André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of...
-
Upload
jordan-poole -
Category
Documents
-
view
216 -
download
2
Transcript of André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of...
![Page 1: André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649efc5503460f94c1048d/html5/thumbnails/1.jpg)
ALICE Technical Board
André Augustinus26 October 2004
DCS for ‘services’
costs
On behalf of Lennart Jirdén
![Page 2: André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649efc5503460f94c1048d/html5/thumbnails/2.jpg)
26 October 2004ALICE Technical BoardAndré Augustinus
LAN
WAN
Storage
Configuration DB,ArchivesFSM serversTerminal servers,ACR consoles, etc
Experimental equipment
Controller/PLC VME
Field Bus
LAN
Node Node
coolin
g
gas
Magnets
Rack
contr
ol
Ele
ctri
city
Safe
ty:
DSS
Safe
ty:
CSA
M
Infr
ast
ruct
ure
Services
Central DCS
Detectors
250K(racks, computers, network, cabling)
Total 1511K
Detailed costing per detector being prepared by Lennart.
(for a next TB)
Note: gas and cooling controls included in the overall costs of gas and cooling
Presented by Lennart
in September T
B
![Page 3: André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649efc5503460f94c1048d/html5/thumbnails/3.jpg)
26 October 2004ALICE Technical BoardAndré Augustinus
Magnets
Rack control
Power distribution control
Safety: DSS
Safety: CSAM (LHC safety)
Experimental Environment
Services 664
185
200
152
70
20
Safety: Sniffer 200
Cost of services (detail)
L3 300 K
Dipole
364 K
Hardware (PLC etc.)
80 K
Sensors 2 K
Cabling 70 KSensors only; restcovered by LHC
50% by LHC50% ALICE
B-field, temperature, alignment etc. (only connection to DCS, not the sensors)
Nex
t sl
ide
Area monitoring+smoke det. Smoke detection covered by LHC;rest (20K) by TS/LEA
Total 1511K
20
![Page 4: André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649efc5503460f94c1048d/html5/thumbnails/4.jpg)
26 October 2004ALICE Technical BoardAndré Augustinus
“Hazemeyer”
Racks
PLC
PC
LAN
T T T T T T T T
S S S S S S S S
LAN
CANbus
Rack control
Power distribution control
185
200
“interlock”
“PLC”
Services
Cost of services (detail)[Power distribution & racks]
Hardware
116 K
Software 22 K
Cabling 62 K
Rack monitoring
90 K
cabling 15 K
Smoke detection
80 K
Rack Mon.
Smoke detection
![Page 5: André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649efc5503460f94c1048d/html5/thumbnails/5.jpg)
26 October 2004ALICE Technical BoardAndré Augustinus
OverviewSystem Detail Cost Budget
Magnets L3 300 KCommon fund
Dipole 364 K
Rack Control Rack monitoring 90 K
Common fundCabling 15 K
Smoke detection 80 K
Power distribution control Hardware 116 K
Rack budgetSoftware 22 K
Cabling 62 K
Safety: DSS Hardware 80 K
Common fundSensors 2 K
Cabling 70 K
Safety: CSAM (LHC safety) CSAM system - - LHC budget
Sensors 70 K Common fund
Safety: Sniffer 200 K 100 K TS/LEA; rest (100 K) common fund
Smoke detection - - LHC budget
Area monitoring 20 K TS/LEA budget
Experimental environment 20 K TS/LEA budget
Total: 1171 K from common fund; 200 K from rack budget; 140 K from TS/LEA budget