA TStep 13 (BlO Tab) will apply. Return to the Blackout Tab on page 21 forfurther actions.

This event is complete once the SRO transitions back to Subsequent Actions, or as directedby the Lead Examiner.

Page 25 of 41

Page 111: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.:_L Event No.:j_ Page 8 of 10

Event Description: Blackout Requiring Manual Alignment From CT-5

Time Position [ Applicant’s Actions or Behavior

SRO/BOP/ AP/1 1 (Recovery From Loss of Power)OATC 4.1 Announce AP entry using OMP 1-18 placard.

4.2 IAAT Pzr level > 8Q”[l 8Q”acc],AND Pzr heaters are desired,THEN position Pzr heaters to AUTO.

4.3 Verify load shed of inverters was performed per Unit 1 EOP End(Load Shed of Inverters During SBO).

RNO: GO TO Step 4.9

4.9 Verify load shed has initiated as indicated by either of the followingstatalarms on:

— iSA-i 5/D-4 (EL LOAD SHED CHNL A LOGIC INITIATE)1SA-14/D-4 (EL LOAD SHED CHNL B LOGIC INITIATE)

4.10 Verify load shed is complete as indicated by LOAD SHEDCOMPLETE on any ES Module (Channel 1 or 2).

4.11 Close the following breakers:

— 1TC INCOMING FDR BUS 1— 1TC INCOMING FDR BUS 2— lTD INCOMING FDR BUS 1— lTD INCOMING FDR BUS 2— 1TE INCOMING FDR BUS 1— 1TE INCOMING FDR BUS 2

4.12 Verify 1SA-15/E-6 (EL SWYD ISOLATION CONFIRMED CHNL ALOGIC) is OFF.

RNO: GO TO Step 4.15

4.15 Verify any Oconee unit receiving power from its normal source (iT,2T, 3T).

4.16 Place transfer switches in MAN for all Oconee units receiving powerfrom the normal source (iT, 2T, 3T):

• MFB1 AUTO/MAN• MFB2 AUTO/MAN• TA AUTO/MAN• TB AUTO/MAN

This event is complete once the SRO transitions back to Subsequent Actions, or as directedby the Lead Examiner

Page 26 of 41

Page 112: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.:3 Event No.:7 Page 9 of 10

Event Description: Blackout Requiring Manual Alignment From CT-5

_Time Position Applicant’s Actions or Behavior

SROIBOPI AP/1 1 (Continued)OATC 4.17 Verify load shed was initiated as indicated by either of the following

statalarms on:

• 1SA-15/D-4 (EL LOAD SHED CHNLA LOGIC INITIATE)• 1SA-14/D-4 (EL LOAD SHED CHNL B LOGIC INITIATE)

4.18 Verify ES has occurred.

RNO: GO TO Step 20

4.20 Simultaneously press RESET on both of the following pushbuttons toreset Main Feeder Bus Monitor Panel Load Shed Circuitry:

• MFBUNDERVOLTAGECHANNEL1 RESET• MFB UNDERVOLTAGE CHANNEL 2 RESET

4.21 Verify load shed signal reset as indicated by both of the followingstatalarms off:

• iSA-i 51D-4 (EL LOAD SHED CHNL A LOGIC INITIATE)• 1SA-14/D-4 (EL LOAD SHED CHNL B LOGIC INITIATE)

4.22 IAAT electrical loads are added,AND any MFB is powered from a Lee Gas Turbine, N/ATHEN notify Lee Steam Station to adjust frequency as necessary.

4.23 Verify both:

• Condensate flow has been lost for < 25 minutes• Condensate system. operation desired

4.24 Place all HWP control switches to OFF.

4.25 Place all CBP control switches to OFF.

4.26 Place in MANUAL and close:

• 1FDW-53• 1FDW-65

4.27 Place iC-b FAIL SWITCH in MANUAL.

4.28 Close iC-b.

4.29 Make plant page to clear basement and third floor of non-essentialpersonnel.

4.30 Start one HWP.

This event is complete once the SRO transitions back to Subsequent Actions, or as directedby the Lead Examiner.

Page 27 of 41

Page 113: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

(Continued)

Verify < 25 minutes elapsed since loss of condensate.

Throttle iC-b controller 10% open to satisfy 25 minute systemrestart criteria.

4.33 WHEN FWP SUCT HDR PRESS (1VB3) is 100 psig,THEN open 10-10.

Place 1C-lO FAIL SWITCH in FAIL OPEN.

