Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information...

36
Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix C3 – Background Information Document Appendix C4 – Newspaper Advert Appendix C5 – Site Notice Report and Map Appendix C6 – Announcement Notification Appendix C7 – Organs of State Correspondence (included in the Final Scoping Report only) Appendix C8 – Minutes of Meetings and Presentations (included in the Final Scoping Report only) Appendix C9 – Comments and Responses Report (included in the Final Scoping Report only)

Transcript of Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information...

Page 1: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

Appendix C: Public Participation Information

Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix C3 – Background Information Document Appendix C4 – Newspaper Advert Appendix C5 – Site Notice Report and Map Appendix C6 – Announcement Notification Appendix C7 – Organs of State Correspondence (included in the Final Scoping Report only) Appendix C8 – Minutes of Meetings and Presentations (included in the Final Scoping Report only) Appendix C9 – Comments and Responses Report (included in the Final Scoping Report only)

Page 2: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

1

Environmental Authorisation and Integrated Water Use Licence Application for the reclamation of the Soweto Cluster Dumps, City of Johannesburg Metropolitan Municipality - Gauteng Province

Directly Affected Landowner Database

Farm Name Farm ID Farm

Portion Infrastructure Farm owner Contact Person

Vlakfontein 238 IQ 1 (RE) 2L24 and 28A DRD Gold Ltd

Roodepoort 237 IQ 14 (RE) 2L21 24 Sturdee (Pty) Ltd James David Thomas

Roodepoort 237 IQ 1 2L20 Dino Prop (Pty) Ltd Deon Meyer

Roodepoort 237 IQ 1 2L16 Dino Prop (Pty) Ltd Deon Meyer

Roodepoort 237 IQ 1 2L17 Dino Prop (Pty) Ltd Deon Meyer

Roodepoort 237 IQ 5 (RE) 2L16 and 2A6 Dino Prop (Pty) Ltd Deon Meyer

Roodepoort 237 IQ 5 (RE) Pipeline Dino Prop (Pty) Ltd Deon Meyer

Roodepoort 237 IQ 1 (RE) Pipeline Dino Prop (Pty) Ltd Deon Meyer

Roodepoort 237 IQ 495 Pipeline No Windeed info

Roodepoort 237 IQ 495/237 Pipeline

Roodepoort 237 IQ 401 (RE) Pipeline City of Johannesburg Metropolitan Municipality

Vlakfontein 238 IQ 94 (RE) Pipeline City of Johannesburg Metropolitan Municipality

Vlakfontein 238 IQ 92 Pipeline No Windeed info

Page 3: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

2

Farm Name Farm ID Farm

Portion Infrastructure Farm owner Contact Person

Vlakfontein 238 IQ 1 (RE) Pipeline DRD Gold Ltd

Vlakfontein 238 IQ 4 Pipeline Quarrytown Ltd Frank Abbott

Doornkop 239 IQ 130 (RE) Pipeline Randfontein Estates Ltd Frank Abbott

Doornkop 239 IQ 131 (RE) Pipeline Randfontein Estates Ltd Frank Abbott

Doornkop 239 IQ 39 Pipeline Provincial Government of Gauteng

Doornkop 239 IQ 38 Pipeline City of Johannesburg Metropolitan Municipality

Zuurbult 240 IQ 240 Pipeline

Luipaardsvlei 243 IQ 141 Pipeline No Windeed info

Luipaardsvlei 243 IQ 14 (RE) Pipeline Rand Uranium Pty Ltd

Luipaardsvlei 243 IQ 13 Pipeline Rand Uranium Pty Ltd

Luipaardsvlei 243 IQ 96 (RE) Deposition pipeline No Windeed Info

Luipaardsvlei 243 IQ 7 (RE) Deposition pipeline

Rand Uranium Pty Ltd

Luipaardsvlei 243 IQ 10 Deposition pipeline

Rand Uranium Pty Ltd

Luipaardsvlei 243 IQ 88 Deposition pipeline

Rand Uranium Pty Ltd

Luipaardsvlei 243 IQ 134 (RE) Deposition pipeline Randfontein Estates Gold Mining Co

Witwatersrand Ltd

Luipaardsvlei 243 IQ 43 Deposition pipeline

Rand Uranium Pty Ltd

Page 4: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

3

Farm Name Farm ID Farm

Portion Infrastructure Farm owner Contact Person

Braamfischerville 649 IQ 2 Pipeline No Windeed info

Braamfischerville 649 IQ 3 Pipeline

No Windeed info

Braamfischerville 649 IQ 1 Pipeline

No Windeed info

Durban Roodepoort Deep 641 IQ 2 Pipeline

No Windeed info

Durban Roodepoort Deep 641 IQ 0 (RE) Pipeline

No Windeed info

Vogelstruisfontein 233 IQ 46 Pipeline

No Windeed info

Vogelstruisfontein 233 IQ 38 Pipeline

Ablesun Inv Pty Ltd Mostert Daniel Nicolaas Hermanus

Vogelstruisfontein 231 IQ 161 Pipeline

Rand Leases Securitisation Pty Ltd February Quintin

Vogelstruisfontein 231 IQ 227 Pipeline

No Windeed Info

Vogelstruisfontein 231 IQ 17 (RE) Pipeline

Fleurhof Extension 2 Pty Ltd April Itumeleng (Company Secretary)

Paardekraal 226 IQ 215 Pipeline

Transnet Ltd

Paardekraal 226 IQ 245 Pipeline

No Windeed Info

Paardekraal 226 IQ 2 (RE) Pipeline

Industrial Zone Pty Ltd

Paardekraal 226 IQ 5 (RE) Pipeline

Industrial Zone Pty Ltd

Paardekraal 226 IQ 26 Pipeline

No Windeed info

Paardekraal 226 IQ 212 (RE) Pipeline Transnet Ltd

Page 5: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

4

Indirectly Affected Landowner Database

Farm Name Farm ID Farm Portion Infrastructure Farm owner Contact Person

Doornkop 239 IQ 1 (RE) 2L24 Province of Gauteng

Roodepoort 237 IQ 193 2L21 Eskom Mr Wikus Snyman, L & R Investigations

Vogelstruisfontein 231 IQ 173 2L16 City of Johannesburg Metropolitan Municipality

Ms Nozipho Maduse, DD: Impact Management

Vogelstruisfontein 233 IQ 48 2L16 No windeed info

Roodepoort 237 IQ 410 2L16 Petrus Johannes Pretorius Petrus Johannes Pretorius

Vogelstruisfontein 231 IQ 227 2L16 No windeed info

Vogelstruisfontein 233 IQ 48 Pipeline

710 710 Pipeline

Uitval 677 IQ 667 Pipeline

No windeed info

Braamfischerville 649 IQ 88/238 Pipeline

Doornkop 239 IQ 109 (RE) Pipeline City of Johannesburg Metropolitan

Municipality Ms Nozipho Maduse, DD: Impact Management

Doornkop 239 IQ 69 Pipeline

R & M TRUST

Doornkop 239 IQ 66 Pipeline

R & M TRUST

Doornkop 239 IQ 113 Pipeline City of Johannesburg Metropolitan

Municipality Ms Nozipho Maduse, DD: Impact Management

Luipaardsvlei 243 IQ 133 Pipeline

Nenyane Trust

Page 6: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

5

Farm Name Farm ID Farm Portion Infrastructure Farm owner Contact Person

Luipaardsvlei 243 IQ 90 Pipeline

Eskom Holdings SOC Ltd

Luipaardsvlei 243 IQ 79 (RE) Pipeline

Charles Villet Charles Villet

Luipaardsvlei 243 IQ 43 Pipeline

Rand Uranium Pty Ltd

Vogelstruisfontein 233 IQ 42 Pipeline

Rand Leases Prop Pty Ltd Fischer Grant

Klipspruit 298 IQ 184 Pipeline

No windeed info

Klipspruit 298 IQ 167 (RE) Pipeline

No windeed info

Klipspruit 298 IQ 174 Pipeline

No windeed info

Klipspruit 298 IQ 149 Pipeline

No windeed info

Klipspruit 298 IQ 94 (RE) Pipeline

Mun Diepmeadow

Klipspruit 298 IQ 146 Pipeline

No windeed info

Klipspruit 298 IQ 148 Pipeline

No windeed info

Klipspruit 298 IQ 158 Pipeline

No windeed info

Klipspruit 318 IQ 83 Pipeline

No windeed info

Paardekraal 226 IQ 112 Pipeline

South African Rail Commuter Corp Ltd

Paardekraal 226 IQ 80 Pipeline

South African Rail Commuter Corp Ltd

Paardekraal 226 IQ 79 Pipeline

South African Rail Commuter Corp Ltd

Page 7: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

6

Farm Name Farm ID Farm Portion Infrastructure Farm owner Contact Person

Paardekraal 226 IQ 82 Pipeline

South African Rail Commuter Corp Ltd

Paardekraal 226 IQ 117 Pipeline

South African Rail Commuter Corp Ltd

Paardekraal 226 IQ 26 Pipeline

No Windeed Info

Paardekraal 226 IQ 211 Pipeline

South African Rail Commuter Corp Ltd

Paardekraal 226 IQ 213 Pipeline

Paardekraal 226 IQ 3 Pipeline

Page 8: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

1

Environmental Authorisation and Integrated Water Use Licence Application for the reclamation of the Soweto Cluster Dumps, City of Johannesburg Metropolitan Municipality - Gauteng Province

