DELTA ENGINEERING
Analysis Report
Kitchen Cupboards (KC Ltd)
DATE: 17/05/2002
PROJECT TEAM
Chris Griffiths (Team Leader)
Jason Foong
Kris Trpevski
Lewis B. Ogundo
Rolando Suarez
![Page 2: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/2.jpg)
All rights reserved. No part of this document may be reproduced, stored in a retrieval system,
or transmitted in any form or by any means, electronic, mechanical, photocopying, recording
or otherwise, without prior consent of the Copyright owners.
Published 2002
![Page 3: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/3.jpg)
TABLE OF CONTENTS
TABLE OF CONTENTS............................................................................................................................................................................ 1
OVERVIEW ................................................................................................................................................................................................. 4
INTRODUCTION..................................................................................................................................................................................... 4 THE TEAM................................................................................................................................................................................................ 4 PROJECT FEASIBILITY......................................................................................................................................................................... 5 PROJECT PLAN ....................................................................................................................................................................................... 5 PROJECT COMLPLETION..................................................................................................................................................................... 5
DESCRIPTION............................................................................................................................................................................................ 7
DESCRIPTION OF CURRENT SYSTEM.............................................................................................................................................. 7 DATA FLOW DIAGRAMS FOR THE CURRENT SYSTEM ............................................................................................................. 9 ENTITY RELATIONSHIP DIAGRAM OF CURRENT SYSTEM....................................................................................................17
Current entity relationship diagram part 1 ........................................................................................................................................17 Current entity relationship diagram part 2 ........................................................................................................................................18
PROBLEMS OF KC LTD........................................................................................................................................................................19 SCOPE OF THE SOLUTION TO BE PROPOSED ..............................................................................................................................................21 ISSUES AND CONSTRAINTS TO BE CONSIDERED........................................................................................................................................22
ANALYSIS..................................................................................................................................................................................................25
DESCRIPTION OF NEW (RECOMMENDED) SYSTEM.................................................................................................................25 DATA FLOW DIAGRAMS FOR THE NEW (RECOMMENDED) SYSTEM.................................................................................29
New logical data flow diagram...........................................................................................................................................................29 New physical data flow diagram.........................................................................................................................................................30
ENTITY RELATIONSHIP DIAGRAM FOR NEW SYSTEM...........................................................................................................33 New entity relationship diagram part 1..............................................................................................................................................33 New entity relationship diagram part 2..............................................................................................................................................34
STRUCTURED ENGLISH FOR THE NEW SYSTEM.......................................................................................................................35 DATA DICTIONARY FOR THE NEW SYSTEM ..............................................................................................................................44
IMPLEMENTATION...............................................................................................................................................................................46
AUDITING AND CONTROLS.......................................................................................................................................................................46 Backup..................................................................................................................................................................................................47
Recommendation Solution..................................................................................................................................................................................................47 Cost Sensitive Solution........................................................................................................................................................................................................48
Security.................................................................................................................................................................................................48 Recommendation Solution..................................................................................................................................................................................................49 Cost Sensitive Solution........................................................................................................................................................................................................49
TEST PLAN.............................................................................................................................................................................................51 ALPHA TESTING................................................................................................................................................................................53
Strain Testing.........................................................................................................................................................................................................................53 Recovery Testing..................................................................................................................................................................................................................54 Security Testing ....................................................................................................................................................................................................................54 Performance Testing.............................................................................................................................................................................................................54
BETA TESTING...................................................................................................................................................................................54 TRAINING PLAN...................................................................................................................................................................................56 CONVERSION STRATEGY ..........................................................................................................................................................................60
Conversion Analysis ............................................................................................................................................................................61 Recommendation Solution...................................................................................................................................................................61 Cost Sensitive Solution.........................................................................................................................................................................62
SCHEDULING.............................................................................................................................................................................................63
![Page 4: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/4.jpg)
Recommendation Solution...................................................................................................................................................................63 Cost Sensitive Solution.........................................................................................................................................................................63
CONCLUSION...........................................................................................................................................................................................65
SUMMARY OF ANALYSIS ...........................................................................................................................................................................65 ESTIMATED COST OF RECOMMENDED SOLUTION .....................................................................................................................................66
Equipment to buy .................................................................................................................................................................................66 Approximate costing of equipment....................................................................................................................................................................................68
COST FOR TRAINING .......................................................................................................................................................................69 COSTING FOR ALPHA TESTING ....................................................................................................................................................70 COSTING FOR HARDWARE AND CABLING INSTALLATION ...................................................................................................71
ESTIMATED COST OF COST-SENSITIVE OPTION.........................................................................................................................................72 Equipment to buy .................................................................................................................................................................................72
Approximate costing of Equipment ...................................................................................................................................................................................73 OTHER COSTS....................................................................................................................................................................................74
RECOMMENDATIONS.................................................................................................................................................................................75
REFRENCES..............................................................................................................................................................................................77
APPENDIX 1 ............................................................................................................................................................................................... II
APPENDIX 2 ..............................................................................................................................................................................................XI
APPENDIX 3 ............................................................................................................................................................................................XII
![Page 5: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/5.jpg)
Overview
![Page 6: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/6.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
4
Kitchen Cupboards (KC Ltd) Project Delta Engineering’s design of a new system
Overview
INTRODUCTION
Kitchen Cupboards is a company that builds kitchens for renovated houses. Each kitchen is
based on a modular pattern. There are a limited number of components that the customer
may choose from but these may be combined in a number of different patterns. The
company does not have a computer and is therefore not highly automated. The company
relies on several manual processes to conduct its business. The company is looking to
expand it’s position in the marketplace. We (Delta Engineering) have been asked to
examine the business and suggest an overall solution to the company with a view to helping
them achieve their objective.
A team was formed and given the task of analysing the current system and designing a new
one that will be presented as a solution to KC Ltd. This report aims to show the steps taken
by the team to achieve the said objective. The report was also produced to clearly present to
the management of KC ltd the recommendations of the team. The report lays out clearly the
process of analysis used by the team to arrive at its conclusions on which its subsequent
recommendations are based.
THE TEAM
The team formed was made up of staff of Delta Engineering. It consisted of five team
members with one of them being nominated as the team leader. The team determined that
regular meetings were required in order to ensure the efficient and expeditious completion of
the project. It was agreed that weekly team meetings would be held with additional meetings
being scheduled and held as necessary. The minutes of these meetings have been
attached as Appendix 1 at the end of this report.
![Page 7: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/7.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
5
PROJECT FEASIBILITY
The team conducted an initial project feasibility study to determine the following
Technical Feasibility
Operational Feasibility
Economic Feasibility
Satisfied with the study the team embarked on making a project plan.
PROJECT PLAN
The Team Proceeded to make a schedule for the various tasks that needed to be
completed in order to complete its objective. It was determined that the team needed a time
frame in order to properly plan its activities. It was determined that 10 weeks was needed to
exhaustively analyse the current system, research possible solutions and design a new
system.
PROJECT COMLPLETION
The team has succeeded in exhaustively analysing the present system and in designing a
new one. This report details the process of arriving at the Teams recommendations.
Throughout the report the recommended solution is referred to both as ‘the new system’ and
the ‘recommended system’. The system presently used by KC Ltd is referred to both as the
‘current system’ and the ‘old system’. However we have also considered a cost sensitive
version of the recommended solution and it is also detailed in this report.
![Page 8: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/8.jpg)
Description
![Page 9: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/9.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
7
Description
This section details the progress the team has made in the various aspects of the project. To
date the team has managed to completely analyse the current system employed by KC
limited and has come up with the information presented in this section.
DESCRIPTION OF CURRENT SYSTEM
In the current system, goods were purchased using purchase orders that were cross
referenced to job contract numbers. The company did not have a computer in this system.
KC Ltd completed a Goods Received Advice every time there were incoming goods. The
incoming invoices had to be cross referenced to the Purchase Orders, Goods Received
Advices, and Job Contract Numbers. KC Ltd paid on the statement only if there were
approved invoices supporting it. Goods Received Advices were documents sent to confirm
that goods were received. Purchase Orders were nothing more than what the name stands
for and Job Contract numbers were simply numbers assigned to different jobs as a quick
means of identification.
