Annexure- Certified Monitoring Report. The Existing Unit establish before 2006 hence, EC is not applicable. CC&A and Amendment in Existing CC&A is attached herewith as Annexure 1(a) & Its Compliance is attached herewith as Annexure 1(b) and consent to establishment before 2006 is attached herewith as Annexure1(c)

Transcript of Annexure- Certified Monitoring...

Page 1: Annexure- Certified Monitoring Report.environmentclearance.nic.in/writereaddata/online/MinistryEAC/0906… · Annexure- Certified Monitoring Report. The Existing Unit establish before

Annexure- Certified Monitoring Report.

The Existing Unit establish before 2006 hence, EC is not applicable. CC&A and Amendment in

Existing CC&A is attached herewith as Annexure 1(a) & Its Compliance is attached herewith as

Annexure 1(b) and consent to establishment before 2006 is attached herewith as Annexure1(c)

Page 2: Annexure- Certified Monitoring Report.environmentclearance.nic.in/writereaddata/online/MinistryEAC/0906… · Annexure- Certified Monitoring Report. The Existing Unit establish before

Annexure 1(a): Existing Consolidated Consent and Authorization (CC&A)

Page 3: Annexure- Certified Monitoring Report.environmentclearance.nic.in/writereaddata/online/MinistryEAC/0906… · Annexure- Certified Monitoring Report. The Existing Unit establish before
Page 4: Annexure- Certified Monitoring Report.environmentclearance.nic.in/writereaddata/online/MinistryEAC/0906… · Annexure- Certified Monitoring Report. The Existing Unit establish before
Page 5: Annexure- Certified Monitoring Report.environmentclearance.nic.in/writereaddata/online/MinistryEAC/0906… · Annexure- Certified Monitoring Report. The Existing Unit establish before
Page 6: Annexure- Certified Monitoring Report.environmentclearance.nic.in/writereaddata/online/MinistryEAC/0906… · Annexure- Certified Monitoring Report. The Existing Unit establish before

Amendment in Existing Consolidated Consent and Authorization (CC&A)

Page 7: Annexure- Certified Monitoring Report.environmentclearance.nic.in/writereaddata/online/MinistryEAC/0906… · Annexure- Certified Monitoring Report. The Existing Unit establish before
Page 8: Annexure- Certified Monitoring Report.environmentclearance.nic.in/writereaddata/online/MinistryEAC/0906… · Annexure- Certified Monitoring Report. The Existing Unit establish before

Renewal application for Consolidated Consent and Authorization (CC&A)

Page 9: Annexure- Certified Monitoring Report.environmentclearance.nic.in/writereaddata/online/MinistryEAC/0906… · Annexure- Certified Monitoring Report. The Existing Unit establish before

Annexure 1(b): Point Wise Compliance Report of existing (CC&A)

Consent Order No. AWH-35884

Amendment of Consolidated Consents & Authorization letter No. PC/CCA-VSD-607/ID-

11476/40885 Dated 8/01/2010

Sr. No.

CONDITIONS COMPLIANCE

1. Consent Order No. AWH-35884, Date of issue: 21/10/2009 Noted

2.

The consents shall be valid up to 20/10/2014 for use of outlet for the discharge of trade effluent & emission due to operation of industrial plant for manufacture of the following items/ products:

S. No.

Name of Products Quantity in MT / Month

Existing Quantity*

Proposed Quantity

Total

1. Alphapipenene, 4,3 careen& pine oil

99.00 - 99

2. Pine Tar 1.00 - 1

3. Ortho Bromo Toluene 25.00 - 25

4. Para Bromo Toluene 30.00 - 30

We are manufacturing only those items with specified quantity as mentioned in CC&A

3. CONDITIONS UNDER THE WATER ACT:

3.1 The quantity of the trade effluent from the industry shall not exceed 500 lits/day.

The total quantity of industrial effluent generated from manufacturing process and other ancillary industrial operations is not exceedingfrom500 lit/day.

3.2

The quantity of domestic effluent shall not exceed 1200 lit/day.

The quantity of domestic waste water (Sewage) is not exceeded from 1200 lit/day.

3.3 TRADE EFFLUENT

Page 10: Annexure- Certified Monitoring Report.environmentclearance.nic.in/writereaddata/online/MinistryEAC/0906… · Annexure- Certified Monitoring Report. The Existing Unit establish before

3.3.1 The applicant shall provide adequate effluent treatment system in order to achieve the quantity of the treated effluent as per GPCB norms in column No.2

Parameters GPCB Norms

pH 6.5 to 8.5

Temperature 40oC

Color (pt.co.scale) in units 100 units

Suspended Solids 100 mg/l

Oil & Grease 10 mg/l

Phenolic Compounds 1 mg/l

Cynides 0.2 mg/l

Ammonical Nitrogen 50 mg/l

Arsenic 0.2 mg/l

Total Chromium 2 mg/l

Hexavelent Chromium 0.1 mg/l

Copper 3 mg/l

Lead 0.1 mg/l

Mercury 0.01 mg/l

Nickel 3 mg/l

Zinc 5 mg/l

Cadmium 2 mg/l

Iron 3 mg/l

BOD (5 days at 20oC) 30 mg/l

COD 100 mg/l Chlorides 600 mg/l

Sulphates 1000 mg/l Fluorides 1.5 mg/l

Total Dissolved Solids 2100 mg/l

Insecticide/Pesticide Absent

Sodium Absorption Ratio 26

Bio-Assay Test 90% survival of fish after 96 hours in 100 % effluent

All efforts shall be made to remove colour& unpleasant odour as far as practicable.

