Appendix “A” Concept Plan

55
Proposed Residential Development – Cresthaven Drive Page - A-1 - Traffic Impact Assessment February, 2010 Appendix “A” Concept Plan

Transcript of Appendix “A” Concept Plan

Page 1: Appendix “A” Concept Plan

Proposed Residential Development – Cresthaven Drive Page - A-1 - Traffic Impact Assessment February, 2010

Appendix “A”

Concept Plan

Page 2: Appendix “A” Concept Plan
Page 3: Appendix “A” Concept Plan

Proposed Residential Development – Cresthaven Drive Page - B-1 - Traffic Impact Assessment February, 2010

Appendix “B”

Traffic Circle Design and Turning Movement Diagrams

Page 4: Appendix “A” Concept Plan
Page 5: Appendix “A” Concept Plan
Page 6: Appendix “A” Concept Plan
Page 7: Appendix “A” Concept Plan
Page 8: Appendix “A” Concept Plan
Page 9: Appendix “A” Concept Plan
Page 10: Appendix “A” Concept Plan

Proposed Residential Development – Cresthaven Drive Page - C-1 - Traffic Impact Assessment February, 2010

Appendix “C”

Intersection Capacity Analysis

(Existing – 2009)

Page 11: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Existing _ 2009

3: Barnstone Drive & Prince of Wales Drive AM Peak Hour

24/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 1

Movement EBL EBR NBL NBT SBT SBR

Lane Configurations

Sign Control Stop Free Free

Grade 0% 0% 0%

Volume (veh/h) 45 15 5 735 245 10

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 45 15 5 735 245 10

Pedestrians

Lane Width (m)

Walking Speed (m/s)

Percent Blockage

Right turn flare (veh)

Median type None

Median storage veh)

Upstream signal (m)

pX, platoon unblocked

vC, conflicting volume 995 250 255

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 995 250 255

tC, single (s) 6.4 6.2 4.1

tC, 2 stage (s)

tF (s) 3.5 3.3 2.2

p0 queue free % 83 98 100

cM capacity (veh/h) 267 781 1293

Direction, Lane # EB 1 NB 1 SB 1

Volume Total 60 740 255

Volume Left 45 5 0

Volume Right 15 0 10

cSH 319 1293 1700

Volume to Capacity 0.19 0.00 0.15

Queue Length 95th (m) 5.5 0.1 0.0

Control Delay (s) 18.9 0.1 0.0

Lane LOS C A

Approach Delay (s) 18.9 0.1 0.0

Approach LOS C

Intersection Summary

Average Delay 1.1

Intersection Capacity Utilization 52.7% ICU Level of Service A

Analysis Period (min) 60

Page 12: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Existing _ 2009

4: Barnstone Drive & Cresthaven Drive AM Peak Hour

24/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 2

Movement WBL WBR NBT NBR SBL SBT

Lane Configurations

Sign Control Stop Stop Stop

Volume (vph) 35 5 80 40 15 45

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 35 5 80 40 15 45

Direction, Lane # WB 1 NB 1 SB 1

Volume Total (vph) 40 120 60

Volume Left (vph) 35 0 15

Volume Right (vph) 5 40 0

Hadj (s) 0.13 -0.02 0.38

Departure Headway (s) 4.4 4.0 4.5

Degree Utilization, x 0.05 0.13 0.07

Capacity (veh/h) 778 871 788

Control Delay (s) 7.7 7.7 7.8

Approach Delay (s) 7.7 7.7 7.8

Approach LOS A A A

Intersection Summary

Delay 7.7

HCM Level of Service A

Intersection Capacity Utilization 24.7% ICU Level of Service A

Analysis Period (min) 60

Page 13: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Existing _ 2009

7: Fairpark Drive & Cresthaven Drive AM Peak Hour

24/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Right Turn Channelized Yes Yes Yes Yes

Volume (veh/h) 0 0 5 5 0 5 5 80 5 10 40 0

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 0 0 5 5 0 5 5 80 5 10 40 0

Approach Volume (veh/h) 0 5 85 50

Crossing Volume (veh/h) 55 85 10 10

High Capacity (veh/h) 1327 1296 1374 1374

High v/c (veh/h) 0.00 0.00 0.06 0.04

Low Capacity (veh/h) 1108 1080 1151 1151

Low v/c (veh/h) 0.00 0.00 0.07 0.04

Intersection Summary

Maximum v/c High 0.06

Maximum v/c Low 0.07

Intersection Capacity Utilization 20.2% ICU Level of Service A

Page 14: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Existing _ 2009

10: Villandry Street & Cresthaven Drive AM Peak Hour

24/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 5 0 10 10 0 5 5 75 5 5 45 0

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 5 0 10 10 0 5 5 75 5 5 45 0

Pedestrians 5 5 5 5

Lane Width (m) 3.6 3.6 3.6 3.6

Walking Speed (m/s) 1.2 1.2 1.2 1.2

Percent Blockage 0 0 0 0

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (m)

pX, platoon unblocked

vC, conflicting volume 158 155 55 162 152 88 50 85

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 158 155 55 162 152 88 50 85

tC, single (s) 7.3 6.7 6.4 7.3 6.7 6.4 4.3 4.3

tC, 2 stage (s)

tF (s) 3.7 4.2 3.5 3.7 4.2 3.5 2.4 2.4

p0 queue free % 99 100 99 99 100 99 100 100

cM capacity (veh/h) 742 688 945 733 690 906 1421 1378

Direction, Lane # EB 1 WB 1 NB 1 SB 1

Volume Total 15 15 85 50

Volume Left 5 10 5 5

Volume Right 10 5 5 0

cSH 866 783 1421 1378

Volume to Capacity 0.02 0.02 0.00 0.00

Queue Length 95th (m) 0.4 0.5 0.1 0.1

Control Delay (s) 9.2 9.7 0.5 0.8

Lane LOS A A A A

Approach Delay (s) 9.2 9.7 0.5 0.8

Approach LOS A A

Intersection Summary

Average Delay 2.2

Intersection Capacity Utilization 18.1% ICU Level of Service A

Analysis Period (min) 60

Page 15: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Existing _ 2009

3: Barnstone Drive & Prince of Wales Drive PM Peak Hour

24/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 1

Movement EBL EBR NBL NBT SBT SBR

Lane Configurations

Sign Control Stop Free Free

Grade 0% 0% 0%

Volume (veh/h) 30 15 15 250 795 35

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 30 15 15 250 795 35

Pedestrians

Lane Width (m)

Walking Speed (m/s)

Percent Blockage

Right turn flare (veh)

Median type None

Median storage veh)

Upstream signal (m)

pX, platoon unblocked

vC, conflicting volume 1092 812 830

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 1092 812 830

tC, single (s) 6.4 6.2 4.1

tC, 2 stage (s)

tF (s) 3.5 3.3 2.2

p0 queue free % 87 96 98

cM capacity (veh/h) 230 374 789

Direction, Lane # EB 1 NB 1 SB 1

Volume Total 45 265 830

Volume Left 30 15 0

Volume Right 15 0 35

cSH 264 789 1700

Volume to Capacity 0.17 0.02 0.49

Queue Length 95th (m) 4.9 0.5 0.0

Control Delay (s) 21.5 0.7 0.0

Lane LOS C A

Approach Delay (s) 21.5 0.7 0.0

Approach LOS C

Intersection Summary

Average Delay 1.0

Intersection Capacity Utilization 54.0% ICU Level of Service A

Analysis Period (min) 60

Page 16: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Existing _ 2009

4: Barnstone Drive & Cresthaven Drive PM Peak Hour

24/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 2

Movement WBL WBR NBT NBR SBL SBT

Lane Configurations

Sign Control Stop Stop Stop

Volume (vph) 40 10 50 50 5 50

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 40 10 50 50 5 50

Direction, Lane # WB 1 NB 1 SB 1

Volume Total (vph) 50 100 55

Volume Left (vph) 40 0 5

Volume Right (vph) 10 50 0

Hadj (s) 0.07 -0.15 0.39

Departure Headway (s) 4.3 3.9 4.5

Degree Utilization, x 0.06 0.11 0.07

Capacity (veh/h) 804 893 785

Control Delay (s) 7.6 7.4 7.8

Approach Delay (s) 7.6 7.4 7.8

Approach LOS A A A

Intersection Summary

Delay 7.6

HCM Level of Service A

Intersection Capacity Utilization 26.6% ICU Level of Service A

Analysis Period (min) 60

Page 17: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Existing _ 2009

7: Fairpark Drive & Cresthaven Drive PM Peak Hour

24/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Right Turn Channelized Yes Yes Yes Yes