There was a bookkeeper working for the company who wrote up a 20-column cash book. It
was organised so there were five columns for the different kinds of receipt and fifteen for
different payments. The suppliers of stock and equipment for the business numbered
around 300. The suppliers made the cupboards, drawers, microwave and oven recesses,
sink benches and other fitments depending on the kitchen design. KC Ltd bought items such
as screws, latches, and whiteboards in bulk and maintained stock.
The order was always received by the salesperson from the customer. Basically the
salesperson had to fill out a contract and make the customer sign it. The contract was based
on a quote that was previously given to the customer. In the old system quoting was all done
by hand and it sometimes took hours to come up with what the customer wanted, even then
he/she was prone to change their minds and the quote would have to be redone which
would take up even more time. Quotes were supported by a layout drawing on special graph
paper.
![Page 10: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/10.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
8
The salespeople had their own diary appointment books which was quite organised in terms
of the salespeople reaching the appointments made with customers. The salespeople had
to maintain it and keep it up to date. The main office checked the diary appointment books to
make sure quotes are passed onto the appropriate salesperson. Salespeople received
numeration by way or salary, not by commission as was usually the case with sale people.
The office had no clue as to where each salesperson is at any time and each person has
their very own diary appointment book.
This is how customers pay in the current system:
deposit 10% of contracted price
initial 50% of contracted price
viewing 30% of contracted price
last allocation 10% of contracted price
The initial 50% of contracted price is paid by the customer when work commences. The
customer pays the 30% of contracted price when the work is considered complete by
Kitchen Cupboards. The last 10% of the contracted price was paid as soon as any
completion work was finished.
The company sent off invoices for completed work as soon as they were due. There was an
invoice book which these invoices were entered into. The format was simple, it was ruled up
showing date, invoice number, date sent, date due, date paid. There was no aging of
debtors done in any way. This means the company did not rank the unpaid amount
according to how long they have been unpaid.
![Page 11: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/11.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
9
DATA FLOW DIAGRAMS FOR THE CURRENT SYSTEM
The following pages contain data flow diagrams for the current system broken down from
the context diagrams to the level 0 diagrams and the level 1 diagrams.
![Page 12: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/12.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
10
Current System Data Flow Diagram – Context Diagram
![Page 13: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/13.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
11
Current System Data Flow Diagram – Level 0
![Page 14: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/14.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
12
Current System Data Flow Diagram – 1: Manage Customer Relations
![Page 15: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/15.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
13
Current System Data Flow Diagram – 2: Generate Quotes
Current
![Page 16: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/16.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
14
System Data Flow Diagram – 3: Act on Contract
![Page 17: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/17.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
15
System Data Flow Diagram – 4: Manage Accounts
![Page 18: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/18.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
16
System Data Flow Diagram – 5: Purchase Products
![Page 19: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/19.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
17
ENTITY RELATIONSHIP DIAGRAM OF CURRENT SYSTEM
Current entity relationship diagram part 1
![Page 20: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/20.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
18
Current entity relationship diagram part 2
![Page 21: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/21.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
19
PROBLEMS OF KC LTD
Communication
o There are about 300 forms or items of communication with suppliers with
proper organization of the ordering of equipment and amending of orders the
amount of communication can be reduced
o The speed of communication between customers and the company and the
company and suppliers is extremely slow. May be improved by
computerization.
o Getting quotes to customers is slow leading to increased turnover time (for
payment) and reduced sales (customers going elsewhere)
Customer relations
o There is no customer relationship control; that is no means to gauge customer
satisfaction. Measuring satisfaction would lead to improvements and therefore
improvement in sales.
o No method is used to obtain feedback and even when feedback is received it
is not documented. There is no way to take action on the feedback.
o Time consuming when customers change their minds (partly due to
communication issues)
Lack of stock control
o There is no formal means for stock control rather bob the builder sends out
stock requests. Making it difficult to budget for purchase or prevent waste.
o Increases production time when production has to cease to await ordered
items.
![Page 22: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/22.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
20
o No indication of fast and slow moving items. Knowing which items move
faster would enable bulk buying therefore reducing costs
Labour and employees
o General lack of employees (leading to reduction of speed)
o There is no permanent bookkeeper or accountant.
o An assistant manager is needed as manager does most of the administrative
work as well as supervision
o More cabinet makers and salesmen to increase volume and speed of work
o Lack of proper specialization and division of labour decreases efficiency (that
is have someone do quotes and stock rather than bob doing both and making
the cabinets as well)
o Dividing labour would lead to employees becoming highly skilled in their areas
increasing both speed and efficiency.
Marketing and sales
o There are no catalogues of the modular designs. Such catalogues would
include prices and enable quick quotes to the customers
o No information available on individual component prices. Such information
would improve the giving of estimates to customers who want custom
designs.
o No way of contacting salesmen in the field. This means there is no way of
ensuring that appointments are kept on time and no time is wasted between
them.
o Being unable to contact salesmen in the field means that new requests can
not be attended to as soon as possible but have to wait until the sales man
![Page 23: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/23.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
21
gets back to the office. (A salesman may be leaving an area where there is a
new request and would have easily attended to it had he got the information)
o The salesmen work on salary basis. There is no motivation to achieve higher
sales since earnings are not pegged to number of orders brought in.
Accounts and Bookkeeping
o End of month figures take too long to produce, up to ten days.
o There is a 30-day turnover on payments caused partly by the slow production
of invoices. (Ideal for manager is seven days)
o The speed of processing accounts leads to an accumulation of outstanding
debt tying up the business capital and a lot of defaults by debtors.
o Errors in accounting have led to loss of some money
Production
o Each unit takes a week to assemble and sometimes longer to if it is a large
job. Faster assembly and installation would lead to taking on of more jobs
o Lack of production employees leads to loss of some business at peak
periods.
o Having same assembly and installation employees reduces speed and
amount of work since while installing the assembly of other jobs stops.
SCOPE OF THE SOLUTION TO BE PROPOSED
The team was required to limit the scope of their analysis, research and subsequent
recommendations. We were instructed not to consider the aspects below in suggesting an
overall solution to the company:
1) Marketing
![Page 24: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/24.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
22
2) Human resources
3) Financing
We were however made aware that our solution should include but not necessarily be
limited to the following:
1) Description of current problems
2) Data flow diagrams and decryptions of each phase of the process for both the current and new systems.
3) A full system repository
4) A conversion strategy
5) Auditing and Data control
6) Testing and training plans
ISSUES AND CONSTRAINTS TO BE CONSIDERED
The following are pertinent issues to be considered in the design
How can the creation of quotes be more efficient?
Who will be able to perform new skills for the new system?
What equipment will be necessary for the new system?
How can the business improve their sales?
How can the office contact the salesmen when they are with customers?
How can the end of month figures be produced efficiently?
How will production of cupboards be increased?
Who will handle the aging of debtors?
![Page 25: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/25.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
23
The following are constraints placed by the ownership of KC Ltd. However it was decided
that if the proposed solution necessitates the overstepping of these limitations then the
information will be conveyed to KC Ltd prior to finalisation.
No increase in individual workload
Reluctant to hire new employees
Does not want to retire or retrench current employees
In case training is required the company prefers in place training
Some employees may not be interested in computers or automation
![Page 26: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/26.jpg)
Analysis
![Page 27: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/27.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
25
ANALYSIS
DESCRIPTION OF NEW (RECOMMENDED) SYSTEM
Kitchen Cupboards Limited will benefit greatly from a centralised, computer based data
storage solution. Delta Engineering has analysed KC Ltd in detail and can now confidently
propose such a new system. Our proposal includes a centralised database for all data
storage, computers for all administrative personnel to access the database and greatly
improved communication abilities for the salespeople. This section will outline the database
and the physical implementation. A cost sensitive solution will also be presented at the end
of this section.
A New Database
All customer, supplier, accounting and kitchen design data will be integrated into a database
developed specifically to suit the requirements of KC Ltd. This database will be hosted on
the Microsoft Access database platform. Tusk Technologies will implement and test the
database based on specific criteria generated from Delta Engineering’s analysis of KC Ltd.
The finished database will automate data handling at KC Ltd in the areas of customer
relations, kitchen design management, quote generation, stock control and accounting.
