Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

49
Analytical Support Analytical Support for the Statewide for the Statewide Multimodal Long- Multimodal Long- Range Range Transportation Plan Transportation Plan Prepared for the Systems and Information Engineerin Prepared for the Systems and Information Engineerin Design Symposium Design Symposium University of Virginia University of Virginia April 26, 2003 April 26, 2003

description

Analytical Support for the Statewide Multimodal Long-Range Transportation Plan . Prepared for the Systems and Information Engineering Design Symposium University of Virginia April 26, 2003. Authors. Mohammed A. Ba-Ali Brister B. Barrett David A. Cowden Jared T. Zane - PowerPoint PPT Presentation

Transcript of Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Page 1: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Analytical Support Analytical Support for the Statewide for the Statewide Multimodal Long-Multimodal Long-

Range Range Transportation Plan Transportation Plan

Prepared for the Systems and Information Engineering Design Prepared for the Systems and Information Engineering Design SymposiumSymposium

University of VirginiaUniversity of Virginia

April 26, 2003April 26, 2003

Page 2: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

AuthorsAuthorsMohammed A. Ba-Ali

Brister B. Barrett David A. Cowden

Jared T. Zane Prof. James H. Lambert

Kenneth D. Peterson (BS/MS Student)C. Ariel Pinto (MS Student)

Center for Risk Management of Engineering Systems and

Department of Systems and Information Engineering,

University of Virginia

Page 3: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Problem StatementProblem Statement

Need for analytical methods to Need for analytical methods to improve the coordination among the improve the coordination among the

various modal transportation agencies various modal transportation agencies of the Commonwealth of Virginiaof the Commonwealth of Virginia

Page 4: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

1.1. Process of case studiesProcess of case studies2.2. Aviation case studyAviation case study3.3. Public transit case studyPublic transit case study4.4. Port case studyPort case study5.5. Rail case studyRail case study6.6. Multimodal systems integrationMultimodal systems integration

OverviewOverview

Page 5: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Multimodal Statewide Multimodal Statewide Planning ProcessPlanning Process

Source: VTrans2025 2002 (Draft)

Page 6: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Process of Case StudiesProcess of Case Studies Collect projects from modal agencies Collect projects from modal agencies

(aviation, public transit, port, rail)(aviation, public transit, port, rail) Assess TEA-21 qualitative metrics for Assess TEA-21 qualitative metrics for

each projecteach project Select quantitative metrics for each modeSelect quantitative metrics for each mode Assess quantitative metrics for each Assess quantitative metrics for each

projectproject Interpret and study the portfolios of Interpret and study the portfolios of

projectsprojects

Page 7: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

TEA-21 Qualitative TEA-21 Qualitative MetricsMetrics

EC: Economic competitiveness FR: Fiscal responsibility IM: Intermodalism and mobility QL: Quality of life SM: Systems management SS: Safety and security

Page 8: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Aviation Case Aviation Case StudyStudy

Page 9: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Aviation Data CollectionAviation Data Collection Recorded project data Recorded project data

from VDOAVfrom VDOAV Description of the Description of the

projects for each airportprojects for each airport Project cost ($)Project cost ($) State funding State funding

(requested and (requested and recommended)recommended)

Page 10: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Aviation Performance Aviation Performance MetricsMetrics

Annual operationsAnnual operations Population served Population served

within 20, 25, 30 miles within 20, 25, 30 miles radiusradius

Page 11: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan
Page 12: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Aviation Project DataAviation Project DataPr

ojec

t ID

#

Subs

yste

m ID

#

Prim

ary

Attr

ibut

es

Leve

ragi

ng (%

no

n-st

ate)

Cos

t ($

thou

ands

)

Ann

ual O

pera

tions

in

thou

sand

s

Popu

latio

n Se

rved

w

ithin

20

Mile

s R

adiu

s (in

th

ousa

nds)

Popu

latio

n Se

rved

w

ithin

25

Mile

s R

adiu

s (in

th

ousa

nds)

Popu

latio

n Se

rved

w

ithin

30

Mile

s R

adiu

s (in

th

ousa

nds)

