Appendix B - City of Sydney€¦ · Subcatchment Scheme Description Pirrama Park Stormwater...
Transcript of Appendix B - City of Sydney€¦ · Subcatchment Scheme Description Pirrama Park Stormwater...
GHD | Report for City of Sydney- Draft WSUD & Stormwater Infrastructure Report | 92
Appendix B Existing WSUD initiatives
Subcatchment Scheme DescriptionSydney Park (Stage 1) Existing harvesting from the west of the LGABurrows Rd GPTSydney Park SQIDExisting rainwater tanksSouthern Area Aquatic Centre Aquifer Recharge Roof & stormwater HarvestingGully Pits (25 no. ) Catchment coverage 45 %Exfiltration Transfer of of stormwater to sandy soils via porous pipe (and onto the
Botany Sands Aquifer) Harcourt Parade?Gully Pits (115 no. ) Catchment coverage 45 %Solander Park, Alexandria - Existing GPT and Underground TankGully Pits (225 no. ) Catchment coverage 45 %Victoria Park (Joynton and Nuffield parks) Stormwater harvesting for open space irrigation
As part of redevelopment, surrounding catchment has applied WSUDfeatures that are assumed to meet best practice.
Epsom Road Depot, St Peters Groundwater & Rainwater HarvestingRedfern Park Diversion of drainage system to underground storageCleveland St PS SQIDMain tunnel southern PS SQIDDacey/ Todman St PS SQIDAustralia Technology Park SQIDWaterloo Park SQIDGully Pits (607 no. ) Catchment coverage 45 %Peace Park Stormwater harvesting from local catchmentPrince Alfred Park Roof water harvestingPrince Alfred Park, Central Stormwater HarvestingBlackwattle Bay Park Stormwater harvesting from local catchment / WSUDBuckland and Meagher Street, Chippendale WSUD & passive wateringCook St BioswaleLeichardt St BioswaleBlackwattle Bay Floating boomGully Pits (398 no. ) Catchment coverage 45 %
City Area Gully Pits (419 no. ) Catchment coverage 45 %
Alexandra Canal
Rosebery
Munni St - Erskineville
Sheas Creek
Blackwattle Bay
Subcatchment Scheme DescriptionPirrama Park Stormwater harvesting and WSUDIan Thorpe Aqautic Centre, Ultimo Roof water harvestingBeare Park, Elizabeth Bay Roof & stormwater HarvestingGlebe Foreshore, Glebe Roof & local stormwater Harvesting (inc WSUD)Water Police Site, Pyrmont Stormwater Harvesting (inc WSUD)Harmony Park, Surry Hills Roofwater harvestingTaylor Square Fountain, DarlinghurstGully Pits (771 no. ) Catchment coverage 45 %Foley Park Glebe Roof water harvestingFederal Park Wetlands Salt water wetlandGully Pits (169 no. ) Catchment coverage 45 %Barcom Avenue, Darlinghurst Retention tank near St Vincents Hospital ~ 100kL tank
Small scaleRushcutters Bay Park Roof & stormwater Harvesting (inc WSUD)Mouth of Rushcutters Bay Floating BoomRoslyn Gardens/Rushcutters Bay Park GPTGully Pits (115 no. ) Catchment coverage 45 %Hyde Park, Cook and Phillip Park Irrigation using groundwaterDarlinghurst Road, Kings Cross WSUD & passive wateringSurry Hills Library and Community Facility Roof water harvestingRushcutters Bay Park GTPBeare Park GTPGully Pits (492 no. ) Catchment coverage 45 %Entry to Centennial Park from Grand Drive GPTPoate Rd CDS trapJohn Thompson & Walter Read Reserves,Paddington
Roof water harvesting
Fox Studios CDS trapEntry into Kippax Lake Litter TrapGully Pits (84 no. ) Catchment coverage 45 %
Johnstons Creek
Rushcutters Bay
Woolloomooloo
Centennial Park
Darling Harbour
Garden Island
Oatley Reserve
Vice Chancellors
Oval