Stakeholder Database

I&AP Sector Organisation Mr/Ms First Name Last Name Position Province

Agricultural Union Agri South Africa (National) Mr Janse Rabie Head of Natural Resources Gauteng Province

Agricultural Union TAU SA Central Region Mrs Lynette Du Plessis TAU SA Central Region Gauteng Province

Agricultural Union TAU SA Northern Region Ms Wilma Prinsloo Regional Secretary Gauteng Province

Agricultural Union Transvaal Agricultural Union of South Africa (TAUSA)

Mr Louis Meintjies President Gauteng Province

Business & commerce Chamber of Mines Mr Nikisi Lesufi Senior Executive Gauteng Province

Business & commerce Chamber of Mines Ms Stephinah Mudau Head: Environmental Advisor Gauteng Province

Business & commerce Roodepoort Chamber of Commerce & Industry

Chairperson Gauteng Province

Business & commerce Eskom Mr Wikus Snyman L & R Investigations Gauteng Province

Business & commerce Eskom Mr Jan Mitchell Land Development Benoni Gauteng Province

Business & commerce SANRAL Ms Victoria Bota Environmentalist Gauteng Province

Business & commerce Transnet Ltd Ms Cynthia Nong Gauteng Manager Gauteng Province

Business & commerce Transnet Ltd Ms Pumelela Ndyawe Gauteng Province

Business & commerce Transnet Ltd Ms Creselda Mangalana Gauteng Province

Business & commerce Transnet Ltd Mr Livhuwani Ndou Gauteng Province

Page 9: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

2

I&AP Sector Organisation Mr/Ms First Name Last Name Position Province

Business & commerce Transnet Ltd Ms Yoliswa Faku Gauteng Province

Business & commerce Transnet Ltd Mr Ndamkele Cwala Gauteng Province

Business & commerce Transnet Ltd Ms Suzan Aidelomo Gauteng Province

Business & commerce Roodepoort Small Business Development Forum

Mr Mbongeni Tabane Gauteng Province

Business & commerce Bramfischerville Multi-Purpose Centre Ms Debra Kagakatsi Public Meeting Venue Gauteng Province

Environmental NGO's African Wattle Crane Programme Ms Kerryn Morrison Manager Gauteng Province

Environmental NGO's Birdlife South Africa Mr Jonathan Booth Advocacy Officer Policy & Advocacy Programme

Gauteng Province

Environmental NGO's Birdlife South Africa (BLSA) Mr Simon Gear Policy & Advocacy Manager Gauteng Province

Environmental NGO's Centre for Environmental Rights (CER) Ms Robyn Hugo Programme Head: Pollution & Climate Change

Gauteng Province

Environmental NGO's Centre for Environmental Rights (CER) Ms Nicole Loser Attorney Gauteng Province

Environmental NGO's Council of Geosciences Mr Henk Coetzee Gauteng Province

Environmental NGO's Earthlife Africa Ms Judith Taylor Member Board Gauteng Province

Environmental NGO's Endangered Wildlife Trust (EWT) Ms Emily Taylor Urban Conservation Project Coordinator

Gauteng Province

Environmental NGO's Federation of Sustainable Environment (FSE)

Ms Mariette Liefferink Chief Executive Officer Gauteng Province

Environmental NGO's Groundwork Mr Bobby Peek Gauteng Province

Environmental NGO's Wildlife and Environmental Society of South Africa (WESSA)

Mr John Wesson Manager: Conservation Specialist

Gauteng Province

Environmental NGO's Johannesburg Mining Forum of South Africa

The Chairman Gauteng Province

Page 10: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

3

I&AP Sector Organisation Mr/Ms First Name Last Name Position Province

Farmers Association National African Farmers’ Union (NAFU) Mr Motsepe Matlala President Gauteng Province

Labour Union Communication Workers Union Mr Joe Chauke The President Gauteng Province

Labour Union Congress of South Africa Trade Union (COSATU)

Mr Sizwe Pamla National Spokesman Gauteng Province

Labour Union National Union of Metal Workers of South Africa (NUMSA)

Mr Woody Aroun Gauteng Province

Labour Union National Union of Mine Workers (NUM) Mr Tafa Moya National Co-Ordinator Gauteng Province

Labour Union National Union of Mine Workers (NUM) Mr Thenji Phoko NUM National Gauteng Province

Libraries Bramfischerville Public Library Ms Patricia Mathe Librarian Gauteng Province

Libraries Roodepoort Public Library Ms Monique Ramabulana Librarian Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Ms Nozipho Maduse DD: Impact Management Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Ms Minenhle Maphumulo Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Mr Themba Masemula Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Ms Lorraine Nzimande Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Ms Themba Masemula Strategic Urban Planner Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Mr Sean Dinat DED Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Mr Lufuno Maise EISD Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Dr Ndivhoniswani Lukhwareni Municipal Manager Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Ms Belinda Bolleurs Municipal Managers, Executive Assistant

Gauteng Province

Page 11: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

4

I&AP Sector Organisation Mr/Ms First Name Last Name Position Province

Municipality City of Johannesburg Metropolitan Municipality

Mr Zamadiba L Department of Economic Development

Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Mr Tembeka M Department of Economic Development

Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Ms Boledi Petje Development Planning Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Mr Piet Con Development Planning Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Mr Rirhandzu Khoza Development Planning Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Ms Jane E Water Management Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Mr Freddie Letsoko Water Quality & Catchment Management

Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Mr Justice Air Quality Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Mr Musa Air Quality Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Mr Mvuseleo Mathebula Water Management Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Mr Mbhekiseni Makhoba Water Management Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Mr Sabelo Michael

Nscana Ward Councillor: Ward 127 Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Mr Mandla Johannes

Mlangeni Ward Councillor: Ward 49 Gauteng Province

Municipality City of Johannesburg Metropolitan Municipality

Mr Jabulani Jan Thomo Ward Councillor: Ward 129 (Indirectly Affacted)

Gauteng Province

National Government Department of Agriculture, Forestry and Fisheries (DAFF)

Ms Portia Khumalo ROC - Environmental Gauteng Province

National Government Department of Agriculture, Forestry and Fisheries (DAFF)

Ms Mashudu Mukwevho Dir: Land Use & Soil Management

Gauteng Province

National Government Department of Agriculture, Forestry and Fisheries (DAFF)

Ms Mulalo Sundani Environmental Impact Management

Gauteng Province

Page 12: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

5

I&AP Sector Organisation Mr/Ms First Name Last Name Position Province

National Government Department of Agriculture, Forestry and Fisheries (DAFF)

Ms Portia Khumalo ROC - Environmental Gauteng Province

National Government Department of Agriculture, Forestry and Fisheries (DAFF)

Ms Mashudu Marubini Deputy Director Gauteng Province

National Government Department of Agriculture, Forestry and Fisheries (DAFF)

Mr Themba Dlamini Gauteng Regional Office Gauteng Province

National Government Department of Environmental Affairs (DEA) Mr Obed Baloyi Environmental Impact Evaluation

Gauteng Province

National Government Department of Environmental Affairs (DEA) Mr Lucas Mahlangu Control Environmental Officer:Waste Licensing

Gauteng Province

National Government Department of Environmental Affairs (DEA) Ms Pumeza Skepe Deputy Director Gauteng Province