App

rove

d/D

isap

prov

ed

Des

crip

tion

Y X X` X``000001 000001 SM IM 91% 1648 152 851 950 997 Y Loop Roadways000002 000001 IM SM 95% 9495 152 851 950 997 Y Terminal Platform and Roadway000003 000001 SM SS 96% 44845 152 851 950 997 Y Terminal Building 000004 000001 SM QL 95% 5497 152 851 950 997 Y Terminal Fumishings000005 000001 SM IM 96% 24924 152 851 950 997 Y Concourse 'C' Expansion000006 000001 SM SS 96% 9674 152 851 950 997 Y Air Traffic Control Tower000007 000001 IM QL 96% 5646 152 851 950 997 Y Taxiway 'U' Extension000008 000001 SM SS 92% 138 21 209 248 367 Y Snow Removal Equipment Building000009 000002 IM SM 92% 400 21 209 248 367 Y Acquire Parcels 36 &40000010 000002 SS IM 100% 333 9 99 144 240 N Partial Parallel Taxway000011 000003 SS SM 100% 150 9 99 144 240 N Airport Layout Plan Update000012 000003 SM SS 100% 80 9 99 144 240 N Helipad & Perimeter Fencing 000013 000003 SM EC 100% 25 22 338 505 619 N Access Road Improvement000014 000004 IM SM 100% 445 22 338 505 619 N T-Hanger Site Preparation & Auto Parking Lot000015 000004 SS IM 20% 591 22 338 505 619 Y Apron Expansion000016 000004 SS QL 20% 3 22 338 505 619 Y Storm water Pollution Plan Update000017 000004 SM SS 100% 1500 9 163 191 258 N Apron Expansion000018 000005 SS SM 91% 500 14 169 296 410 Y Apron Rehabiliation 000019 000006 SM QL 100% 125 23 159 228 366 N West Side Airport Development (Design)000020 000007 SS SM 100% 180 23 159 228 366 N West Side Corporate Hanger Site Preparation (Construction)000021 000007 EC SM 100% 1949 23 159 228 366 N West Side Airport Development (Construction)000022 000007 QL SM 100% 20 23 159 228 366 N West Side Corporate Hanger Site Preparation (Design)000023 000007 SS SM 92% 250 23 159 228 366 Y FAR Part 77 Obstruction Removal 000024 000007 IM SM 100% 34 23 159 228 366 N West Side Auto Parking Area (Construction)000025 000007 QL SS 100% 150 23 159 228 366 N Obstruction Lighting000026 000007 QL EC 100% 6 23 159 228 366 N West Side Auto Parking Area (Design)000027 000007 SS SM 34% 10 6 95 156 221 Y Fuel Storage Tank & Card Reader

Page 13: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Aviation: Portfolio Aviation: Portfolio ResultsResults

Ann

ual O

pera

tions

in th

ousa

nds

Ann

ual O

pera

tions

in th

ousa

nds

Population Served within 20 Miles Radius (in thousands)

Ann

ual O

pera

tions

in th

ousa

nds

Population Served within 20 Miles Radius (in thousands)

0

50

100

150

200

250

300

10 100 1000 10000

>

> EC: Economic competitivenessFR: Fiscal responsibility IM: Intermodalism and mobilityQL: Quality of lifeSM: Systems managementSS: Safety and security

Page 14: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Aviation Projects Aviation Projects Motivated by Systems Motivated by Systems

Management and Management and Safety/SecuritySafety/Security

0

50

100

150

200

250

10 100 1000 10000

Population served w ithin 20 miles radius (thousands)

Ann

ual O

pera

tions

(tho

usan

ds)

Page 15: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Aviation: Count of Aviation: Count of ProjectsProjects

EC: Economic competitivenessFR: Fiscal responsibility IM: Intermodalism and mobilityQL: Quality of lifeSM: Systems managementSS: Safety and security

EC (4%)

FR (1%)

IM (1

5%)

2 2 6QL (1

9%)

3 9 7SM (3

1%)

7 11 26SS (3

0%)

Page 16: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Aviation: Population Aviation: Population Served by SectorServed by Sector

EC (2%)

FR (0%)

IM (1

8%)

217 153 2485QL (2

0%)

631 3655 2624SM (3

5%)

1023 2113 6706SS (2

5%)

EC: Economic competitivenessFR: Fiscal responsibility IM: Intermodalism and mobilityQL: Quality of lifeSM: Systems managementSS: Safety and security

Page 17: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Public Transit Public Transit Case StudyCase Study

Page 18: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Public Transit Public Transit Performance MetricsPerformance Metrics

Population servedPopulation served Revenue hours Revenue hours

plus revenue milesplus revenue miles

Page 19: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Public Transit Project Public Transit Project DataData