From the initial phone call through to the final payment, all customer records will be handled
efficiently by the database. The customer’s name and contact details will be entered during
the initial discussions with KC Ltd staff. Appointments are allocated to the customer
electronically and as the kitchen design is created and amended it will remain linked to the
customer’s record. When it comes time to post quotes and invoices to the customer the
correct address will automatically be inserted into the document.
![Page 28: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/28.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
26
Kitchen designs will be stored in the database as both lists of components and as CAD
drawings. The database will have a record of all modular components and other items used
in a new kitchen, making entering a design as easy as select and store. As a kitchen design
in amended intermediate versions will be saved allowing easy reverting to an earlier version.
Previously implemented kitchens could also be amended to quickly satisfy the requests of a
new customer. The database will also be able to quickly tally the total component costs and
combine the entered construction and installation cost to generate a quote in a fraction of
the normal time.
The database will include a stock control system to keep track of current inventory and job
requirements. An initial count of current stock levels will be required. The database will store
this and continually update the tally as stock is used. When levels are low the database will
notify a user who can then automatically generate a purchase order for the required
component. The system will also check requirements of jobs and generate PO’s for required
modules.
All aspects of accounting for KC Ltd will be integrated into the database. The automatic
invoicing will trigger when a signed contract is received, when the forman indicates a job has
started and at the other appropriate times. Similarly when a payment is entered other areas
of the company are notified to continue work. The database can also manage cross
referencing of invoices because the JCNo, PO, and GRA are all stored.
Physical Implementation
The physical implementation includes a computer network within the office and a
combination of mobile phones and formatted worksheets for the salespeople.
![Page 29: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/29.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
27
The computer network allows all users to access one database and pass information
between the business units quickly and efficiently. Access to the database will be restricted
to within the company building because the extra cost of strongly securing and maintaining
that security is not justified. An internet presence and company web page could be
considered at a future date. The centre of the network is the server. This hosts the database
as well as providing security. All company data is located on the server and only people
logged in with valid passwords will be able to view or alter data.
Workstations are the users’ portal into the network and database. KC Ltd’s needs are not
very computationally complex therefore these machines can be relatively modest. A
workstation will be allocated to the receptionist, manager, foreman, apprentice and
managing director. The accountant will also require access to a computer. The managing
director’s requirement of computer time is expected to be low and the accountant is part
time therefore it could be feasible for them to share a workstation. Otherwise a sixth
workstation will be required for the accountant. The apprentice would benefit from a more
powerful computer due to the higher demands CAD work places on a system.
The communication between salespeople and the office will be greatly improved through the
use of mobile phones, e-mail and formal worksheets. At the start of the day salespeople will
collect worksheets from reception. These will list the appointments they are expected to
attend and also contain sections for them to fill out during the day. When meeting with
customers, the salespeople will fill out kitchen design sheets which the manager will later
enter into the database. Salespeople will also use e-mail capable mobile phones to check
small changes to quotes or receive amendments to the day’s appointment schedule. The e-
mail capability is required because transferring larger amounts of data by phone call
becomes cumbersome. When transferring e-mail the phones dial directly to KC Ltd’s server
in order to avoid the ongoing cost of two internet accounts.
![Page 30: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/30.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
28
Cost Sensitive Solution
In order to cut the cost of transition a lower budget system is described here. KC Ltd can
then upgrade from this solution to the full recommendation when it considers it beneficial to
do so.
In this scenario the same database is used, however only the receptionist and manager will
have a workstation and the database will be hosted on one of the workstations - there will be
no server. This will streamline customer relations and quote generation which are the major
bottlenecks in the company at present. A third computer could be added for the foreman or
accountant; however Delta Engineering strongly advises KC Ltd upgrade to a server
environment if 4 workstations are to be connected. Servers are engineered to be more
reliable systems than workstations and as the size of the database increases so does the
risk of the workstation hosting it crashing.
Salespeople will have standard mobile phones without e-mail capability but will not be
otherwise affected.
![Page 31: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/31.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
29
DATA FLOW DIAGRAMS FOR THE NEW (RECOMMENDED) SYSTEM
New logical data flow diagram
![Page 32: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/32.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
30
New physical data flow diagram
![Page 33: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/33.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
31
New Physical DFD Section 1: Reception
![Page 34: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/34.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
32
New Physical DFD Section 2: Salesperson
![Page 35: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/35.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
33
ENTITY RELATIONSHIP DIAGRAM FOR NEW SYSTEM
New entity relationship diagram part 1
![Page 36: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/36.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
34
New entity relationship diagram part 2
![Page 37: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/37.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
35
STRUCTURED ENGLISH FOR THE NEW SYSTEM
This section of the report presents the logical operation recommended system in the form of
structure English. This is to facilitate implementation of the new system.
Receptionist -- Receives a Customer call
If it is a new customer
Enter Customer
Schedule salesperson Appointment
Else if existing customer
Open Customer
Case - Reason for Call:
Request another appointment:
Schedule salesperson Appointment
Reschedule
Open Appointment
Modify Appointment
Email Salesperson
If today’s schedule changes
Call Salesperson
End if
Salesperson has not arrived at appointment
Open Appointment
Call Salesperson
If Salesperson cannot be reached
Call Customer
Apologise
Else if salesperson answers
Enter reason appointment missed into extra details of Appointment
![Page 38: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/38.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
36
Check salesperson has correct contact number
Request Salesperson call Customer
End If
Case Else
Manage customer Call
End Case
End If
Receptionist
Print worksheets for salespeople
Print Kitchen_Design_Sheets for current Customers
Print extra, numbered Kitchen_Design_Sheets
Loop until 5pm
Answer customer calls
Enter completed Worksheets
Pass completed Kitchen_Design_Sheets to Manager
Print completed Quotes
Post printed Quotes
Print completed Invoices
Post printed invoices
End Loop
![Page 39: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/39.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
37
Salesperson
Collect Worksheet
Loop throughout day
Visit Customer
Record Time_Arrived on Worksheet
Fill out Kitchen_Design_Sheets, based on customer requests.
Record numbers of Kitchen_Design_Sheets used on Worksheet.
If Informal Quote requested
Case of number of items contained or changed in kitchen design
Less than 5 items changed
Call for Instant Quote.
5 – 20 Items Changed
E-mail for 1 hour Quote
Proceed to next customer.
When quote is ready Call customer and inform them of quote.
More than 20 Items
Inform customer they will be contacted within 2 business days.
End IF
If Printed_Quote requested
Mark Formal_Quote_Requested on Kitchen_Design_Sheet.
Inform Customer it will be posted within 3 business days.
End If
Proceed to next Customer
End loop
![Page 40: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/40.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
38
Manager
Loop throughout day
Select Kitchen_Design_Sheet, Start with e-mailed designs.
Enter Sheet_Number
Check customer_name on sheet and computer
Case
Names are different
Check with receptionist – Cross reference to worksheet
Name not found in computer
Receptionist has not entered relevant worksheet yet – Enter name and continue
Else Names Match
Continue
End Case
Enter Kitchen Components
If Component_Price not in computer
Call Supplier
Enter Price
End If
Estimate labour expense
Select formal or informal according to check on Kitchen_Design_Sheet
If design was e-mailed
Return e-mail the salesperson
Notify reception to call salesperson
End If
End Loop
![Page 41: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/41.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
39
Accountant – Process supplier invoices
Enter Goods Received Advice
Enter Supplier Invoice
- System will cross reference to PO and JCNo’s
Case - Cross referencing fails because
PO not in system
Contact Forman for PO
GRA not in system
Contact foreman for GRA.
If Goods not received then Delay payment.
PO and Invoice do not match
Contact Supplier
End Case
Pay Supplier
Record payment in system
![Page 42: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/42.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
40
Accountant – Process customer invoices
When system notifies that a signed contract has been recorded.
Generate invoice for initial 10% deposit. (The system will do this automatically)
Check invoice for discrepancies
If problems found then fix problems
Indicate invoice ready for mailing. (The system will then transfer the invoice to reception for
Printing and mailing)
When work commences
Generate 50% invoice
Check for problems
Indicate invoice ready for mailing
When work complete
Generate 30% invoice
When job finalised
Generate 10% invoice
![Page 43: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/43.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
41
Accountant – Process customer payments
Enter invoice number into system
Check amount paid against invoice amount
Case
Amount paid greater than amount on invoice
If Total_Paid is greater than Total_Cost_of_Job
Enter amount paid into system
Generate refund check
Else
Enter amount paid into system (System will subtract extra from future invoices, or cancel them
completely)
End If
Payment matches invoice
Mark invoice paid
Payment is less than invoice
Enter amount paid
Generate invoice for remainder
Notify Salesperson
End Case
![Page 44: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/44.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
42
Foreman
When job starts (System will notify when deposit has been received)
Generate PO’s for goods required.