Pyrmont PointPark
Metcalfe Park
NewtownPublicSchool
Cook Community Garden
Cadi Park andElizabeth Plaza
The Maze
Moore Park Trust
Royal Botanic Gardens
Darling Harbour
Moore Park Trust
Harold Park
Victoria Park
The Domain
Hyde Park North
JubileePark
Hyde Park South
PrinceAlfred Park
Tumbalong Park
SCG
AlexandriaPark
Fox Studios
Wentworth Park
The DomainLawns
Reg Bartley Oval
Pirrama Park
FederalPark
Redfern Park
Waterloo Oval
Circular Quay
Observatory Hill Park
Aussie Stadium
ErskinevilleOval
Bicentennial Park
JubileeOval
Joynton Park
Belmore Park
First Fleet Park
Blackwattle Bay Park
EddieWardPark
HarryNoble
Reserve
FederalPark
Wynyard Park
Crown Park
GreenPark
Embarkation Park
Waterloo Park & Mount Carmel
Nuffield Park
Dawes Point Park
Pyrmont Bay Park
Glebe Foreshore Walk East
EdmundResch
Reserve
University of Sydney
Harmony Park
Glebe Foreshore Walk West
Dr H J Foley Rest Park
Mary AnnStreet Park
South SydneyRotary Park
Caldwell Park
Forbes StreetReserve
Cook + Phillip Park
Gibba Park
Glebe Foreshore Walk West
331,000
331,000
332,000
332,000
333,000
333,000
334,000
334,000
335,000
335,000
336,000
336,000
6,247
,000
6,247
,000
6,248
,000
6,248
,000
6,249
,000
6,249
,000
6,250
,000
6,250
,000
6,251
,000
6,251
,000
6,252
,000
6,252
,000
6,253
,000
6,253
,000
N:\AU\Sydney\Projects\21\20242\GIS\Maps\MXD\Deliverables for Melbourne Report\31_27217_Z032_MB_Existing_WSUD_Sites.mxd
0 100 200 30050
MetresMap Projection: Transverse Mercator
Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 56 o
© 2011. Whilst every care has been taken to prepare this map, GHD, City of Sydney, Sydney Water make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.
City of SydneyDecentralised Water Master Plan
Figure 1
Job NumberRevision A
31-27217
17 Nov 2011Date
Data source: Data Custodians City of Sydney, Sydney Water, 2011. Created by:AMDosani
Level 15, 133 Castlereagh Street Sydney NSW 2000 T 61 2 9239 7100 F 61 2 9239 7199 E [email protected] W www.ghd.com.au
Paper Size A3
This map and/or data has been compiled from various sources andthe publisher and/or contributors accept no responsibility for anyinjury, loss or damage arising from the use, error or omissionstherein. While all care is taken to ensure a high degree of accuracy,users are invited to notify Council’s GIS Group of any mapdiscrepancies. No part of this map or data may be reproduced
Sydney Harbour
LegendExisting WSUD, Stormwater & Roofwater$1 Existing SQID"/ Roofwater Harvest#0 Stormwater Harvest
StormwaterClosed (Unknown)Closed (City of Sydney)Closed (Sydney Water)
Open (Unknown)
Open (City of Sydney)
Open (Sydney Water)
CoS Drainage CatchmentsPipe Amplification
Cooks River
Sydney Harbour
Centennial Park
DRAFT
Existing WSUD Sites
Oatley Reserve
Moore Park Trust
Moore Park Trust
SCG
Fox Studios
Aussie Stadium
Crown Park
EdmundResch
Reserve
335,000
335,000
336,000
336,000
337,000
337,000
6,247
,000
6,247
,000
6,248
,000
6,248
,000
6,249
,000
6,249
,000
N:\AU\Sydney\Projects\21\20242\GIS\Maps\MXD\Deliverables for Melbourne Report\31_27217_Z032_MB_Existing_WSUD_Sites.mxd
0 100 200 30050
MetresMap Projection: Transverse Mercator
Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 56 o
© 2011. Whilst every care has been taken to prepare this map, GHD, City of Sydney, Sydney Water make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.
