APN-59 10 of 10

download APN-59 10 of 10

of 39

description

Weather RADAR 10th part

Transcript of APN-59 10 of 10

  • 5/22/2018 APN-59 10 of 10

    1/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    1

  • 5/22/2018 APN-59 10 of 10

    2/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Checks

    After this lesson we will

    be able to understand

    To Connect eternalpower unit

    Complete Operation

    check of Search and

    Weather Radar.

    2

  • 5/22/2018 APN-59 10 of 10

    3/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Foreign Object Damage

    Preventable

    Non-Preventable ( hail, ice,

    animals, material failure)

    RADAR

    Search & Weather Radar Sys (APN-59) > FOD 10 of 10

    3

  • 5/22/2018 APN-59 10 of 10

    4/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    4

    Personnel Safety

    Safety harness

    should be worn when

    removing and

    installing antenna

    Search and weather Radar (APN-59) >Safety

    RADAR

    4

  • 5/22/2018 APN-59 10 of 10

    5/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    CAUTION

    Ensure that the DC

    power supply output

    does not exceed 115

    VAC and 27 VDC at any

    time as to ensure that

    the displays are notdamaged

    CAUTION

    Ensure system power isOFF before removal or

    installation of control

    panel. This will prevent

    component damage

    caused by voltagespikes

    5

  • 5/22/2018 APN-59 10 of 10

    6/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Discrepancy

    Stab switch U/S.

    Cause

    Sys Ops Checked On

    Ground Found Working

    Normal.

    Remedial Action

    Complete wiring checked all plugs

    security checked found sat. Entrysubjected to next pilot report.

    6

    Search & Weather Radar Sys (APN-59) > Defect 10 of 10

    WXR RADRA CONT PNL

    RADAR

  • 5/22/2018 APN-59 10 of 10

    7/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    You went to shop to purchase TV, how you will be satisfied that this TV is

    serviceable ?

    a After checking of all TV functions only

    b After checking of physical damage of TV only

    c After checking of physical damage and functions of TV

    d Believe on shopkeepers statement

    Q & A

    7

  • 5/22/2018 APN-59 10 of 10

    8/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Checks

    Visual operational

    check procedure

    Connect eternal power

    unit

    8

  • 5/22/2018 APN-59 10 of 10

    9/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operationalcheck procedurePre procedure warning

    Before starting theAN/APN-59 Transmitter,ensure that

    Hazard warning signsare posted 40 feetfrom nose radome

    In 40 feet area

    No personnel grouping

    Powered AGE removed

    9

    Checks

  • 5/22/2018 APN-59 10 of 10

    10/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operationalcheck procedure

    Pre procedure warning

    Before starting theAN/APN-59 Transmitter,ensure that

    External powerposition

    Upwind from the A/C fuelvent sys

    Distance 50 feet fromA/C

    10

    Checks

  • 5/22/2018 APN-59 10 of 10

    11/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operationalcheck procedure

    Pre procedure warning

    Before starting theAN/APN-59 Transmitter,ensure that

    Dont point the

    energy beam toward

    inhibited structures

    or other personnel

    grouping

    11

    Checks

  • 5/22/2018 APN-59 10 of 10

    12/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operational

    check procedure

    Initial Control Position

    On C-1242 / AN/APN-59

    RANGE Knob on 3-30/1

    FUNCTION Switch on

    OFF

    TEST Meter Knob on

    LINE

    SCAN OFF

    HDG SEL on Zero

    GAIN Fully CCW

    12

    Checks

  • 5/22/2018 APN-59 10 of 10

    13/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operationalcheck procedureInitial Control Position