Send to suppliers
Print Kitchen_Design_sheets and draw Construction_Design
Give Construction_Design to apprentice to record with CAD
(When the apprentice has more experience he will be able to
create the Construction design’s directly with CAD)
When goods received
Fill out Goods received advice (GRA).
Enter GRA into system
If GRA does not match PO then contact supplier
When stock used
Record quantity and Job Contract No in system
If Stock low then Generate PO to replace stock
When work commences
Record Work_Commenced for JCNo in system. (system will notify accountant)
Give Kitchen_Design_sheet and Construction_design to cabinet makers
When ready for installation
Open JCNo in system
Check 50% payment has been received
If payment not received then delay installation
Record ready_for_installation for JCNo in system (accountant will be notified)
Notify Salesperson to arrange an installation time.
![Page 45: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/45.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
43
Apprentice Entering or creating Construction_design using CAD
If Job is similar to a previous job
Open existing CAD drawing
Replace Job and Customer information
Modify Construction_design to reflect current Job
Else new job
Open Construction_design template
Enter Job and Customer information
Draw Construction_design
End If
Managing Director
When a Job is complete
Compare the quoted_price to the cost of job for company
If Profit is too small then consult with manager about quote prices
Check ageing of debtors Report (generated by system)
If payment overdue
Notify accountant – generate new invoice
Notify Salesperson – Contact Customer
End If
![Page 46: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/46.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
44
DATA DICTIONARY FOR THE NEW SYSTEM
Printed Items Worksheet = Salesperson_Name + Date + 1{time + location + customer_name + Purpose +
time_arrived + {Kitchen_Design_sheets}} Kitchen_Design_Sheet = Sheet # + Customer_Name + Customer # + Informal_Quote +
Formal_Quote_Requested? + 1{Kitchen_elements} Invoice = Invoice # + Quote# + Customer_Name + Customer_Postal_address +
KC_Postal_address + Date + Invoiced_Amount Purchase_Order= Order# + Supplier_name + Supplier_postal_address + KC_Postal_address + Date
+ Components_Required Construction_Design= * Graphic representation of kitchen design. Database Items Customer = Customer # + surname + given_name + contact # + mobile # + postal_address +
{appointments} + {quotes} + {invoices} Postal_address = street# + street_name + Suburb + State + Postcode KC_Postal_address= * Postal Address of KC Ltd. Supplier= Supplier# + Business_name + contact# + postal_address Appointment = Appointment # + Customer + Salesperson + Time + Date + Location + Purpose +
{extra_details} Quote = Quote # + Customer + Date_Generated +Total_Price + 1{Kitchen_components} Printed_Quote = Quote # + Customer_Name + Customer.postal_address + KC_Postal_address +
Date_generated + Total_Price + 1{Kitchen_elements} + Terms_and_Conditions Salesperson = Surname + FirstName + Mobile # + {Appointment_History} + {Worksheet_History} Component = Component# + Component_Name + Component_Description + Component+Price
+ Supplier# GRA = GRA# + Goods_Received + Date_Received
![Page 47: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/47.jpg)
Implementation
![Page 48: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/48.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
46
IMPLEMENTATION
This section lays out the plans for processes involved implementation of the new system.
Unless otherwise specified information in this section refers to the recommended option.
AUDITING AND CONTROLS
There will always be mistakes with manual tasks, such as data entry, due to human error.
These problems cannot be controlled, as most of the time the data is valid, but not accurate.
But, these errors can be found by auditing. Auditors control the quality of the data; they will
look through the data to find mistakes of vital information, such as payment amounts. A
payment is accompanied by an invoice, which is input to the system database. The amounts
on the invoice and on the system must be compared to find any differences. The data
accuracy will give the company an accurate idea of how they are doing, such as a report for
the month’s profits.
The auditing should be carried out by administration, so the directing manager should do the
auditing. The directing manager will be able to get an overview of how the business is doing
and the effectiveness of the system. The directing manager will be trained in how to audit
the information, which should be audited monthly or else yearly.
The software handles the data entered into computers. Software has restrictions of the data
that is entered. Numbers such as dates and invoices are automatically generated, so that
the data is accurate. Calculations are done automatically to prevent human error.
The foreman should confirm the design plans of kitchens when they are drawn from the
quotes, as he is more experienced with the building.
![Page 49: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/49.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
47
Backup
The importance of data is crucial to any business. Now that data will become electronic,
information will become vulnerable. Since data will be stored on hard drives, it is always a
good idea to keep a copy of data offsite in case anything may happen to the computers.
There are different options for backup. Different mediums can store different amount of
information. The floppy disk is versatile since floppy drives are common with computers.
However the floppy disk can store the least amount and a large number of disks would be
required. There are zip disks that store 150Mb to 2 GB; removable hard drives the size of
computer hard drives, tape, and CD’s that store approximately 650Mb.
Recommendation Solution
This case has a server, which will be able to store large amounts of information, the data is
all centralized and backup will be easier. With a server, there will be large amounts of data
to store each employee’s data files. Here, a tape drive may be considered. Tape drives are
able to hold large amounts of data, although slow, it is the recommended medium for a
server.
For each of these cases, the backup should take place during a time when there isn’t too
much business, such as when the business is closing. Backup should take place everyday
after the business is closed. The backup medium should be stored offsite, such as in
another room or out of the office with the manager where it is safe.
Another issue is power failures. A power unit may be considered for each computer. With a
power unit, when the power fails, the unit will allow the computer enough time to save files
and shutdown the computer. This device will save time when it comes to loosing information
and corrupting files from power failures.
![Page 50: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/50.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
48
Cost Sensitive Solution
Since the business will only use two computers, the data is not centralized. Shared
information, such as the database, should be located on the manager’s computer.
Estimating the amount of data to be stored leads to the conclusion that CDs are the best
choice. Other mediums are too costly, especially when the amount of storage is not
necessary. One CD can store approximately 650Mb to 700Mb and cost less than one dollar.
Using recordable CD’s will allow the company to archive their files and allow them to access
past information.
Security
It is common sense to secure an office, but now that an electronic system is in place,
security must be increased and enforced. Security is vital for every organization, such things
as keeping customer details private, and securing business information. Since customer
details are stored, it is important to keep the customer’s privacy. If the customer’s details are
not secure, they may feel insecure using the business. Business information is just as
important, because the businesses trading information should be kept secret from rival
companies and other outside entities.
The first step would be physical security. Simple things such as locking doors and not
allowing unauthorized people into the office increase security. The server particularly must
be physically secure and locked at all times. Passwords and logins on computers will stop
anyone who happens to access a computer. For increased security, passwords should be
changed monthly or weekly. There is the possibility of using security cameras and, or
employing security guards. Security cameras will allow identification of any unauthorized
employees and catch thieves. Security guards will be able to enforce any security that is
already in place.
![Page 51: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/51.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
49
Electronic security is vital since that electronic data can be transported and accessed easily.
Data files on computers can also be password protected to ensure more security. Logins
can also restrict user’s data access. The receptionist should only be able to access the
information she requires, such as customer details. The manager would be able to have all
access privileges. Since there is Internet access, Internet security will need to be in place.
Firewall software will block any outside users from trying to access data stored on the
computers connected to the Internet. Email encryption can be considered for sending emails
to employees and other businesses, such as suppliers. Encrypting emails will stop hackers
from being able to read confidential information when they intercept emails. With the
increase of viruses and awareness, virus protection software should be installed into each
computer. Viruses are program code attached to executable files. When an infected file is
run the virus will infect the computer by duplicating itself. There are different kinds of viruses.
Some slow down computer systems, destroy data, or spy on information from the computer.