Volume (veh/h) 5 0 5 10 0 10 5 50 0 15 55 5

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 5 0 5 10 0 10 5 50 0 15 55 5

Approach Volume (veh/h) 5 10 55 70

Crossing Volume (veh/h) 80 60 20 15

High Capacity (veh/h) 1301 1321 1363 1369

High v/c (veh/h) 0.00 0.01 0.04 0.05

Low Capacity (veh/h) 1085 1104 1142 1147

Low v/c (veh/h) 0.00 0.01 0.05 0.06

Intersection Summary

Maximum v/c High 0.05

Maximum v/c Low 0.06

Intersection Capacity Utilization 19.7% ICU Level of Service A

Page 18: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Existing _ 2009

10: Villandry Street & Cresthaven Drive PM Peak Hour

24/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 5 0 0 5 0 5 10 45 5 15 45 10

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 5 0 0 5 0 5 10 45 5 15 45 10

Pedestrians 5 5 5 5

Lane Width (m) 3.6 3.6 3.6 3.6

Walking Speed (m/s) 1.2 1.2 1.2 1.2

Percent Blockage 0 0 0 0

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (m)

pX, platoon unblocked

vC, conflicting volume 162 160 60 158 162 58 60 55

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 162 160 60 158 162 58 60 55

tC, single (s) 7.3 6.7 6.4 7.3 6.7 6.4 4.3 4.3

tC, 2 stage (s)

tF (s) 3.7 4.2 3.5 3.7 4.2 3.5 2.4 2.4

p0 queue free % 99 100 100 99 100 99 99 99

cM capacity (veh/h) 743 686 954 752 684 957 1441 1448

Direction, Lane # EB 1 WB 1 NB 1 SB 1

Volume Total 5 10 60 70

Volume Left 5 5 10 15

Volume Right 0 5 5 10

cSH 743 843 1441 1448

Volume to Capacity 0.01 0.01 0.01 0.01

Queue Length 95th (m) 0.2 0.3 0.2 0.3

Control Delay (s) 9.9 9.3 1.3 1.7

Lane LOS A A A A

Approach Delay (s) 9.9 9.3 1.3 1.7

Approach LOS A A

Intersection Summary

Average Delay 2.3

Intersection Capacity Utilization 18.4% ICU Level of Service A

Analysis Period (min) 60

Page 19: Appendix “A” Concept Plan

Proposed Residential Development – Cresthaven Drive Page - D-1 - Traffic Impact Assessment February, 2010

Appendix “D”

Collision Statistics

Page 20: Appendix “A” Concept Plan

Collision Main Detail Summary (On TRAC Reporting System) From: 2005-01-01 To: 2007-12-31

Cresthaven Dr, Fairpark Dr to Skyview PrivFormer Municipality: Nepean Traffic Control: No control Number of Collisions: 1

COLLISION ID DATE DAY TIME ENV LIGHT IMPACT TYPE CLASS DIR SURFACE COND'N VEHICLE MANOEUVRE VEHICLE TYPE FIRST EVENT NO. PED

1 22/10/2006 Su 22:00 Rain Dark Single Vehicle P.D. Only V1 E Wet Going Ahead Automobile, station Unattended vehicle 0

Cresthaven Dr & Grovehurst DrFormer Municipality: Nepean Traffic Control: Stop sign Number of Collisions: 1

COLLISION ID DATE DAY TIME ENV LIGHT IMPACT TYPE CLASS DIR SURFACE COND'N VEHICLE MANOEUVRE VEHICLE TYPE FIRST EVENT NO. PED

2 17/05/2005 Tu 19:10 Clear Daylight Angle P.D. only V1 E Dry Turning left Automobile, station Other motor vehicle 0

V2 N Dry Slowing or stop passenger van Other motor vehicle 0

Cresthaven Dr, Grovemont Dr to Cresthaven DrFormer Municipality: Nepean Traffic Control: No control Number of Collisions: 2

COLLISION ID DATE DAY TIME ENV LIGHT IMPACT TYPE CLASS DIR SURFACE COND'N VEHICLE MANOEUVRE VEHICLE TYPE FIRST EVENT NO. PED

3 10/02/2007 Sat 16:49 Clear Dusk Single Vehicle P.D. only V1 W Dry Going ahead Truck - closed Unattended vehicle 0

4 03/03/2007 Sat 19:52 Clear Dark Single vehicle P.D. only V1 U Dry Unknown Unknown Unattended vehicle 0

Barnstone Dr, Cresthaven Dr to Proposed Marcay StFormer Municipality: Nepean Traffic Control: No control Number of Collisions: 1

COLLISION ID DATE DAY TIME ENV LIGHT IMPACT TYPE CLASS DIR SURFACE COND'N VEHICLE MANOEUVRE VEHICLE TYPE FIRST EVENT NO. PED

1 17/11/2007 Sat 16:09 Clear Dusk Turning move P.D. only V1 E Dry Making U-Turn Automobile, station Other motor vehicle 0

V2 E Dry Going ahead passenger van Other motor vehicle 0

Barnstone Dr & Prince of Wales DrFormer Municipality: Nepean Traffic Control: Stop Sign Number of Collisions: 2

COLLISION ID DATE DAY TIME ENV LIGHT IMPACT TYPE CLASS DIR SURFACE COND'N VEHICLE MANOEUVRE VEHICLE TYPE FIRST EVENT NO. PED

2 20/06/2005 Mo 11:50 Clear Daylight Rear end Non-fatal V1 N Dry Going ahead Automobile, station Other motor vehicle 0

V2 N Dry Turning left Automobile, station Other motor vehicle

3 04/04/2007 We 07:20 Clear Daylight Angle non-fatal V1 N Wet Going ahead Automobile, station Other motor vehicle 0

V2 E Wet Stopped Automobile, station Other motor vehicle

Barnstone Dr, Prince of Wales Dr to Proposed Marcay StFormer Municipality: Nepean Traffic Control: No control Number of Collisions: 1

COLLISION ID DATE DAY TIME ENV LIGHT IMPACT TYPE CLASS DIR SURFACE COND'N VEHICLE MANOEUVRE VEHICLE TYPE FIRST EVENT NO. PED

4 24/08/2007 Fri 11:45 Clear Daylight Turning move P.D. only V1 S Wet Going ahead Automobile, station Other motor vehicle 0

V2 S Wet Turning left Automobile, station Other motor vehicle

Barnstone Dr & Proposed Marcay StFormer Municipality: Nepean Traffic Control: Stop Sign Number of Collisions: 1

COLLISION ID DATE DAY TIME ENV LIGHT IMPACT TYPE CLASS DIR SURFACE COND'N VEHICLE MANOEUVRE VEHICLE TYPE FIRST EVENT NO. PED

5 21/12/2005 We 07:40 Clear Dawn Angle P.D. only V1 S Loose snow Turning left Passenger Van Other motor vehicle 0

V2 W Loose snow Turning right Automobile, station Other motor vehicle

Page 21: Appendix “A” Concept Plan

Proposed Residential Development – Cresthaven Drive Page - E-1 - Traffic Impact Assessment February, 2010

Appendix “E”

