PPP Nodal Officers’ WorkshopMarch 23, 2009
Presentation by
PPP CELLAndhra Pradesh
Venue: The Taj Mahal Hotel
New Delhi
2
PPP Policy
Capacity Improvement
Development of PPP Guidelines Manual
Pipeline Development
Management Systems
Project Lists
Case Studies
Other Initiatives and Ideas
CONTENTS
3
Draft PPP Policy is under discussion Draft PPP Policy is prepared taking inputs from PPP
Policy of other states Draft PPP Policy is going to be discussed in a PPP Policy
workshop going to be held in April 2009 ISB Hyderabad is conducting the workshop with senior
government officials, Developers and PPP experts The final copy of the PPP Policy is expected to be ready by
May 2009 Formation of PPP Cell as a Society
Draft Memorandum of Association (MOA) and draft Rules / Bylaws for formation of PPP Cell as a society is prepared
The draft copy is under discussion
PPP POLICY
4
Workshop with the assistance of Administrative Staff College of India (ASCI) The workshop was conducted in July 2008 for the PPP Nodal
Officers of the State Administrative Departments The topics broadly covered are Rationale for PPP, Financing
Techniques, Legal Aspects and Case studies
Workshop with Transaction Advisors IL&FS and SBI Caps made a presentation about the various
types of PPP projects handled by them Case studies were discussed
Capacity Improvement
5
Workshop with the assistance of Indian School of Business (ISB) Planning to have a capacity building workshop for the
Administrative Secretaries in May 2009 PPP Monthly News
It capture the Infrastructure Developments in the form a Monthly News Letter
It captures the News Items, Expression of Interests advertised for selection of the Consultants and Developers by various governments
The monthly news letter is circulated to the Administrative Secretaries, Heads of Departments and the Nodal Officers of the various Administrative Departments
Capacity Improvement contd..2
6
Assistance of PPP Cell was sought on the following PPP Projects
Major Bridge on River Godavari on PPPMass Rapid Transit System (MRTS)Krishnapatnam PortNellore – Gooty Road ProjectPublic Library at Vizag IT based rural initiatives in KadapaUp gradation of Five Roads at PulivendulaSetting up of Distilleries at VishakhapatnamSetting up of Working Women's Hostel, Nursing Schools
Capacity Improvement contd..3
7
PPP Guidelines Manual contains..
AP Infrastructure Development Enabling Act 2001 V G F Guidelines IIPDF Guidelines Guidelines for usage of Transaction Advisors PPPs: Creating an enabling environment for state projects Model Request for Qualification Model Request for Proposal Summary of the list of PPP projects undertaken in AP The copy of the manual is distributed to the PPP Nodal
Officers of the State Administrative Departments
PPP Guidelines Manual
8
Urban Infrastructure like Foot Over bridge, Pay use Toilets, Parks: Its being developed on PPP. DEA has given in principal approval for under taking the project under IIPDF Scheme
Gandhi Hospital: Initial study is conducted to find out what areas can be taken up under PPP. KPMG had a initial discussion in this regard
Education Department: Establishment of rural residential schools on PPP. Presentations were made to the Prl Secretary in this regard by IFC
Pipeline Development
9
Commissioner of Sugars: Setting up of Distillery units on PPP mode at various places in AP.
Transportation Department: Setting up of Vehicle Testing Centers, Driving Testing Centers and Automated Weighbridges on PPP mode
INCAP: Development of Growth Corridor from Vizag to Kakinada. Development of Faster Rail Link between Begumpet and Shamshabad Airport
Pipeline Development Contd..2
10
Development of PPP Website with the assistance of A P Technology Services Ltd (APTS): Comprehensive website has been developed to serve as the repository of all the information relating to PPP’s in the State for the purpose of information sharing and information dissemination.
Major Content Coverage:Reference Documents (for Information sharing)
Important Circulars, Orders, Guide lines, PPP best practices etc. Case Studies, MCA’s, DPRs, RFP’s, PPP related EOI’s, Tenders etc. Important news, media coverage pertaining to projectsDetails of PPP related important eventsDetails of Departmental Nodal Officers, Consulting agencies, Developers
PPP Project details and Up coming ProjectsMessage Centre (close user group)Glossary, FAQs etc.
Official launch of this website is expected shortly
PPP Website of AP (www.ppp.ap.gov.in)
11
Development of MIS Application with the assistance of Center for Good Governance (CGG): A web-enabled integrated system is proposed to be developed to facilitate proper record keeping and on line monitoring of the overall progress / status of all PPP projects of the state .
The system is designed to capture the following details: Project Details General Information pertaining to project including the Project Benefits Project Timeline and Bidding Information Project costing/share etc. and Details of Funding Agencies and pattern Major Milestone during construction and operation period Major Risk factorsProject accomplishment detailsDetails of Project related approvals, orders, Relevant documents, Photos etc. Details of Issues/problems or suggestions Actual execution details pertaining to each stage of Project Planning
PPP-MIS Application
12
Current Status
Comprehensive MIS Design Document completed (Covering all the phases of Project Life Cycle)
Obtained commercial proposal for development and implementation of MIS from Center for Good Governance (CGG)
Administrative approval on the proposal is being sought
PPP-MIS Application Contd…
13
PPP Project Lists
Sector Number (and Value) of PPP Projects in various stages Total
Identified Detailed Project Report
RFP Bidding Construction/Implementation
Nos. App.Cost(Rs. Cr.)