Maximize total recirc flow < 1200 gpm with one of the following:

• 1FDW-53• 1FDW-65

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.:_ Event No.:j_ Page 10 of 10

Event Description: Blackout Requiring Manual Alignment From CT-5

Time Position Applicant’s Actions or Behavior

SRO/BOP/OATC

API1 1

4.31

4.32

4.34

4.35

This event is complete once the SRO transitions back to Subsequent Actions, or as directedby the Lead Examiner.

Page 28 of 41

Page 114: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: lLT42 Scenario No.: 3 Event No.: 8 Page 1 of 3

Event Description: Turbine Building Flood

J_Time Position Applicant’s Actions or Behavior

Plant Response:

• 25A-18/B-1 1 (TURBINE BSMT WATER LEVEL ALERT)• Notification from Unit 2 that Turbine Building flooding exists as indicated by

the following:o 2SA-i 8/A-il (TURBINE BSMT WATER EMERGENCY HIGH LEVEL)

EXAMINER NOTE: The B-il ALERT will alarm before the A-ilEMERGENCY HIGH alarms. Entry Conditions for AP-lO are not met untilthe A-il Emergency High statalarm is received.

Crew Response:

ARG 2SA-18/B-1l (TURBINE BSMT WATER LEVEL ALERT)

3.1. Dispatch operator to “T.B. Water Level Monitoring Panel,” locatedSRO/OATC outside #2 CR in order to determine which level switches are in alarm.

/BOP 3.2. Investigate and correct reason for water in T.B. Basement.

ARG 2SA-181A-11 (TURBINE BSMT WATER EMERGENCY HIGH LEVEL)

3.1. Notify Unit 3 Control Room.

3.2. All units immediately refer to AP/1 ,2,3/N1 700/10(UNCONTROLLABLE FLOODING TURBINE BUILDING).

OATC/BOP performs AP-lO (Turbine Building Flood) after receiving directionfrom the SRO (details on page 31)

SRO enters the EOP TBF (Turbine building Flood) Tab and proceeds through itin parallel with the BOP performing AP-lO. (see next page)

This event is complete Close 1/Close 2 pushbutton has been depressed lAW API1O or asdirected by the lead examiner

Page 29 of 41

Page 115: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.: 3 Event No.: 8 Page 2 of 3

Event Description: Turbine Building Flood

Time Position f ApplicanVs Actions or Behavior

EOPTBF Tab

NOTEFeeding to 95% O.R. in Step 1 supersedes guidance in Rule 7 (SG FeedControl), Table 4 (SG Level Control Points).

1. Initiate feeding SGs to 95% O.R. at maximum allowable rate using allSRO/BOP available feedwater sources while maintaining the following:

• Initial Tave 532° F — maintain Tave 532° F during SG fill.• Initial Tave < 532° F — minimize cooldown during SG fill utilizing

TBVs as required.

2. Minimize Pzr level> 100” [180” accj.

NOTERCP 1 Al provides the best Pzr spray.

3. Reduce operating RCP5 to one

NOTETurbine Building flooding will result in loss of condenser vacuum, renderingTBVs unavailable.

4. Stabilize temperature determined in Step 1 by performing the following:

A. Dispatch two operators to perform End 5.24 (Operation of theADVs)

B. Adjust SG pressure as necessary using:

• TBV5 while available• ADV5 after TBVs are lost

5. IAAT LPSW is lost,THEN stop all RCPs.

6. Verify SSF-ASW available.

7. Dispatch operators to SSF with a copy of End 5.34 (Aligning SSF-ASWfor SG feed).

Examiner Note: If Unit 1 RO attempts to go to SSF, inform them that aUnit 2 RO will staff the SSF

8. Dispatch an operator to perform End 5.10 (Station ASW PumpAlignment). (PS)

This event is complete Close 1/Close 2 pushbutton has been depressed lAW AP/10 or asdirected by the lead examiner

Page 30 of 41

Page 116: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Op-Test No.: 1LT42 Scenario No.: 3 Event No.: 8 Page 3 of 3

Event Description: Turbine Building Flood

Tim Position Applicant’s Actions or Behaviore

AP/lO (Turbine Building Flood)

SRO/BOP/ 4.1. Trip the Rx.OATC

NOTETripping the CCW pumps will cause loss of condenser vacuum which willresult in TBVs failing closed and trip of the Main FDW pumps.