Recommendation Solution
Office doors should be locked whenever employees leave the room and lock their
workstations. Any unwanted documents should be shredded or disposed, so that the
information cannot be taken from anyone searching through rubbish. Each computer will be
setup for profile roaming, so that any user can use any computer to login. Each login will be
given specific access privileges to prevent any unauthorized access. A firewall will need to
be used that will be installed on the server to protect the other computers. Email encryption
should be used when sending emails, which is an option on most email applications. Virus
protection software should be installed and updated regularly to protect the computer
systems from new viruses.
Cost Sensitive Solution
The receptionist’s computer will be given a login and password, only the administration and
the receptionist should know the password and login. The database should also be given a
![Page 52: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/52.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
50
password and only given to those who need it. The manager’s computer will also be given a
login and password; one profile will be for the manager and another for the bookkeeper. All
passwords should be changed monthly to ensure security. Office doors should be locked
whenever employees leave the room and lock their workstations. Any unwanted documents
should be shredded or disposed, so that the information cannot be taken from anyone
searching through rubbish. Although there will not be Internet access, virus protection
software should be installed on each computer. Viruses can be infected on disks, so
employees must be wary of any disks that they may use on the computer. The virus
protection software should also be updated regularly when possible.
![Page 53: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/53.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
51
TEST PLAN
System testing is recognised as an important part of quality assurance. Testing proceeds in
parallel with system development (Hawryszkiewycz, 1988). The testing of the system will be
composed of several aspects and will take place at different points during the development
process. The individual components will of course be tested as they are developed,
purchased or modified. However after the components have been integrated major system
testing will be undertaken. A diagram illustrating the system is shown below.
Kitchen Cupboard Ltd System Diagram
![Page 54: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/54.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
52
As can be seen the system components need to function efficiently on their own in order for
the entire system to do the same.
Hardware components will be purchased and will therefore be pre-tested by the
manufacturers. Delta Engineering will only undertake hardware testing as part of the overall
system testing. This is considered a reasonable test strategy because as the hardware is
commercially produced it is under warranty and has already been extensively tested.
The software will be tested in-house as modifications are made. When all the required
modifications have been completed the entire system will be integrated and tested as a
whole. This is to ensure the seamless functioning of all the software packages necessary to
construct the system.
This test plan lays out the intended aspects of testing the integrated system. This is a
general outline of the test strategy and no distinction has been made between the hardware
and software aspects. This is intentional since the system is meant to function as a whole.
The system testing will be divided into two phases
Alpha Testing: This will be performed at the Project offices. It will be performed by testers
from Delta Engineering alongside the management of KC Ltd. Any key personnel may also
be present at this stage. The intent of Alpha Testing is to exercise the nearly completed
application in real-world situations. The goal is not just to uncover bugs, but to discover any
deficiencies, unintended side-affects, clumsiness in the UI, and misconceptions in how the
application will be used.
The Alpha Test phase begins when all features have been implemented, but a number of
known bugs still exist. Some companies begin Alpha Testing before all features exist—we
feel that is not really Alpha since the testers can exercise only a portion of the features, not
the entire product. (Full Spectrum Software, 2002)
Beta Testing: This will be performed on-site at KC Ltd. This will be performed by the actual
users with support by testing staff from Delta Engineering. This will also be performed In
![Page 55: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/55.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
53
sections in conjunction with training of the employees. Please refer to Appendix 2 for details
of the time plan for this part of the testing.
The intent of Beta Testing is to exercise the virtually completed application in real-world
situations. Beta Test has just one goal: to uncover bugs. The Beta Test phase begins when
all features have been implemented and virtually no known bugs still exist.
(Full Spectrum Software, 2002)
ALPHA TESTING
This will be undertaken in a purely test environment with the entire system set up at the
project offices. It will be undertaken using simulated data. This simulated data will be
formulated to mirror real conditions. Alpha testing will be divided into five major sections to
be undertaken in the following order:
1) Function Testing
2) Strain Testing
3) Recovery Testing
4) Security Testing
5) Performance Testing
6) Function Testing
A walkthrough of the entire system is conducted in this section. It ensures that the system
actually functions. It also tests that the system reacts as expected in the different situations it
is designed to handle. Simulated day to day data and transactions will be used in this
section.
Strain Testing
This is a more specific test section whereby the system is subjected to several strains on it’s
working in order to determine it’s error handling capabilities. The objective is basically to
attempt to crash the system. Incomplete data and invalid information is entered at this stage.
![Page 56: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/56.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
54
This stage also tries to put maximum or excessive load on the system. This may be done for
example by allowing all the devices to simultaneously be communicating on the network. Or
several devices attempting to access the same record.
Recovery Testing
At this point the system will be forced to fail in order to gauge it’s recovery capabilities.
Situations like power loss will be simulated and recovery attempted. Failure of key
components will also be simulated to determine the speed of recovery and/or the possibility
of continued functioning. This will help with determination of the requirement of backups.
Security Testing
Security will be tested with the aim of determining the level of protection of system and the
system’s data. It will test the specific aspects of the system designed to protect it from
unauthorised access and modification. Areas of potential penetration will be exhaustively
tested.
Performance Testing
This is in order to benchmark the speed and efficiency of the system. Execution and
response times will be determined. All avenues of data operation and communications will
be benchmarked.
BETA TESTING
This phase of the testing involves supervised use of the system by the staff of Kitchen
Cupboards Ltd. As the staff are trained they will be required to go through a period of
supervised use (refer to the training and testing Gantt Chart in Appendix 2) where any
issues that arise will be dealt with.
![Page 57: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/57.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
55
During this phase (and up to 2 months after full implementation) technical support staff of
Delta Engineering will be on call. They will provide technical support over the telephone and
be equipped to be on site within an hour if the need arises. This part of the testing is very
important as some aspects can only be tested through actual use. The end-users of the
system are also able suggest changes to it to further tailor it to their specific needs.
![Page 58: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/58.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
56
TRAINING PLAN
The Training Plan is designed to outline how long each employee will be trained for and
what they will be trained in. The plan will be constructed in maximum detail and will cover all
essential aspects of the training procedure. Issues such as who will be trained, who will
conduct the training, and how will the training be carried out will be addressed.
There will be 8 pre-employed people that will be trained according to what their given tasks
in the business will be. The training will last over a period of 8 days and will run concurrently
with our testing. A receptionist, two salespersons, a manager, bookkeeper, foreman,
apprentice, and a managing director will need to be trained before they can officially begin
work. The length of training from person to person will remain very similar as there is really
no need for more than a day's training before employment.
The receptionist will be trained in answering the phone, receiving other people, and
generally communicating with potential customers. The training is extremely simple and will
take no more than two hours for him/her to be completely familiarised with the tasks of the
receptionist. The first step will be to teach the receptionist what to say when he/she answers
every time the phone rings. After the very basic lesson of learning how to speak to people
on the telephone, the receptionist will be taught how to schedule appointments. This will
involve writing down or entering in a computer appointments which have been made by
clients. General business receptionists will also have to ensure that clients and customers
are referred to the correct staff members who can take care of their specific problems.
The receptionist will be taught how to do the basic office work such as:
filing and filling in forms
printing work sheets for salespeople, and Kitchen Design Sheets for the customers
enter completed worksheets and pass completed kitchen design sheets to the
manager
![Page 59: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/59.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
57
print completed quotes
post printed quotes
print completed invoices
post printed invoices
The two salespeople that will be employed will be trained in representing the company on
the customer side. They will need to show up for appointments with the customers. They will
be trained to do these particular things:
Visit the customer
Record the time arrived on a Worksheet
Fill out Kitchen Design Sheets, based on the customer's requests
Record the numbers of Kitchen Design Sheets used on the Worksheet
There will be a need for strong communication skills and the training will start for the first
salesperson in the morning of Thursday while the second person will start training straight
after the other one. The training will not take any more than one hour for each person.