National Government Department of Mineral Resources (DMR) Mr Max Madubane Gauteng Province

National Government Department of Mineral Resources (DMR) Mr Rudzani Mabogo Head of Environment: Assistant Director

Gauteng Province

National Government Department of Mineral Resources (DMR) Mr Jimmy Sekgale Assistant Director Gauteng Province

National Government Department of Mineral Resources (DMR) Mr Joel Raphela DDG Gauteng Province

National Government Department of Mineral Resources (DMR) Mr Andre Cronje Chief Director Gauteng Province

National Government Department of Mineral Resources (DMR) Ms Suzan Malebe Regional Manager Gauteng Province

National Government Department of Mineral Resources (DMR) Mr Dimakatso Ledwaba Acting Regional Manager Gauteng Province

National Government Department of Mineral Resources (DMR) Ms Moleseng Tlaila Assistant Director Gauteng Province

National Government Department of Public Works (DPW) Ms Jeanette Monare Regional Manager Gauteng Province

National Government Department of Public Works (National) Ms Joyce Nyoka (Acting) Director Gauteng Province

National Government Department of Rural Development and land Reform (DRDLR)

Mr Harry Maphutha Regional Land Claims Commissioner

Gauteng Province

Page 13: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

6

I&AP Sector Organisation Mr/Ms First Name Last Name Position Province

National Government Department of Rural Development and Land Reform (DRDLR)

Mr Solomon Maruma Land Claims Gauteng Regional Officer

Gauteng Province

National Government Department of Rural Development and Land Reform (DRDLR)

Ms Cindy Benyane Land Claims Commissioner: Gauteng Regional Office

Gauteng Province

National Government Department of Water and Sanitation (DWS) Mr Phillimon Khwinana Control Environmental Officer Gauteng Province

National Government Department of Water and Sanitation (DWS) Mr Marius Keet Acting Provincial Head Gauteng Province

National Government Department of Water and Sanitation (DWS) Mr Victor Nkuna Environmental Officer Gauteng Province

National Government Department of Water and Sanitation (DWS) Mr Bashan Govender Water Quality Manager (National)

Gauteng Province

National Government Department of Water and Sanitation (DWS) Mr Londolani Mutshekwa National Gauteng Province

National Government Department of Water and Sanitation (DWS) Mr Divan Van Niekerk National Gauteng Province

National Government Department of Water and Sanitation (DWS) Mr Ayanda Mtetwa National Gauteng Province

National Government Department of Water and Sanitation (DWS) Mr Desmond Mutshaine Geochemistry Gauteng Province

National Government Department of Water and Sanitation (DWS) Mr Kevin Koketso Aphane GT Gauteng Province

National Government Department of Water and Sanitation (DWS) Ms Malalo Sidogi Environmental Officer Gauteng Province

National Government Department of Water and Sanitation (DWS) Mr Andrew Mbedzi Instream Gauteng Province

National Government Gauteng Department of Agriculture and Rural Development (GDARD)

Mr Loyiso Mkwana Chief Director Gauteng Province

National Government Gauteng Department of Agriculture and Rural Development (GDARD)

Mr Jacob Legadima Director - Air Quality Management

Gauteng Province

National Government Gauteng Department of Agriculture and Rural Development (GDARD)

Mr Eric Mulibana Air Quality Gauteng Province

National Government Gauteng Department of Agriculture and Rural Development (GDARD)

Mr Marcelle Johnson Mining and Energy Unit: Air Quality

Gauteng Province

Page 14: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

7

I&AP Sector Organisation Mr/Ms First Name Last Name Position Province

National Government Gauteng Department of Agriculture and Rural Development (GDARD)

Mr Dan Motaung Deputy Director: EIA Gauteng Province

National Government Gauteng Department of Agriculture and Rural Development (GDARD)

Ms Amanda Ndleleni Administration Office Gauteng Province

National Government Gauteng Department of Agriculture and Rural Development (GDARD)

Ms Boniswa Belot Regional Manager Gauteng Province

National Government National Department of Environmental Affairs (DEA)

Dr Mpho Tshitangoni Chief Director Gauteng Province

National Government National Department of Environmental Affairs (DEA)

Mr Lucas Mahlangu DD: Licensing Systems Management

Gauteng Province

National Government National Department of Environmental Affairs (DEA)

Ms Pumeza Skepe Licencing Department Gauteng Province

National Government National Department of Health Ms Belinda Makhafola Directorate: Environmental Health

Gauteng Province

National Government National Nuclear Regulator (NNR) Mr Patle Mohajane Programme Manager: NORM Gauteng Province

National Government National Nuclear Regulator (NNR) Mr Elmond Lekota Senior Analyst: NORM Gauteng Province

National Government National Nuclear Regulator (NNR) Ms Malebo Makgale Manager: Assessments: NORM Gauteng Province

National Government National Nuclear Regulator (NNR) Ms Veronica Ditsi Gauteng Province

National Government Department of Environmental Affairs (DEA) Ms Amanda Britz Gauteng Province

National Government Department of Environmental Affairs (DEA) Ms Sibusisiwe Hlela Gauteng Province

Provincial Government Department of Mineral Resources (DMR) Mr Sunday Mabaso Regional Manager Gauteng Province

Provincial Government Department of Mineral Resources (DMR) Ms Mashudu Maduka Assistant Director Gauteng Province

Provincial Government Department of Mineral Resources (DMR) Mr Musa Mangobe Gauteng Environment Gauteng Province

Provincial Government Department of Mineral Resources (DMR) Ms Nkosinathi Mahlaba Ergo Project Case Officer Gauteng Province

Page 15: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

8

I&AP Sector Organisation Mr/Ms First Name Last Name Position Province

Provincial Government Department of Health: Gauteng Mr Albert Marumo Programme Manager Environmental Health, Gauteng Health

Gauteng Province

Provincial Government Department of Health Johannesburg District

Ms Crystal Rosenburg Environmental Health Practitioner

Gauteng Province

Provincial Government Department of Health Johannesburg District

Ms Vonani Nkuna Environmental Health Practitioner

Gauteng Province

Provincial Government Department of Health Johannesburg District

Ms Thabiso Motlhamme Environmental Health Practitioner

Provincial Government Department of Water and Sanitation (DWS) Ms Barbara Kalembo Gauteng Regional Environmental Officer

Gauteng Province

Provincial Government Department of Water and Sanitation (DWS) Ms Faith Fulufhelo

Khosa Gauteng Regional Representative

Gauteng Province

Provincial Government Department of Water and Sanitation (DWS) Mr Khathutshelo Mudau Gauteng Regional Representative

Gauteng Province

Provincial Government Department of Water and Sanitation (DWS) Mr Mabona (Rodney)

Lesiba Gauteng Regional Representative

Gauteng Province

Provincial Government Gauteng Department of Agriculture and Rural Development (GDARD)

Mr Tendani Rambuda Gauteng Province

Provincial Government Gauteng Department of Agriculture and Rural Development (GDARD)

Mr Mokutu Nketu Gauteng Province

Provincial Government Gauteng Department of Agriculture and Rural Development (GDARD)

Mr Erick Moletsane Gauteng Province

Provincial Government Gauteng Department of Agriculture and Rural Development (GDARD)

Mr Tjatja Mosia Gauteng Province

Provincial Government Gauteng Department of Agriculture and Rural Development (GDARD)

Mr Steven Mukhola Gauteng Province

Provincial Government Gauteng Department of Labour Gauteng Province

Provincial Government South African Heritage Resources Agency Gauteng Province

Provincial Government Johannesburg Roads Agency (JRA) Gauteng Province

Provincial Government Johannesburg Roads Agency (JRA) Gauteng Province

Page 16: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

9

I&AP Sector Organisation Mr/Ms First Name Last Name Position Province

Provincial Government Gauteng Observatory Ms Nadine Abrahams Gauteng Province

Water Bodies -Institution

Johannesburg Water (Pty) Ltd Mr William Bedser Engineer Gauteng Province

Water Bodies -Institution

Randwater Mr Marc de Fontein Gauteng Province

Water Bodies -Institution

Randwater Mr Peter Hoge Gauteng Province

Water Bodies -Institution

Water Research Commission Dr Schafic Adams Gauteng Province

Page 17: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

1

Sibongile Bambisa

From: Vanessa Viljoen <[email protected]>Sent: Thursday, 30 May 2019 10:38 AMTo: [email protected]: [email protected]: Crown Gold Recoveries: Land Claims EnquiryAttachments: Soweto Cluster_Regional_Land ClaimsLetter_V1_20190527.pdf