4.2. Ensure all CCW pumps are shutdown.

4.3. Press both of the following on the TURB BLDG FLOOD EMERCLOSING ALL CCWP DISCH VALVES control switch: TCA #4 (PressClose i/Close 2 within 20 minutes of CCW break OR within 11.3minutes of receiving TB Emergency High Level alarm)

• CLOSE 1• CLOSE 2

4.4. Verify all CCW pump discharge valves are closed.

4.5. Dispatch operators to ensure all three flood doors are closed and inthe SECURED position from the AB side (A-i, at Unit 1, 2, and 3stairwell entrances to TB): {2}

• Unit 1 Flood Door• Unit 2 Flood Door• Unit 3 Flood Door

4.6. Verify LPI decay heat removal is in progress.

RNO: GO TO Step 4.8

4.8. Dispatch an operator to position the waterbox discharge valveswitches (T-3, East of condenser catwalk):

• 1CCW-20 (1A1) switch to HAND• 1CCW-20 (1A1) switch to CLOSE• 1CCW-21 (1A2) switch to HAND• 1CCW-21 (1A2) switch to CLOSE• 1CCW-22 (iBi) switch to HAND• 1CCW-22 (1B1) switch to CLOSE• 1 CCW-23 (1 B2) switch to HAND• 1 CCW-23 (1 B2) switch to CLOSE• 1CCW-24 (1C1) switch to HAND• 1CCW-24 (1C1) switch to CLOSE• 1CCW-25 (1C2) switch to HAND• 1 CCW-25 (1 C2) switch to CLOSE

This event is complete Close 1/Close 2 pushbutton has been depressed lAW AP/lO or asdirected by the lead examiner

Page 31 of 41

Page 117: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Page 1 of 8

NOTEAt any time during this scenario the operator may choose to use Enclosure 5.5 to maintainRCS inventory control. See below.

ENCLOSURE 5.5

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

NOTE

Maintaining Pzr level >100” [180” acc] will ensure Pzr heater bundles remain covered.

1. Utilize the following as necessary to maintain — IF 1 HP-26 will NOT open,desired Pzr level: THEN throttle 1 HP-41 0 to maintain

• 1A HPI Pump desired Pzr level.

. 1BHPI Pump

. 1HP-26

. 1HP-7

. 1 HP-120 setpoint or valve demand

• 1HP-5

2. IAAT makeuj to the LDST is desired,THEN makeup from 1A BHUT.

3. IAAT it is desired to secure makeur toLDST,THEN secure makeup from 1A BHUT.

4. IAAT it is desired to bleed letdown flow to1A BHUT,THEN perform the following:

A. Open:

1CS-26

1CS-41

B. Position 1HP-l4to BLEED.

C. Notify SRO.

5. IAAT letdown bleed is NO longer desired,THEN position 1 HP-i 4 to NORMAL.

Page 32 of 41

Page 118: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

ENCLOSURE 5.5 (cont.)Page 2 of 8

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

6. IAAT 10 HPI PUMP is required, — GO TO Step 10.THEN perform Steps 7- 9.

7. Open: 1._ IF BWST suction valves• 1 HP-24 (1 HP-24 and 1 HP-25) are closed,

• 1 HP-25THEN perform the following:A. — Start 1A LPI PUMP.B. — Start lB LPI PUMP.C. Open:

1LP-15

1LP-161LP-9

1 LP-1 01LP-6

1LP-7D. — IF two LPI Pumps are running jjjy

to provide HPI pump suction,THEN secure one LPI pump.

E. — Dispatch an operator to open1 HP-363 (Letdown Line To LPIPump Suction Block) (A-i -119,Ui LPI Hatch Rm, N end).

F. — GO TO Step 8.2. IF only one BWST suction valve

(1 HP-24 or 1 HP-25) is open,THEN perform the following:A. — IF three HPI pumps are operating,

THEN secure lB HPI PUMP.B. — IF <2 HPI pumps are operating,

THEN start HPI pumps to obtaintwo HPI pump operation,preferably in opposite headers.

C._ GOTO Step 9.

Page 33 of 41

Page 119: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

ENCLOSURE 5.5 (cont.)Page3 of 8

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

8. Start 10 HPI PUMP. — IF at least two HPI pumps are operating,THEN throttle 1 HP-409 to maintaindesired Pzr level.

9. Throttle the following as required to 1._ IF at least two HPI pumps are operating,maintain desired Pzr level: AND 1 HP-26 will NOT open,

P 2THEN throttle 1 HP-41 0 to maintain• 1 H - 6desired Pzr level.