Site Generated Traffic Volumes

Page 22: Appendix “A” Concept Plan

0 (0)

0 (0)

0 (0)

0 (0)

0 (0)

0 (

0)

0 (

0)

0 (

0)

0 (

0)

0 (

0)

0 (

0)

0 (0)

2

0 (0)

0 (0)

0 (0)

0 (0)

0 (

0)

0 (

0)

0 (

0)

0 (

0)

0 (0)

0 (0)

0 (0)

0 (0)

0 (0)

0 (

0)

0 (

0)

0 (

0)

0 (

0)

0 (

0)

0 (

0)

0 (0)

1

0 (0)

0 (0)

0 (0)

0 (0)

0 (

0)

0 (

0)

0 (

0)

0 (

0)

0 (0)

0 (0)

0 (

0)

0 (

0)

0 (

0)

0 (

0)

4

0 (0)

0 (0)

0 (

0)

0 (

0)

0 (

0)

0 (

0)

0 (0)

0 (0)

0 (0)

25 (30)

0 (0)

0 (

0)

0 (

0)

0 (

0)

0 (

0)

0 (

0)

0 (

0)

10 (30)

7

10 (30)

25 (30)

10 (30)

25 (30)

0 (

0)

0 (

0)

0 (

0)

0 (

0)

15 (35)

0 (0)

5 (5)

0 (0)

0 (0)

5 (

5)

0 (

0)

30

(2

5)

0 (

0)

0 (

0)

0 (

0)

0 (0)

6

5 (5)

5 (5)

15 (35)

30 (25)

35

(3

0)

20

(4

0)

0 (

0)

0 (

0)

0 (0)

0 (0)

0 (0)

5 (5)

0 (0)

0 (

0)

0 (

0)

0 (

0)

0 (

0)

0 (

0)

0 (

0)

5 (5)

5

5 (5)

5 (5)

5 (5)

5 (5)

0 (

0)

0 (

0)

0 (

0)

0 (

0)

Exhibit E-1: Site Generated Traffic (180 Units)

Format: Morning Peak Hour (Afternoon Peak Hour)

Assumes: w/ Strandherd Extension and

Bridge, w/ Barnstone RI/RO

0 (0)

0 (0)

0 (0)

0 (0)

40 (30)

0 (

0)

0 (

0)

0 (

0)

20

(4

0)

0 (

0)

0 (

0)

0 (0)

3

20 (40)

40 (30)

0 (0)

0 (0)

0 (

0)

0 (

0)

40

(3

0)

20

(4

0)

Page 23: Appendix “A” Concept Plan

Proposed Residential Development – Cresthaven Drive Page - F-1 - Traffic Impact Assessment February, 2010

Appendix “F”

Forecast Intersection Capacity Analysis

(2012 and 2017 Horizon Years)

Page 24: Appendix “A” Concept Plan

Proposed Residential Development – Cresthaven Drive Page – F1-1 - Traffic Impact Assessment February, 2010

Appendix “F-1”

2012 Intersection Capacity Analysis

Page 25: Appendix “A” Concept Plan

HCM Signalized Intersection Capacity Analysis Forecast 2012

13: Cresthaven Drive & Strandherd Drive AM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.97 0.95 1.00 1.00 0.95 1.00

Frpb, ped/bikes 1.00 1.00 0.98 1.00 0.99 1.00 1.00 0.97 1.00 1.00 0.98

Flpb, ped/bikes 0.99 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.85 1.00 0.92 1.00 1.00 0.85 1.00 1.00 0.85

Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00

Satd. Flow (prot) 1652 1765 1473 1654 1596 3252 3353 1455 1676 3353 1473

Flt Permitted 0.72 1.00 1.00 0.66 1.00 0.95 1.00 1.00 0.95 1.00 1.00

Satd. Flow (perm) 1254 1765 1473 1157 1596 3252 3353 1455 1676 3353 1473

Volume (vph) 5 115 135 95 25 30 10 475 55 15 510 5

Peak-hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Adj. Flow (vph) 5 115 135 95 25 30 10 475 55 15 510 5

RTOR Reduction (vph) 0 0 0 0 24 0 0 0 0 0 0 0

Lane Group Flow (vph) 5 115 135 95 31 0 10 475 55 15 510 5

Confl. Peds. (#/hr) 20 20 20 20 20 20

Turn Type Perm Free Perm Prot Free Prot Free

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 Free 8 Free Free

Actuated Green, G (s) 13.1 13.1 80.5 13.1 13.1 1.0 46.8 80.5 1.3 47.1 80.5

Effective Green, g (s) 15.6 15.6 80.5 15.6 15.6 3.4 49.2 80.5 3.7 49.5 80.5

Actuated g/C Ratio 0.19 0.19 1.00 0.19 0.19 0.04 0.61 1.00 0.05 0.61 1.00

Clearance Time (s) 6.5 6.5 6.5 6.5 6.4 6.4 6.4 6.4

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 243 342 1473 224 309 137 2049 1455 77 2062 1473

v/s Ratio Prot 0.07 0.02 0.00 0.14 c0.01 c0.15

v/s Ratio Perm 0.00 c0.09 c0.08 0.04 0.00

v/c Ratio 0.02 0.34 0.09 0.42 0.10 0.07 0.23 0.04 0.19 0.25 0.00

Uniform Delay, d1 26.3 28.0 0.0 28.5 26.7 37.0 7.1 0.0 37.0 7.0 0.0

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.0 0.6 0.1 1.3 0.1 0.2 0.3 0.0 1.2 0.3 0.0

Delay (s) 26.3 28.6 0.1 29.8 26.8 37.3 7.4 0.0 38.2 7.3 0.0

Level of Service C C A C C D A A D A A

Approach Delay (s) 13.5 28.7 7.2 8.1

Approach LOS B C A A

Intersection Summary

HCM Average Control Delay 10.8 HCM Level of Service B

HCM Volume to Capacity ratio 0.27

Actuated Cycle Length (s) 80.5 Sum of lost time (s) 8.0

Intersection Capacity Utilization 41.3% ICU Level of Service A

Analysis Period (min) 60

c Critical Lane Group

Page 26: Appendix “A” Concept Plan

HCM Signalized Intersection Capacity Analysis Forecast 2012

16: Strandherd Drive & Crestway Drive AM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 2

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 0.97 0.95 1.00 0.97 0.95 0.97 1.00 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 0.97 1.00 0.99 1.00 1.00 0.97 1.00 1.00 0.97

Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.85 1.00 0.97 1.00 1.00 0.85 1.00 1.00 0.85

Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00

Satd. Flow (prot) 3252 3353 1452 3252 3239 3252 1765 1456 1676 1765 1456

Flt Permitted 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00

Satd. Flow (perm) 3252 3353 1452 3252 3239 3252 1765 1456 1676 1765 1456

Volume (vph) 275 420 315 195 260 60 80 30 50 60 130 435

Peak-hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Adj. Flow (vph) 275 420 315 195 260 60 80 30 50 60 130 435

RTOR Reduction (vph) 0 0 193 0 18 0 0 0 39 0 0 336

Lane Group Flow (vph) 275 420 122 195 302 0 80 30 11 60 130 99

Confl. Peds. (#/hr) 20 20 20 20

Turn Type Prot Perm Prot Prot Perm Prot Perm

Protected Phases 7 4 3 8 5 2 1 6

Permitted Phases 4 2 6

Actuated Green, G (s) 9.4 30.9 30.9 8.2 29.7 4.1 17.0 17.0 4.2 17.1 17.1

Effective Green, g (s) 11.8 33.3 33.3 10.6 32.1 6.6 19.5 19.5 6.7 19.6 19.6

Actuated g/C Ratio 0.14 0.39 0.39 0.12 0.37 0.08 0.23 0.23 0.08 0.23 0.23

Clearance Time (s) 6.4 6.4 6.4 6.4 6.4 6.5 6.5 6.5 6.5 6.5 6.5

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 446 1297 562 400 1208 249 400 330 130 402 331

v/s Ratio Prot c0.08 c0.13 0.06 0.09 0.02 0.02 c0.04 c0.07

v/s Ratio Perm 0.08 0.01 0.07

v/c Ratio 0.62 0.32 0.22 0.49 0.25 0.32 0.07 0.03 0.46 0.32 0.30

Uniform Delay, d1 35.0 18.5 17.7 35.2 18.7 37.6 26.2 26.0 38.0 27.7 27.6

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 2.6 0.7 0.9 0.9 0.5 0.8 0.1 0.0 2.6 0.5 0.5