Importance: High

Dear Mr Maruma Kongiwe Environmental (Pty) Ltd (Kongiwe) has been appointed as an independent Environmental Assessment Practitioner to undertake an Environmental Impact Assessment (EIA) process for Crown Gold Recoveries (Pty) Limited (Crown Gold) which intends to reprocess and reclaim gold from six historic Slimes dams: 2L24; 2L20; 2L21; 2L16; 2L17 and 2L18 as well as two historic Sand dumps 2A6 and 2A8. These dams and dumps are referred to collectively as “the Soweto Cluster “and are located in Ward 49 and 127 within the City of Johannesburg Metropolitan Municipality. We would like to enquire if there are any land claims within the proposed project area, please refer to the attached document for a list of the affected farms. Your response will be greatly appreciated. Kind Regards,

Vanessa Viljoen | Stakeholder Engagement | Kongiwe Environmental (Pty) Ltd. Tel: +27 (12) 003 6627 Cell: +27 (71) 485 5388 | Email: [email protected] Spaces, Byls Bridge Office Park, Building 14, Block B, Corner of Olievenhoutbosch & Jean Ave, Centurion, 0157, South Africa. PostNet Suite no 163, Private Bag X21, Bryanston, 2021, South Africa.

www.kongiwe.co.za Disclaimer: The provisions of Section 11 of the Electronic Communications and Transactions Act 25 of 2002 apply to this email notice and make it enforceable and binding on the recipient/addressee. This email message (including attachments) contains information which may be confidential and/or legally privileged. Unless you are the intended recipient, you may not use, copy or disclose to anyone the message or any information contained in the message or from any attachments that were sent with this email, and If you have received this email message in error, please advise the sender by email, and delete the message. Unauthorised disclosure and/or use of information contained in this email may result in civil and criminal liability. Everything in this e-mail and attachments relating to the official business of Kongiwe Environmental (Pty) Ltd is proprietary to the company. Caution should be observed in placing any reliance upon any information contained in this e-mail, which is not intended to be a representation or inducement to make any decision in relation to Kongiwe Environmental (Pty) Ltd. Any decision taken based on the information provided in this e-mail, should only be made after consultation with appropriate legal, regulatory, tax, technical, business, investment, financial, and accounting advisors. The e-mail address of the sender may not be used, copied, sold, disclosed or incorporated into any database or mailing list for spamming and/or other marketing purposes without the prior consent of Kongiwe Environmental (Pty) Ltd. Unless the intention to contract has been expressed in this message, this message cannot be regarded as a solicitation to contract, nor be seen as an offer or acceptance of contractual agreement. Neither the sender of the e-mail, nor Kongiwe Environmental (Pty) Ltd shall be liable to any party for any direct, indirect or consequential damages, including, without limitation, loss of profit, interruption of business or loss of information, data or software or otherwise. No warranties are created or implied that an employee of Kongiwe Environmental (Pty) Ltd and/or a contractor of Kongiwe Environmental (Pty) Ltd is authorised to create and send this e-mail.

Page 18: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

Crown Gold Recoveries (Pty) Limited Project: Soweto Cluster Reclamation Project

Land Claims Letter © 2019 Kongiwe Environmental (Pty) Ltd

1

Date: Thursday, 30 May 2019

Attention: Mr Solomon Maruma

Gauteng Department of Rural Development and Land Reform (DRDLR)

Office of the Regional Land Claims Commissioner: Gauteng

Email: [email protected]

Environmental Authorisation and an Integrated Water Use Licence Application for the proposed

reclamation of the Soweto Cluster Dumps, City of Johannesburg Metropolitan Municipality -

Gauteng Province

LAND CLAIMS ENQUIRY

Kongiwe Environmental (Pty) Ltd (Kongiwe) has been appointed as an independent Environmental

Assessment Practitioner to undertake an Environmental Impact Assessment (EIA) process for Crown Gold

Recoveries (Pty) Limited (Crown Gold) which intends to reprocess and reclaim gold from six historic Slimes

dams: 2L24; 2L20; 2L21; 2L16; 2L17 and 2L18 as well as two historic Sand dumps 2A6 and 2A8. These dams

and dumps are referred to collectively as “the Soweto Cluster “and are located in Ward 49 and 127 within

the City of Johannesburg Metropolitan Municipality.

The project area is made up of 43 farm portions all falling within the City of Johannesburg Metropolitan

Municipality. The affected farms are listed in Table 1 below.

Table 1: Directly Affected Landowners

Farm Name Farm ID Farm Portion Infrastructure

Vlakfontein 238 IQ 1 (RE) 2L24 and 28A

Roodepoort 237 IQ 14 (RE) 2L21

Roodepoort 237 IQ 1 2L20, 2L16 and 2L17

Roodepoort 237 IQ 5 (RE) 2L16 and 2A6

Roodepoort 237 IQ 5 (RE) Pipeline

Roodepoort 237 IQ 1 (RE) Pipeline

Roodepoort 237 IQ 495 Pipeline

Roodepoort 237 IQ 495/237 Pipeline

Roodepoort 237 IQ 401 (RE) Pipeline

Vlakfontein 238 IQ 94 (RE) Pipeline

Vlakfontein 238 IQ 92 Pipeline

Vlakfontein 238 IQ 1 (RE) Pipeline

Vlakfontein 238 IQ 4 Pipeline

Doornkop 239 IQ 130 (RE) Pipeline

Doornkop 239 IQ 131 (RE) Pipeline

Doornkop 239 IQ 39 Pipeline

Page 19: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

Farm Name Farm ID Farm Portion Infrastructure

Doornkop 239 IQ 38 Pipeline

Zuurbult 240 IQ 240 Pipeline

Luipaardsvlei 243 IQ 141 Pipeline

Luipaardsvlei 243 IQ 14 (RE) Pipeline

Luipaardsvlei 243 IQ 13 Pipeline

Luipaardsvlei 243 IQ 96 (RE) Deposition pipeline

Luipaardsvlei 243 IQ 7 (RE) Deposition pipeline

Luipaardsvlei 243 IQ 10 Deposition pipeline

Luipaardsvlei 243 IQ 88 Deposition pipeline

Luipaardsvlei 243 IQ 134 (RE) Deposition pipeline

Luipaardsvlei 243 IQ 43 Deposition pipeline

Braamfischerville 649 IQ 2 Pipeline

Braamfischerville 649 IQ 3 Pipeline

Braamfischerville 649 IQ 1 Pipeline

Durban Roodepoort Deep 641 IQ 2 Pipeline

Durban Roodepoort Deep 641 IQ 0 (RE) Pipeline

Vogelstruisfontein 233 IQ 46 Pipeline

Vogelstruisfontein 233 IQ 38 Pipeline

Vogelstruisfontein 231 IQ 161 Pipeline

Vogelstruisfontein 231 IQ 227 Pipeline

Vogelstruisfontein 231 IQ 17 (RE) Pipeline

Paardekraal 226 IQ 215 Pipeline

Paardekraal 226 IQ 245 Pipeline

Paardekraal 226 IQ 2 (RE) Pipeline

Paardekraal 226 IQ 5 (RE) Pipeline

Paardekraal 226 IQ 26 Pipeline

Paardekraal 226 IQ 212 (RE) Pipeline

Kongiwe would like to enquire if there are any land claims on any of the farms listed above. Please could you

revert to us as a matter of urgency.