    On C-1242 / AN/APN-59

    TILT Zero

    STC CCW

    STAB OFF

    FTC OFF

    IAGC OFF

    PATT on FAN

    BEARING STAB onREL

    13

    Checks

  • 5/22/2018 APN-59 10 of 10

    14/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operational

    check procedure

    Time delay check

    Function switch on

    STDBY

    Allow 3 to 5 minutes

    warm up time

    14

    Checks

  • 5/22/2018 APN-59 10 of 10

    15/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operational

    check procedure

    Time delay check

    On test meter

    Indication 0.6 0.2

    mill ampere and

    steady

    15

    Checks

  • 5/22/2018 APN-59 10 of 10

    16/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operational

    check procedure

    Time delay check

    Note

    Make sure HD 150

    vaneaxial fans areoperating properly

    16

    Checks

  • 5/22/2018 APN-59 10 of 10

    17/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operational

    check procedure

    Magnetron current

    check

    Function switch on

    SEARCH

    Test meter switch to

    MAG

    Select each range one

    by one and observe

    Indication between

    0.4 and 0.8 mill

    ampere and steady

    17

    Checks

  • 5/22/2018 APN-59 10 of 10

    18/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operational

    check procedure

    Mixer and AFC current

    check

    RANGE switch on 3-

    30/5

    TEST METER switch to

    MIXER 1 and 2 and AFC

    1 and 2 one by one

    Indication between 0.4

    and 0.8 mill ampere

    Reading must balance

    within 0.2 mill ampere

    of each other

    18

    Checks

  • 5/22/2018 APN-59 10 of 10

    19/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operational

    check procedure

    Preliminary Indicator

    check

    RANGE switch on 3-30/1

    Adjust INST control onboth indicators CW untilsweep just appear

    Adjust RANGE MKScontrol CW until range

    marks just appear

    19

    Checks

  • 5/22/2018 APN-59 10 of 10

    20/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operational

    check procedure

    Preliminary Indicator

    check

    Observe on indicators

    Trace appear

    2 to 3 range marker

    3-30/1 lamp ON

    20

    Checks

  • 5/22/2018 APN-59 10 of 10

    21/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operational

    check procedure

    range Marks and Range

    Lamps checkOn C/UnitSelect different ranges

    On indicators330 control CCW

    Observe on indicator

    RANGE # of range

    marks

    3-30/1 2 or 3

    3-30/5 None

    50/10 4 or 5

    100/20 5 or 6

    240/30 8 or 921

    Checks

  • 5/22/2018 APN-59 10 of 10

    22/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operational

    check procedure

    range Marks and Range

    Lamps checkOn C/UnitRange SW on330 /1

    On indicators330 control CW

    Observe on indicator

    o Minimum 25 rangemarks

    NoteIf strobing is encountered,

    rotate range 3-30 controlCCW turn

    22

    Checks

  • 5/22/2018 APN-59 10 of 10

    23/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operational

    check procedure

    Sweep Delay Circuits

    check

    On C/Unit

    SCAN on PPI

    On indicators

    Sweep rotate CW 457

    Rotate RANGE DELAY

    Control slowly in CW andobserve

    Variable range mark ringshould appear as anexpanding circle

    23

    Checks

  • 5/22/2018 APN-59 10 of 10

    24/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operational

    check procedure

    Sweep Delay Circuits

    check

    On indicator

    RANGE DELAY SW ON

    Rotate RANGE DELAYControl fully CCW

    3-30 control fully CWand observe

    o 3-30 lamp and TDlamp illuminate

    24

    Checks

  • 5/22/2018 APN-59 10 of 10

    25/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operational

    check procedure

    Focus controls check

    On indicator

    Adjust FOCUS control toobtain sharp trace

    25

    Checks

  • 5/22/2018 APN-59 10 of 10

    26/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operational

    check procedure

    Sweep rotation check

    On C/Unit

    Bearing SW on REL

    On indicator

    On Main Instrumentpanel indicator S-R SWto R position

    Sweep rotate CWdirection (RPM 45 7)on both indicators

    26

    Checks

  • 5/22/2018 APN-59 10 of 10

    27/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operational

    check procedure

    Sweep rotation check

    On indicator

    On Main Instrument

    panel indicator S-R SWto S position

    Sweep rotate CWdirection (RPM 45 7)on both indicators

    27

    Checks

  • 5/22/2018 APN-59 10 of 10

    28/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operational

    check procedure

    Sweep rotation check

    On C/Unit

    Bearing SW on STAB

    On indicator

    Sweep rotate CWdirection (RPM 45 7)on both indicators

    28

    Checks

  • 5/22/2018 APN-59 10 of 10

    29/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operational

    check procedure

    Heading marker check

    On C/Unit

    Bearing SW on REL

    On indicator

    Heading marker controlfully CCW and observe

    Bright heading marker

    appear at 0 2on bothindicators

    29

    Checks

  • 5/22/2018 APN-59 10 of 10

    30/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Visual operational

    check procedure

    Gain Control circuit

    check

    On C/Unit

    Rotate gain control CWand observe

    On indicator

    Noise level increases

    30

    Checks

  • 5/22/2018 APN-59 10 of 10

    31/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    31

    Personnel Safety

    Safety harness

    should be worn when

    removing and

    installing antenna

    Search and weather Radar (APN-59) >Safety

    RADAR

    31

    f

  • 5/22/2018 APN-59 10 of 10

    32/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    CAUTION

    Ensure that the DC

    power supply outputdoes not exceed 115

    VAC and 27 VDC at any

    time as to ensure that

    the displays are not

    damaged

    CAUTION

    Ensure system power is

    OFF before removal or

    installation of controlpanel. This will prevent

    component damage

    caused by voltage

    spikes

    32

    10 f 10

  • 5/22/2018 APN-59 10 of 10

    33/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    SUMMARY

    To Connect eternal power unit to Aircraft Complete Operation check of

    Search and Weather Radar (APN-59).

    Search and weather Radar (APN-59) > 10 of 10

    RADAR

    33

    10 f 10

  • 5/22/2018 APN-59 10 of 10

    34/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Q & A

    34

    10 f 10

  • 5/22/2018 APN-59 10 of 10

    35/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    Q. SCAN switch On PPI and mode switch on WRN, Antenna RPM will be

    a 45 7

    b 10 to 15

    c Depend on target range

    d Depend on target mode

    35

    Q & A

    10 f 10

  • 5/22/2018 APN-59 10 of 10

    36/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    If radar range is 3-30/5 is selected on control panel and 3-30 control on IP-239

    indicator is fully CCW, how many range marks appear on indicator ?

    a 2 or 3

    b None

    c 4 or 5

    d 5 or 6

    36

    Q & A

    10 of 10

  • 5/22/2018 APN-59 10 of 10

    37/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    AN/APN-59 radar system S/R function is active on ?

    a IP-239 indicator installed on main instrument panel

    b IP-268 indicator installed on main instrument panel

    c IP-239 indicator installed on Navigator station

    d IP-268 indicator installed on Navigator station

    37

    Q & A

    10 of 10

  • 5/22/2018 APN-59 10 of 10

    38/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    In AN/APN-59 radar system HDG SEL knob is effective when?

    a STAB switch is on STAB position

    b BEARING STAB switch is on REL position

    c BEARING STAB switch is on STAB position

    d STAB switch is in down position

    38

    Q & A

    10 of 10

  • 5/22/2018 APN-59 10 of 10

    39/39

    RADAR

    Search and Weather Radar (AN/APN-59) >

    10 of 10

    39

    End