An Employer’s and Engineer’s Guide to the FIDIC Conditions of Contract, First Edition. Michael D. Robinson. © 2013 John Wiley & Sons, Ltd. Published 2013 by John Wiley & Sons, Ltd. Appendix D Appendix D Employer’s Claims under a CONS Contract Sub-Clause Title 4.18 Electricity, Water, Gas if stated in the Contract 4.19 Employer’s Equipment and Free-Issue Material 7.5 Rejection (Defective Plant and Material) 7.6 Remedial Work 8.6 Rate of Progress (Contractor adopts revised methods that cause Employer additional cost) 8.7 Delay Damages (Contractor fails to complete on time) 9.4 Failure to pass tests on completion (only if Employer incurs additional costs) 11.4 Failure to rectify defects (Contractor fails to rectify) 13.7 Adjustments for changes in Legislation (reductions in cost to be refunded by the Contractor to the Employer) 15.3 Valuation at Date of Termination (Contractor’s property valued by Employer on Termination) 15.4 Payment after Termination (Employer may claim losses and damage after Termination) 17.1 Indemnities (Employer claims for the cost of events for which he is to be indemnified by the Contractor) 18. 1 General Requirements for Insurances (Employer makes claim if Contractor fails to insure) 18. 2 Insurance of Works and Contractor’s Equipment (Employer can claim refund if Contractor is unable to insure in accordance with the Contract) Appendix D 153

description

claims

Transcript of app4

Page 1: app4

An Employer’s and Engineer’s Guide to the FIDIC Conditions of Contract, First Edition. Michael D. Robinson. © 2013 John Wiley & Sons, Ltd. Published 2013 by John Wiley & Sons, Ltd.

App

endi

x D

Appendix DEmployer’s Claims under a CONS Contract

Sub-Clause Title

4.18 Electricity, Water, Gas if stated in the Contract

4.19 Employer’s Equipment and Free-Issue Material

7.5 Rejection (Defective Plant and Material)

7.6 Remedial Work

8.6 Rate of Progress (Contractor adopts revised methods that cause Employer additional cost)

8.7 Delay Damages (Contractor fails to complete on time)

9.4 Failure to pass tests on completion (only if Employer incurs additional costs)

11.4 Failure to rectify defects (Contractor fails to rectify)

13.7 Adjustments for changes in Legislation (reductions in cost to be refunded by the Contractor to the Employer)

15.3 Valuation at Date of Termination (Contractor’s property valued by Employer on Termination)

15.4 Payment after Termination (Employer may claim losses and damage after Termination)

17.1 Indemnities (Employer claims for the cost of events for which he is to be indemnified by the Contractor)

18. 1 General Requirements for Insurances (Employer makes claim if Contractor fails to insure)

18. 2 Insurance of Works and Contractor’s Equipment (Employer can claim refund if Contractor is unable to insure in accordance with the Contract)