000001 50 0% 18.4 103 IM SS Y 0003 Bristol City Bus000002 50 0% 6.5 59 IM SS Y 0012 Graham Transit - Town of Bluefield000003 4.2 0% 156.1 433 FR SM Y 0008 District III Governmental Cooperative000004 90 0% 156.1 433 SM IM Y 0008 District III Governmental Cooperative000005 230 0% 91.5 649 IM SS Y 0021 Mountain Empire Older Citizens - Wise Co. Area000006 45 0% 46 26 IM SS Y 0027 Tazewell County Transportation000007 200 0% 40 515 SM QL Y 0005 Charlottesville Transit Service000008 2400 0% 40 515 IM SM Y 0005 Charlottesville Transit Service000009 818 0% 169.5 1530 IM SS Y 0019 JAUNT, Inc. - Charlottesville Area000010 371.44 0% 169.5 1530 QL SM Y 0019 JAUNT, Inc. - Charlottesville Area000011 77.3 0% 13.5 204 IM SS Y 0016 Greene County Transit000012 50 0% 53 90 IM SS Y 0001 Bay Transit - Gloucester County000013 250 0% 53 90 EC SM Y 0001 Bay Transit - Gloucester County000014 1045 0% 1343.3 12744 IM SS Y 0028 Transportation District Comm. Of Hampton Roads000015 2390 0% 1343.3 12744 QL SM Y 0028 Transportation District Comm. Of Hampton Roads000016 1679.708 0% 1343.3 12744 QL SM Y 0028 Transportation District Comm. Of Hampton Roads000017 3045 0% 1343.3 12744 IM SS Y 0028 Transportation District Comm. Of Hampton Roads000018 100 0% 45.7 270 IM SS Y 0009 Eastern Shore - Star Transit000019 1000 0% 45.7 270 EC SM Y 0009 Eastern Shore - Star Transit000020 22.371 0% 66.1 961 FR SM Y 0013 Greater Lynchburg Transit Company000021 100 0% 66.1 961 QL SM Y 0013 Greater Lynchburg Transit Company000022 93.125 0% 53.1 334 IM SS Y 0006 Danville Transit000023 143.142 0% 29.5 214 IM SS Y 0004 Central Virginia Transit - Cumberland Co.000024 100 0% 17.3 95 IM SS Y 0010 Farmville Area Bus000025 820 0% 1247.5 35320 EC SM Y 0022 Northern Virginia Transportation Commission000026 22284.08 0% 1247.5 35320 FR SM Y 0022 Northern Virginia Transportation Commission000027 246.2 0% 1247.5 35320 QL SM Y 0022 Northern Virginia Transportation Commission000028 2800 0% 1247.5 35320 IM SM Y 0022 Northern Virginia Transportation Commission000029 2000 0% 1247.5 35320 QL IM Y 0022 Northern Virginia Transportation Commission000030 30 0% 1247.5 35320 QL EC Y 0022 Northern Virginia Transportation Commission

Page 20: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Public Transit: Portfolio Public Transit: Portfolio ResultsResults

EC

Rev

. Hrs

. plu

s Rev

. Mi.

(in th

ousa

nds)

EC

Rev

. Hrs

. plu

s Rev

. Mi.

(in th

ousa

nds)

FR

IM

Rev

. Hrs

. plu

s Rev

. Mi.

(in th

ousa

nds)

FR

Population Served (in thousands)

IM

QL

Population Served (in thousands)

QL

SMSM

SSSS

0

2000000

4000000

6000000

8000000

10000000

12000000

10 100 1000 10000

>

>EC: Economic competitivenessFR: Fiscal responsibility IM: Intermodalism and mobilityQL: Quality of lifeSM: Systems managementSS: Safety and security

Page 21: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Public Transit Projects Public Transit Projects Motivated by Motivated by

Intermodalism/Mobility Intermodalism/Mobility and Safety/Securityand Safety/Security

0.01

0.1

1

10

100

1000

10000

100000

1000000

10000000

10 100 1000 10000

Population Served (1000's)

Rev

enue

Hou

rs P

lus

Rev

enue

Mile

s (1

000'

s $)

Page 22: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Public Transit: Count of Public Transit: Count of ProjectsProjects

3

2 1

4 4

7 10 25 14

27 1 1

EC: Economic competitivenessFR: Fiscal responsibility IM: Intermodalism and mobilityQL: Quality of lifeSM: Systems managementSS: Safety and security