After adequate treatment in ETP, the company is discharging the treated effluent through underground drainage system after confirming the inlet norms.

3.3.2 The final treated effluent confirming to the above standards shall be discharged into GIDC underground drainage system & shall ultimately be conveyed into Arabian sea through diffuse system.

Complied with.

3.3.3 Domestic effluent shall be disposed off through septic tank/soak pit system.

Complied with.

4. CONDITIONS UNDER THE AIR ACT:

4.1

The following shall be used as fuel in the Boiler.

Sr. No.

Fuel Quantity

1 LDO 200 Lit/Hour

2 Coal 1 MT/Day

We are using Coal @1 MT/day in thermic fluid heater.

4.2 The applicant shall install & operate air pollution control order to achieve norms prescribed below

We have provided adequate chimney height to thermic fluid heater Also,

Page 11: Annexure- Certified Monitoring Report.environmentclearance.nic.in/writereaddata/online/MinistryEAC/0906… · Annexure- Certified Monitoring Report. The Existing Unit establish before

we have installed multicyclone dust collector & bag filter as APCD to thermic fluid heater.

4.3 The flue gas emission through stack shall conform to the following standards:

Stack No.

Stack attached to

Stack height in Meter

Air pollution control devices

Parameter

Permissible Limit

1. Non IBR Boiler

11 ----- PM SO2

NOx

150 mg/NM3

100 ppm 50 ppm

2. Thermo pack 10 Lac

30 Multicyclone dust collector.

PM SO2

NOx

150 mg/NM3

100 ppm 50 ppm

The flue gas emissions are maintained well below permissible limits.

4.4

There shall be no any process emission & any other ancillary industrial process.

Complied with.

4.5

The concentration of the following substances in the ambient air within the premises of the industry and at a distance of 10 meters from the source (other than the stack/vent with height of more than 9 meters from the ground level) shall not exceed the following levels:

PARAMETERS PERMISSIBLE LIMIT

Oxides of sulphur 120 Microgram/M3

Oxides of Nitrogen 120 Microgram/M3

RSPM 150 Microgram/M3

Complied with.

4.6 The applicant shall provide portholes, ladder, platform etc at chimney(s) for monitoring the air emissions and the same shall be open for inspection to/and for use of Board’s staff. The chimney(s) vents attached to various sources of emission shall be designed by numbers such as S-1, S-2, etc. and these shall be painted/ displayed to facilitate identification.

Complied with

4.7

The industry shall take adequate measures for control of noise levels from its own sources within the premises so as to maintain ambient air quality standards in respect of noise to less than 75 dB(a) during day time and 70 dB(a) during night time. Day time is reckoned in between 6 a.m. and 10 p.m. and nighttime is reckoned between 10 p.m. and 6 a.m.

We have taken adequate measures for control of noise levels from its own sources within the premises so as to maintain the air quality standards in respect of noise to less than 75dB(a) during day time and 70 dB(A) during night time. Noise control devices such as anti-vibration pads and flexible bellows and flexible hose connections are provided wherever

Page 12: Annexure- Certified Monitoring Report.environmentclearance.nic.in/writereaddata/online/MinistryEAC/0906… · Annexure- Certified Monitoring Report. The Existing Unit establish before

applicable

5. GENERAL CONDITIONS:

5.1 Any change in personnel, equipment or working conditions as mentioned in the consents form/order should immediately be intimated to this Board.

We shall immediately intimate about any change in personnel, equipment or working conditions to the board.

5.2 Applicant shall also comply with the general conditions given in annexure I.

Weare also complying with the general conditions laid down by the board.

6. AUTHORIZATION FOR THE MANAGEMENT OF HAZARDOUS WASTES Form-2 (See rule 3 I & 5 (5)

From for grant of authorization for occupier or operator handling hazardous waste.

6.1 Number of Authorization: AWH-35884 Date if issue: 23/12/2009. M/s. Sun Industriesis hereby granted an authorization to operate facility for following hazardous wastes on the premises situated at plot No. 1212, GIDC Estate, Sarigam-396 155, Dist. Valsad.

Sr. No.

Type of Waste

Quantity Schedule Facility

1.