Kind regards,

Sibongile Bambisa

Stakeholder Engagement & Social Consultant

Kongiwe Environmental (Pty) Ltd

Tel: +27 (10) 140 6508 | Cell: +27 (72) 468 9584 |Email: [email protected]

Page 20: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

1

Sibongile Bambisa

From: Vanessa Viljoen <[email protected]>Sent: Friday, 31 May 2019 12:25 PMTo: [email protected]: FW: Crown Gold Recoveries: Land Claims Enquiry

FIY

From: Amukelani Hulsky Shiburi <[email protected]> Sent: 31 May 2019 10:48 To: [email protected] Subject: RE: Crown Gold Recoveries: Land Claims Enquiry Good day Please note that your receipt of inquiry it is hereby acknowledged , our turnaround time it is 14 working days due to our internal procedures that must be followed. Kind regards, Amukelani

From: Solomon Maruma [mailto:[email protected]] Sent: 30 May 2019 11:01 AM To: Amukelani Hulsky Shiburi; Fundiswa Ndaba; Desiree Kgole Cc: Nkokhelo Mshengu; 'Vanessa Viljoen' ([email protected]) Subject: FW: Crown Gold Recoveries: Land Claims Enquiry Importance: High Good day Colleagues Attached please find land claim enquiry for your attention. Regards Maruma MS

From: Vanessa Viljoen [mailto:[email protected]] Sent: 30 May 2019 10:38 AM To: Solomon Maruma Cc: [email protected] Subject: Crown Gold Recoveries: Land Claims Enquiry Importance: High Dear Mr Maruma Kongiwe Environmental (Pty) Ltd (Kongiwe) has been appointed as an independent Environmental Assessment Practitioner to undertake an Environmental Impact Assessment (EIA) process for Crown Gold Recoveries (Pty) Limited (Crown Gold) which intends to reprocess and reclaim gold from six historic Slimes dams: 2L24; 2L20; 2L21;

Page 21: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

2

2L16; 2L17 and 2L18 as well as two historic Sand dumps 2A6 and 2A8. These dams and dumps are referred to collectively as “the Soweto Cluster “and are located in Ward 49 and 127 within the City of Johannesburg Metropolitan Municipality. We would like to enquire if there are any land claims within the proposed project area, please refer to the attached document for a list of the affected farms. Your response will be greatly appreciated. Kind Regards,

Vanessa Viljoen | Stakeholder Engagement | Kongiwe Environmental (Pty) Ltd. Tel: +27 (12) 003 6627 Cell: +27 (71) 485 5388 | Email: [email protected] Spaces, Byls Bridge Office Park, Building 14, Block B, Corner of Olievenhoutbosch & Jean Ave, Centurion, 0157, South Africa. PostNet Suite no 163, Private Bag X21, Bryanston, 2021, South Africa.

www.kongiwe.co.za Disclaimer: The provisions of Section 11 of the Electronic Communications and Transactions Act 25 of 2002 apply to this email notice and make it enforceable and binding on the recipient/addressee. This email message (including attachments) contains information which may be confidential and/or legally privileged. Unless you are the intended recipient, you may not use, copy or disclose to anyone the message or any information contained in the message or from any attachments that were sent with this email, and If you have received this email message in error, please advise the sender by email, and delete the message. Unauthorised disclosure and/or use of information contained in this email may result in civil and criminal liability. Everything in this e-mail and attachments relating to the official business of Kongiwe Environmental (Pty) Ltd is proprietary to the company. Caution should be observed in placing any reliance upon any information contained in this e-mail, which is not intended to be a representation or inducement to make any decision in relation to Kongiwe Environmental (Pty) Ltd. Any decision taken based on the information provided in this e-mail, should only be made after consultation with appropriate legal, regulatory, tax, technical, business, investment, financial, and accounting advisors. The e-mail address of the sender may not be used, copied, sold, disclosed or incorporated into any database or mailing list for spamming and/or other marketing purposes without the prior consent of Kongiwe Environmental (Pty) Ltd. Unless the intention to contract has been expressed in this message, this message cannot be regarded as a solicitation to contract, nor be seen as an offer or acceptance of contractual agreement. Neither the sender of the e-mail, nor Kongiwe Environmental (Pty) Ltd shall be liable to any party for any direct, indirect or consequential damages, including, without limitation, loss of profit, interruption of business or loss of information, data or software or otherwise. No warranties are created or implied that an employee of Kongiwe Environmental (Pty) Ltd and/or a contractor of Kongiwe Environmental (Pty) Ltd is authorised to create and send this e-mail.

Page 22: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

Crown Gold Recoveries: Soweto Cluster Reclamation Project

Background Information Document © 2019 Kongiwe Environmental (Pty) Ltd

Page | 1

PURPOSE OF THE DOCUMENT

This Background Information Document aims to provide you with important information regarding:

❖ The reclamation of the existing Soweto Cluster dumps;

❖ The Environmental Impact Assessment and the Public Participation Process to be undertaken in

support of the reclamation process;

❖ An Integrated Water Use Licence Application process;

❖ How you can register as an Interested and Affected Party (I&AP) and be kept informed about the

project developments;

❖ The Public review and comment period for the Draft Scoping Report; and

❖ An invitation to attend a public meeting.

APPLICANT BACKGROUND AND CONTEXT

DRDGold Limited, the largest gold tailings retreatment company in South Africa, is divided into two

operating subsidiary companies: Crown Gold Recoveries (Pty) Limited (Crown Gold) and Ergo Mining (Pty)

Limited (Ergo).

The Applicant for the reclamation of the Soweto Cluster dumps will be Crown Gold. Crown Gold intends

to reprocess and reclaim gold from six historic Slimes dams: 2L24; 2L20; 2L21; 2L16; 2L17 and 2L18 as well

as two historic Sand dumps 2A6 and 2A8. These dams and dumps are referred to collectively as “the

Soweto Cluster” and were all created prior to the Mineral and Petroleum Resources Development Act

(MPRDA) which came into force in 2002.

Ultimately, by reclaiming the Soweto Cluster Dumps, Crown Gold will displace environmentally

problematic dams and dumps to controlled tailings disposal facilities such as Brakpan/Withok Tailings

Storage Facility (TSF), Cooke TSF and Regional TSF (not yet constructed, but planned).

LOCALITY

The Soweto Cluster dumps include:

❖ Site 1: The large 2L24 dump (Vlakfontein Dump) which covers an area of approximately 273.64

hectares (Ha).

Environmental Authorisation and Integrated Water Use Licence

Application for the reclamation of the Soweto Cluster Dumps, City of

Johannesburg Metropolitan Municipality - Gauteng Province

Background Information Document

June 2019

Page 23: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

Crown Gold Recoveries: Soweto Cluster Reclamation Project

Background Information Document © 2019 Kongiwe Environmental (Pty) Ltd

Page | 2

❖ Site 2: Three northern dumps (2L20; 2L21 and 2A8), which cover an approximate area of 59.58 Ha,

and;

❖ Site 3: Four north easterly dumps:(2L16; 2L17; 2L18 and 2A6), which cover an approximate area

of 97.14 Ha.

These three project sites are located in ward 49 and ward 127 of the City of Johannesburg Metropolitan

Municipality. The dumps are situated adjacent to the suburb of Bramfischerville and fall within both the

greater Soweto and Roodepoort areas.