Page 23: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Public Transit: Cost of Public Transit: Cost of Projects Projects

7012.5

3740.904 300

410 2700

3337 28652.4 21456.92 5238.848

17410.57 200 96

EC: Economic competitivenessFR: Fiscal responsibility IM: Intermodalism and mobilityQL: Quality of lifeSM: Systems managementSS: Safety and security

Page 24: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Public Transit: Public Transit: Population Served by Population Served by

SectorSector

2535

2686.9 1247.5

3983 4990

5250.6 5494.9 22736.3 8913.4

12679.4 300.1 122.3

EC: Economic competitivenessFR: Fiscal responsibility IM: Intermodalism and mobilityQL: Quality of lifeSM: Systems managementSS: Safety and security

Page 25: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Port Case StudyPort Case Study

Page 26: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Port Performance Port Performance MetricsMetrics

Total tonnage per Total tonnage per yearyear

Total acresTotal acres

Page 27: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Port Project DataPort Project Data

Project

ID #

Cost ($

thou

ands)

Leverag

ing (%

non-st

ate)

Popula

tion S

erved

with

in 30

Mile

s Rad

ious

Annual

Operat

ions i

n thou

sands

Primary

Attr

ibutes

Includ

e in C

ompa

rison

s (Y or

N)

Highlig

ht in

Graphs?

(Y or

N)

Subsyt

em of

: Syst

em ID

#

System

Desc

riptio

n

1 66068 0% 811 42336883 SM IM Y Y 0001 Norfolk International Terminals2 14224 0% 811 42336883 IM SM Y Y 0001 Norfolk International Terminals3 8579 0% 811 42336883 IM SM Y Y 0001 Norfolk International Terminals4 8890 0% 811 42336883 IM SM Y Y 0001 Norfolk International Terminals5 80504 0% 811 42336883 SM IM Y Y 0001 Norfolk International Terminals6 5647 0% 811 42336883 SM IM Y Y 0001 Norfolk International Terminals7 3814 0% 811 42336883 SM IM Y Y 0001 Norfolk International Terminals8 89800 0% 811 42336883 SM EC Y Y 0001 Norfolk International Terminals9 22388 0% 811 42336883 IM EC Y Y 0002 Norfolk International Terminals

10 21804 0% 811 42336883 SM IM Y Y 0002 Norfolk International Terminals11 7920 0% 811 42336883 SM IM Y Y 0003 Norfolk International Terminals12 34382 0% 811 42336883 IM EC Y Y 0003 Norfolk International Terminals13 10627 0% 811 42336883 SM IM Y Y 0003 Norfolk International Terminals14 4469 0% 811 42336883 IM EC Y Y 0004 Norfolk International Terminals15 5539 0% 811 42336883 IM SM Y Y 0004 Norfolk International Terminals

Page 28: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Port: Portfolio ResultsPort: Portfolio Results

EC: Economic competitivenessFR: Fiscal responsibility IM: Intermodalism and mobilityQL: Quality of lifeSM: Systems managementSS: Safety and security

Page 29: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Port Projects Motivated Port Projects Motivated by Economic by Economic

Competitiveness and Competitiveness and Intermodalism/MobilityIntermodalism/Mobility

Total Tonnage per Year vs. Total Acres

0

10000000

20000000

30000000

40000000

50000000

60000000

70000000

0 200 400 600 800 1000 1200 1400

Total Acres

Tota

l Ton

nage

per

Yea

rTo

tal T

onna

ge p

er Y

ear

Page 30: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Port: Count of Port: Count of ProjectsProjects

14

3 17

Grand Total: 34

EC: Economic competitivenessFR: Fiscal responsibility IM: Intermodalism and mobilityQL: Quality of lifeSM: Systems managementSS: Safety and security

Page 31: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Port: Cost of ProjectsPort: Cost of Projects

250000

132000 266000

Grand Total: 648000

EC: Economic competitivenessFR: Fiscal responsibility IM: Intermodalism and mobilityQL: Quality of lifeSM: Systems managementSS: Safety and security

Page 32: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Rail Case StudyRail Case Study

Page 33: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Rail Performance Rail Performance MetricsMetrics

• Track milesTrack miles• Total freight cars Total freight cars

on-line (per year)on-line (per year)

Page 34: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Rail Project DataRail Project Data

Project

ID #

Cost ($

thou

ands)

Levera

ging (

% non-s

tate)

Track M

iles

Total F

reigh

t Cars

On-L

ine (P

er W

eek)

Primary

Attri

butes

Includ

e in C

ompa

rison

s (Y or

N)

Highlig

ht in

Graphs?