City of SydneyDecentralised Water Master Plan
Figure 1
Job NumberRevision A
31-27217
17 Nov 2011Date
Data source: Data Custodians City of Sydney, Sydney Water, 2011. Created by:AMDosani
Level 15, 133 Castlereagh Street Sydney NSW 2000 T 61 2 9239 7100 F 61 2 9239 7199 E [email protected] W www.ghd.com.au
Paper Size A3
This map and/or data has been compiled from various sources andthe publisher and/or contributors accept no responsibility for anyinjury, loss or damage arising from the use, error or omissionstherein. While all care is taken to ensure a high degree of accuracy,users are invited to notify Council’s GIS Group of any mapdiscrepancies. No part of this map or data may be reproduced
Centennial Park
LegendExisting WSUD, Stormwater & Roofwater$1 Existing SQID"/ Roofwater Harvest#0 Stormwater Harvest
StormwaterClosed (Unknown)Closed (City of Sydney)Closed (Sydney Water)
Open (Unknown)
Open (City of Sydney)
Open (Sydney Water)
CoS Drainage CatchmentsPipe Amplification
Cooks River
Sydney Harbour
Centennial Park
DRAFT
Existing WSUD Sites
Oatley Reserve
Vice Chancellors
Oval
NewtownPublicSchool
Cook Community Garden
The Maze
SydneyPark
Moore Park Trust
Moore Park Trust
Victoria Park
PrinceAlfred Park
SCG
AlexandriaPark
PerryPark
Redfern Park
Turruwul Park
Waterloo Oval
Aussie Stadium
ErskinevilleOval
Joynton Park
AllanDavidson
Oval
Belmore Park
EddieWardPark
HarryNoble
Reserve
Crown Park
Park
Waterloo Park & Mount Carmel
Southern Cross Dr Reserve
Nuffield Park
EdmundResch
Reserve
University of Sydney
Harmony Park
Kimberly Grove Reserve
Dr H J Foley Rest Park
Mary AnnStreet Park
South SydneyRotary Park
Caldwell Park
332,000
332,000
333,000
333,000
334,000
334,000
335,000
335,000
6,245
,000
6,245
,000
6,246
,000
6,246
,000
6,247
,000
6,247
,000
6,248
,000
6,248
,000
6,249
,000
6,249
,000
N:\AU\Sydney\Projects\21\20242\GIS\Maps\MXD\Deliverables for Melbourne Report\31_27217_Z032_MB_Existing_WSUD_Sites.mxd
0 100 200 30050
MetresMap Projection: Transverse Mercator
Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 56 o
© 2011. Whilst every care has been taken to prepare this map, GHD, City of Sydney, Sydney Water make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.
City of SydneyDecentralised Water Master Plan
Figure 1
Job NumberRevision A
31-27217
17 Nov 2011Date
Data source: Data Custodians City of Sydney, Sydney Water, 2011. Created by:AMDosani
Level 15, 133 Castlereagh Street Sydney NSW 2000 T 61 2 9239 7100 F 61 2 9239 7199 E [email protected] W www.ghd.com.au
Paper Size A3
This map and/or data has been compiled from various sources andthe publisher and/or contributors accept no responsibility for anyinjury, loss or damage arising from the use, error or omissionstherein. While all care is taken to ensure a high degree of accuracy,users are invited to notify Council’s GIS Group of any mapdiscrepancies. No part of this map or data may be reproduced
Cooks River
LegendExisting WSUD, Stormwater & Roofwater$1 Existing SQID"/ Roofwater Harvest#0 Stormwater Harvest
StormwaterClosed (Unknown)Closed (City of Sydney)Closed (Sydney Water)
Open (Unknown)
Open (City of Sydney)
Open (Sydney Water)
CoS Drainage CatchmentsPipe Amplification
Cooks River
Sydney Harbour
Centennial Park
DRAFT
Existing WSUD Sites