Delay (s) 37.6 19.2 18.6 36.2 19.2 38.4 26.3 26.0 40.6 28.2 28.1

Level of Service D B B D B D C C D C C

Approach Delay (s) 24.0 25.6 32.2 29.3

Approach LOS C C C C

Intersection Summary

HCM Average Control Delay 26.4 HCM Level of Service C

HCM Volume to Capacity ratio 0.35

Actuated Cycle Length (s) 86.1 Sum of lost time (s) 8.0

Intersection Capacity Utilization 65.4% ICU Level of Service C

Analysis Period (min) 60

c Critical Lane Group

Page 27: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Forecast 2012

3: Barnstone Drive & Prince of Wales Drive AM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 1

Movement EBL EBR NBL NBT SBT SBR

Lane Configurations

Sign Control Stop Free Free

Grade 0% 0% 0%

Volume (veh/h) 0 105 0 1120 380 15

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 0 105 0 1120 380 15

Pedestrians

Lane Width (m)

Walking Speed (m/s)

Percent Blockage

Right turn flare (veh)

Median type None

Median storage veh)

Upstream signal (m)

pX, platoon unblocked

vC, conflicting volume 940 190 395

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 940 190 395

tC, single (s) 6.9 7.0 4.2

tC, 2 stage (s)

tF (s) 3.5 3.3 2.2

p0 queue free % 100 87 100

cM capacity (veh/h) 257 810 1139

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 105 560 560 190 190 15

Volume Left 0 0 0 0 0 0

Volume Right 105 0 0 0 0 15

cSH 810 1700 1700 1700 1700 1700

Volume to Capacity 0.13 0.33 0.33 0.11 0.11 0.01

Queue Length 95th (m) 3.6 0.0 0.0 0.0 0.0 0.0

Control Delay (s) 10.1 0.0 0.0 0.0 0.0 0.0

Lane LOS B

Approach Delay (s) 10.1 0.0 0.0

Approach LOS B

Intersection Summary

Average Delay 0.7

Intersection Capacity Utilization 34.3% ICU Level of Service A

Analysis Period (min) 60

Page 28: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Forecast 2012

4: Barnstone Drive & Cresthaven Drive AM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 2

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Right Turn Channelized Yes Yes Yes Yes

Volume (veh/h) 5 0 40 55 0 10 20 100 70 20 55 0

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 5 0 40 55 0 10 20 100 70 20 55 0

Approach Volume (veh/h) 5 55 120 75

Crossing Volume (veh/h) 130 125 25 75

High Capacity (veh/h) 1251 1256 1358 1306

High v/c (veh/h) 0.00 0.04 0.09 0.06

Low Capacity (veh/h) 1040 1044 1137 1090

Low v/c (veh/h) 0.00 0.05 0.11 0.07

Intersection Summary

Maximum v/c High 0.09

Maximum v/c Low 0.11

Intersection Capacity Utilization 31.9% ICU Level of Service A

Page 29: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Forecast 2012

7: Fairpark Drive & Cresthaven Drive AM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Right Turn Channelized Yes Yes Yes Yes

Volume (veh/h) 0 0 5 5 0 5 5 105 5 15 55 0

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 0 0 5 5 0 5 5 105 5 15 55 0

Approach Volume (veh/h) 0 5 110 70

Crossing Volume (veh/h) 75 110 15 10

High Capacity (veh/h) 1306 1271 1369 1374

High v/c (veh/h) 0.00 0.00 0.08 0.05

Low Capacity (veh/h) 1090 1058 1147 1151

Low v/c (veh/h) 0.00 0.00 0.10 0.06

Intersection Summary

Maximum v/c High 0.08

Maximum v/c Low 0.10

Intersection Capacity Utilization 23.1% ICU Level of Service A

Page 30: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Forecast 2012

10: Villandry Street & Cresthaven Drive AM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 5 0 10 10 0 5 5 100 5 5 60 0

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 5 0 10 10 0 5 5 100 5 5 60 0

Pedestrians 5 5 5 5

Lane Width (m) 3.6 3.6 3.6 3.6

Walking Speed (m/s) 1.2 1.2 1.2 1.2

Percent Blockage 0 0 0 0

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (m)

pX, platoon unblocked

vC, conflicting volume 198 195 70 202 192 112 65 110

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 198 195 70 202 192 112 65 110

tC, single (s) 7.3 6.7 6.4 7.3 6.7 6.4 4.3 4.3

tC, 2 stage (s)

tF (s) 3.7 4.2 3.5 3.7 4.2 3.5 2.4 2.4

p0 queue free % 99 100 99 99 100 99 100 100

cM capacity (veh/h) 698 653 927 689 655 877 1402 1348

Direction, Lane # EB 1 WB 1 NB 1 SB 1

Volume Total 15 15 110 65

Volume Left 5 10 5 5

Volume Right 10 5 5 0

cSH 835 742 1402 1348

Volume to Capacity 0.02 0.02 0.00 0.00

Queue Length 95th (m) 0.4 0.5 0.1 0.1

Control Delay (s) 9.4 10.0 0.4 0.6

Lane LOS A A A A

Approach Delay (s) 9.4 10.0 0.4 0.6

Approach LOS A A

Intersection Summary

Average Delay 1.8

Intersection Capacity Utilization 19.4% ICU Level of Service A

Analysis Period (min) 60

Page 31: Appendix “A” Concept Plan
Page 32: Appendix “A” Concept Plan

HCM Signalized Intersection Capacity Analysis Forecast 2012

13: Cresthaven Drive & Strandherd Drive PM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.97 0.95 1.00 1.00 0.95 1.00

Frpb, ped/bikes 1.00 1.00 0.98 1.00 0.99 1.00 1.00 0.97 1.00 1.00 0.98

Flpb, ped/bikes 0.99 1.00 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.85 1.00 0.97 1.00 1.00 0.85 1.00 1.00 0.85

Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00

Satd. Flow (prot) 1652 1765 1473 1649 1708 3252 3353 1455 1676 3353 1473

Flt Permitted 0.66 1.00 1.00 0.73 1.00 0.95 1.00 1.00 0.95 1.00 1.00

Satd. Flow (perm) 1151 1765 1473 1263 1708 3252 3353 1455 1676 3353 1473

Volume (vph) 5 45 20 35 90 20 130 510 160 35 475 5

Peak-hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Adj. Flow (vph) 5 45 20 35 90 20 130 510 160 35 475 5

RTOR Reduction (vph) 0 0 0 0 9 0 0 0 0 0 0 0

Lane Group Flow (vph) 5 45 20 35 101 0 130 510 160 35 475 5

Confl. Peds. (#/hr) 20 20 20 20 20 20

Turn Type Perm Free Perm Prot Free Prot Free

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 Free 8 Free Free

Actuated Green, G (s) 15.5 15.5 89.1 15.5 15.5 7.4 51.1 89.1 3.2 46.9 89.1

Effective Green, g (s) 18.0 18.0 89.1 18.0 18.0 9.8 53.5 89.1 5.6 49.3 89.1

Actuated g/C Ratio 0.20 0.20 1.00 0.20 0.20 0.11 0.60 1.00 0.06 0.55 1.00

Clearance Time (s) 6.5 6.5 6.5 6.5 6.4 6.4 6.4 6.4

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 233 357 1473 255 345 358 2013 1455 105 1855 1473

v/s Ratio Prot 0.03 c0.06 c0.04 c0.15 0.02 0.14

v/s Ratio Perm 0.00 0.01 0.03 0.11 0.00

v/c Ratio 0.02 0.13 0.01 0.14 0.29 0.36 0.25 0.11 0.33 0.26 0.00

Uniform Delay, d1 28.5 29.1 0.0 29.2 30.2 36.8 8.4 0.0 40.0 10.4 0.0

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.0 0.2 0.0 0.2 0.5 0.6 0.3 0.2 1.9 0.3 0.0