Road 11 6 1 3 37 58 12624
Railways - - - - 1 1 12000
Ports 1 - - - 3 4 14200
Airports 2 - - - 1 3 2978
Tourism 1 1 10 1 35 48 1386
IT - - - - 4 4 77
Others - - - 1 14 15 2021
Total 15 7 11 5 94 132 43537
14
Major Bridge across River Godavari (Rs 593 crs)
Krishnapatnam Port (Rs 10400 crs)
Mass Rapid Transit System (MRTS) (Rs 12000 crs)
Hyderabad Outer Ring Road (Rs 3000 crs)
Hyderabad International Airport (Rs 1760 crs)
Mind Space Project
Convention Centre & Integrated Township
Hyderabad Integrated Trade and Exposition Center
Major PPP Projects in the State
15
Major Bridge Across River Godavari
Its near RajahmundryIts on BOT with VGF from GOIIn principal approval is given, waiting
for final approvalProject Cost is Rs 593 croresIt’s a toll bridgeDeveloper is Ms Gammon India LtdIndependent Engineer is Ms Scott WilsonConcession agreement is signed in Oct 2008Project expected to be completed in 3 years
16
Krishnapatnam Port
17
Developer is M/s Krishnapatnam Port Company Limited.Project cost of Phase – I Rs 1400 crs Project cost of Phase – II Rs 4000 crs Estimated cost of Phase – III Rs 5000 crsBuilt Operate Share and Transfer basis (BOST)Contract period is 30 years with further extention of 20 yrsLease Rentals is 2% of the fair market value with yrly escalationConcession fee is 2.6% of the Gross Income for 30 yrsGovernment has provided four lane approach road to the Port,
Power Supply, R&R. The total cost is Rs 159 crs
Krishnapatnam Port Contd..
18
Mass Rapid Transit System (MRTS) - Hyderabad
19
Mass Rapid Transit System (MRTS) - Hyderabad
Length of the corridor is 69 Kms with elevated structure
Project Cost Rs 12000 crs approx.
PHPDT is 40000 passengers approx with 3 min headway
Passengers expected to travel by 2011 is 1.6 mil per day and by 2021 is 2.3 million per day
Travel time from Miyapur to LB Nagar is 43 min covering a distance of 26 km against Bus Peak hour time of 1 hr 44 min
Concession period is 35 years with a construction period of 5 yrs
Bidder is Ms Maytas Infra Consortium offered a negative grant
Financial Closure is required to be achieved
20
Outer Ring Road - Hyderabad
SPV is incorporated as “Hyderabad Growth Corridor Limited”
Total Length – 158 Kms
Estimated cost – Rs 3000 crs
Part of the project which is of 62.3 km is on PPP Annuity basis
Provides orbital linkage to radial arterial roads
Creates options for development of the further satellite townships
Provides linkage to the proposed MRTS and Bus System
21
Rajeev Gandhi International Airport
22
Rajeev Gandhi International Airport Contd…
23
Total Project Cost is Rs 2478 crs Project area is about 5495 acresProject Partners: GMR Group (63%), MAHB (11%), Govt of
India (13%), Govt of Andhra Pradesh: 13%BOOT Format – Build Own Operate TransferConcession period is 30 yrsConcession fee is 4% of Gross Revenue AnnuallyCommenced operation from Mar 200842 aircraft parking stands - 12 boarding bridgesModular Cargo Terminal initial capacity - 100,000 MT/year 146 Check-in counters including 16 self check-in kiosksModern Air Traffic Control tower 75m high
Rajeev Gandhi International Airport Contd…
24
Phased Development
Airport is to be developed in phases based on the air traffic forecast.
Design Capacity (mppa) Construction-Start/FinishPhase 1 12 March 2008Phase 2 20 As per traffic triggerPhase 3 & 4 40 As per traffic trigger
Rajeev Gandhi International Airport Contd…
25
Mind Space Project
A Special Project for IT & IT enabled services Project area 110 acres at MadhapurAPIIC Ltd & K.Raheja Corpn. P Ltd have jointly promoted the projectTotal investment is around Rs.600 crs with employment generation of about 30000 personsEquity Partners: Govt of AP-11%, Private partner 89%. The revenue to AP Govt on dividend declared on equityBuilt up space of 5 million sft completedSecured approval for IT/ITES SEZ
26
Convention Centre & Integrated Township An integrated township, 18 – hole international golf course, a convention centre with 6000 seating capacity and a business hotel APIIC Ltd and EMAAR Properties, Dubai jointly promoted the project with 3 SPVs with equity of 26% and 74% respectivelyHyderabad International Convention Centre was built on an extent of 15 acres.The Golf Course is developed on an extent of 235 acres.The assets of Convention Centre and Golf Course will revert back to Govt. of A P after 66 years of lease without any encumbrances.Besides equity, APIIC Ltd shall receive 2 and 3% Gross Annual Revenue as lease rentals from both assets
27
Roads and Bridges
There are 58 Road projects in the state at
various stages of development apart from
Outer Ring RoadThe total project cost is Rs 12624 crs The projects are taken under BOT / Annuity
modeOut of 58 road projects 18 are under
implementation stage
28
Tourism Projects
There are 48 tourism projects on PPP modeThe total project cost is Rs 1386 crs Status of the projects
Implementation Stage - 21 ProjectsVarious stages of bidding Stage - 27
Major Tourism Projects:IMAX Theatre at HyderabadBeach Resort at Rishikonda, VizagSnow World at HyderabadFood Courts at Lower Tank Bund, Hyderabad
Beach Resort at Rishikonda, Vizag
29
Infrastructure Vision Document 2030: The document brings out Infrastructure Requirements, Infrastructure Gaps, Resources required and how to take it forward
Setting up of a State Project Development Fund (PDF): This assistance will encourage more and more departments to take up Infrastructure Projects on PPP
Setting up of a State Viability Gap Funding Scheme (VGF): This fund will help in attracting developers toward projects which are economically viable but not financially
Empanelling Transaction Advisors for the State who have local presence
Other Initiatives and Ideas
30