Analysis using Oil Field Manager (OFM)

18
Prepared by : Mustafa Abdolmotaleb

Transcript of Analysis using Oil Field Manager (OFM)

Page 1: Analysis using Oil Field Manager (OFM)

Prepared by :

Mustafa Abdolmotaleb

Page 2: Analysis using Oil Field Manager (OFM)

Project Objectives

Plotting and Reporting Oil, Gas and water performance

Forecasting by Decline Curve Analysis ”DCA”

Conclusion

Page 3: Analysis using Oil Field Manager (OFM)

To analyze the production performance using plots

and reports

To perform Oil Forecast using DCA

Page 4: Analysis using Oil Field Manager (OFM)
Page 5: Analysis using Oil Field Manager (OFM)
Page 6: Analysis using Oil Field Manager (OFM)

1995 96 97 98 99200001 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 190.1

0.5

1

5

10

50

100

Pro

ducin

g D

ay O

il R

ate

, bbl/d

Date

oil production forecast

PVE3_0931 Working Forecast ParametersPhase : OilCase Name : Case1b : 0

Di : 0.0217745 M.n.qi : 2.62443 bbl/dti : 01/31/2009te : 01/31/2019Final Rate : 0.192489 bbl/dCum. Prod. : 34.1581 MbblCum. Date : 01/31/2009Reserves : 3.3995 MbblReserves Date : 01/31/2019EUR : 37.5576 Mbbl

Forecast Ended By : TimeDB Forecast Date : 08/19/2013Reserve Type : None

oil production forecast

PVE3_0931

Page 7: Analysis using Oil Field Manager (OFM)
Page 8: Analysis using Oil Field Manager (OFM)

2006 07 08 09 10 11 12 130.1

0.5

1

5

10

50

100

Pro

ducin

g D

ay O

il R

ate

, bbl/d

Date

oil production forecast

ACL1012

Working Forecast ParametersPhase : OilCase Name : Case1b : 0

Di : 0.0314759 M.n.qi : 5.20077 bbl/dti : 01/31/2009te : 06/30/2013Final Rate : 0.982992 bbl/dCum. Prod. : 11.8639 MbblCum. Date : 01/31/2009Reserves : 4.07863 MbblReserves Date : 06/30/2013EUR : 15.9425 Mbbl

Forecast Ended By : RateDB Forecast Date : 08/19/2013Reserve Type : None

oil production forecast

ACL1012

Page 9: Analysis using Oil Field Manager (OFM)
Page 10: Analysis using Oil Field Manager (OFM)
Page 11: Analysis using Oil Field Manager (OFM)
Page 12: Analysis using Oil Field Manager (OFM)
Page 13: Analysis using Oil Field Manager (OFM)
Page 14: Analysis using Oil Field Manager (OFM)
Page 15: Analysis using Oil Field Manager (OFM)
Page 16: Analysis using Oil Field Manager (OFM)
Page 17: Analysis using Oil Field Manager (OFM)
Page 18: Analysis using Oil Field Manager (OFM)

The OFM project was created according to specific

data, in order to perform various analysis.

By forecasting model “DCA” analysis, we can predict

the productivity of the fields for future periods