The Manager will be trained on Monday during the morning. He/she will be taught how to
deal with quotes and computers and will be trained in the following tasks:
Entering a Sheet Number
Checking the customer's name on the sheet and computer
Selecting a Kitchen Design Sheet
If the names are different, then to check with the receptionist and cross reference to
worksheet
![Page 60: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/60.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
58
If the name is not found in the computer, then the manager would enter the name
and continue
The Bookkeeper will be trained on Tuesday morning and like the other employees will be
taught everything needed to know within one hour. He/she will be trained how to write up a
20 column cash book and how to handle the bookkeeping. These are the tasks which the
bookkeeper will be trained in:
Log incoming checks, record in accounting system, and make deposits
Process credit card payments
Prepare biweekly payroll
Pay and distribute grants and accounts payable
Manage petty cash
Office skills such as word processing, data entry, copying, and filing
The foreman will be trained in leading a production team. His job is to achieve all the aims of
his team. Training will begin on the morning of Wednesday and will last no more than two
hours. The foreman will be thoroughly trained in the following skills:
Keeping a careful watch on product quality, cost, date of delivery, safety, and also
human relationships
Trained in generating Purchase Orders
Printing Kitchen Design sheets and drawing Construction Design
Deal with Goods received advices(filling out, entering into system)
Recording quantities of stock and Job Contract Numbers
![Page 61: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/61.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
59
It will be assumed the Apprentice will have sufficient background in the usage of CAD
software so training of the Apprentice will be very swift. It will be done in the afternoon of
Wednesday and will last no more than thirty minutes. He/she will be trained in the following:
How to replace/enter Job and Customer information in a drawing
Using AutoCAD or any CAD software to construct designs for the company
The Managing Director will be trained on Friday for no more than two hours in the morning.
He/she will need to be familiar with the use of computers. Training in the following will occur:
Comparing quoted prices to the cost of job for company
Calculating the profit and dealing with quote prices
Checking the ageing of debtors report
Being skilled in management, such as notifying the accountant and salesperson
Communication skills
The training of all the employees will be done by one of our company members. It will be the
same trainer for each employee. The testing will be done immediately after the training and
will last for the remainder of the working day (see Appendix 2).
![Page 62: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/62.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
60
CONVERSION STRATEGY
There are different ways to convert the old system to the new system. Different conversion
methods suit different systems. These are the most common methods of conversion:
Direct conversion: This is when the old system is replaced by the new system
straight away. The company will stop using the old system and go directly to using the new
system. Converting to the new system is quick, but may disrupt the business if there are
problems with the new system.
Parallel conversion: This is when the old system and new system are in use at the
same time. This means that tasks will be carried out twice, since two systems are being
used. Implementing the new system may take some time, so the extra tasks will have to be
carried out until the change over of the new system occurs. This conversion allows the
business to test the new system and see if they find it effective, but it is an expensive
method since employees will work twice as much. Though using this method, the business
can go back to using the old system if the new system does not work out.
Phased conversion: This conversion allows the new system to be introduced to the
business a step at a time. A section of the business will use the new system, while the rest
of the business uses the old system. When the section of the business is use to the new
system, another section will use the new system, until the new system has been
implemented. This conversion method is time consuming, but this method is not as risky
because the company can go back to the old system if the new system isn’t what the
company wants.
Pilot conversion: This conversion is similar to the phased conversion. A section
of the business such as the accounting section only will use the new system, and then when
the company approves of the new system being used, the rest of the business will change to
the new system. This method assumes that the rest of the business can change over to the
new system, so there may be a few disruptions to business if this happens. Implementing
![Page 63: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/63.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
61
the new system does not take as much time as some of the other conversion methods, and
the new system can be improved when used on the section.
Conversion Analysis
The direct conversion is not a suitable implementation method since the company is not a
small organization, as it has more risks and problems. A small company with very few staff
and business could convert using the direct method, but Kitchen Cupboards cannot convert
directly as it may cause implications. The company will require the data from the old system
with current customers. If the company decided to choose a direct conversion, the data will
have to be transferred to the new system, which could take a substantial amount of time.
Parallel conversion is not suitable for KC Ltd because the employees will have to do more
work. If the old system could barely handle the amount of work then increasing the workload
would not be recommended since the old system as well as the new are in place.
The phased conversion is our recommendation it will allow each part of the company to
improve the new system. Phased conversion will give the company time to adjust to the new
system. The pilot conversion is similar to the phased conversion, but it is riskier since the
new system is implemented into a large portion of the company, which could cause some
problems. This method may take longer than the pilot conversion, but it will be safer to
convert the old system to the new.
Recommendation Solution
For our recommendation, the office will be setup with cabling and a server before any
sections are converted.
The company will be implemented in the following order:
Receptionist
Salespeople
![Page 64: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/64.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
62
Manager
Bookkeeper
Foreman and Apprentice
Managing director
Cost Sensitive Solution
For the system that is budget restricted, the company will be implemented in the following
order:
Receptionist
Salespeople
Manager
Bookkeeper
![Page 65: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/65.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
63
SCHEDULING
It is important that the conversion of the new system is implemented without too many
problems. That is why the implementation must be scheduled. (see Appendix 3)
First the software and hardware is purchased, which would approximately take three days.
Concurrently, the company will be consulted for the designing, implementation and testing of
the database, which will take approximately five weeks. Then when most of the equipment
has arrived, the system can be tested in the alpha testing. In the alpha testing, tests are
performed on the system to find any problems that may occur prior to implementation. This
is where the test plan is used, using test data. The creation of the database may take
approximately 5 weeks.
When testing is complete and problems have been refined, the installation of the equipment
into the company can occur.
Recommendation Solution
The office will have cabling installed into the office and as well as a server at the start of the
week. Computers and equipment will all be setup prior to the staff training to avoid any
unnecessary equipment in the office. The receptionist will be given their computer and start
training on Wednesday. On the next two days, the salespeople are trained with their mobile
phones. During the weekend, the staff that has been trained can relearn the information that
has been given to them. Start of next week, the manager will be trained to use his computer.
The next day, the bookkeeper will be trained, then the foreman, apprentice, and lastly the
managing director. The full implementation should be complete within three weeks.
Cost Sensitive Solution
The network cables will be setup to run from the receptionist’s computer to the manager’s
computer. The receptionist’s computer and printer will be setup prior to the receptionist’s
training. Mobile phones that have been given approved plans will be given to salespeople.
Finally the manager’s computer will be setup for training.
![Page 66: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/66.jpg)
Conclusion
![Page 67: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/67.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
65
CONCLUSION
SUMMARY OF ANALYSIS – BENEFITS OF THE NEW SYSTEM
The recommended system outlined in this report will greatly enhance the operating
efficiency of KC Ltd. The strongest benefits of this system are found in the areas of
maintaining customer records, salesperson communication, generating quotes, job
management and computerised accounting.
With all customer records in a centralised, cross referenced database searching through
card files and hand addressing envelopes become things of the past. All data relating to a
customer is instantly available. Appointments, kitchen designs, job progress, invoiced
amounts and payments received are all referenced to customer records. This will allow KC
Ltd to provide a more organised and timely service to its customers.
Communication between salespeople and office during the day brings many advantages.
Appointments can now be amended or cancelled with a simple phone call or e-mail to the
salesperson. Your customers can enjoy getting instant quotes on small changes to designs,
and same day quotes on larger changes. The scheduling of appointments is also much
simpler with the database allocating in salespeople’s free time and printing worksheets
automatically.
The process of generating quotes is sped up by entering them in the database. A full
component pricelist within the database allows the system to tally the total price for
components in a snap. A quick entry of the construction and installation cost and the quote’s
complete. It can then be sent to the printer, with the database filling in the customers details
and formal contract. The benefits of supplying rapid quotes to your customers are obvious.
Having job management and accounting integrated into the database allows invoices to be
automatically generated at the relevant stages of the job. It also ensures payment is
received before job progress continues. With all accounting data within the database there is
no longer any need for hand tallying of columns and tables, allowing accounting totals when
you want them without hassle.
![Page 68: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/68.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
66
ESTIMATED COST OF RECOMMENDED SOLUTION
Equipment to buy:
2 Nokia 9110 Communicator mobile phones
o 1 for salesperson1
o 1 for salesperson2
4 Basic workstation computers
o 1 for the receptionist
o 1 for the managing director
o 1 for manager
o 1 for foreman
1 more powerful computer
o for the apprentice
Software packages
o MS Office XP
o Cad
Networking equipment
o 8 port network switch
o 1 network card for each computer (total of 6)
o cables (total of 6)
Printer
![Page 69: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/69.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
67
o HP LaserJet Printer (network capable)
Telecommunications
o 2 mobile phone accounts
o 2 registration fees
o 1 modem
o 1 internet access account
Backup
o Tape Drive
Consumables
o Paper
Server
o Computer
o Database
This option is the ideal setup for fulfilling KC ltd requirements in expanding their position in
the market place. This new system is fully optimised to create a largely computer automated
company. Although the price is for this system is quite large, Delta engineering believes that
this option is the most efficient for its price.