Table 1: Soweto Cluster Property details

Farm Name Farm ID Farm Portion Infrastructure

Vlakfontein 238 IQ 1 (RE) 2L24 and 28A

Roodepoort 237 IQ 14 (RE) 2L21

Roodepoort 237 IQ 1 2L20, 2L16 and 2L17

Roodepoort 237 IQ 5 (RE) 2L16 and 2A6

Roodepoort 237 IQ 5 (RE) Pipeline

Roodepoort 237 IQ 1 (RE) Pipeline

Roodepoort 237 IQ 495 Pipeline

Roodepoort 237 IQ 495/237 Pipeline

Roodepoort 237 IQ 401 (RE) Pipeline

Vlakfontein 238 IQ 94 (RE) Pipeline

Vlakfontein 238 IQ 92 Pipeline

Vlakfontein 238 IQ 1 (RE) Pipeline

Vlakfontein 238 IQ 4 Pipeline

Doornkop 239 IQ 130 (RE) Pipeline

Doornkop 239 IQ 131 (RE) Pipeline

Doornkop 239 IQ 39 Pipeline

Doornkop 239 IQ 38 Pipeline

Zuurbult 240 IQ 240 Pipeline

Luipaardsvlei 243 IQ 141 Pipeline

Luipaardsvlei 243 IQ 14 (RE) Pipeline

Luipaardsvlei 243 IQ 13 Pipeline

Luipaardsvlei 243 IQ 96 (RE) Pipeline

Luipaardsvlei 243 IQ 7 (RE) Pipeline

Luipaardsvlei 243 IQ 10 Pipeline

Page 24: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

Crown Gold Recoveries: Soweto Cluster Reclamation Project

Background Information Document © 2019 Kongiwe Environmental (Pty) Ltd

Page | 3

Farm Name Farm ID Farm Portion Infrastructure

Luipaardsvlei 243 IQ 88 Pipeline

Luipaardsvlei 243 IQ 134 (RE) Pipeline

Luipaardsvlei 243 IQ 43 Pipeline

Braamfischerville 649 IQ 2 Pipeline

Braamfischerville 649 IQ 3 Pipeline

Braamfischerville 649 IQ 1 Pipeline

Durban Roodepoort Deep 641 IQ 2 Pipeline

Durban Roodepoort Deep 641 IQ 0 (RE) Pipeline

Vogelstruisfontein 233 IQ 46 Pipeline

Vogelstruisfontein 233 IQ 38 Pipeline

Vogelstruisfontein 231 IQ 161 Pipeline

Vogelstruisfontein 231 IQ 227 Pipeline

Vogelstruisfontein 231 IQ 17 (RE) Pipeline

Paardekraal 226 IQ 215 Pipeline

Paardekraal 226 IQ 245 Pipeline

Paardekraal 226 IQ 2 (RE) Pipeline

Paardekraal 226 IQ 5 (RE) Pipeline

Paardekraal 226 IQ 26 Pipeline

Paardekraal 226 IQ 212 (RE) Pipeline

PROJECT DESCRIPTION

Crown Gold intends to make use of its current infrastructure as well as other assets of subsidiaries held by

DRDGold Ltd for the reclamation of the Soweto Cluster.

Surface gold retreatment is a largely mechanised process with a risk profile that is significantly lower from

that of conventional mining. It is envisioned that the tailings material of the Soweto Cluster will be

reclaimed by using high-pressure water jets (slimes dams) or front-end loaders (sand dumps) and is fed as

slurry to a metallurgical processing plant for gold recovery.

Three existing authorised processing plants, each with a capacity to process 500 000 tons to 1.2 million

tons of slurry per month, will be investigated as alternatives for this project. The plants include Ergo Plant,

Cooke Plant and the yet to be constructed Central Processing Plant (CPP). Final deposition of the processed

slurry from the plants will be at the associated authorised deposition site, namely the Brakpan/Withok

TSF, the Cooke TSF or Pits, and/or the Regional TSF (which is still to be constructed).

Page 25: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

Crown Gold Recoveries: Soweto Cluster Reclamation Project

Background Information Document © 2019 Kongiwe Environmental (Pty) Ltd

Page | 4

Three 500 mm slurry pipelines and three 500 mm return water pipelines will be investigated as alternatives

for the project. These pipelines are linked to the plant alternatives considered above. The pipelines will

require authorisation in terms of the National Water Act (Act No. 36 of 1998) (NWA) for Section 21 water

uses. An Integrated Water Use Licence Application (IWULA) will be prepared and submitted in accordance

with the Water Use Licence Application and Appeals Regulations 2017, published in GNR 267 on 24 March

2017, and will be supported by a Technical Report and Integrated Water and Waste Management Plan

(IWWMP).

WATER SUPPLY

Potable water will be purchased from Rand Water, with a contingency for portable JoJo tanks or

connection to existing water pipeline infrastructure. In terms of process water, the water cycle operates

as a closed circuit, meaning that limited make-up water will be required for the reclamation of the Soweto

Cluster. Water required for the reclamation activities will be recovered from either of the three TSF’s

mentioned above, or from dirty water contained from existing mine shafts.

INFRASTRUCTURE

The Soweto Cluster is well serviced by existing roads and infrastructure; however the following

infrastructure is proposed:

❖ Overland slurry pipelines of 500 mm in diameter;

❖ Overland return water pipelines of 500 mm in diameter;

❖ Reclamation pump stations, which include:

o Slurry storage tank;

o Linear screen

o Water tank;

o Motor control centre; and

❖ Water infrastructure, stormwater systems and spillage handling systems;

❖ Electricity reticulation;

❖ Administration buildings, including change houses and ablution facilities;

❖ Access roads, routed from existing entry points; and

❖ Construction contractors’ yards (temporary facilities).

LEGISLATIVE FRAMEWORK

Prior to proceeding with the reclamation process, Crown Gold is required to obtain various licences and

an Environmental Authorisation from the relevant Competent Authorities. The required licences and the

environmental authorisation will be undertaken in accordance with the following legislation:

❖ Application for an Environmental Authorisation for listed activities triggered in Listing Notices GN

R983, GN R984 and GN R985 in terms of the Environmental Impact Assessment (EIA) Regulations,

Page 26: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

Crown Gold Recoveries: Soweto Cluster Reclamation Project

Background Information Document © 2019 Kongiwe Environmental (Pty) Ltd

Page | 5

2014 (as amended), as promulgated in terms of the National Environmental Management Act,

1998 (Act No. 107 of 1998) (NEMA);

❖ Application for listed waste activities in terms of the National Environmental Management: Waste

Act, 2008 (Act No. 59 of 2008), as amended (NEM:WA). The Competent Authority responsible for

assessing the abovementioned applications is the Department of Mineral Resource- Gauteng

Region (DMR).

❖ An Integrated Water Use Licence Application (IWULA) will be undertaken in accordance with the

National Water Act, 1998 (Act No.36 of 1998) (NWA). The Department of Water and Sanitation

will be the Competent Authority to assess the IWULA for the proposed project.

Please refer to Table 2 below for a list of activities to be authorised under the NEMA, NEM:WA and NWA.

Table 2: List of Activities to be authorised in accordance with NEMA, NEM:WA and NWA

Applicable listing notices in terms of NEMA

Waste management authorisation in terms of NEM:WA

Water Use Licence Authorisation in terms of the NWA

GN R983, Activities: 9; 10; 12, 13, 19 and 24

None 21(b)

GN R984, Activities: 6 and 7 GNR 921 -B(1);

21(c) & (i);

GN R985, Activities: 2, 4, 14 and 18

GNR 921 -B(2)

SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

Kongiwe Environmental (Pty) Ltd has been appointed as an independent Environmental Assessment

Practitioner to conduct the EIA process for the proposed project. In accordance with the provisions of the

EIA 2014 Regulations (as amended), the EIA process for the proposed project will be carried out in the

following phases:

Figure 1: EIA process and the associated timeline

Scoping phase

Purpose: Identify potential impacts and project alternatives to

guide the EIA

Process

Timeline: 30 May 2019 to end August

Impact Assessment Phase

Purpose: Conduct detailed specialist

studies to assess both positive and negative impacts. Consolidate

impact assessments and provide

recommendations on how to enhance positive

impacts and mitigate negative impacts

Time line: August 2019 to January 2020

Decision making phase

Purpose : Competent Authority evaluates

findings from the EIA process and

grants/rejects the Environmental Authorisation.

Time line: January 2020 - March 2020

Page 27: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

Crown Gold Recoveries: Soweto Cluster Reclamation Project

Background Information Document © 2019 Kongiwe Environmental (Pty) Ltd

Page | 6

INTEGRATED WATER USE LICENCE

An Integrated Water Use Licence Application will be conducted for water uses associated with Section 21

of the NWA. The IWULA process will be undertaken concurrently with the EIA process for the proposed

Soweto Cluster’s reclamation project.

SPECIALIST STUDIES

Various specialist studies will be undertaken as part of the EIA/IWULA process to assess the potential

impacts associated with the proposed project. Specialist studies to be undertaken include:

PUBLIC PARTICIPATION PROCESS

The public participation process will form part of the Integrated Environmental Authorisation, Waste

Management Licence Application and the IWULA process. The public participation process offers

stakeholders a fair opportunity to be informed about the proposed project, to raise issues of concern and

to make suggestions for enhanced project benefits. The project team will consider relevant issues and

suggestions during the EIA/IWULA process.

AVAILABILITY OF THE SCOPING REPORT FOR PUBLIC REVIEW AND COMMENT

The Draft Scoping Report for the Reclamation of the Soweto Cluster project will be made available for

public review and comment for a period of 30 days, from Tuesday, 4 June 2019 to Monday, 8 July 2019.

