3.2 Services description
Scope of the service
3.2.1Contractor is committed to perform preventive and corrective maintenance visits to all Fiber Cable
Routes and SDH Sites , as listed in Appendix 6.2
3.2.2
Contractor is committed to accept all new SDH Sites or new Fiber Cable Routes assigned to him. For
avoidance of doubt, Contractor is committed to perform all Services, as specified in Appendix 2, to all
new SDH Sites or new Fiber Cable Routes assigned to Contractor.
3.2.3
Contractor shall perform Preventive Maintenance and Corrective Maintenance to the SDH Sites or
new Fiber Cable Routes in accordance with the activity matrix, as specified in Appendix 2. Preventive
Maintenance shall be performed on a regular basis according to the following frequencies: XXXX
3.2.4 Corrective Maintenance shall be performed upon the request of the Purchaser.
3.2.5
When Contractor is located in the SDH Site or working on any part of the Fiber Cable Route of the
Supplier, he shall interact with Purchaser's Field Services, if and when required, following remote
assistance instructions to solve failures.
Reporting and maintenance follow up
3.2.9Contractor shall, if requested by Purchaser, participate in weekly follow up meetings with Purchaser.
3.2.10
Contractor shall each month deliver a time schedule of the Preventive Maintenance for the upcoming
month, as specified in Appendix 4. The time schedule of the upcoming month shall be sent by
Contractor no later than the last working day of the month.
3.2.11
Contractor shall perform Preventive Maintenance to the SDH Sites and Fiber Cable Routes and
deliver a Maintenance Report for each visi t per SDH Site and each Hop of Fiber. The Maintenance
Reports shall be based on the template specified in Appendix 3.
3.2.12
In order to spread out the monthly Maintenance Reports over time, Contractor is committed to send at
least 25% of all appl icable monthly Maintenance Reports every week. 100% of all monthlyMaintenance Reports shall be sent by Contractor no later than the last working day of the month.
3.2.13
For each report, Contractor shall take a list of digital pictures as specified in Appendix 3. When
requested by the Supplier, Contractor shall include in the picture the newspaper of the day as a proof
of the date it has been taken.
3.2.14
For each visit on a SDH Site, Contractor shall keep and update the logbook on the SDH Site, where
every Contractors personnel working or visiting the SDH Site shall be properly registered.
3.2.15
When Maintenance Reports are delivered, the assigned supervisor shall review and approve the
reports. If the reports are not accepted, Contractor shall without undue delay, correct them.
3.2.16
When performing Corrective Maintenance or repairs, Contractor shall deliver a report of the task,
including pictures before and after the repairs, based on the template specified in Appendix 3. If
Purchaser does not approve the repairs, Contractor shall without undue delay, redo the repairswithout extra charge. Contractor is not allowed to charge repairs that have not been approved by
Purchaser.
3.2.17
Every month Purchaser reserves the right to perform random audits on 3 SDH Sites and 3 Hops of
Fiber Cable maintained during the month before, based on the Maintenance Reports. If the audit
shows that at least 2 SDH Sites out of 3 or 2 Fiber Cable Hops out of 3 are not coherent with the
report, Contractor shall, without undue delay, redo the maintenance visits of all SDH Sites and Fiber
Cable Routes of the past month without extra charge.
Equipment and spares
3.2.25Contractor shall provide his own equipment for measurement and maintenance to his teams including
at least those listed in Appendix 7.
3.2.26Contractor shall bear the cost for all low cost spares, like duct tape, bulbs, garbage bags, light
switches, electrical plugs, labels and non specialized fuses.
Services description and l
Item
-
7/27/2019 Appendix 2 - Statement of Compliance
2/6
3.2.27All corrective infrastructure maintenance, in which special ized materials are needed, will be paid
according to the pricelist in Appendix 8.
3.2.28
If the materials used are not contained in the pricelist, Contractor shall provide a quotation to
Purchaser before providing the materials. If Purchaser does not agree on the quotation, Purchaser
can provide the materials.
3.2.29
Contractor shall request Purchaser's written agreement before performing any repair that requires
more than 200 USD of spare materials, even if they are included in the pricelist specified in Appendix8.
3.3 Lead times
3.3.1
Contractor is committed to have regional maintenance centers in order to comply with the Lead
Times. The locations of these regional maintenance centers shall be approved by Purchaser in
writing.
3.3.2
In case of a failure reported by the Purchaser to the Contractor, Contractor shall reach the SDH Site
or Fiber Cable Hop affected and repair the failure according to the lead times defined in the contract.
3.3.3SDH Site and Fiber Cable Hops Priorities and associated lead times are fully detailed in Appendix 5.
-
7/27/2019 Appendix 2 - Statement of Compliance
3/6
Respondent's
Compliance
Respondent's Justification
(mandatory if not fully compliant)
ad times
-
7/27/2019 Appendix 2 - Statement of Compliance
4/6
-
7/27/2019 Appendix 2 - Statement of Compliance
5/6
# Preventive
Maintenance
Corrective
Maintenance
1 Fiber Cable Maintenance
1.1 Fiber Cable Route
1.1.1 Monthly visual inspection of cable layout of the whole network (12 times per year)
1.1.2 Cut and clear bushes, trees, branches less than 1 meter away from fiber cable and pole
1.1.3 Fix the installation of fiber cable too loose and less than 4 meter from the ground
1.1.4 Replace any broken support or hanger on the poles (compare with specifications)
1.1.5 Realign any concrete pole not vertically standing (coordinate with owner if necessary)
1.1.6 Replace a missing label on a road crossing (that informs about the cable height)
1.1.7 Replace fiber cable closure if there is any crack with risk to water infiltration
1.1.8 Inspect and fix the bend of the fiber cable on curve points (compare with specifications)
1.2 SDH Sites
1.2.1 Visit all SDH sites to clean dust1.2.2 Check Fan for Mini Shelter
1.2.3 Check any abnormal situation (water leak, stolen equipment, etc.)
1.3 Generator on SDH Sites1.3.1 Remove any equipment stored inside the generator house
1.3.2 Check around Generator if some oil leaking
1.3.3 Clean dust and grass inside the generator house
1.3.4 Check around External fuel Tank if some oi l leaking
1.3.5 Check external tank fuel level and refil l to the maximum if less than 75%
Task
Fiber Maintenance Activity
-
7/27/2019 Appendix 2 - Statement of Compliance
6/6
Respondent's
Compliance
Respondent's Justification
(mandatory if not fully compliant)
atrix