(Y or

N)

Coincid

ent w

ith H

ighway

Mod

e?

Coincid

ent w

ith A

viatio

n Mod

e?

Coincid

ent w

ith Port

Mod

e?

Coincid

ent w

ith Pub

lic Tran

sit M

ode?

Coincid

ent w

ith H

eavy

Rail

Mod

e?

Subsyt

em of

: Syst

em ID

#

System

Desc

riptio

n

0001 370,000 18% 118 225179 EC FR Y Y Y 0001 DC-Richmond (Main St. Station)0002 200000 0% 70 225179 FR IM Y Y Y Y 0002 Richmond-Newport News (Hampton Roads)0003 100,000 0% 30 225179 IM SM Y Y Y 0003 Richmond-Petersburg (Tri-Cities)0004 200,000 0% 84 184506 SM IM Y Y Y Y 0004 Petersburg-Norfolk(South Hampton Roads)0005 225,000 0% 70 225179 SM IM Y Y Y Y 0005 Petersburg-North Carolina Line0006 100,000 9% 480 184506 IM SM Y Y Y 0006 TransDominion Express0007 1,200,000 10% 250 184506 IM EC Y Y Y 0007 Virginia Railway Express0008 356000 0% 356 225179 IM SM Y Y Y 0008 I-81 Rail Corridor0009 3966 13% 39 450 SM EC Y Y Y 0009 Buckingham Branch Railroad0010 580 29% 16 1360 SM IM Y Y Y 0010 Commonwealth Railway0011 9608 5% 70 108760 SM IM Y Y Y Y 0011 Eastern Shore Railroad0012 480 0% 40 10000 SM EC Y Y Y 0012 North Carolina and Virginia Railroad0013 1130 46% 36 12540 FR SM Y Y Y Y 0013 Norfolk and Portsmouth Belt Line RR0014 6875 0% 30 300 IM EC Y Y Y 0014 Shenandoah Valley Railroad0015 7606 7% 75 1020 IM SM Y Y Y 0015 Virginia Southern Railroad0016 5958 10% 54 800 FR SM Y Y Y 0016 Winchester and Western Railroad

Page 35: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Rail: Portfolio ResultsRail: Portfolio Results

EC

Tota

l Fre

ight

Car

s On-

Line

(Per

Wee

k)

EC

Tota

l Fre

ight

Car

s On-

Line

(Per

Wee

k)

FR

IM

Tota

l Fre

ight

Car

s On-

Line

(Per

Wee

k)

FR

Track Miles

IM

QL

Track Miles

QL

SMSM

SSSS

0

50000

100000

150000

200000

250000

300000

10 100 1000

>

>EC: Economic competitivenessFR: Fiscal responsibility IM: Intermodalism and mobilityQL: Quality of lifeSM: Systems managementSS: Safety and security

Page 36: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Rail Projects Motivated Rail Projects Motivated by Systems by Systems

Management and Management and Intermodalism/MobilitIntermodalism/Mobilit

yy

0.01

50000.01

100000.01

150000.01

200000.01

250000.01

300000.01

350000.01

10 100 1000

Track Miles

Tota

l Car

s O

n-lin

e

Page 37: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Rail: Count of ProjectsRail: Count of Projects

0 EC

0 1 FR

0 2 1 IM

0 0 0 0 QL

0 2 2 8 0 SM

0 0 0 0 0 0 SS

EC: Economic competitivenessFR: Fiscal responsibility IM: Intermodalism and mobilityQL: Quality of lifeSM: Systems managementSS: Safety and security

Page 38: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Rail: Cost of ProjectsRail: Cost of Projects

0 EC

0 370000 FR

0 1206875 200000 IM

0 0 0 0 QL

0 4446 7088 998794 0 SM

0 0 0 0 0 0 SS

EC: Economic competitivenessFR: Fiscal responsibility IM: Intermodalism and mobilityQL: Quality of lifeSM: Systems managementSS: Safety and security

Page 39: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Multimodal Systems Multimodal Systems IntegrationIntegration

Page 40: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Comparison of Multimodal Comparison of Multimodal SystemsSystemsEC