The report can be accessed at the following locations:

LOCATION PHYSICAL ADDRESS CONTACT PERSON

Hard copies

Bramfischerville Public Library Cnr Loerie Blaar & Methlokgo

Phase 2, Bramfischerville

Ms Patricia Mathe (Librarian)

Tel: (011) 765 4025

Roodepoort Public Library Cnr Berlandina & Hodgson Streets

Ms Monique Ramabulana Tel: (011 763 1031)

Electronic copies

Kongiwe Environmental website www.kongiwe.co.za/ public documents

For a CD copy please contact the stakeholder engagement team (Sibongile Bambisa/ Vanessa Viljoen),

Tel: 012 003 6627, Email: [email protected]

❖ Biodiversity; ❖ Social;

❖ Surface Water; ❖ Heritage;

❖ Groundwater; ❖ Visual; and

❖ Air quality;

❖ Traffic Assessment;

❖ Noise

Page 28: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

Crown Gold Recoveries: Soweto Cluster Reclamation Project

Background Information Document © 2019 Kongiwe Environmental (Pty) Ltd

Page | 7

A technical report in support of the IWULA process will be made available for public review and comment

for a period of 60 days. It is anticipated that the IWULA report will be made available during the impact

assessment phase. Information regarding the availability of the IWULA report and how stakeholders can

provide their comments will be communicated to all stakeholders.

INVITATION TO A PUBLIC MEETING

Interested and Affected Parties are invited to attend a public meeting which will be held on Thursday, 20th

June 2019 at the Bramfischerville Multipurpose Centre, Cnr Loerie Blaar & Methlokgo Phase 2,

Bramfischerville. The purpose of the meeting is to discuss the proposed project, contents of the Scoping

Report and also to provide I&APs with an opportunity to raise their concerns/comments

HOW TO BECOME INVOLVED

Any person affected by or who may be interested in the proposed project is asked to register as an

Interested and Affected Party (I&AP) by contacting the stakeholder engagement team. Contact person:

Sibongile Bambisa/Vanessa Viljoen Tel: (012) 003 6627, Email: [email protected]. Our team

welcomes your participation and looks forward to your involvement throughout this process.

COMMENTS AND QUERIES:

Should you have any comments/queries, please contact the stakeholder engagement team.

Contact persons: Sibongile Bambisa/Vanessa Viljoen

Tel: 012 003 6627

Email: [email protected]

Page 29: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

¬«R558

¬«M77

¬«N14

%,N14

%,N12

City of Johannesburg Metropolitan Municipality

Mogale City Local Municipality

Rand West City Local Municipality

Midvaal Local Municipality

Soweto

Kagiso

Florida

LenasiaEikenhof

Honeydew

Diepkloof

Zandspruit

Bekkersdal

Slovoville

Tshepisong

Roodepoort

RietvalleiToekomsrus

Krugersdorp

Muldersdrif

Meadowlands

Munsieville

Randfontein

Van Wyksrust

Luipaardsvlei

Eldorado Park

Klip

Crocodi le

Kl

ein-Jukskei

Wonde

rfonte

inspr

uit

Bloubanksp

ruit

Braamfonteinspruit

NGI, Municipal Demarcation Board, SANPARKS

-130000 -120000 -110000 -100000

-29

10

00

0-2

90

00

00

-28

90

00

0

Thulani

Chamdor

S o w e t o C l u s t e r D u m p s : L o c a l i t y

LegendProposed Pipelines

2L24 - Pipeline Crown Northern Dumps Pipeline Pipeline to Cooke Plant

RoadsMain Road

National Road

Perennial River

Non-Perennial River

District Municipality

Soweto Cluster Dumps

Protected Areas

0 2.5 51.25 Kilometers $Projection: Transverse MercatorCentral Meridian: 29°E

Datum: WGS 84

©2019 Kongiwe Environmental

Page 30: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

Soweto

Kagiso

Florida

Libanon

Lenasia

Midvaal

Finsbury

Eikenhof

Grasmere

Poortjie

Kocksoord

Ennerdale

Diepkloof

Mohlakeng

Westonaria

Bekkersdal

Slovoville

Tshepisong

Roodepoort

RietvalleiToekomsrus

Meadowlands

Walkerville

Glen Harvie

Venterspost

Hills Haven

Randfontein

Van Wyksrust

Eldorado Park

Lawley Estate

Modderfontein

Randfontein Mine

Elsburg Gold Mine

K

lip

Riets

pruit

Won

derfo

nteinspr

uit

Leeuspruit

Loop

sp

ruit

Midd

el vlei

spru

it

Brandvlei

Wonderfonteinspruit

Wonderfonteinspruit

NGI, Municipal Demarcation Board, SANPARKS, Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics,

CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

27.517148 27.603552 27.689956 27.776360 27.862764 27.949168-2

6.4

31

38

0-2

6.3

77

31

0-2

6.3

23

24

0-2

6.2

69

17

0-2

6.2

15

10

0-2

6.1

61

03

0

¹Geographic Coordinate System: WGS 84 Geographic System

©2019 Kongiwe Environmental

LegendSlurry Pipeline Options

Alternative 1

Alternative 2

Alternative 3

Perennial River

Non-Perennial River

Soweto Cluster Dumps

Project: Soweto Cluster | Client:Crown Gold Recoveries (Pty) Limited |Drawn By: NK Ndala | Date: 24 May 2019 | Ref: DRDG#009_Soweto Cluster |DataSource: NGI Aerial Photograph, Imagery date: 2015 |Projection:Geographic| Datum: WGS84 | © 2019 Kongiwe Environmental (Pty) Ltd. www.kongiwe.co.za

2L24

2L20/212A8

2L17/162A6

Source: Esri, DigitalGlobe,

GeoEye, Earthstar Geographics,CNES/Airbus DS, USDA, USGS,AeroGRID, IGN, and the GIS

User Community

Alternative 1-CookePlant

Alternative 3- Central Processing Plant

Locality Map

Alternative 2 –To Ergo Plant

0 1 2 3 4 50.5 Kilometers

Page 31: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

Ergo Mining: Soweto Cluster Reclamation Project Stakeholder Registration and Reply Form

© 2019 Kongiwe Environmental (Pty) Ltd

1

Environmental Authorisation and an Integrated Water Use Licence

Application for the reclamation of the Soweto Cluster Dumps,

City of Johannesburg Metropolitan Municipality - Gauteng Province

Stakeholder Registration and Reply Form

Please return a completed reply form to the Stakeholder Engagement team:

Sibongile Bambisa / Vanessa Viljoen

Phone: 012 003 6627 or E-mail: [email protected]

Postal Address: PostNet Suite no 163, Private Bag X21, Bryanston, 2021

Please provide your complete contact details:

If you are a landowner or you are occupying land, please indicate farms and who owns the farm.

I intend attending the Public Meeting

Thursday, 20 June 2019, 10:00 at the Bramfischerville Multipurpose Centre, Cnr Loerie Blaar & Methlokgo Phase 2, Bramfischerville

Yes No

To assist us with the specialist studies please answer the questions below. Should you require any assistance with filling in the questions please contact the abovementioned persons from the stakeholder engagement team.

1. How do you think the project might affect / impact you?

2. How do you think these effects/impacts can be managed, avoided and / or fixed should they happen?

Landowner Farm/s

Land occupier

Farm Farm owner

Title Mr Mrs Ms Dr Prof Other

First Name

Surname

Organisation/Farm/ Business/ Village. Etc.

Position in organisation

Contact Numbers

Cell phone

Fax Tel

Email address

Postal address

Please indicate your preferred method of communication

Email SMS Post Fax

Page 32: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

Ergo Mining: Soweto Cluster Reclamation Project Stakeholder Registration and Reply Form

© 2019 Kongiwe Environmental (Pty) Ltd

2

3. What is the land currently being used for?

4. Where are these land uses taking place?

5. Are there any natural environmental/ ecological aspects which we need to be aware of? (water, heritage sites, grave sites, special plants or animals)

6. Where are these aspects found?

7. Do you think the project could affect / impact any structures you might have? (e.g. houses, buildings, roads, dams)

8. If so how can these effects/ impacts be managed, avoided or fixed should they happen?

Any other comments

Please provide contact details of any other stakeholders we should consult.

Page 33: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

Ergo Mining: Soweto Cluster Reclamation Project Stakeholder Registration and Reply Form

© 2019 Kongiwe Environmental (Pty) Ltd

3

Title Mr Mrs Ms Dr Prof Other

First name

Surname

Organisation/ Farm / Business

Cell phone

Email

Title Mr Mrs Ms Dr Prof Other

First name

Surname

Organisation/ Farm / Business

Cell phone

Email

Signature: Date:

Page 34: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

Environmental Authorisation and an Integrated Water Use Licence Application for the

reclamation of the Soweto Cluster Dumps, City of Johannesburg Metropolitan Municipality -

Gauteng Province.