Delay (s) 28.5 29.3 0.0 29.4 30.6 37.4 8.7 0.2 41.8 10.7 0.0

Level of Service C C A C C D A A D B A

Approach Delay (s) 20.9 30.3 11.6 12.7

Approach LOS C C B B

Intersection Summary

HCM Average Control Delay 14.2 HCM Level of Service B

HCM Volume to Capacity ratio 0.27

Actuated Cycle Length (s) 89.1 Sum of lost time (s) 8.0

Intersection Capacity Utilization 47.0% ICU Level of Service A

Analysis Period (min) 60

c Critical Lane Group

Page 33: Appendix “A” Concept Plan

HCM Signalized Intersection Capacity Analysis Forecast 2012

16: Strandherd Drive & Crestway Drive PM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 2

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 0.97 0.95 1.00 0.97 0.95 0.97 1.00 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 0.96 1.00 1.00 1.00 1.00 0.97 1.00 1.00 0.97

Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.85 1.00 0.98 1.00 1.00 0.85 1.00 1.00 0.85

Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00

Satd. Flow (prot) 3252 3353 1445 3252 3276 3252 1765 1450 1676 1765 1450

Flt Permitted 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00

Satd. Flow (perm) 3252 3353 1445 3252 3276 3252 1765 1450 1676 1765 1450

Volume (vph) 460 295 80 50 425 60 275 110 160 60 35 525

Peak-hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Adj. Flow (vph) 460 295 80 50 425 60 275 110 160 60 35 525

RTOR Reduction (vph) 0 0 45 0 8 0 0 0 115 0 0 291

Lane Group Flow (vph) 460 295 35 50 477 0 275 110 45 60 35 234

Confl. Peds. (#/hr) 20 20 20 20

Turn Type Prot Perm Prot Prot Perm Prot Perm

Protected Phases 7 4 3 8 5 2 1 6

Permitted Phases 4 2 6

Actuated Green, G (s) 17.6 43.7 43.7 2.7 28.8 11.5 27.5 27.5 5.8 21.8 21.8

Effective Green, g (s) 20.0 46.1 46.1 5.1 31.2 14.0 30.0 30.0 8.3 24.3 24.3

Actuated g/C Ratio 0.19 0.44 0.44 0.05 0.30 0.13 0.28 0.28 0.08 0.23 0.23

Clearance Time (s) 6.4 6.4 6.4 6.4 6.4 6.5 6.5 6.5 6.5 6.5 6.5

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 616 1465 631 157 969 432 502 412 132 407 334

v/s Ratio Prot c0.14 0.09 0.02 c0.15 c0.08 0.06 0.04 0.02

v/s Ratio Perm 0.02 0.03 c0.16

v/c Ratio 0.75 0.20 0.06 0.32 0.49 0.64 0.22 0.11 0.45 0.09 0.70

Uniform Delay, d1 40.4 18.3 17.1 48.5 30.6 43.3 28.8 27.9 46.4 31.9 37.3

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 5.1 0.3 0.2 1.2 1.8 3.1 0.2 0.1 2.5 0.1 6.7

Delay (s) 45.4 18.6 17.3 49.7 32.4 46.4 29.0 28.0 48.9 32.0 44.0

Level of Service D B B D C D C C D C D

Approach Delay (s) 33.3 34.0 37.5 43.8

Approach LOS C C D D

Intersection Summary

HCM Average Control Delay 36.9 HCM Level of Service D

HCM Volume to Capacity ratio 0.63

Actuated Cycle Length (s) 105.5 Sum of lost time (s) 16.0

Intersection Capacity Utilization 75.4% ICU Level of Service D

Analysis Period (min) 60

c Critical Lane Group

Page 34: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Forecast 2012

3: Barnstone Drive & Prince of Wales Drive PM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 1

Movement EBL EBR NBL NBT SBT SBR

Lane Configurations

Sign Control Stop Free Free

Grade 0% 0% 0%

Volume (veh/h) 0 90 0 390 1100 50

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 0 90 0 390 1100 50

Pedestrians

Lane Width (m)

Walking Speed (m/s)

Percent Blockage

Right turn flare (veh)

Median type None

Median storage veh)

Upstream signal (m)

pX, platoon unblocked

vC, conflicting volume 1295 550 1150

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 1295 550 1150

tC, single (s) 6.9 7.0 4.2

tC, 2 stage (s)

tF (s) 3.5 3.3 2.2

p0 queue free % 100 81 100

cM capacity (veh/h) 150 471 586

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 90 195 195 550 550 50

Volume Left 0 0 0 0 0 0

Volume Right 90 0 0 0 0 50

cSH 471 1700 1700 1700 1700 1700

Volume to Capacity 0.19 0.11 0.11 0.32 0.32 0.03

Queue Length 95th (m) 5.6 0.0 0.0 0.0 0.0 0.0

Control Delay (s) 14.4 0.0 0.0 0.0 0.0 0.0

Lane LOS B

Approach Delay (s) 14.4 0.0 0.0

Approach LOS B

Intersection Summary

Average Delay 0.8

Intersection Capacity Utilization 42.6% ICU Level of Service A

Analysis Period (min) 60

Page 35: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Forecast 2012

4: Barnstone Drive & Cresthaven Drive PM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 2

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Right Turn Channelized Yes Yes Yes Yes

Volume (veh/h) 5 0 30 55 0 10 40 60 130 10 60 5

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 5 0 30 55 0 10 40 60 130 10 60 5

Approach Volume (veh/h) 5 55 100 70

Crossing Volume (veh/h) 125 105 15 95

High Capacity (veh/h) 1256 1276 1369 1286

High v/c (veh/h) 0.00 0.04 0.07 0.05

Low Capacity (veh/h) 1044 1062 1147 1071

Low v/c (veh/h) 0.00 0.05 0.09 0.07

Intersection Summary

Maximum v/c High 0.07

Maximum v/c Low 0.09

Intersection Capacity Utilization 39.7% ICU Level of Service A

Page 36: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Forecast 2012

7: Fairpark Drive & Cresthaven Drive PM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Right Turn Channelized Yes Yes Yes Yes

Volume (veh/h) 5 0 5 10 0 15 5 70 0 15 75 5

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 5 0 5 10 0 15 5 70 0 15 75 5

Approach Volume (veh/h) 5 10 75 90

Crossing Volume (veh/h) 100 80 20 15

High Capacity (veh/h) 1281 1301 1363 1369

High v/c (veh/h) 0.00 0.01 0.06 0.07

Low Capacity (veh/h) 1067 1085 1142 1147

Low v/c (veh/h) 0.00 0.01 0.07 0.08

Intersection Summary

Maximum v/c High 0.07

Maximum v/c Low 0.08

Intersection Capacity Utilization 21.2% ICU Level of Service A

Page 37: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Forecast 2012

10: Villandry Street & Cresthaven Drive PM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 5 0 0 5 0 5 10 60 10 20 65 15

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 5 0 0 5 0 5 10 60 10 20 65 15