![Page 70: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/70.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
68
Approximate costing of equipment
ITEM QUANTITY PRICE (approx) TOTAL COST
Nokia 9110 Communicator mobile phones
2
$500.00
$1000.00
Basic workstation computers
4 $1,500.00 $6,000.00
More powerful computer
1 $2,000.00 $2,000.00
Software package
Microsoft Office XP
CAD
6
1
$500.00
$500.00
$3000.00
$500.00
Networking equipment
Cables
Network cards
8 Port Hub
6
6
1
$20.00
$50.00
$200
$120.00
$300.00
$200.00
Printer 1 $870.00 $870.00
Telecommunications
Mobile phone account
Registration Fee
Modem
Internet access
2
2
1
1
$30.00 per month
$20.00
$100.00
$50.00
$60.00 (first month)
$40.00
$100.00
$50.00 (per month)
![Page 71: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/71.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
69
Backup
Tape Drive 1 $800.00 $800.00
Consumables
Paper 5 (packs of 500) $5.00 per month $25.00 (first month)
Server
Computer
Database
1
1
$5,000.00
$8,000.00
$5,000.00
$8,000.00
Total $28,065.00
Approximate costing for all equipment required in the recommended option is $28,065.00
COST FOR TRAINING
After the new system has been installed and tested, a training plan will commence. An
employee from Delta engineering will come to KC Ltd company and train employees on how
the new system is to be used. This document displays the total cost that will be charged for
training.
Training will be charged at an hourly rate of $80.00 per hour.
Training time will be allocated as follows:
TRAINING FOR TRAINING TIME (hours)
Receptionist 2
Salesperson 1 1
Salesperson 2 1
Manager 1.5
Book keeper 1
![Page 72: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/72.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
70
Foreman 2
Apprentice (assuming familiar with CAD) 0.5
Managing director 2
Total 11
The total hours of training in the company will be 11 hours.
Charged at an hourly rate of $80.00, the total cost for training would be $880.00
This charge includes extra support where needed. (i.e. free phone support and call out for
major difficulties).
COSTING FOR ALPHA TESTING
Alpha testing is the first stage of the implementation of the new system. Delta engineering
will be charging for the testing as follows:
60% of testing time will be charged at $40.00 per hour and;
40% of testing time will be charged at $80.00 per hour
Delta engineering needs 20 hours of alpha testing before beta testing can commence
so :
60% of $40.00 is $24.00 and 40% of $80.00 is $32.00
Total cost per hour is $56
For 20 Hours :
$56 ã 20(hours) = $1120.00
The total charge for alpha testing is $1120.00
![Page 73: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/73.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
71
COSTING FOR HARDWARE AND CABLING INSTALLATION
When computers are all in the desired area, cabling can commence. Cabling involves
networking of all computers to the server, printer and the hub.
Cabling will be charged at an hourly rate of $40.00. Delta engineering approximates 1 hour
of cabling which will be $40.00.
Once computers are networked and in functioning order, hardware installation will
commence.
Hardware installation includes the installation of Microsoft Office XP and CAD on the
computers.
Delta Engineering will charge for hardware installation as follows:
Hardware installation will be charged at an hourly rate of $40.00 per hour
Installation on each computer will take approximately 15 minutes. With six computers, total
time for installation will be 1.5 hours.
Installation will cost a total of $60.00.
The total cost for all Hardware and Cabling is $100.00.
The total system cost for the recommended solution is $30,165.00
![Page 74: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/74.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
72
ESTIMATED COST OF COST-SENSITIVE OPTION
Equipment to buy:
2 Nokia mobile phones
o 1 for salesperson1
o 1 for salesperson2
2 Basic workstation computers
o 1 for the receptionist
o 1 for the manager
Software packages
o MS Office XP
Networking equipment
o Cable to link both computers
o 1 network card for each computer (total of 2)
Printer
o HP LaserJet Printer (network capable)
Telecommunications
o 2 Mobile Phone accounts
Backup
o CD Rewriter
Consumables
![Page 75: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/75.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
73
o Paper
o CDs
This option is a cost sensitive one and is designed to minimise costs. This option is intended
as a fallback option for KC Ltd if financial considerations are overbearing.
Approximate costing of Equipment
ITEM QUANTITY PRICE (approx) TOTAL COST
Nokia mobile phones
2 $100.00 $200.00
Basic workstation computers
2 $1,500.00 $3,000.00
Software package
Microsoft Office XP 2 $500.00 $1000.00
Networking equipment
Cables
Network cards
1
2
$20.00
$50.00
$20.00
$100.00
Printer 1 $870.00 $870.00
Telecommunications
Mobile phone account
Registration Fee
2
2
$30.00 per month
$20.00
$60.00 (first month)
$40.00
Backup
CD rewriter 1 $300.00 $300.00
![Page 76: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/76.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
74
Consumables
Paper
Recordable CDs
5 (packs of 500)
2
$5.00 per month
$1.00 per month
$25.00 (first month)
$2.00 (first month)
Database 1 $8,000 $8,000
Total $13,617.00
Approximate costing for all equipment required in the cost sensitive option is $13,617.00
OTHER COSTS
The cost of other items like testing, training, hardware and software installation will only
experience a slight variance estimated at 0.01. Therefore refer to their costs as estimated in
the previous section (estimated cost of recommended solution)
![Page 77: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/77.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
75
RECOMMENDATIONS
Based on it’s analysis, the project team recommends the adoption of it’s designed solution.
In view of the prevailing economic situation, a cost-sensitive version of the solution has also
been presented. We would advise however, in order to experience the maximum benefit,
an implementation of the fully fledged option. The Project is considered a success as all its
required objectives were met or surpassed and was completed within the required time
frame.
![Page 78: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/78.jpg)
References
![Page 79: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/79.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
77
REFRENCES
Books
Harwryszkiewycz I. (1988). Introduction to Systems Analysis and Design. Australia: Prentice Hall
Pty Ltd.
Cross R. & Watson T.
(1994).
The Professional Analyst. Australia: Edith Cowan University.