Applicant: Crown Gold Recoveries (Pty) Limited (Crown Gold)

Project Name: Reclamation of the Soweto Cluster DumpsNotice is hereby given that Crown Gold intends to reprocess and reclaim gold from six historic Slimes dams: 2L24; 2L20; 2L21; 2L16; 2L17 and 2L18 as well as two historic Sand dumps 2A6 and 2A8. These dams and dumps are referred to collectively as the “Soweto Cluster“ and are located in Ward 49 and 127 within the City of Johannesburg Metropolitan Municipality. The Soweto Cluster is situated adjacent to the suburb of Bramfischerville and fall within both the greater Soweto and Roodepoort areas. In terms of the environmental legislation, Crown Gold is required to obtain certain licences and an Environmental Authorisation prior to proceeding with the reclamation process. The required licences and the environmental authorisation will be undertaken in accordance with the following legislation:

Application for an Environmental Authorisation for listed activities triggered in Listing Notices GN R983, GN R984 and GN R985 in terms of the Environmental Impact Assessment (EIA) Regulations, 2014 (as amended), as promulgated in terms of the National Environmental Management Act, 1998 (Act No. 107 of 1998) (NEMA). The Competent Authority is identified as the Department of Mineral Resources (DMR). Application for Waste Management Licence in terms of the National Environmental Management: Waste Act, 2008 (Act No. 59 of 2008), as amended (NEM:WA). The Competent Authority is identified as the Department of Mineral Resources (DMR). An Integrated Water Use Licence Application (IWULA) will be undertaken in accordance with the National Water Act, 1998 (Act No.36 of 1998) (NWA). The Competent Authority is identified as the Department of Water and Sanitation (DWS).

AVAILABILITY OF THE DRAFT SCOPING REPORT FOR PUBLIC REVIEW AND COMMENT

The Draft Scoping Report for the reclamation of Soweto Cluster will be made available for public review and comment for a period of 30 days, from Tuesday, 4 June to Monday, 8 July 2019. The report can be accessed at the following locations:

Location Physical Address Contact PersonHard copies

Bramfischerville Public Library Cnr Loerie Blaar & Methlokgo Phase 2, Bramfischerville

Ms Patricia Mathe Tel: (011) 765 4025

Roodepoort Public Library Cnr Berlandina & Hodgson Streets

Ms Monique Ramabulana Tel: (011) 763 1031

Electronic copies

Kongiwe Environmental website www.kongiwe.co.za/public documents

Sibongile Bambisa / Vanessa Viljoen

For a CD copy please contact the stakeholder engagement team (Sibongile Bambisa / Vanessa Viljoen), Tel: (012) 003 6627, Email: [email protected]

INVITATION TO A PUBLIC MEETING

Interested and Affected Parties are invited to attend a public meeting which will be held on Thursday, 20 June 2019 at 10H00 at the at the Bramfischerville Multipurpose Centre, Cnr Loerie Blaar & Methlokgo Phase 2, Bramfischerville. The purpose of the meeting is to discuss the proposed project, contents of the Scoping Report and also to provide I&APs with an opportunity to raise their concerns/comments.

To register as an I&AP please contact: Kongiwe Environmental, Contact person: Sibongile Bambisa / Vanessa Viljoen, Tel: 010 140 6508, Email: [email protected]

Please ensure you submit any information or comments before Monday, 8 July 2019.

ENVIRONMENTAL SCIENCE & ENGINEERING

Page 35: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

1

Kongiwe Stakeholders

From: Vanessa Viljoen <[email protected]>Sent: Friday, 31 May 2019 10:30 AMTo: [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; 'NDLELENI, AMANDA (GDARD)'; [email protected]

Subject: Crown Gold Recoveries (Pty) Limited proposed reclamation of the Soweto Cluster Dumps

Attachments: Ergo_Soweto cluster_BID_Final_20190531_Reduced.pdf

Importance: High

Dear Stakeholders

This email serves to inform you that Crown Gold Recoveries (Pty) Limited (Crown Gold), intends to reprocess and reclaim gold from the Soweto Cluster Dumps, City of Johannesburg Metropolitan Municipality, in the Gauteng Province.

Kongiwe Environmental has been appointed as an independent Environmental Assessment Practitioner to undertake an Environmental Impact Assessment (EIA) process for the proposed project. Crown Gold holds various Mining Rights in respect of slimes dams and sand dumps with operations located throughout central Johannesburg, stretching immediately west of the N1 highway to the Cason Dump in Boksburg. The surface deposits controlled by Crown Gold are waste products created from the historical processing of gold and uranium ores of the Witwatersrand Supergroup. The six (6) existing Slimes dams: 2L24; 2L20; 2L21; 2L16; 2L17 and 2L18 as well as two (2) Sand dumps 2A6 and 2A8. These dams and dumps are referred to collectively as “the Soweto Cluster”. AVAILABILITY OF THE SCOPING REPORT FOR PUBLIC REVIEW AND COMMENT The Draft Scoping Report will be made available for public review and comment for a period of 30 days, from Tuesday, 4 June 2019 to Monday, 8 July 2019. INVITATION TO A PUBLIC MEETING Interested and Affected Parties (I&APs) are invited to attend a public meeting which will be held on Thursday, 20 June 2019 at the Bramfischerville Multipurpose Centre, Cnr Loerie Blaar & Methlokgo Phase 2, Bramfischerville. The purpose of the meeting is to discuss the proposed project, contents of the Scoping Report and also to provide I&APs with an opportunity to raise their concerns/comments. Any person affected by or who may be interested in the proposed project is asked to register as an I&AP by completing the attached reply sheet or by contacting the stakeholder engagement team. Contact person: Sibongile Bambisa/Vanessa Viljoen, Email: [email protected], Tel: (012) 003 6627. For more information, please refer to the attached Background Information Document. Kind Regards,

The Stakeholder Engagement Team | Kongiwe Environmental (Pty) Ltd. Tel: +27 (12) 003 6627 | Email: [email protected] Spaces, Byls Bridge Office Park, Building 14, Block B, Corner of Olievenhoutbosch & Jean Ave, Centurion, 0157, South Africa. PostNet Suite no 163, Private Bag X21, Bryanston, 2021, South Africa.

www.kongiwe.co.za

Page 36: Appendix C: Public Participation Information€¦ · Appendix C: Public Participation Information Appendix C1 – Stakeholder Database Appendix C2 – Land Claims Letters Appendix

2

Disclaimer: The provisions of Section 11 of the Electronic Communications and Transactions Act 25 of 2002 apply to this email notice and make it enforceable and binding on the recipient/addressee. This email message (including attachments) contains information which may be confidential and/or legally privileged. Unless you are the intended recipient, you may not use, copy or disclose to anyone the message or any information contained in the message or from any attachments that were sent with this email, and If you have received this email message in error, please advise the sender by email, and delete the message. Unauthorised disclosure and/or use of information contained in this email may result in civil and criminal liability. Everything in this e-mail and attachments relating to the official business of Kongiwe Environmental (Pty) Ltd is proprietary to the company. Caution should be observed in placing any reliance upon any information contained in this e-mail, which is not intended to be a representation or inducement to make any decision in relation to Kongiwe Environmental (Pty) Ltd. Any decision taken based on the information provided in this e-mail, should only be made after consultation with appropriate legal, regulatory, tax, technical, business, investment, financial, and accounting advisors. The e-mail address of the sender may not be used, copied, sold, disclosed or incorporated into any database or mailing list for spamming and/or other marketing purposes without the prior consent of Kongiwe Environmental (Pty) Ltd. Unless the intention to contract has been expressed in this message, this message cannot be regarded as a solicitation to contract, nor be seen as an offer or acceptance of contractual agreement. Neither the sender of the e-mail, nor Kongiwe Environmental (Pty) Ltd shall be liable to any party for any direct, indirect or consequential damages, including, without limitation, loss of profit, interruption of business or loss of information, data or software or otherwise. No warranties are created or implied that an employee of Kongiwe Environmental (Pty) Ltd and/or a contractor of Kongiwe Environmental (Pty) Ltd is authorised to create and send this e-mail.