• 1HP-272._ IF1AHPI PUMP and 1BHPI PUMP are

operating,AND 1 HP-27 will NOT open,THEN throttle 1 HP-409 to maintaindesired Pzr level.

Page 34 of 41

Page 120: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

ENCLOSURE 5.5 (cont.)Page 4 of 8

ACTION/EXPECTED RESPONSE RESPONSE NOTOBTAINED

10. IAAT LDST vel CANNOT bemaintained,THEN perform Step 11.

11. Perform the following:

.Open 1HP-24.

.Open 1HP-25.

‘Close 1HP-16.

— GOTO Step 12.

1._ IF both BWST suction valves(1 HP-24 and 1 HP-25) are closed,THEN perform the following:A. — Start 1ALPI PUMP.B. — Start lB LPI PUMP.

C. Open:

1LP-15

1 LP-1 61LP-9

1 LP- 10

1LP-6

1LP-7D. — IF two LPI Pumps are running çjjjy

to provide HPI pump suction,THEN secure one LPI pump.

E. — Dispatch an operator to open1 HP-363 (Letdown Line To LPIPump Suction Block) (A-1-119,Ui LPI Hatch Rm, N end).

F._ GOTOStep12.2. — IF only one BWST suction valve

(1 HP-24 or 1 HP-25) is open,AND three HPI pumps are operating,THEN secure lB HPI PUMP.

Page 35 of 41

Page 121: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Page 5 of 8ENCLOSURE 5.5 (cont.)

I ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED I

12. IAAT additional makeup flow to LDST isdesired,AND 1A BLEED TRANSFER PUMP isoperating,THEN dispatch an operator to close1CS-48 (1A BHUT Recirc) (A-i -107,Unit 1 RC Bleed Transfer Pump Rm.).

13. IAAT two Letdown Filters are desired,THEN perform the following:• Open 1HP-17.• Open 1HP-18

14. IAAT ll of the following exist: — GO TO Step 34.• Letdown isolated• LPSW available• Letdown restoration desiredTHEN perform Steps 15-33

. —

15. Open: 1._ Notify CR SRO that letdown CANNOT be• 1 CC-7 restored due to inability to restart the CC• 1CC-8 system.

2. GO TO Step 34.

16. Ensure only one CC pump running.

17. Place the non-running CC pump inAUTO.

18. Verify are open: 1._ IF 1 HP-i is closed due to 1 HP-3 failing to• 1HP-i close,• 1HP-2 THEN GO TO Step 20.

2._ IF 1 HP-2 is closed due to 1 HP-4 failing toclose,THEN GO TO Step 20.

19. GO TO Step 22.

NOTEVerification of leakage requires visual observation of East Penetration Room.

20. Verify letdown line leak in East — GO TO Step 22.Penetration Room has occurred.

21. GO TO Step 34.

Page 36 of 41

Page 122: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

ENCLOSURE 5.5 (cont.)Page 6 of 8

ACTION/EXPECTED RESPONSE RESPONSE NOTOBTAINED

22. Monitor for unexpected conditions whilerestoring letdown.

23. Verify both letdown coolers to be placed 1 . — IF 1 A letdown cooler is to be placed inin service, service,

THEN open:

1HP-11HP-3

2. IF 1 B letdown cooler is to be placed inservice,THEN open:

1 HP-21 HP-4

3._ GO TO Step 25.

24. Open:

. 1HP-1

. 1HP-2

. 1HP-3

. 1HP-4

25. Verify at least one letdown cooler is Perform the following:aligned. A. CR SRO of problem.

B. GOTO Step 34.

26. Close 1 HP-6.

27. Close 1 HP-7.

28. Verify letdown temperature < 125°F. 1 . — Open 1 HP-i 3.2. Close:

1HP-81HP-9&il

3._ IF jjy deborating IX is in service,THEN perform the following:A. 1HP-l4to NORMAL.B. 1HP-i6.

4._ Select LETDOWN HI TEMP INTLK BYPswitch to BYPASS.

