RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
1
-
5/22/2018 APN-59 10 of 10
2/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Checks
After this lesson we will
be able to understand
To Connect eternalpower unit
Complete Operation
check of Search and
Weather Radar.
2
-
5/22/2018 APN-59 10 of 10
3/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Foreign Object Damage
Preventable
Non-Preventable ( hail, ice,
animals, material failure)
RADAR
Search & Weather Radar Sys (APN-59) > FOD 10 of 10
3
-
5/22/2018 APN-59 10 of 10
4/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
4
Personnel Safety
Safety harness
should be worn when
removing and
installing antenna
Search and weather Radar (APN-59) >Safety
RADAR
4
-
5/22/2018 APN-59 10 of 10
5/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
CAUTION
Ensure that the DC
power supply output
does not exceed 115
VAC and 27 VDC at any
time as to ensure that
the displays are notdamaged
CAUTION
Ensure system power isOFF before removal or
installation of control
panel. This will prevent
component damage
caused by voltagespikes
5
-
5/22/2018 APN-59 10 of 10
6/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Discrepancy
Stab switch U/S.
Cause
Sys Ops Checked On
Ground Found Working
Normal.
Remedial Action
Complete wiring checked all plugs
security checked found sat. Entrysubjected to next pilot report.
6
Search & Weather Radar Sys (APN-59) > Defect 10 of 10
WXR RADRA CONT PNL
RADAR
-
5/22/2018 APN-59 10 of 10
7/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
You went to shop to purchase TV, how you will be satisfied that this TV is
serviceable ?
a After checking of all TV functions only
b After checking of physical damage of TV only
c After checking of physical damage and functions of TV
d Believe on shopkeepers statement
Q & A
7
-
5/22/2018 APN-59 10 of 10
8/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Checks
Visual operational
check procedure
Connect eternal power
unit
8
-
5/22/2018 APN-59 10 of 10
9/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operationalcheck procedurePre procedure warning
Before starting theAN/APN-59 Transmitter,ensure that
Hazard warning signsare posted 40 feetfrom nose radome
In 40 feet area
No personnel grouping
Powered AGE removed
9
Checks
-
5/22/2018 APN-59 10 of 10
10/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operationalcheck procedure
Pre procedure warning
Before starting theAN/APN-59 Transmitter,ensure that
External powerposition
Upwind from the A/C fuelvent sys
Distance 50 feet fromA/C
10
Checks
-
5/22/2018 APN-59 10 of 10
11/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operationalcheck procedure
Pre procedure warning
Before starting theAN/APN-59 Transmitter,ensure that
Dont point the
energy beam toward
inhibited structures
or other personnel
grouping
11
Checks
-
5/22/2018 APN-59 10 of 10
12/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operational
check procedure
Initial Control Position
On C-1242 / AN/APN-59
RANGE Knob on 3-30/1
FUNCTION Switch on
OFF
TEST Meter Knob on
LINE
SCAN OFF
HDG SEL on Zero
GAIN Fully CCW
12
Checks
-
5/22/2018 APN-59 10 of 10
13/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operationalcheck procedureInitial Control Position
On C-1242 / AN/APN-59
TILT Zero
STC CCW
STAB OFF
FTC OFF
IAGC OFF
PATT on FAN
BEARING STAB onREL
13
Checks
-
5/22/2018 APN-59 10 of 10
14/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operational
check procedure
Time delay check
Function switch on
STDBY
Allow 3 to 5 minutes
warm up time
14
Checks
-
5/22/2018 APN-59 10 of 10
15/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operational
check procedure
Time delay check
On test meter
Indication 0.6 0.2
mill ampere and
steady
15
Checks
-
5/22/2018 APN-59 10 of 10
16/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operational
check procedure
Time delay check
Note
Make sure HD 150
vaneaxial fans areoperating properly
16
Checks
-
5/22/2018 APN-59 10 of 10
17/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operational
check procedure
Magnetron current
check
Function switch on
SEARCH
Test meter switch to
MAG
Select each range one
by one and observe
Indication between
0.4 and 0.8 mill
ampere and steady
17
Checks
-
5/22/2018 APN-59 10 of 10
18/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operational
check procedure
Mixer and AFC current
check
RANGE switch on 3-
30/5
TEST METER switch to
MIXER 1 and 2 and AFC
1 and 2 one by one
Indication between 0.4
and 0.8 mill ampere
Reading must balance
within 0.2 mill ampere
of each other
18
Checks
-
5/22/2018 APN-59 10 of 10
19/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operational
check procedure
Preliminary Indicator
check
RANGE switch on 3-30/1
Adjust INST control onboth indicators CW untilsweep just appear
Adjust RANGE MKScontrol CW until range
marks just appear
19
Checks
-
5/22/2018 APN-59 10 of 10
20/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operational
check procedure
Preliminary Indicator
check
Observe on indicators
Trace appear