Pedestrians 5 5 5 5

Lane Width (m) 3.6 3.6 3.6 3.6

Walking Speed (m/s) 1.2 1.2 1.2 1.2

Percent Blockage 0 0 0 0

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (m)

pX, platoon unblocked

vC, conflicting volume 212 212 82 208 215 75 85 75

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 212 212 82 208 215 75 85 75

tC, single (s) 7.3 6.7 6.4 7.3 6.7 6.4 4.3 4.3

tC, 2 stage (s)

tF (s) 3.7 4.2 3.5 3.7 4.2 3.5 2.4 2.4

p0 queue free % 99 100 100 99 100 99 99 99

cM capacity (veh/h) 686 638 927 695 636 936 1411 1423

Direction, Lane # EB 1 WB 1 NB 1 SB 1

Volume Total 5 10 80 100

Volume Left 5 5 10 20

Volume Right 0 5 10 15

cSH 686 798 1411 1423

Volume to Capacity 0.01 0.01 0.01 0.01

Queue Length 95th (m) 0.2 0.3 0.2 0.3

Control Delay (s) 10.3 9.6 1.0 1.6

Lane LOS B A A A

Approach Delay (s) 10.3 9.6 1.0 1.6

Approach LOS B A

Intersection Summary

Average Delay 2.0

Intersection Capacity Utilization 20.9% ICU Level of Service A

Analysis Period (min) 60

Page 38: Appendix “A” Concept Plan
Page 39: Appendix “A” Concept Plan

Proposed Residential Development – Cresthaven Drive Page – F2-1 - Traffic Impact Assessment February, 2010

Appendix “F-2”

2017 Intersection Capacity Analysis

Page 40: Appendix “A” Concept Plan

HCM Signalized Intersection Capacity Analysis Forecast 2017

13: Cresthaven Drive & Strandherd Drive AM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.97 0.95 1.00 1.00 0.95 1.00

Frpb, ped/bikes 1.00 1.00 0.98 1.00 0.99 1.00 1.00 0.97 1.00 1.00 0.98

Flpb, ped/bikes 0.99 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.85 1.00 0.92 1.00 1.00 0.85 1.00 1.00 0.85

Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00

Satd. Flow (prot) 1653 1765 1473 1656 1597 3252 3353 1455 1676 3353 1473

Flt Permitted 0.72 1.00 1.00 0.64 1.00 0.95 1.00 1.00 0.95 1.00 1.00

Satd. Flow (perm) 1255 1765 1473 1115 1597 3252 3353 1455 1676 3353 1473

Volume (vph) 5 130 155 105 25 30 15 545 55 15 580 5

Peak-hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Adj. Flow (vph) 5 130 155 105 25 30 15 545 55 15 580 5

RTOR Reduction (vph) 0 0 0 0 24 0 0 0 0 0 0 0

Lane Group Flow (vph) 5 130 155 105 31 0 15 545 55 15 580 5

Confl. Peds. (#/hr) 20 20 20 20 20 20

Turn Type Perm Free Perm Prot Free Prot Free

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 Free 8 Free Free

Actuated Green, G (s) 12.7 12.7 76.5 12.7 12.7 1.0 43.3 76.5 1.2 43.5 76.5

Effective Green, g (s) 15.2 15.2 76.5 15.2 15.2 3.4 45.7 76.5 3.6 45.9 76.5

Actuated g/C Ratio 0.20 0.20 1.00 0.20 0.20 0.04 0.60 1.00 0.05 0.60 1.00

Clearance Time (s) 6.5 6.5 6.5 6.5 6.4 6.4 6.4 6.4

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 249 351 1473 222 317 145 2003 1455 79 2012 1473

v/s Ratio Prot 0.07 0.02 0.00 0.16 0.01 c0.17

v/s Ratio Perm 0.00 c0.11 c0.09 0.04 0.00

v/c Ratio 0.02 0.37 0.11 0.47 0.10 0.10 0.27 0.04 0.19 0.29 0.00

Uniform Delay, d1 24.7 26.5 0.0 27.1 25.0 35.1 7.4 0.0 35.0 7.4 0.0

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.0 0.7 0.1 1.6 0.1 0.3 0.3 0.0 1.2 0.4 0.0

Delay (s) 24.7 27.2 0.1 28.7 25.2 35.4 7.7 0.0 36.2 7.8 0.0

Level of Service C C A C C D A A D A A

Approach Delay (s) 12.7 27.5 7.7 8.4

Approach LOS B C A A

Intersection Summary

HCM Average Control Delay 10.7 HCM Level of Service B

HCM Volume to Capacity ratio 0.29

Actuated Cycle Length (s) 76.5 Sum of lost time (s) 4.0

Intersection Capacity Utilization 52.1% ICU Level of Service A

Analysis Period (min) 60

c Critical Lane Group

Page 41: Appendix “A” Concept Plan

HCM Signalized Intersection Capacity Analysis Forecast 2017

16: Strandherd Drive & Crestway Drive AM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 2

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 0.97 0.95 1.00 0.97 0.95 0.97 1.00 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 0.97 1.00 0.99 1.00 1.00 0.97 1.00 1.00 0.97

Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.85 1.00 0.97 1.00 1.00 0.85 1.00 1.00 0.85

Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00

Satd. Flow (prot) 3252 3353 1451 3252 3236 3252 1765 1456 1676 1765 1456

Flt Permitted 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00

Satd. Flow (perm) 3252 3353 1451 3252 3236 3252 1765 1456 1676 1765 1456

Volume (vph) 310 480 360 220 295 70 90 35 55 70 150 495

Peak-hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Adj. Flow (vph) 310 480 360 220 295 70 90 35 55 70 150 495

RTOR Reduction (vph) 0 0 224 0 19 0 0 0 42 0 0 343

Lane Group Flow (vph) 310 480 136 220 346 0 90 35 13 70 150 152

Confl. Peds. (#/hr) 20 20 20 20

Turn Type Prot Perm Prot Prot Perm Prot Perm

Protected Phases 7 4 3 8 5 2 1 6

Permitted Phases 4 2 6

Actuated Green, G (s) 9.9 30.5 30.5 9.1 29.7 4.1 17.4 17.4 4.2 17.5 17.5

Effective Green, g (s) 12.3 32.9 32.9 11.5 32.1 6.6 19.9 19.9 6.7 20.0 20.0

Actuated g/C Ratio 0.14 0.38 0.38 0.13 0.37 0.08 0.23 0.23 0.08 0.23 0.23

Clearance Time (s) 6.4 6.4 6.4 6.4 6.4 6.5 6.5 6.5 6.5 6.5 6.5

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 460 1268 549 430 1194 247 404 333 129 406 335

v/s Ratio Prot c0.10 c0.14 0.07 0.11 0.03 0.02 c0.04 0.08

v/s Ratio Perm 0.09 0.01 c0.10

v/c Ratio 0.67 0.38 0.25 0.51 0.29 0.36 0.09 0.04 0.54 0.37 0.45

Uniform Delay, d1 35.4 19.6 18.6 35.1 19.4 38.2 26.4 26.1 38.7 28.2 28.8

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 4.0 0.9 1.1 1.0 0.6 0.9 0.1 0.0 4.7 0.6 1.0

Delay (s) 39.4 20.5 19.6 36.2 20.0 39.1 26.5 26.1 43.3 28.8 29.8

Level of Service D C B D C D C C D C C

Approach Delay (s) 25.3 26.1 32.7 30.9

Approach LOS C C C C

Intersection Summary

HCM Average Control Delay 27.5 HCM Level of Service C

HCM Volume to Capacity ratio 0.42

Actuated Cycle Length (s) 87.0 Sum of lost time (s) 8.0

Intersection Capacity Utilization 69.3% ICU Level of Service C

Analysis Period (min) 60

c Critical Lane Group

Page 42: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Forecast 2017

3: Barnstone Drive & Prince of Wales Drive AM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 1

Movement EBL EBR NBL NBT SBT SBR

Lane Configurations

Sign Control Stop Free Free

Grade 0% 0% 0%

Volume (veh/h) 0 110 0 1275 435 15

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 0 110 0 1275 435 15

Pedestrians

Lane Width (m)

