Future LuToN: Making best use of our runway
Preliminary Environmental Information Report Volume 3: Appendices
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | October 2019
Appendix 3-1 Alternative Options Appraised
![Page 2: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/2.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
11 September 2019
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1
![Page 3: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/3.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019
Contents Page
1.1 Sift 1 1
1.2 Sift 2 2
1.3 Sift 3 3
1.4 Landform 4
1.5 Drainage 13
1.6 Fuel Farm 17
1.7 Fuel Farm 2.0 20
1.8 Car Park 22
1.9 Car Park Combination 13 23
1.10 Masterplan 24
1.11 Preferred option 34
![Page 4: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/4.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 1
1.1 Sift 1
![Page 5: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/5.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 2
1.2 Sift 2
![Page 6: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/6.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 3
1.3 Sift 3
![Page 7: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/7.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 4
1.4 Landform
Option 1 – Excavate ridgeline to the northeast of the existing airport up to Winch Hill Lane
![Page 8: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/8.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 5
Option 2 – Retain ridgeline to the northeast of the existing airport by excavating east up to Winch Hill Lane.
![Page 9: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/9.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 6
Option 3 – Retain ridgeline to Winch Hill by excavating both to the north and to the south of the ridgeline.
![Page 10: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/10.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 7
Option 4 – Retain land to the north east adjacent to Darley Road, remove material from west and east of Winch Hill Lane
![Page 11: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/11.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 8
Option 5
5a – Partial import of fill material into east
![Page 12: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/12.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 9
5b – Partial import of fill material into Winch Hill
![Page 13: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/13.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 10
Option 6
6a – Full import of fill material into east
![Page 14: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/14.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 11
6b – Full import of fill material into Winch Hill
![Page 15: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/15.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 12
Option 7 – Retain Wigmore Valley Park, excavate to the east of Winch Hill Lane.
![Page 16: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/16.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 13
1.5 Drainage
Surface water drainage strategy – Forced aeration lagoon option
![Page 17: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/17.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 14
Surface water drainage strategy – Waste water treatment plant option
![Page 18: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/18.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 15
Proposed surface water catchment areas
![Page 19: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/19.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 16
Proposed surface water catchment areas including existing terminal
![Page 20: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/20.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 17
1.6 Fuel Farm
Proposed fuel farm delivery options (Option A, B and C)
![Page 21: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/21.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 18
Proposed fuel farm storage options
![Page 22: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/22.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 19
Proposed fuel farm distribution options
![Page 23: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/23.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 20
1.7 Fuel Farm 2.0
Option 1: Optimal earthworks profile
Option 2: Current option
![Page 24: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/24.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 21
Option 3: Possible connection outside LLAL land boundary
![Page 25: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/25.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 22
1.8 Car Park
![Page 26: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/26.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 23
1.9 Car Park Combination 13
![Page 27: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/27.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 24
1.10 Masterplan
Western terminal
38mppa
![Page 28: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/28.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 25
32mppa
![Page 29: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/29.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 26
25mppa
![Page 30: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/30.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 27
Central terminal
38mppa
![Page 31: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/31.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 28
32mppa
![Page 32: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/32.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 29
25mppa
![Page 33: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/33.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 30
Eastern terminal
38mppa
![Page 34: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/34.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 31
![Page 35: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/35.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 32
32mppa
![Page 36: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/36.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 33
25mppa
![Page 37: Appendix 3-1 Alternative Options Appraised - FutureLuToN › wp-content › uploads › ... · Appendix 3-1 Alternative Options Appraised LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1](https://reader033.fdocuments.in/reader033/viewer/2022053012/5f0fdfbc7e708231d446505c/html5/thumbnails/37.jpg)
Luton Airport Expansion Project
Preliminary Environmental Information Report Volume 3: Appendices
Appendix 3-1 Alternative Options Appraised
LLADCO-3B-ARP-00-00-RP-YE-0007 | Issue 1 | 11 September 2019 Page 34
1.11 Preferred option