2 to 3 range marker
3-30/1 lamp ON
20
Checks
-
5/22/2018 APN-59 10 of 10
21/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operational
check procedure
range Marks and Range
Lamps checkOn C/UnitSelect different ranges
On indicators330 control CCW
Observe on indicator
RANGE # of range
marks
3-30/1 2 or 3
3-30/5 None
50/10 4 or 5
100/20 5 or 6
240/30 8 or 921
Checks
-
5/22/2018 APN-59 10 of 10
22/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operational
check procedure
range Marks and Range
Lamps checkOn C/UnitRange SW on330 /1
On indicators330 control CW
Observe on indicator
o Minimum 25 rangemarks
NoteIf strobing is encountered,
rotate range 3-30 controlCCW turn
22
Checks
-
5/22/2018 APN-59 10 of 10
23/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operational
check procedure
Sweep Delay Circuits
check
On C/Unit
SCAN on PPI
On indicators
Sweep rotate CW 457
Rotate RANGE DELAY
Control slowly in CW andobserve
Variable range mark ringshould appear as anexpanding circle
23
Checks
-
5/22/2018 APN-59 10 of 10
24/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operational
check procedure
Sweep Delay Circuits
check
On indicator
RANGE DELAY SW ON
Rotate RANGE DELAYControl fully CCW
3-30 control fully CWand observe
o 3-30 lamp and TDlamp illuminate
24
Checks
-
5/22/2018 APN-59 10 of 10
25/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operational
check procedure
Focus controls check
On indicator
Adjust FOCUS control toobtain sharp trace
25
Checks
-
5/22/2018 APN-59 10 of 10
26/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operational
check procedure
Sweep rotation check
On C/Unit
Bearing SW on REL
On indicator
On Main Instrumentpanel indicator S-R SWto R position
Sweep rotate CWdirection (RPM 45 7)on both indicators
26
Checks
-
5/22/2018 APN-59 10 of 10
27/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operational
check procedure
Sweep rotation check
On indicator
On Main Instrument
panel indicator S-R SWto S position
Sweep rotate CWdirection (RPM 45 7)on both indicators
27
Checks
-
5/22/2018 APN-59 10 of 10
28/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operational
check procedure
Sweep rotation check
On C/Unit
Bearing SW on STAB
On indicator
Sweep rotate CWdirection (RPM 45 7)on both indicators
28
Checks
-
5/22/2018 APN-59 10 of 10
29/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operational
check procedure
Heading marker check
On C/Unit
Bearing SW on REL
On indicator
Heading marker controlfully CCW and observe
Bright heading marker
appear at 0 2on bothindicators
29
Checks
-
5/22/2018 APN-59 10 of 10
30/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Visual operational
check procedure
Gain Control circuit
check
On C/Unit
Rotate gain control CWand observe
On indicator
Noise level increases
30
Checks
-
5/22/2018 APN-59 10 of 10
31/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
31
Personnel Safety
Safety harness
should be worn when
removing and
installing antenna
Search and weather Radar (APN-59) >Safety
RADAR
31
f
-
5/22/2018 APN-59 10 of 10
32/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
CAUTION
Ensure that the DC
power supply outputdoes not exceed 115
VAC and 27 VDC at any
time as to ensure that
the displays are not
damaged
CAUTION
Ensure system power is
OFF before removal or
installation of controlpanel. This will prevent
component damage
caused by voltage
spikes
32
10 f 10
-
5/22/2018 APN-59 10 of 10
33/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
SUMMARY
To Connect eternal power unit to Aircraft Complete Operation check of
Search and Weather Radar (APN-59).
Search and weather Radar (APN-59) > 10 of 10
RADAR
33
10 f 10
-
5/22/2018 APN-59 10 of 10
34/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Q & A
34
10 f 10
-
5/22/2018 APN-59 10 of 10
35/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
Q. SCAN switch On PPI and mode switch on WRN, Antenna RPM will be
a 45 7
b 10 to 15
c Depend on target range
d Depend on target mode
35
Q & A
10 f 10
-
5/22/2018 APN-59 10 of 10
36/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
If radar range is 3-30/5 is selected on control panel and 3-30 control on IP-239
indicator is fully CCW, how many range marks appear on indicator ?
a 2 or 3
b None
c 4 or 5
d 5 or 6
36
Q & A
10 of 10
-
5/22/2018 APN-59 10 of 10
37/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
AN/APN-59 radar system S/R function is active on ?
a IP-239 indicator installed on main instrument panel
b IP-268 indicator installed on main instrument panel
c IP-239 indicator installed on Navigator station
d IP-268 indicator installed on Navigator station
37
Q & A
10 of 10
-
5/22/2018 APN-59 10 of 10
38/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
In AN/APN-59 radar system HDG SEL knob is effective when?
a STAB switch is on STAB position
b BEARING STAB switch is on REL position
c BEARING STAB switch is on STAB position
d STAB switch is in down position
38
Q & A
10 of 10
-
5/22/2018 APN-59 10 of 10
39/39
RADAR
Search and Weather Radar (AN/APN-59) >
10 of 10
39
End