Websites
Professor Kevin R. Parker http://cobhomepages.isu.edu/parkerkr/courses/Cis382/notes/TOPIC1
2_conversion.htm
Hewlett Packard http://www.hp.com/products1/storage/index.html
Peter M. Kogge http://members.rediff.com/shiladitya/ISR.html
Full Spectrum Software http://www.fullspectrumsw.com/New_Pages/devphases.asp
Nokia www.nokia.com/phones/9110
Harvey Norman www.harveynorman.com.au
![Page 80: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/80.jpg)
Appendices
![Page 81: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/81.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
II
APPENDIX 1
Minutes of Meeting Friday 22nd February
Location: Library 2nd Floor. 11:05am Attended: Kris, Rolando, Lewis, Chris, Jason Absent: Zelalem Previous Weeks Tasks: All completed except for Kris, Chris, and Zelalem Discussed: -Checked previous weeks work -DFD's -Scope -Objectives -Issues Tasks for following Monday Jason- Expansion of number 5 of DFD Rolando- Expansion of number 1 of DFD Lewis- Expansion of number 2 of DFD Kris- Expansion of number 4 of DFD Chris- Expansion of numbers 6 and 3 of DFD Objective for Monday- have detailed DFD's complete Meeting adjourned 11:50am
![Page 82: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/82.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
III
Minutes Meeting Where held: Library, 2nd floor Time began: 11:05am Time ended: 11:40am Date: 01/03/02 People present: People absent: Zelalem Gilmour (no one absent) Chris Griffiths Rolando Suarez Kris Trpevski Jason Foong Discussion: Worked out what to ask the manager for KC. for the following week. We also went through the actual task to go through any parts of the assignment that we didn’t really understand. Worked out what was to be done for next weeks meeting. Decided upon a leader (Chris Griffiths). Tasks not achieved: (no tasks set before this meeting) Who completed tasks: (no tasks set before this meeting) Tasks for following week : Ask manager questions about: JCNo's : Jason Foong Communication with suppliers: Chris Griffiths Cross referencing on incoming invoices: Jason Foong Stock Inventory: Zelalem Gilmour Quotes: Chris Griffiths Customer relationship control: Chris Griffiths To research: Purchase orders: Zelalem Gilmour Goods Received Advices: Kris Trpevski Accounts Cash books: Rolando Suarez End of meeting
![Page 83: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/83.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
IV
Minutes Meeting Where held: Library second floor Time began: 11:00am Time ended: 11:30am Date: 08/03/02 People present: People absent: Zelalem Gilmour (no one absent) Chris Griffiths Rolando Suarez Kris Trpevski Jason Foong Lewis Ogundo(new member) Discussion: Went through tasks from week before. Introduced Lewis to the group and explained what was happening. Arranged ourselves into groups of 2 to do specific tasks and when to meet up in our own time. Researched data flow diagrams in "The Professional analyst" (by Robert Cross and Tony Watson). Went through notes gathered in the tute. Tasks not achieved: All tasks from week before were completed Who completed tasks: (Everyone completed their tasks from week before) Jason Foong researched JCNos and cross referencing on incoming invoices; Chris Griffiths asked about communication with suppliers, quotes and customer relationship control; Zelalem Gilmour researched stock inventory and Purchase orders; Kris Trpevski researched Goods Received advices; and Rolando researched what were in cashbooks. Tasks for following week: 1. To begin giving a description of the problems in KC (Rolando Suarez and Lewis Ogundo) 2. Beginning Physical Data flow diagrams (Zelalem Gilmour, Chris Griffiths) 3. Beginning Logical Data flow diagrams (Jason Foong, Kris Trpevski) End of meeting
![Page 84: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/84.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
V
Minutes of Meeting 15th March 2002
Location: Library 2nd Floor. 11:10am Attendance: (ALL) Kris Zelalem Rolando Lewis Chris Jason Previous Weeks Tasks: All completed Discussion: Review previous weeks work DFD’s – Context and Level 0 - Some alterations agreed upon Approach to report discussed. Objectives for the week: Finalise current system. Ensure current system is well understood by all members. Look at Objectives, Issues and Scope Tasks for Monday: Look at Objectives: Zelalem Rolando Chris Scope: Lewis Issues: Kris Jason Minutes: Chris Meeting adjourned 11:50am Meeting 18th March 2002 Held after Lecture Attendance: Lewis Jason Rolando Purpose: Group work on Level 1 Data Flow Diagram.
![Page 85: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/85.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
VI
Minutes of Meeting
26th April 2002
Location: Library second Floor. 11:05 am
All attended: Kris, Rolando, Lewis, Chris, Jason
Last Weeks Tasks: All completed
Discussion:
Entity Analysis
Finalized last week’s work
System repository
Objectives for the week:
-Begin work on the entity relationship diagrams
-Understand the system repository and begin work on it
Tasks for Monday:
-System Repository(Lewis, Jason, and Chris)
-Entity Analysis(Kris and Rolando)
-Minutes of this meeting(Kris)
Meeting ended at 12:05am
![Page 86: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/86.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
VII
Minutes Meeting Where held: Lecture room, 7.102 Time began: 12:15pm Time ended: 1:15pm Date: 29/04/02
People present: People absent: Rolando Suarez Kris Trpevski Jason Foong Zelalem Gilmour Chris Griffiths Lewis Ogundo Discussion:
• Worked on the new physical dfd • Agreed on new logical dfd • Talked about how the new system is going to be implemented in the company
Tasks not achieved: All tasks from week before were completed Who completed tasks: Rolando Suarez : did level 1 dfd of 'process job' on new logical Jason Foong : did level 1 dfd of 'manage accounts' on new logical Lewis Ogundo : did level 1 dfd of 'manage quotes' on new logical Chris Griffiths : Completed the new logical dfd Tasks for following week:
• Do scheduling for implementation of new system (for case 1) • Start Case 2 - Jason Foong • New Physical structured english - Chris Griffiths • New Physical dfd - Rolando Suarez • Scheduling - Lewis Ogundo
End of meeting
![Page 87: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/87.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
VIII
Minutes Meeting Where held: Library, 2nd floor Time began: 11:05am Time ended: 12:35pm Date: 03/05/02
People present: People absent: Rolando Suarez Zelalem Gilmour Jason Foong Lewis Ogundo Chris Griffiths Kris Trpevski Discussion:
• went over last week's tasks • went over tasks still needed to be completed • break down and allocation of final report
Tasks not achieved: All tasks from week before were completed Who completed tasks: Chris Griffiths did new physical dfd Jason Foong started case 2, the conversion strategy Lewis Ogundo started testing plan Rolando Suarez started benefits and costing of case 1 and 2 Kris started the entity relationship diagram Tasks for following week:
• Chris Griffiths : complete structured english • Kris Trpevski : finish entity analysis • Lewis Ogundo : finish scheduling • Rolando Suarez : finish costing and benefits • Lewis Ogundo : start test plan • Jason Foong : continue working on the conversion strategy
End of meeting
![Page 88: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/88.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
IX
Minutes Meeting Where held: Library, 2nd floor Time began: 11:05am Time ended: 12:35pm Date: 10/05/02
People present: People absent: Rolando Suarez Zelalem Gilmour Jason Foong Chris Griffiths Kris Trpevski Lewis Ogundo Discussion:
• Went through progress of task • discussed the physical structure and relationship
Tasks not achieved: All tasks from the week before were started but were unfinished Who completed tasks: Chris Griffiths did new physical structured english Jason Foong started case 2, the conversion strategy Lewis Ogundo started testing plan Rolando Suarez started benefits and costing of case 1 and 2 Kris started the entity relationship diagram Tasks for following week: Continue with current unfinished tasks End of meeting
![Page 89: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/89.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
X
Minutes of Meeting
15th May 2002
Location: Library 2nd Floor. Meeting began at 2:15pm.
Attendance (ALL): Kris, Chris, Lewis, Rolando, and Jason
Previous Weeks Tasks: All completed except some had to be modified
Discussion:
-Costing
-Auditing and Controls
-Entity Relationship Diagrams
-Representation of the final copy of the assignment
-Structured English
-Gantt Chart
Objectives for this week:
-Finish all parts of the assignment, have it printed and bound by Thursday evening
Tasks for tonight/Thursday morning:
Modify the costing outline: Rolando
Auditing and Controls must be modified before finalising: Jason
Finish Training Plan and Entity Relationship Diagram for the New System: Kris
Complete the Structured English and Description of new System: Chris
Finish assignment cover sheets and make a complete continuous document
Minutes: Kris
Meeting adjourned at 4:15pm
![Page 90: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/90.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
XI
APPENDIX 2
![Page 91: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/91.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
XII
APPENDIX 3
Implementation and Final Testing Schedule
ID Task Name Duration1 Purchasing software & hardware 10 days
2 Database 25 days
3 Alpha testing 5 days
4 Cabling & Server 2 days
5 Implementation 8 days
6 Training & testing 8 days
S M T W T F S S M T W T F S S M T W T F S S M T W T F S3 Jun '02 10 Jun '02 17 Jun '02 24 Jun '02
Task
Split
Progress
Milestone
Summary
Project Summary
External Tasks
External Milestone
Deadline
Project: KC Ltd. System ScheduleDate: Fri 17/05/02
![Page 92: Analysis Report - iiNetmembers.iinet.net.au/~griffs/deltaeng/PDF/Final.pdf · Economic Feasibility Satisfied with the study the team embarked on making a project plan. PROJECT PLAN](https://reader031.fdocuments.in/reader031/viewer/2022030419/5aa55e977f8b9a185d8d3481/html5/thumbnails/92.jpg)
DELTA ENGINEERING KC LTD PROJECT: ANALYSIS REPORT
XIII
ID Task Name Duration1 Purchasing software & hardware 10 days
2 Database 25 days
3 Alpha testing 5 days
4 Cabling & Server 2 days
5 Implementation 8 days
6 Training & testing 8 days
S M T W T F S S M T W T F S S M T W T F S S M T W T F S1 Jul '02 8 Jul '02 15 Jul '02 22 Jul '02
Task
Split
Progress
Milestone
Summary
Project Summary
External Tasks
External Milestone
Deadline
Project: KC Ltd. System ScheduleDate: Fri 17/05/02