FR

EC

FR

IM

QL

IM

QL

SM

SS

SM

SS

EC

FR

EC

FR

IM

QL

IM

QL

SM

SS

SM

SS

Aviation Ports

Rail and Public Transportation Roads

EC

FR

EC

FR

IM

QL

IM

QL

SM

SS

SM

SS

Page 41: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Integration of Modal Integration of Modal ProjectsProjects

Soo-Haeng Cho, 2001

Page 42: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Study of Dulles Study of Dulles CorridorCorridor Multimodal Multimodal

SystemSystem

http://web.mit.edu/dsm/Tutorial/DSM_reading.htm

Page 43: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Dulles Corridor (cont.)Dulles Corridor (cont.)

http://web.mit.edu/dsm/Tutorial/tutorial_intro.htm

Page 44: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Future WorkFuture Work

Development of a “multimodal impact Development of a “multimodal impact statement”statement” Need and purposeNeed and purpose Rationale for selected alternativeRationale for selected alternative Integration and implementation planIntegration and implementation plan

Page 45: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

MIS Example: Route MIS Example: Route 460 Corridor460 Corridor

Page 46: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Route 460 Corridor Route 460 Corridor (cont.)(cont.)

Various upgrades to bring US460 to near interstate standardsVarious upgrades to bring US460 to near interstate standards Construct new 6000 ft runway at Hampton Roads airportConstruct new 6000 ft runway at Hampton Roads airport Provide dedicated access/interchanges for the following Provide dedicated access/interchanges for the following

general aviation and small commercial facilities: Blackstone general aviation and small commercial facilities: Blackstone Municipal Airport, Petersburg Airport, Wakefield Airport Municipal Airport, Petersburg Airport, Wakefield Airport (runway protection zone necessitates realignment), Crewe (runway protection zone necessitates realignment), Crewe Airport, Farmville Airport, Lynchburg-Falwell Airport, Airport, Farmville Airport, Lynchburg-Falwell Airport, Lynchburg Regional Airport, Roanoke AirportLynchburg Regional Airport, Roanoke Airport

Rail upgrade (double track, sidings, speeds) and realignment Rail upgrade (double track, sidings, speeds) and realignment of Norfolk Southern and CSXT linesof Norfolk Southern and CSXT lines

APM Terminals (Maersk subsidiary) intermodal container port APM Terminals (Maersk subsidiary) intermodal container port in Portsmouth (largest such private facility in the US)in Portsmouth (largest such private facility in the US)

Intermodal container rail to port facility in Suffolk (Virginia Intermodal container rail to port facility in Suffolk (Virginia Port Authority)Port Authority)

Intermodal container rail to port facility in Petersburg Intermodal container rail to port facility in Petersburg (Richmond Ports Commission)(Richmond Ports Commission)

Various rail-industrial development sites west of PetersburgVarious rail-industrial development sites west of Petersburg

Page 47: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

Dulles Corridor Disaster preparedness Eastern airport I-81 Corridor Third Crossing Western Rail Expansion Space transportation Olympics High-tech rail Cruise ship terminals Door-to-door freight

Future Work: Other Future Work: Other Multimodal SystemsMultimodal Systems

Coal/mineral transportation Urban undergrounds Urban public/personal transportation Tourism centers Multimodal service areas Innovative transit solutions Innovative parking solutions Urban corridors

-DC-RIC-RIC-NOR

Page 48: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

AcknowledgementsAcknowledgementsJim Bland, Cliff Burnette, Jeff Florin, Jim Bland, Cliff Burnette, Jeff Florin,

George Connor, Bill LaBaugh, Alan George Connor, Bill LaBaugh, Alan Tobias, Ranjeet Rathore, Ken Lantz, Tobias, Ranjeet Rathore, Ken Lantz,

Diane Mitchell, Marsha Fiol, Katherine Diane Mitchell, Marsha Fiol, Katherine Graham, Kimberly Spence, Frank Dunn, Graham, Kimberly Spence, Frank Dunn,

Gus Robey, Mary Lynn Tischer, Mike Gus Robey, Mary Lynn Tischer, Mike Knott, Chip Badger, Alan Tobias, Bill Knott, Chip Badger, Alan Tobias, Bill Ketron, Kevin Page, Wayne Ferguson, Ketron, Kevin Page, Wayne Ferguson,

Mike Fontaine, and John MillerMike Fontaine, and John Miller

Page 49: Analytical Support for the Statewide Multimodal Long-Range Transportation Plan

DiscussionDiscussion