Page 37 of 41

Page 123: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

Page 7 of 8ENCLOSURE 55 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED I

29. Open 1 HP-5.

30. Adjust 1 HP-7 for 20 gpm letdown.

31. WHEN letdown temperature is <125°F,THEN place LETDOWN HI TEMPINTLK BYP switch to NORMAL.

32. Open 1 HP-6.

33. Adjust 1 HP-7 to control desired letdownflow.

NOTEAP/32 (Loss of Letdown) provides direction to cool down the RCS to offset increasing pressurizerlevel.

34. IAAT it is determined that letdown isunavailable due to equipment failuresletdown system leakage,THEN notify CR SRO to initiateAP/32 (Loss of Letdown).

35. IAAT> 1 HPI pump is operating,AND additional HPI pumps are NOlonger needed,THEN perform the following:A. Obtain SRO concurrence to reduce

running HPI pumps.B. Secure the desired HPI pumps.C. Place secured HPI pump switch in

AUTO, if desired.

36. IAAT jj the following conditions exist:• Makeup from BWST NOT required• LDST level > 55”• All control rods inserted• Cooldown Plateau NOT being used

THEN close:

• 1HP-24• 1HP-25

Page 38 of 41

Page 124: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

ENCLOSURE 5.5 (cont.)Page 8 of 8

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

37. Verify 1CS-48 (1A BHUT Recirc) has — GO TO Step 39.been closed to provide additionalmakeup flow to LDST.

38. WHEN 1CS-48 (1A BHUT Recirc) is NOlonger needed to provide additionalmakeup flow to LDST,THEN perform the following:

A. Stop 1A BLEED TRANSFERPUMP.

B. Locally position 1 CS-48 (1 ABHUT Recirc) one turn open (A1-107, Unit 1 RC Bleed TransferPump Rm.).

C. Close 1 CS-46.D. Start 1A BLEED TRANSFER

PUMP.E. Locally throttle 1CS-48 (1A

BHUT Recirc) to obtain 90 - 110psig discharge pressure.

F. Stop 1A BLEED TRANSFERPUMP.

39. Verify two Letdown Filters in service, — GO TO Step 41.AND only one Letdown filter is desired.

40. Perform one of the following:

. Place 1 HP-i 7 switch to CLOSE.

. Place 1 HP-i 8 switch to CLOSE.

41. WHEN directed by CR SRO,THEN EXIT this enclosure.

•..END.

Page 39 of 41

Page 125: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-2

CRITICAL TASKS

CT-8, Restore Power from CT-5 Standby BUS 1 or 2 Feeder (Page 25)

TCA #4, Press Close 1/Close 2 within 11.3 minutes of receiving TB Emergency High Levelalarm. (Page 31)

Page 40 of 41

Page 126: Appendix D Scenario Outline Form ES-D-1 ILT42 December 17 ...

Appendix D Scenario Outline Form ES-D-1ILT41 June 11,2012

SAFETY: Take a Minute

UNIT 0 (OSM)

SSF Operable: Yes II KHU’s Operable: Ui - OH, U2 - UG II LCTs Operable: 2 ii Fuel Handling: NoUNIT STATUS (CR SRO)

Unit 1 Simulator Other Units

Mode: 2 Unit 2 Unit 3

Reactor Power: 3% Mode: 1 Mode: 1

Gross MWE: N/A 100% Power 100% Power

RCS Leakage: 0.024 gpm EFDW Backup: Yes EFDW Backup: Yes

RBNS Rate: 0.01 gpm

Technical Specifications/SLC Items (CR SRO)Component/Train 005 Restoration Required TSISLC #

Date/Time Date/Time

Shift Turnover Items (CR SRO)

Primary

• Tave=543°F

.

.

.

Secondary

• 1SSH-1, 1SSH-3, 1SD-2, 1SD-5, 1SD-140, 1SD-303, 1SD-355, 1SD-356 and 1SD-358 are closed withpower supply breakers open per the Startup Procedure for SSF Overcooling Event.

• 1AS-35 throttled per Secondary Chemist to provide steam to E heaters for secondary 02 removal.

• Swap CBPs to the 1A CBP running and lB HWP running using OP/1/A11106/002 C Enclosure 4.3.Chemistry has been consulted and bypassing the Powdex is not desired..

Reactivity Management CR SRO)R2 Reactivity management controlsRCS Boron = 1756

Rod position Gp 7 5% WD established in the Control Room per SOMPppmb01-02

Human Performance Emphasis (OSM)Procedure Use and Adherence