Walking Speed (m/s)

Percent Blockage

Right turn flare (veh)

Median type None

Median storage veh)

Upstream signal (m)

pX, platoon unblocked

vC, conflicting volume 1072 218 450

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 1072 218 450

tC, single (s) 6.9 7.0 4.2

tC, 2 stage (s)

tF (s) 3.5 3.3 2.2

p0 queue free % 100 86 100

cM capacity (veh/h) 210 778 1086

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 110 638 638 218 218 15

Volume Left 0 0 0 0 0 0

Volume Right 110 0 0 0 0 15

cSH 778 1700 1700 1700 1700 1700

Volume to Capacity 0.14 0.38 0.38 0.13 0.13 0.01

Queue Length 95th (m) 3.9 0.0 0.0 0.0 0.0 0.0

Control Delay (s) 10.4 0.0 0.0 0.0 0.0 0.0

Lane LOS B

Approach Delay (s) 10.4 0.0 0.0

Approach LOS B

Intersection Summary

Average Delay 0.6

Intersection Capacity Utilization 38.6% ICU Level of Service A

Analysis Period (min) 60

Page 43: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Forecast 2017

4: Barnstone Drive & Cresthaven Drive AM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 2

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Right Turn Channelized Yes Yes Yes Yes

Volume (veh/h) 5 0 40 60 0 10 20 115 75 25 65 0

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 5 0 40 60 0 10 20 115 75 25 65 0

Approach Volume (veh/h) 5 60 135 90

Crossing Volume (veh/h) 150 140 30 80

High Capacity (veh/h) 1232 1241 1353 1301

High v/c (veh/h) 0.00 0.05 0.10 0.07

Low Capacity (veh/h) 1022 1031 1132 1085

Low v/c (veh/h) 0.00 0.06 0.12 0.08

Intersection Summary

Maximum v/c High 0.10

Maximum v/c Low 0.12

Intersection Capacity Utilization 32.5% ICU Level of Service A

Page 44: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Forecast 2017

7: Fairpark Drive & Cresthaven Drive AM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Right Turn Channelized Yes Yes Yes Yes

Volume (veh/h) 5 0 5 5 0 5 5 120 5 15 65 0

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 5 0 5 5 0 5 5 120 5 15 65 0

Approach Volume (veh/h) 5 5 125 80

Crossing Volume (veh/h) 85 130 20 10

High Capacity (veh/h) 1296 1251 1363 1374

High v/c (veh/h) 0.00 0.00 0.09 0.06

Low Capacity (veh/h) 1080 1040 1142 1151

Low v/c (veh/h) 0.00 0.00 0.11 0.07

Intersection Summary

Maximum v/c High 0.09

Maximum v/c Low 0.11

Intersection Capacity Utilization 22.0% ICU Level of Service A

Page 45: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Forecast 2017

10: Villandry Street & Cresthaven Drive AM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 5 0 15 10 0 10 5 110 5 5 65 0

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 5 0 15 10 0 10 5 110 5 5 65 0

Pedestrians 5 5 5 5

Lane Width (m) 3.6 3.6 3.6 3.6

Walking Speed (m/s) 1.2 1.2 1.2 1.2

Percent Blockage 0 0 0 0

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (m)

pX, platoon unblocked

vC, conflicting volume 218 210 75 222 208 122 70 120

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 218 210 75 222 208 122 70 120

tC, single (s) 7.3 6.7 6.4 7.3 6.7 6.4 4.3 4.3

tC, 2 stage (s)

tF (s) 3.7 4.2 3.5 3.7 4.2 3.5 2.4 2.4

p0 queue free % 99 100 98 98 100 99 100 100

cM capacity (veh/h) 672 640 921 664 642 865 1396 1336

Direction, Lane # EB 1 WB 1 NB 1 SB 1

Volume Total 20 20 120 70

Volume Left 5 10 5 5

Volume Right 15 10 5 0

cSH 843 751 1396 1336

Volume to Capacity 0.02 0.03 0.00 0.00

Queue Length 95th (m) 0.6 0.7 0.1 0.1

Control Delay (s) 9.4 9.9 0.3 0.6

Lane LOS A A A A

Approach Delay (s) 9.4 9.9 0.3 0.6

Approach LOS A A

Intersection Summary

Average Delay 2.0

Intersection Capacity Utilization 19.9% ICU Level of Service A

Analysis Period (min) 60

Page 46: Appendix “A” Concept Plan
Page 47: Appendix “A” Concept Plan

HCM Signalized Intersection Capacity Analysis Forecast 2017

13: Cresthaven Drive & Strandherd Drive PM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.97 0.95 1.00 1.00 0.95 1.00

Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 1.00 1.00 0.97 1.00 1.00 0.98

Flpb, ped/bikes 0.99 1.00 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.85 1.00 0.98 1.00 1.00 0.85 1.00 1.00 0.85

Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00

Satd. Flow (prot) 1652 1765 1473 1649 1714 3252 3353 1455 1676 3353 1473

Flt Permitted 0.62 1.00 1.00 0.72 1.00 0.95 1.00 1.00 0.95 1.00 1.00

Satd. Flow (perm) 1085 1765 1473 1258 1714 3252 3353 1455 1676 3353 1473

Volume (vph) 5 50 20 35 105 20 150 580 165 35 545 5

Peak-hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Adj. Flow (vph) 5 50 20 35 105 20 150 580 165 35 545 5

RTOR Reduction (vph) 0 0 0 0 7 0 0 0 0 0 0 0

Lane Group Flow (vph) 5 50 20 35 118 0 150 580 165 35 545 5

Confl. Peds. (#/hr) 20 20 20 20 20 20

Turn Type Perm Free Perm Prot Free Prot Free

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 Free 8 Free Free

Actuated Green, G (s) 15.2 15.2 89.9 15.2 15.2 9.3 50.6 89.9 4.8 46.1 89.9

Effective Green, g (s) 17.7 17.7 89.9 17.7 17.7 11.7 53.0 89.9 7.2 48.5 89.9

Actuated g/C Ratio 0.20 0.20 1.00 0.20 0.20 0.13 0.59 1.00 0.08 0.54 1.00

Clearance Time (s) 6.5 6.5 6.5 6.5 6.4 6.4 6.4 6.4

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 214 348 1473 248 337 423 1977 1455 134 1809 1473

v/s Ratio Prot 0.03 c0.07 c0.05 c0.17 0.02 0.16

v/s Ratio Perm 0.00 0.01 0.03 0.11 0.00

v/c Ratio 0.02 0.14 0.01 0.14 0.35 0.35 0.29 0.11 0.26 0.30 0.00

Uniform Delay, d1 29.1 29.8 0.0 29.8 31.1 35.7 9.2 0.0 38.9 11.4 0.0

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.0 0.2 0.0 0.3 0.6 0.5 0.4 0.2 1.0 0.4 0.0

Delay (s) 29.2 30.0 0.0 30.1 31.8 36.2 9.5 0.2 39.9 11.8 0.0

Level of Service C C A C C D A A D B A

Approach Delay (s) 22.0 31.4 12.3 13.4

Approach LOS C C B B

Intersection Summary

HCM Average Control Delay 14.9 HCM Level of Service B

HCM Volume to Capacity ratio 0.31

Actuated Cycle Length (s) 89.9 Sum of lost time (s) 8.0

Intersection Capacity Utilization 48.1% ICU Level of Service A

Analysis Period (min) 60

c Critical Lane Group

Page 48: Appendix “A” Concept Plan

HCM Signalized Intersection Capacity Analysis Forecast 2017

16: Strandherd Drive & Crestway Drive PM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 2

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 0.97 0.95 1.00 0.97 0.95 0.97 1.00 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 0.96 1.00 1.00 1.00 1.00 0.97 1.00 1.00 0.97

Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.85 1.00 0.98 1.00 1.00 0.85 1.00 1.00 0.85

Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00

Satd. Flow (prot) 3252 3353 1442 3252 3274 3252 1765 1448 1676 1765 1448

Flt Permitted 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00

Satd. Flow (perm) 3252 3353 1442 3252 3274 3252 1765 1448 1676 1765 1448

Volume (vph) 525 335 90 55 485 70 310 130 185 70 45 595

Peak-hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Adj. Flow (vph) 525 335 90 55 485 70 310 130 185 70 45 595

RTOR Reduction (vph) 0 0 54 0 9 0 0 0 126 0 0 263

Lane Group Flow (vph) 525 335 36 55 546 0 310 130 59 70 45 332

Confl. Peds. (#/hr) 20 20 20 20

Turn Type Prot Perm Prot Prot Perm Prot Perm

Protected Phases 7 4 3 8 5 2 1 6

Permitted Phases 4 2 6

Actuated Green, G (s) 19.4 42.8 42.8 3.8 27.2 11.7 33.5 33.5 6.3 28.1 28.1

Effective Green, g (s) 21.8 45.2 45.2 6.2 29.6 14.2 36.0 36.0 8.8 30.6 30.6

Actuated g/C Ratio 0.19 0.40 0.40 0.06 0.26 0.13 0.32 0.32 0.08 0.27 0.27

Clearance Time (s) 6.4 6.4 6.4 6.4 6.4 6.5 6.5 6.5 6.5 6.5 6.5

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 632 1351 581 180 864 412 566 465 131 481 395

v/s Ratio Prot c0.16 0.10 0.02 c0.17 c0.10 0.07 0.04 0.03

v/s Ratio Perm 0.03 0.04 c0.23

v/c Ratio 0.83 0.25 0.06 0.31 0.63 0.75 0.23 0.13 0.53 0.09 0.84

Uniform Delay, d1 43.4 22.2 20.5 50.9 36.5 47.3 27.9 27.0 49.7 30.4 38.5

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 9.9 0.4 0.2 1.0 3.6 8.0 0.2 0.1 4.2 0.1 17.0

Delay (s) 53.3 22.7 20.7 51.9 40.1 55.3 28.1 27.1 53.9 30.5 55.5

Level of Service D C C D D E C C D C E

Approach Delay (s) 39.4 41.1 41.3 53.8

Approach LOS D D D D

Intersection Summary

HCM Average Control Delay 43.7 HCM Level of Service D

HCM Volume to Capacity ratio 0.76

Actuated Cycle Length (s) 112.2 Sum of lost time (s) 16.0

Intersection Capacity Utilization 81.0% ICU Level of Service D

Analysis Period (min) 60

c Critical Lane Group

Page 49: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Forecast 2017

3: Barnstone Drive & Prince of Wales Drive PM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 1

Movement EBL EBR NBL NBT SBT SBR

Lane Configurations

Sign Control Stop Free Free

Grade 0% 0% 0%

Volume (veh/h) 0 95 0 445 1255 55

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 0 95 0 445 1255 55

Pedestrians

Lane Width (m)

Walking Speed (m/s)

Percent Blockage

Right turn flare (veh)

Median type None

Median storage veh)

Upstream signal (m)

pX, platoon unblocked

vC, conflicting volume 1478 628 1310

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 1478 628 1310

tC, single (s) 6.9 7.0 4.2

tC, 2 stage (s)

tF (s) 3.5 3.3 2.2

p0 queue free % 100 77 100

cM capacity (veh/h) 113 419 508

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 95 222 222 628 628 55

Volume Left 0 0 0 0 0 0

Volume Right 95 0 0 0 0 55

cSH 419 1700 1700 1700 1700 1700

Volume to Capacity 0.23 0.13 0.13 0.37 0.37 0.03

Queue Length 95th (m) 7.0 0.0 0.0 0.0 0.0 0.0

Control Delay (s) 16.1 0.0 0.0 0.0 0.0 0.0

Lane LOS C

Approach Delay (s) 16.1 0.0 0.0

Approach LOS C

Intersection Summary

Average Delay 0.8

Intersection Capacity Utilization 47.2% ICU Level of Service A

Analysis Period (min) 60

Page 50: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Forecast 2017

4: Barnstone Drive & Cresthaven Drive PM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 2

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Right Turn Channelized Yes Yes Yes Yes

Volume (veh/h) 5 0 30 60 0 10 40 70 140 10 70 5

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 5 0 30 60 0 10 40 70 140 10 70 5

Approach Volume (veh/h) 5 60 110 80

Crossing Volume (veh/h) 140 115 15 100

High Capacity (veh/h) 1241 1266 1369 1281

High v/c (veh/h) 0.00 0.05 0.08 0.06

Low Capacity (veh/h) 1031 1053 1147 1067

Low v/c (veh/h) 0.00 0.06 0.10 0.08

Intersection Summary

Maximum v/c High 0.08

Maximum v/c Low 0.10

Intersection Capacity Utilization 41.4% ICU Level of Service A

Page 51: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Forecast 2017

7: Fairpark Drive & Cresthaven Drive PM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 3

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Right Turn Channelized Yes Yes Yes Yes

Volume (veh/h) 5 5 5 15 5 15 5 80 5 20 85 5

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 5 5 5 15 5 15 5 80 5 20 85 5

Approach Volume (veh/h) 10 20 85 105

Crossing Volume (veh/h) 120 90 30 25

High Capacity (veh/h) 1261 1291 1353 1358

High v/c (veh/h) 0.01 0.02 0.06 0.08

Low Capacity (veh/h) 1049 1076 1132 1137

Low v/c (veh/h) 0.01 0.02 0.08 0.09

Intersection Summary

Maximum v/c High 0.08

Maximum v/c Low 0.09

Intersection Capacity Utilization 23.7% ICU Level of Service A

Page 52: Appendix “A” Concept Plan

HCM Unsignalized Intersection Capacity Analysis Forecast 2017

10: Villandry Street & Cresthaven Drive PM Peak Hour

25/02/2010 Synchro 6 Report

CastleGlenn Consultants Inc. Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 5 0 5 5 5 10 15 65 10 25 70 15

Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Hourly flow rate (vph) 5 0 5 5 5 10 15 65 10 25 70 15

Pedestrians 5 5 5 5

Lane Width (m) 3.6 3.6 3.6 3.6

Walking Speed (m/s) 1.2 1.2 1.2 1.2

Percent Blockage 0 0 0 0

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (m)

pX, platoon unblocked

vC, conflicting volume 250 242 88 242 245 80 90 80

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 250 242 88 242 245 80 90 80

tC, single (s) 7.3 6.7 6.4 7.3 6.7 6.4 4.3 4.3

tC, 2 stage (s)

tF (s) 3.7 4.2 3.5 3.7 4.2 3.5 2.4 2.4

p0 queue free % 99 100 99 99 99 99 99 98

cM capacity (veh/h) 637 610 921 651 608 930 1404 1417

Direction, Lane # EB 1 WB 1 NB 1 SB 1

Volume Total 10 20 90 110

Volume Left 5 5 15 25

Volume Right 5 10 10 15

cSH 753 750 1404 1417

Volume to Capacity 0.01 0.03 0.01 0.02

Queue Length 95th (m) 0.3 0.7 0.3 0.4

Control Delay (s) 9.8 9.9 1.3 1.8

Lane LOS A A A A

Approach Delay (s) 9.8 9.9 1.3 1.8

Approach LOS A A

Intersection Summary

Average Delay 2.7

Intersection Capacity Utilization 21.2% ICU Level of Service A

Analysis Period (min) 60

Page 53: Appendix “A” Concept Plan
Page 54: Appendix “A” Concept Plan

Proposed Residential Development – Cresthaven Drive Page – G-1 - Traffic Impact Assessment February, 2010

Appendix “G”

Strandherd Drive Extension Detailed Design

(City of Ottawa Website)

Page 55: Appendix “A” Concept Plan