ETP Sludge from waste water treatment

0.06 MT/Year

34.3 Collection Storage, Transportation and Disposal at TSDF Site.

2. Used Oil 25 Kg/Year

5.1 Collection Storage, Transportation and Disposal by selling registered recyclers.

3. Discarded Containers/Barrels/ Liners

120 Nos/ Yr

33.3 Collection Storage, Disposal by sold out to Decontamination facility or send back to suppliers.

The hazardous wastes generated from the existing activities are stored in a designated storage area safely and properly.

We are regularly disposing its ETP Waste at TSDF site developed by the VWEMCL, Vapi& is selling its used oil & discarded containers to registered re-processors.

6.2 The authorization is granted to operate a facility for collection, storage within factory premises transportation and ultimate disposal of Hazardous wastes as TSDF developed by the Vapi Waste & Effluent Management Co. Ltd. – Vapi.

The company is regularly disposing its ETP Waste at TSDF site developed by the VWEMCL, Vapi& is selling its used oil & discarded containers to registered re-processors.

6.3 The authorization shall be valid upto20/10/2014 Noted

6.4 The authorization is subject to the conditions stated below and such other conditions as may be specified in the rules from time to time under the Environment (Protection) Act-1986.

The company is subject to the conditions specified in the rules from time to time under the Environment (protection) Act-1986.

Page 13: Annexure- Certified Monitoring Report.environmentclearance.nic.in/writereaddata/online/MinistryEAC/0906… · Annexure- Certified Monitoring Report. The Existing Unit establish before

6.5 TERMS AND CONDITIONS OF AUTHORIZATION:

a) The applicant shall comply with the provisions of the Environment (Protection) Act-1986 and the rules made there under.

We do comply with the provisions of the Environment (Protection) Act-1986 and rules made there under.

b) The authorization shall be produced for inspection at the request of an officer authorized by the GPCB

We shall produce for inspection at the request of an officer authorized by the GPCB.

c) The persons authorized shall not rent, lend, sell, transfer of otherwise transport the hazardous wastes without obtaining prior permission of the GPCB

We shall not rent, lend, sell and transfer of otherwise transport the hazardous waste without obtaining prior permission of the GPCB.

d) Any unauthorized change in personnel, equipment or working conditions as mentioned in the authorization order by the persons authorized shall constitute a breach of this authorization. .

We will not make any authorized change in personnel, equipment or working conditions as mentioned in the authorized order.

e) It is the duty of the authorized person to take prior permission of the GPCB to close down the facility

We will seek permission of the GPCB to close down the facility.

f) An application for the renewal of an authorization shall be made as laid down in rule 5(6)(ii)

We will renew the authorization as laid down in rule 5(6) (ii).

g) Industry shall submit annual report within 15days and subsequent by 30th June every year.

We shall submit the annual report regular.

6.6 In addition to above terms and conditions Industry shall also comply following directives issued by the Supreme Court of India dated. 14.10.2003

a) Industry shall have to display the relevant information with regard to hazardous waste as indicated in the Court’s order in W.P. No. 657 of 1995 dated 14th October 2003.

We have displayed the relevant information as indicated in the Court’s order.

b) Industry shall have to display online data outside the main factory gate with regard to quantity and nature of Hazardous chemicals being handled in the plant, including wastewater and air emissions and solid hazardous wastes generated within the factory premises.

We have displayed online data outside the main gate with quantity and nature of Haz. Chemicals, wastewater, emission and solid waste details generated in the factory. Photographs of Display board at main gate is attached here with.

Page 14: Annexure- Certified Monitoring Report.environmentclearance.nic.in/writereaddata/online/MinistryEAC/0906… · Annexure- Certified Monitoring Report. The Existing Unit establish before

Display Board on Main Gate

Page 15: Annexure- Certified Monitoring Report.environmentclearance.nic.in/writereaddata/online/MinistryEAC/0906… · Annexure- Certified Monitoring Report. The Existing Unit establish before

Annexure 1(c): Consent to establishment before 2006

Page 16: Annexure- Certified Monitoring Report.environmentclearance.nic.in/writereaddata/online/MinistryEAC/0906… · Annexure- Certified Monitoring Report. The Existing Unit establish before
Page 17: Annexure- Certified Monitoring Report.environmentclearance.nic.in/writereaddata/online/MinistryEAC/0906… · Annexure- Certified Monitoring Report. The Existing Unit establish before
Page 18: Annexure- Certified Monitoring Report.environmentclearance.nic.in/writereaddata/online/MinistryEAC/0906… · Annexure- Certified Monitoring Report. The Existing Unit establish before
Page 19: Annexure- Certified Monitoring Report.environmentclearance.nic.in/writereaddata/online/MinistryEAC/0906… · Annexure- Certified Monitoring Report. The Existing Unit establish before
Page 20: Annexure- Certified Monitoring Report.environmentclearance.nic.in/writereaddata/online/MinistryEAC/0906… · Annexure- Certified Monitoring Report. The Existing Unit establish before